R-2025-322 - 12/4/2025 RESOLUTION NO. R-2025-322 WHEREAS, the City of Round Rock ("City") has previously determined that "Competitive Sealed Proposal" is the delivery method which provides the best value for the West Transmission Main Valve Replacement Project, and WHEREAS, after advertising for and receiving proposals from offerors, the City of Round Rock determines that Patin Construction, LLC is the offeror which offers the best value for the City, and WHEREAS, the City Council now wishes to enter into a "Standard Form of Agreement Between Owner and Contractor" with Patin Construction, LLC, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That, after advertising for and receiving proposals from offerors, the City of Round Rock hereby finds that Patin Construction, LLC is the offeror which offers the best value for the City for the West Transmission Main Valve Replacement Project. BE IT FURTHER RESOLVED, That the Mayor is hereby authorized and directed to execute on behalf of the City a "Standard Form of Agreement Between Owner and Contractor" with Patin Construction, LLC for the West Transmission Main Valve Replacement Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. 0112.20252;4916-8981-5419 RESOLVED this 4th day of December, 2025. /ZJlj M / CRAIG MORGANIpayor City of Round RocW, Texas ATT T: n AN FRANKLIN, City Clerk 2 DCS 1101 S.Capital of Texas Highway Building G-100 Austin,Texas 78746 Tel:(512)614-6171 A T.B.P.E.Firm No F-13162 www.DCS-Engineering.coni November 6,2025 Mr. Kit Perkins Public Works-Utilities City of Round Rock 3400 Sunrise Road Round Rock,TX 78665 Ref: City of Round Rock—West Transmission Main Valve Replacements Recommendation to Award Contract DCS Project No. 20101594 Dear Mr. Perkins: DCS has completed our review of the competitive sealed proposals for the construction of the City of Round Rock West Transmission Main Valve Replacements project. Three proposals were received with a total price spread of$218,065.05 resulting in a tight grouping of bidders. DCS recommends that the construction contract be awarded to Patin Construction,LLC for a total bid amount of$1,463,470.00 which is$536,530.00 under the$2,000,000.00 Engineer's opinion of most probable construction cost for this project. Proposal Process The proposal process followed the schedule outlined below with official proposal opening by the City at 9:00 AM on Tuesday,October 28,2025. First Advertisement: September 24,2025 Second Advertisement: October 1,2025 Pre-Proposal Meeting: October 9,2025 Proposal Opening: October 28, 2025 Three proposals were received containing information reflecting offerors'proposed price; schedule to substantial and final completion;relevant experience; and financial capability. The three proposal prices for the Total Bid Amounts ranged from$1,452,989.95 to$1,671,055.00. The three offerors were as follows: 1. Arguijo Corporation 2. Patin Construction,LLC 3. C.C. Carlton Industries, LTD Proposal Review Proposals were opened on October 28,2025. DCS verified all of the bid calculations and tabulations. Discrepancies by the Offerors found in the bid form have been corrected with notations for those corrections and noted at the bottom of the Bid Tabulation in the footnotes. DCS also ensured that all signatures were received along with pertinent information for best value scoring purposes. In accordance with the Competitive Sealed Proposal process,this letter of recommendation is based on a best-value determination.The selected proposal,while not the lowest-priced,received the highest overall score based on the evaluation factors. While cost was an important consideration in the evaluation Mr.Kit Perkins Page 2 of 2 process,the overall selection was based on a comprehensive assessment of all evaluation criteria, including qualifications and overall value to the City of Round Rock. The Engineer's opinion of most probable construction