R-2025-306 - 11/20/2025 RESOLUTION NO. R-2025-306 WHEREAS, the City of Round Rock ("City") has previously determined that "Competitive Sealed Proposal' is the delivery method which provides the best value for the Two Million Gallon Resue Ground Storage Tank Project, and WHEREAS, after advertising for and receiving proposals from offerors, the City of Round Rock deterndnes that DN Tanks,LLC is the offeror which offers the best value for the City,and WHEREAS, the City Council now wishes to enter into a "Standard Form of Agreement Between Owner and Contractor" with DN Tanks, LLC, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That, after advertising for and receiving proposals from offerors, the City of Round Rock hereby finds that DN Tanks, LLC is the offeror which offers the best value for the City for the Two Million Gallon Resue Ground Storage Tank Project. BE IT FURTHER RESOLVED, That the Mayor is hereby authorized and directed to execute on behalf of the City a 'Standard Form of Agreement Between Owner and Contractor"with DN Tanks,LLC for the Two Million Gallon Resue Ground Storage Tank Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. nux wxsx:a9ssasi.nxi No Text RESOLVED this 20th day of November, 2025. CRA17G/fAbRGIN, Mayor City o Round r k, Texas AMS i AM FRANKLIN,City Clerk 2 No Text October 30, 2025 Michael Thane, P.E. Executive Director of Public Works City of Round Rock 3400 Sunrise Road Round Rock,T%78665 Re: 2 Million Gallon Reuse Ground storage Tank Engineer's Recommendation of Award of Contract A total of two(2)sealed bids were received and opened on September 10, 2025 for the above referenced project.The base bids ranged from 4,194,551.00 to 4,444,206.00. DN Tanks from Grand Prairie,Texas,submitted the lowest base bid in the amount of 4,194,551.00. After reviewing the contractors experience and bid price, I recommend award of this project to ON Tanks.A post bid addendum was issued resulting in a deduction of$956,468.00 to the bid alternative resulting in an alternative cost of$151,500.00.The base bid plus the alternative is a total of$4,346,051.00. Sincerely, Daniel LaCour, P.E. Project Engineer 8GE Inc. Enclosures cc: Kaitlyn Saucedo, Project Manager, City of Round Rock Project File u.r� amis No Text Post-Proposal Negotiated Items 2 MiAion Capon Reuse Storage Tank Project 1012912025 The City received two(2)Competitive Sealed Proposals on September 10, 2025,for the Two Million Gallon Reuse Storage Tank Project.DN Tanks, LLC,was selected as the proposal that is the"Best Value"for the City. DN Tanks,LLC, submitted a proposal with a Base Bid of $4,194,551.00,Alternate One total of$1,107,968.00, and a total contract sum of$5,302,519.00. The City,DN Tanks,LLC,and BGE,Inc.,have negotiated the project and have agreed upon the total project sum of$4,346,051.00 by way of value engineering and/or scope reduction. The following list is a brief description of the value engineering items and/or scope reduction. The list is for descriptive purposes only and shall not be used for construction purposes. The project manual(includes the construction plans, specifications, addendum, and general conditions) shall be revised to include a Post Proposal Addendum(#5)agreed upon by both parties;and will be used for construction purposes. The agreed upon value engineering items and/or scope reduction for Alternate I is a deduct total amount of-$956,468.00. No Text pN BUILT TANKS FOR THE FUTURE v 10/29/2025 Kaitlyn Saucedo Engineer—Associate City of Round Rock Reference: Scope Modifications-2 Million Gallon Reuse Ground Storage Tank Public Works—Utilities—City of Round Rock Dear Ms.Saucedo, DN is pleased to provide the requested deductive pricing associated with the scope modifications discussed during the meeting with the City and BGE on October 8,2025,and as reflected in the updated drawing set dated October 10,2025.The following summarizes the modified items: Bid Form Items: Please reference the attached bid form and updated drawing set for detailed information. • Bid Items Al—A8 o Deduct:Removal of the potable water piping,while maintaining the exterior inlet riser, pipe supports,and check valve. o Total Deduct Amount:($956,468.00) Please feel free to contact me if you have any questions or require additional information. Sincerely, Ryan Wessels,P.E. Regional Manager 361.799.9566 Phone Victoria,Tx Ryan.W esselsOcIntanks.com www.dntanks.com O1 BUILT FOR THE FUTURE BUILT FOR THE FUTURE Iwww.cinuink,com No Text CFCV OF ROUND ROCK BIDS EXTENDED AND CHECKED Public Works BY: Kaitlya Saacedo 3400 Sa0rixe Road BID TABULATION BATE: SMtember 10,2025 Round Rock,Texas 78665 PROJECT: 2 Million Galhv Resse Ground Stec a Task LOCATION: Virtual Con Name: DN Taub Preload BIDDATE: 9.10.2025 Stnemestof Safety?Ym Stamm,stof5efety?Yea SOtemem.f5af.W.Yes Stafementof Safety?Ym Addendum(.)