Loading...
Contract - K Friese + Associates, Inc. - 1/9/2025 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO.3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: K FRIESE + ASSOCIATES, LLC ("Engineer") ADDRESS: 1120 S. Capital of Texas Hwy.CityView 2.Suite 100,Austin,TX 78746 PROJECT: Greenlawn Boulevard Widenine—SH 45 to IH 35 This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock. Texas, hereinafter called the "City' and K Friese + Associates, LLC, hereinafter called the"Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the"Contract,"on the 24th day of October, 2019 for the Greenlawn Boulevard Widening— SH 45 to IH 35 Project in the amount of$155,413.00;and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on February 11, 2021 to amend the scope of services and to increase the compensation by $820,982.00 to a total of $976,395.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on October 12, 2023 to amend the scope of services and to increase the compensation by $222,010.00 to a total of $1,198,405.00; and WHEREAS,it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $98,190.00 to a total of$1,296,595.00; NOW THEREFORE,premises considered, the City and the Engineer agree that said Contract is amended as follows: I. Article 1,City Services and Exhibit A.City Services shall be amended as set forth in the attached Addendum To Exhibit A. I1. Article 2, Engineering Services and Exhibit B. Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C. Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Supplemental Contract Rev.06/16 0199 1953,4902-5093-0181 84275 I DD Ill. Article 4, Compensation and Exhibit D. Fee Schedule shall be amended by increasing by $98,190.00 the lump sum amount payable under the Contract for a total of$1,296,595.00,as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF,the City and the Enuincer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06116 0199 1953;4902-5093-0181 84275 2 K FRIESE + ASSOCIATES, LLC Bv: __Charlotte A.Gilpin,PE,CFM Operations Manager December 18, 2024 Date Supplemental Contract Rev.06/16 0199 1953.4902-5093-0181 84275 3 CITY OF ROUND ROCK APPROVED AS TO FORM: By: - . Tephanle L. Sandre,City Attorney Printed Name: Cl'Qi9 Mocqc, a Title: &UP C Date Signed: i 1 JZJ Supplemental Contract Rev.06/16 0199 1953,4902-5093-0181 84275 4 Greenlawn Blvd Widening IH 35 to Louis Henna Blvd (SH 45) Addendum to Exhibit A City Services The City of Round Rock (City) will provide the following information and other assistance to K Friese & Associates (Engineer) that the City deems appropriate and necessary. 1 Any readily available pertinent existing information relating to the services to be performed by the Engineer: the City will provide one copy of such information in a format chosen by the City. This includes block maps of water wastewater, gas. and electric services.. as-builts of the existing water mains, and information regarding any water services such as size and location 2 Clear direction and/or response to questions or requests made by the Engineer in the course of the Engineer's performance of services.. including allowable water main shutdown durations. 3. Timely review of deliverables that have been properly completed and submitted by the Engineer, and timely provision of comments, if any, to the Engineer resulting from said reviews A-I of, I Greenlawn Blvd Widening IH 35 to Louis Henna Blvd (SH 45) Addendum to Exhibit B Engineering Services UNDERSTANDING K Friese & Associates, LLC (KFA) is currently designing the roadway and drainage improvements for the expansion of Greenlawn Boulevard from IH 35 to Louis Henna Boulevard (SH 45) During preliminary design the KFA Team identified several existing water mains that are in conflict with proposed improvements The water mains in conflict will require adjustment so KFA will develop Plans, Specifications. and Estimate (PS&E) documents for eight (8) adjustment. one (1) 8-in. two (2) 12- inch, and four (4) 16-inch water mains This work order consists of the replacement of the following • Greenlawn Blvd -STA 10+30 130 linear feet of 12-inch water service, bored • Greenlawn Blvd -STA 12+85 LT 60 linear feet of 16-inch water main • Greenlawn