cost for the project was$2,000,000.00. The recommended offeror is Patin Construction,LLC from Taylor,Texas with a proposal of$1,463,470.00. This is$536,530.00 below the Engineer's opinion of most probable construction cost for this project. The bid prices submitted are summarized below.A tabulation of the bids is provided in Attachment A. Attachment B provides a summary of the scoring criteria with DCS and City Staff's resulting scores for the three offerors. Offeror Total Bid Amount Arguijo Corporation $1,452,989.95 Patin Construction,LLC $1,463,470.00 C.C. Carlton Industries,LTD $1,671,055.00 Recommendation for Award DCS recommends that the construction contract be awarded to Patin Construction, LLC for a total bid amount of$1,463,470.00. Please review the information and feel free to contact me at(512)614-6171, or by email at jhurta@dcs- engineering.com if you have any questions or need any additional information. Sincerely, OF TES%, % 1 %..............................j j JORDAN T. HURT A W .......................... W tt 143332 �i ProjectP.E.Jordan Hurta, 11 i I��FSS'ONA eManage I �r� 111-612026- Attachments: Attachment A—Bid Tabulation Attachment B—Competitive Scoring Summary ATTACHMENT A BID TABULATION City of Round Rock West Transmission Line Valve Replacements Bids Opened: 10/28/2025 at 9:00 am BID TABULATION Argaijo Corporation Patin Construction,LLC C.C.Carlton Industries,LTD Proposal Package Y Y Y Bid Form /N Y Y Y Bid Security /N Y Y Y Addenda Acknowledged /N Y V Y Contractor's Safety Statement /N Y V Y Bid Item Description Quantity Unit Una Price I Total Amount Unit Price TotalAmount Unit Price I Total Amount GENERAL BID ITEMS: 1 Mobilization(maximum 5%of total Bid) I LS $ 88,342.63 I S 88,342.63 S 150,000.00 $ 150,000.00 $ 80 000.00;$ 80 000.00 2 Furnish and Install Restrained 18"Ductile Iron Pipe(Class 250 psi)including excavation,ground and surface water dewatering,embedment,backfill,metallic underground warning tape,adaptors,couplings,joint restraints,thrust blocks, polyethylene wrap,surface restoration,disposal of excess material,incidental work not covered by other bid items,3/8"F bedding and backfill,and apytirtcrianccs.Comelotc,in Placc 167 LF $ 301.38 $ 50 330.46 $ 285.00 S 47 595.00 $ 450.00 1$ 75 150.00 3 Furnish and Install Restrained 24"Ductile Iron Pipe(Class 250 psi)including excavation,ground and surface water dewatering,embedment,backfill,metallic underground waning tape,adaptors,couplings,joint restraints,thrust blocks, I i polyethylene wrap,surface restoration,disposal of excess material,incidental work not covered by other bid items,3/8"F bedding and backfill,and appurtenances,Complete in Place: 51 LF S 437.70 I S 22,322.70 S 350.00 1$ 17,850.00 1$ 700.00 1$ 35 700.00 4 Furnish and Install Restrained 30"Ductile Iron Pipe(Class 250 psi)including excavation,ground and surface water dewatering,embedment,backfill,metallic underground warning tape,adaptors,couplings,joint restraints,thrust blocks, polyethylene wrap,surface restoration,disposal of excess material,incidental work not covered by other bid items,3/8"F bedding and backfill,and appurtensc..Complotc in Place, 16 LF $ 1,091.50'S 17 464.00 S 415.00 1$ 6,640.00 $ 1,350.00'$ 21 600.00 5 Furnish and Install Restrained 36"Ductile Iron Pipe(Class 250 psi)including excavation,ground and surface water dewatering,embedment,backfill,metallic underground warming tape,adaptors,couplings,joint restraints,thrust blocks, polyethylene wrap,surface restoration,disposal of excess material,bmcidmtal work not covered by other bid items,3/8"F bedding and backfill,and appurtenances,Complete in Place: 33 LF S 1,203.98 1 S 39 731.34 S 475.00 1 S 15,675.010 $ 1,500.00 1 S 49 500.00 6 Furnish and Install Pipe Access Port per Detail 1,Drawing OOC-05,including I I but not limited to excavation,ground and surface water dewatering,bedding material,crushed limestone,DI flanged Tee(size per