? Addendum(.)? AddeadtunD)? Addenda-(s)? Bid Bond? Ya Bid Bsed? Yes Bid Bond? Ym Bid Bond? Yea APPROX UNIT UNIT ITEM# QTY. UNIT IOVPf PRICE COST UNIT PRICE COST PRICE COST PRICE COST 1 1 Provide Hoods,Mobilization and Insurance,not m ezceed LS $200,400.00 5200.400.00 5222,000.00 5222,000.00 50.00 50.00 2 Furnish and install all v labor,materials,e 1 U $2,968,500.00 52,968,500.00S353,355,578.00 $3,355,575.00 SOHO 50.00 3 Deal funrsh,astal4 meivtain,and amoval n W required' 1 m 53,400A0 $3,4 .W $2,5W.W 52,500.00 $0.00 50.00 Furnish Fvish and install all voessary labor materials, I m 5213,600.00 $213,600.00 $2W W).00 5200,000.00 50.00 SOHO 5 Fumish and install all neccmo rylabor,materials, ui t 1 LS 2339,4W.W 5339,400.0 $330,000.00 5330,OOO.W 50.00 W.W 6 Furnish andnnall all necess labor,materials,equipment 1 LS 5157,800.0) $157,SW.W $150,000.00 $150,000.00 SO.W $O.W 7 Furnish and install all Electrical haprovements associated 1 U $141,000.W $141,OOO.W $95,000.00 595,000.W SO.W SO.W 8 Furnish and install all necessary labor,materials,equipneont 9 SY 5325.00 52,925.W 5216.00 $1,944.W SO.W SO.W 9 Fummh and install all neceasmy labor,materials,equip.. 125 LP 5192.00 $24,000.W $220.00 527,500.00 Som $O.0) 10 Furnish and install all necessary labor materials,equipment, 807 LF 518.00 $14,526.00 $12.W 59,6M.W 50.00 MA 11 Ow s Allowance for dust es and adjustmentsro euumn, 1 13.51 $50,O00.W sm,OOO.W SSO,000.W S50,OOO.W $0.00 SB.W 12 Furnish and install all necessary labor,materlals,eui rnt 1 IS 579,000.0) $79,M.W $25,000.00 $25,000.W SO.W SO.W 13 $0.00 $0.00 50.00 $0.00 14 SO.W 50.00 SO.W saw 15 $am $O.0) $6.00 SO.W 16 SO.W SO.W $000 SO.W 17 W.W $0.00 $0.0) Sum 18 $0.00 SO.W $O.0) Som TOTAL $4,19409m, SI,4 06.W SOHO $0.00 No Text CITY OF ROUND ROCK BIDS EXTENDED AND CHECKED Public Works BY: Erin,Stated. 3400 Sarnia.Road DATE: September 10,2035 Round Rock,Teras 78665 BID TABULATION PROJECT: 2 MM ion Gallon Reuse Ground Storage Tank PROJECT: 2 Million Gallon Reuse Ground Storage Tank LOCATION: Virtual Com as Name: DN Tundra Preload Bur DATE: 9.10.2025 Statemem of Sa"?Yes Statemeutof Safro?Ya soth.autof Safely?Ym Statemeatorsdety?Yes, Addendum(.)? Adde.dum(r)? AOdeadum(q? Addenda.(,)? Bid Sued, Ya Bid Boal? Y. Bid Ba.d? Ym Bid Bond? Y. APPROX UNIT UNIT [M .Furnish QTY. UNIT UNr1'PBICB COST UNrr PRICE COST PRICE COST PBICE con Provide Bonds,MobiEmtiw and Insurance,not to exceed Al 1 LS 547.00).00 547,000.00 536,000.00 E36,d(p.00 50.00 50.00 Furnish and install all necessary laborawterials, ui ment 1 LS M87,SM.M $88],800.00 1606,000.00 $606,000.00 $0.00 SOHOAt direction ofEv ' em Only,Furnish and install a6 necess 2 EA $4,800.0° 59,600.00 S3,500.00 $],000.00 Sum 10.00Fumiah end install all necessary 46or,materials,equipment 418 SY $9].00 T4o,546.00 573.00 530,096.00 50.00 50.00 Furnish and install all labor,mutorials,a ui ent 13 SY 5440.00 15,720.00 1216.00 52,808.0° $0.00 $0.00 Furnish and install all v...ary labor,matials,eq-ipmev 20 LF 5370.00 57,400.00 $220.00 Mmo.00 Sum so.00 Furnish and install all necessary labor,materials,e rn 1913 LF $17.00 132,521.00 $1200 522,956.00 50.00 $o.00 and install all necessary labor,materials,equip. 223 SY SM7.00 M,38LM 5258.00 157,534.00 50.00 S0.00 a0.00 $0.00 10.00 $0.00 The original Alternate 1 total per the Bid Opening on 500v "Mso.00 S0'oo 9/10/2025, totals $1,107,968.00. SOHO Su $d.0u w.u0 m.ao ram.ao $0.00 so.00 Mao so.00 $0.00 m.00 Per the Post Proposal Narrative dated 10/29/2025, Sum $0.w so.00 $0.0 the total deduct amount for Bid Items Al-A8 is $0.00 Mw $0.w Sum $956,468.00, making the updated amount for $0M $ON 50.00 so.00 Alternate 1 total $151,500.00. Soon SON ".00 $0.00 9 So.ao SOM so.00 So.00 TOTAL 5110]968.00 5] 794.00 10.00 $0.00 1 No Text y w Brushy Creek Regional Wastewater System East Plant r� � s 2A „J•"• i tet, T _ _ _ �. O a . _ r Projed.Locationr. N - r I + . t - r r I r • ' a • ^ tk 1 , r. ' I: t aizvizaza ' O- Reuse storage ranks 2 Million Gallon Reuse Ground Storage Tank Project — Reuse Lines No Text