Blvd -STA 23+40 LT 60 linear feet of 16-inch water main • Greenlawn Blvd -STA 25+72 1-1 130 linear feet of 12-inch water service • Greenlawn Blvd -STA 27+95 LT 60 linear feet of 16-inch water main • Greenlawn Blvd -STA 29+95 LT 60 linear feet of 16-inch encased water main • Greenlawn Blvd -STA 33+75 LT c 60 linear feet of 16-inch water main • Greenlawn Blvd -STA 41+25 c 175 linear feet of 12-inch encased water main. bored c. Fire hydrant relocations Other City of Round Rock infrastructure exists within the corridor that may need to be replaced/adjusted if found to be in conflict with the roadway proposed improvements Additional services will be required if more infrastructure is required to be replaced Below is a list of the anticipated sheets required and updated • General Plans Sheet Index Quantity/Summary Sheets • Water Summary Sheet (1 Sheet) Project Layout • Water Plan Sheets Water Notes Sheet (1 Sheet) Water Plan and Profile Sheets (1" = 40' scale) (3 Sheets) Water Standard Details Sheets (4 Sheets) 13-1 ol'-I Greenlawn Blvd Widening IH 35 to Louis Henna Blvd (SH 45) Addendum to Exhibit B Engineering Services In addition. KFA will extend the contract time through the end of design and include meetings for the project and water main adjustment design team throughout the remaining schedule KFA assumes that there will be monthly meetings with the City for the remainder of the design phase which is assumed to be an additional six (6) months and six (6) additional meetings are needed SCOPE OF SERVICES TASK 1 — PROJECT MANAGEMENT 1. Project Management/Administration — This task includes routine communication with the City, managing sub-consultants developers, workload. budgets, and schedules invoicing, implementing and monitoring of QA/QC efforts and other activities associated with managing the project An additional 6 months has been added to the original project duration. 2 Project Meetings and Status Reports — KFA will attend virtual regular status meetings with the City to review progress and upcoming work We have budgeted for three (3) additional meetings to review and discuss the water main relocation design Time includes preparation of agendas and meeting minutes. TASK 2 — FINAL DESIGN & BID PHASE 1 50% Design Phase a Review Surveys, Maps. As-Builts — Review documents depicting the existing water infrastructure provided by the City of Round Rock b Walk Project — The KFA Team will visit the site to walk the project and assess existing conditions that are visible in order to evaluate new alignments c Prepare Plan Sheets — Prepare Water Quantities. Water Notes, and Water Standard Details sheets for the project The KFA Team will prepare plan and profile sheets for the segments of water main replacement via open cut. Existing utilities will be shown where information was found to be available and based on field mark-outs of utilities d Prepare Opinion of Probable Construction Cost — KFA will prepare a construction cost estimate based on the quantities developed in the plans and pricing on recent similar construction projects This will be prepared in Microsoft Excel format. B-2 ol'4 Greenlawn Blvd Widening IH 35 to Louis Henna Blvd (SH 45) Addendum to Exhibit B Engineering Services e. QA/QC -KFA will conduct QA/QC of the plans for each design phase. f Design Submittal - The KFA Team will prepare and submit plans to the City of Round Rock for review at the 50% design stage Plans and profiles will be prepared on 11" x 17" sheets at 1"=40' horizontal scale and 1 ' = 10' vertical scale and will be submitted in PDF format. 2 95% Design Phase a Prepare Revised Plan Sheets - Revise Water Quantities. Water Notes and Water Standard Details sheets for the project The KFA Team will add as-built information and revise the plan and profile sheets for the segments of water main replacement KFA Team will summarize and respond to comments received from the City at the 50% submittal b Prepare Opinion of Probable Construction Cost - KFA will prepare an updated construction cost estimate based on updated quantities developed in the plans and pricing on recent similar construction projects. This will be prepared in Microsoft Excel format c QA/QC - The KFA Team will