plans),36"D.I.blind flange(class 150 min.),6"DI spool piece,6"FLXFL resilient wedge gate valve, 6"D.I.blind flange(class 150 rain.),72"Class III RCP,pre-cast concrete led w/ manhole cover,adaptors,couplings,surface restoration,disposal of excess I I material,ircidental work not covered by other bid items,and appurtenances, Complete in Place: 1 LS $ 80 426.30 1$ 80 426.30 S 85 000.00 1$ 85 000.00 $ 139 270.00 1$ 139 270.00 7 Finish and Install 1-ft thick 3,000 psi min.Concrete Encasement Where Shown on Plans and per Specifications,Complete in Place: 47 CY 1$ 526.88 I$ 24 763.36 S 500.00 I$ 23 500.00 $ 900.00 1$ 42 300.00 8 Furnish and Install 18"FLXFL Resilient Wedge Gate Valve,valve box,concrete valve anchor,and appurtenances,Complete in Place: 3 EA $ 33 636.51 $ 100 909.53 $ 35 000.00 1$ 105 000.00 S 36 000.00 S 108 000.00 9 Furnish and Install 24"FLXFL Resilient Wedge gate Valve,valvel box,concrete valve anchor,and appurtenances,Complete in Place: 5 EA S 52 807.02 1 S 264 035.10 S 45 000.00 1$ 225 000.00 $ 49 500.00 1$ 247 500.00 10 Furnish and Install 30"FLXFL Resilient Wedge Gate Valve,valve box,concrete valve anchor,and appurtenances,Complete in Place: 1 EA S 95 623.06 1$ 95 623.06 $ 80 000.00 I$ 80 000.00 $ 79 500.00 1$ 79 500.00 11 Install 36"FLXFL Resilient Wedge Gate Valve,with valve box,concrete valve I anchor,and appurtenances.36"Gate valve to be provided by owner,contractor shall famish valve box,valve anchor and appurtenances.Complete in Place: 1 EA S 42 066.84 1$ 42 066.84 $ 60 000.00 1$ 60 000.00 $ 58 100.00 1 S 58 100.00 12 Famish and Install 6"Drain Valve,including 6"ductil iron piping,6"Gate Valve with Box,Thrust Blocking,fittings,Restrained Joints,concrete pad,and appurtenances,per City of Round Rock std.Detail WT-29 on Dwg.OOC-05, Complete in Place: 1 EA S 5,842.46 1$ 5 842.46 S 5,000.00 1$ 5,000.00 $ 6,500.00;$ 6,500.00 13 Fumish and Install 18"Ductile Iron restrained M.J.11.25 degree bend(Class 350 psi)per AW WA C 153,Complete in Place: 2 EA $ 21907.73 1$ 5,815.46 $ 3,500.00;S 7,000.00 $ 4,250.00 1$ 8,500.00 14 Furnish and Install 18"Ductil Iron restrained M.J.45 degree bend(Class 350 psi)per AW WA Cl 53,Complete in Place: 8 EA $ 2,848.04 1$ 22 784.32 S 3,500.00 1$ 28 000.00 $ 4.2.00.00 1 S 33 600.00 T.B.P.E.Firm No.F-13162 I of 3 �` City of Round Rock West Transmission Line Valve Replacements Bids Opened: 10/28/2025 at 9:00 am BID TABULATION Argidjo Corporation Patin Constmetion,LLC C.C.Carlton Industries,LTD Proposal Package Y Y Y Bid Form /NY Y Y Bid Security /N Y Y Y Addenda Acknoviled ed /N Y Y Y Contractor's Safety Statement Y Y Y Bid Item Description ­2=0,2.2" Unit Unit Price Total Amount Unit Price Total Amount Unit Price Tata]Amaont 15 Furnish and Install 24"Ductile Iron restrained M.J.45 degree bend(Class 350 i)per AW WA C153,Complete in Place: 2 EA S 4,690.50 S 9,381.00 S 5,000.00 1 S 10 000.00 S 6,200.00;$ 12 400.00 16 Fumish and Install 18"x 6"M.J.Ductile Iron restrained Tee(Class 350 psi),per 1 i AW WA C153,Complete in Place: I EA $ 3,354.88{$ 3,354.88 $ 2,500.00 l$ 2,500.00 $ 4,600. l$ 4 600.00 17 Furnish and Install 18"x 18"M.J.Ductile Iron restrained Tee(Class 350 psi), r AW WA C153,Complete in Place: I EA $ 4,829.38 S 4,829.38 $ 5,000.00 $ 5,000.00 S 6,150.00;$ 6,150.00 18 Furnish and Install 24"x 24"M.J.Ductile Iron restrained Tee(Class 350 psi), per AW WA C153,Complete in Place: 2 EA S 7,349.75 $ 14 699.50 $ 7,500.00 $ 15 000.00 $ 7,350.00 $ 14 700.00 19 Furnish and Install 30"x 30"M.J.Ductile Iron restrained Tee(Class 350 psi), per AW WA C153,Complete in Place: 1 EA $ 15 499.30 $ 15,499.30 $ 15 000.00 S 15 000.00 $ 19 800.00 $ 19 800.00 20 Furnish and Install 24"x 18"M.J.Ductile Iron restrained Reducer(Class 250 psi),per AW WA C153,Complete in Place: I EA $ 3,594.20 $ 3,594.20 $ 5,000.00 S 5,000.00 $ 5,180.00 1 S 5,180.00 21 Furnish and Install 30"x 24"M.J.Ductile Iron restrained Reducer(Class 250 psi),per AW WA C153,Complete in Place: 1 EA $ 6,370.31 S 6,370.31 S 5,000.00;$ 5,000.00 $ 7,950.00;$ 7,950.00 22 Furnish and Install 36"x 24"M.J.Ductile Iron restrained Reducer(Class 250 psi),per AW WA C 153,Complete in Place: I EA $ 8,928.47;$ 8,928.47 $ 8,500.00;S 8,500.N S 12 200.00 1$ 12 200.00 23 Furnish and Install 36"x 30"M.J.Ductile Iron restrained Reducer(Class 250 psi)per AW WA C153,Complete in Place: I EA $ 10 349.86;S 10 349.86 $ 10 000.00;$ 10 000.00 $ 15 900.00;$ 15 900.00 24 Furnish and Install Valve Marker per Detail WT-27,Drawing OOC-04,Complete in Place: 10 EA $ 340.96 $ 3,409.60 $ 4,000.00 1 S 40 000.00 $ 96.00 $ 960.00 25 Furnish and Install temporary type"A"barbed wim fence as required to maintain secure fencelme for livestock,M Drawing O1X-01. 500 LF S 18.66 1$ 9,330.00 S 50.00'$ 25 000.00 $ 20.00 1$ 10 000.00 26 Demolition of existing facilities shown on drawing Ol X-01 including all labor, materials,and equipment for removal of materials as described on the Plans with legal disposal at off-site location as required by applicable regulations,Complete in Place: I LS I S 12 074.53 l$ 12 074.53 $ I S 000.00'$ 15,000.00. S 49 800.00 1$ 49 800.00 27 Modify exist pipe access port per Detail 1,sheet OOC-05 inclusive of ground and surface water dewatering,salvage and reinstall exist top concrete fid,removal and disposing of exist 36"blind flange,installation of new 36'D.I.fiat face blind flange(Class 150 min.)with tapped connection to 6"ductile iron spool piece,installation off"FLXFL resilient wedge gate valve capped with 6"D.I. flat face blind flange(class 150 mm.),surface restoration,disposal of excess material,incidental work not covered by other bid items,and appurtenances, Complete in Place: 2 EA $ 15,742.20;$ 31 484.40 S 10 000.00;$ 20 000.00 S 23 000.00 1 S 46 000.00 28 Remove and replace existing 10-ft wide sidewalk along Site No.3 access route, Complete in Place: 568 SY $ 206.44;S 117 257.92 $ 75.00 $ 42 600.00 $ 85.00 1$ 48 280.00 29 Furnish and Install replacement fencing for fencing removed per Drawing 01 X- Ol following completion of work.Complete in Place: 500 LF $ 35.75 l$ 17 875.00 $ 50.00 1$ 25 000.00 $ 25.00 1 S 12 500.00 30 Clearing and Grabbing of Areas as required within Street Right-of-Way and Utility Easements,Complete in Place: 1.5 AC $ 3,309.49;S 4,964.24. $ 5,000.00;$ 7,500.00 $ 9,500.00 $ 14 250.00 31 Off-site Disposal of Cleared and Grabbed Material,Complete in Place: I LS $ 1,300.00 1$ 1,300.00 S 10 000.00 1$ 10 000.00 S 4,500.00 1$ 4,500.00 32 Pollution Prevention Implementation including Storm Water Pollution Prevention Plan,Mainterumce,Permitting,Inspections,and Reporting for all Pollution Prevention Measures as shown on the plans,Complete in Place: 1 LS $ 1,950.00 1$ 1,950.00 S 5,000. S 5000.00 $ 5,000.010 1$ 5,000.00 33 Furnish,Install,Maintain and Remove stabilized construction access as indicated on plans,Complete in Place: 3 EA $ 2 600.00 1$ 7,800.00 ' $ 2,000.00 1$ 6,000.00 $ 3,750.00,S 11 250.00 34 Furnish,Install,Maintain and Remove Filter Fabric Fence per Plans and Specifications,Complete in Place: 725 LF $ 8.13 l S 5,894.25 $ 5.00 I$ 3,625.00 $ 8.00:$ 5,800.00 35 Famish,Install,Maintain and Remove Rock Berms per Plans and Specifications, Complete in Place: 110 LF $ 33.80;$ 3,718.00 $ 75.001$ 8,250.00 $ 65.00 1 S 715000 T.B.P.E.Funs No.F-13162 2 of 3 &Z City of Round Rock West Transmission Line Valve Replacements Bids Opened: 10/28/2025 at 9:00 aro BID TABULATION Arguijo Corporation Patin Construction,LLC C.C.Cartion Industries,LTD Proposal Packa e Y Y Y Bid Form /N Y Y Y Bid Security /N Y Y Y Addenda Acknowledged Y Y Y Contractor's Safety Statement /N Y Y Y Bid Item Description Quan Unit Una Price Total Amount Unit Price Total Amount Una Price Total Amount 36 Famish and Install Hydromulch seeding per plans and specifications.Contractor shall restore additional areas disturbed by his activities at his cost,Complete in Place: 1.5 AC $ 23 280.40 I$ 34 920.60 S 5,000.00 S 7 500.00 $ 6,500.00 I$ 9,750.00 37 Furnish and Install Trench Safety System for waterline construction,Complete in Place: 267 LF $ 63.30 S 16 901.10 $ 10.00 $ 2,670.00 S 5.00 1$ 1,335.00 38 Furnish and Install Project Sign including removing and relocating project sign at two additional locations.Include all Material and Labor,Complete in Place: I EA $ 1,300.00 $ 1,300.00 S 2,000.00 1$ 2,000.00 $ 6,350.00 $ 6,350.00 39 Furnish,Install,and Maintain Traffic Control Plan and Traffic Control Devices along waterline route and construction access to sites with signage,electronic message boards,safety barriers,appurtenances,in accordance with Texas Manual on Uniform Traffic Control Devices(Latest Edition);Complete in Place: 1 LS S 7,832.50 I S 7,832.50 $ 30 000.00 I S 30 000.00 $ 60 000.00 $ 60 000.00 40 Cleaning,Flushing,Disinfection,and pressure testing all waterlines including installation and removal of temporary flushing valves and piping;Complete in Place: I LS $ 7,542.05 $ 7542.05 S 15 000.00 $ 15 000.00 S 19 100.00 1$ 19 100.00 41 Connection to Existing Water System Transmission Line(18"to 24"diameters) including flanged and ductile von connections.Including furnishing and installing sleeves,couplers,labor equipment,and appurtenances as necessary, Complete in Place: 6 EA $ 14 376.32 S 86 257.92 $ 15,000.00 S 90 000.00 $ 11 500.00 i$ 69 000.00 42 Connection to Existing Water System Transmission Line(30"to 36"diameter) mcludme flanged and ductile von connections.Including famishing and installing sleeves,couplers,labor equipment,and appurtenances as necessary, Complete in Place: 2 EA $ 26 628.41 $ 53 256.82 S 25 000.00 $ 50 000.00 E 24 50(1.00;$ 49 000.00 43 Connection to Existing Water System Transmission Line(18"to 24"diarneten) including ductile von to CSC connections.Including furnishing and installing DI to CSC adapters,sleeves,couplers,labor,equipment,and appurtenances as necessary,Complete in Place: I EA $ 32,532.61 $ 32,532.61 $ 40 000.00 I$ 40 000.00 S 36,950.00',$ 36,950.00 44 Connection to Existing Water System Transmission Line(30"to 36"diameters) including ductile von to CSC connections.Including famishing and installing DI to CSC adapters,sleeves,couplers,labor,equipment,and appurtenances as I EA necessary,Complete in Place: $ 40 086.16;S 40 086.16 $ 5U00 S 50 000.00 $ 52 300.00 $ 52 300.00 45 Salvage and reinstall one guy wire and hold two power poles during construction activities on site No.1,including coordination with Oncor,all 1 Labor,equipment and materials,Complete m Place: LS S 12 933.61 1$ 12 933.61 $ 5000.00 1$ 5000.00 $ 4,800.00 1$ 4,800.00 46 Salvage and reinstall existing traffic sign along Site No.3 access route, 1 I 1 Complete N Place- 1 EA S 625.08 i$ 625.08 J S 500.00 I$ 500.00 $ 1,750.00;$ 1,750.00 47 Furnish,Install,Maintain and Remove Mulch Sock per Plans and Specifications, 1 l Complete in Place: 6,113 LF ^W $ 0.70 1$ 4,279.10 $ 5.00 I S 30,565.00 E 10.00 $ 61,130.00 TOTAL BID AMOUNT: $ 1,452,989.95 4 1 S 1,463,470.00 S 1,671,055.00 Calculation error in Bid Item No.23 Total Amount by Contractor.This amount has been corrected and is shown in the Total Amount column. Z Calculation error in Bid Item No.33 Total Amount by Contractor.This amount has been corrected and is shown in the Total Amount column. 'Calculation error in Bid Item No.46 Total Amount by Contractor.This amount has been corrected and is shown in the Total Amount column. Total Bid Amount for Arguijo Corporation has been adjusted to reflect the corrections made to the Total Amounts in Bid Items No.23,33,and 46. T.B.P.E.Firm No.F-13162 3 of 3 �` ATTACHMENT B COMPETITIVE SCORING SUMMARY CONTRACTOR NAME TOTAL POINTS FINAL RANKING Arguijo Corporation 75.00 3 Patin Construction, LLC 89.64 1 C.C. Carlton Industries, LTD 86.47 2 4 � Vt is. " x West Transmission Main Valve Replacement ,-