conduct QA/QC of the plans for each design phase. d Design Submittal - The KFA Team will prepare and submit plans to the City of Round Rock for review at the 95% design stage. The plans will be submitted in PDF format 3 100% Design Phase a. Attend City of Round Rock QA/QC Meeting - The KFA Team will attend a QA/QC meeting with City of Round Rock Staff to go over the plans and to receive comments/questions b. Prepare Revised Plan Sheets - Revise Water Quantities, Water Notes, and Water Standard Details sheets for the project. The KFA Team will revise the plan and profile sheets for the segments of water main replacement. KFA Team will summarize and respond to comments received from the City at the 95% submittal c QA/QC - The KFA Team will conduct QA/QC of the plans for each design phase. d Design Submittal - The KFA Team will prepare and submit sealed final plans to the City of Round Rock at the 100% design stage The plans will be submitted in PDF format B-3 of 4 Greenlawn Blvd Widening IH 35 to Louis Henna Blvd (SH 45) Addendum to Exhibit B Engineering Services APPLICATION DELIVERABLES • Electronic submittals of Plans and OPCC's at 50%, 95% and 100% design phases EXCLUSIONS Items not anticipated for this assignment which have not been included in this Scope of Services are as follows design survey. subsurface utility locates (SUE), flow development. temporary waterline main design hydraulic analysis of pipe lines metes and bounds for easements easement acquisitions. structural engineering geotechnical engineering environmental studies traffic control plans surface adjustment sheets. and permitting fees B-4 of 4 Addendum to Exhibit C Work Schedule Attached Behind This Page Greenlaw.Boulevard it, orFaMmICK FRIESE wk 1cFWhulaASSOCIATES 10CK IEXAti t.00t4waw t ---. — _ _ .----------— - --. __. ----- - ID Task Name (hrauor Star I~ Predece•Oesource Namea 79,'24 0.6.'24 Oct 11,'24 Oct 20,'74 Oct 27,'24 Nm 3,'14 Nov 10,24 Nov 17.'24 Nov 24,'24 Dec 1,'14 Dec K.'24Dee 15.24 D.77,'74 OK 'WTF 55M'T W7 SSM TWT F$S*TW T F S S M TWT F 5 S MI TWT IS SM'W'FSSM'TWI F.S,SMIWTI SSMTWT'SSMTWTF 5 SMTWT F S SMTWT F SSA4 1 Task I-Prolml Management/Administration 41 days Wed 10/16/24 Fn 12/13/24 - .1 7 Task 2 F1nal Design 43 days Wed 10/16/24 Fr112/13/24 I Develop Pr000sed Alignments 5 days Wed 10/16/24 Tue 10/22/24 4 Proposed AbIg— s CWQC 3 days Wed 10/23/24 Fn 10/25/24 3 , 6 Suomn Proposed Al gnments 1 day Fn 10/25/24 Fn 10/25/24 4FF � 6 Plam,ed Ahgnment,C1tr It—and Comm 5 days Mon 10/23124 fn 11/1/24 7 100%Unsealed 11—Preparation 10 days Mon 10/28/24 Fn 11/g/14 655 It • 100%Unsealed QA/QC 8days Man 11/11/24 Wed 11/20/24 7 - 9 100%Unsealed Su6m4ta 1 day Wed 11/20/24 Wed 11/20/24 OFF M� 10 IPO%ti ealyd C 1y Renew and Comment 5 days Thu 11/21/24 Wed 11/77/24 9 11 Final plans PTeparat— S days Mon 12/2124 Fn 12/6/24 -- ..13 i Flnal QA/QC 5 days Mon 12/9/24 Fn 12/13/24 11 IaaFNW ll— 13 Final Subrn,ttal 1 day /rl 12/13/24 Fn 12/13/74 12FF 4N1 holeet Summary 1 F Ins Ive Mvntone Manual Summary goauP 0-di— date r Wed 10/16174 S/al .... .....,. trternal lasts Inurrve Summary I Manual Summary Magress 6Mest— • Faternal Meestone Manual Tay etle141Fawwwt St.—I, 1 Manual Progress SWI-mv 1 ln-t—lass Durano�—1, msh only I Page 1 1 Addendum to Exhibit D Fee Schedule Attached Behind This Page Greeniawn Blvd Widening IH 35 to Louis Henna Blvd(SH 45) K FRIES E EXHIBIT D SCHEDULE FEE SCHEDULE + ASSOCIATES ROUND ROCK TEXAS LOCHNER Billing Rate S 25000 S 21500 S 185 DO $ 105 DO $ 105 DO $ 9000 ar lafe"t >sarller ftiaimet Sr.CARD A'O)set Tidal NN"W llgYt411r onw— or TedwAd n AOIaYwenM► LOW TOW LOW DWMw TIMI Ttlak MttRa Matra Mara Ilettra Ilstlra Mtwa Maafa Caa Catt am Task 11-Project Management 1_ Project ManagemerltlAdmmistration 4 36 B _ 0 0 5 54 $10760 s0 $10760 2 Project Meetings&Status Reports t3 Meetings i 0 12 8 0 0 0 20 $4,060 $500 $4560 Subtotal Task 11 4 48 1 18 1 0 1 0 6 74 $14,820 $500 $15,320 Task 2-Final Design ? 50%Design Phase a,Review Su vets,Maps As&.ills 4 0 18 0 0 G 22 $4,330 $15 $4.480 c Prepare Plan Sheets 24 0 92 0 0 0 116 $23020 $ $23020 �d Prepare Opinion of Probable Cortstru tion Cost _ 0 8 0 0 0 10 $1 980 $1 SIM e OArClC _ 0 0 0 C, 10 $2500 f Design Submittal 2 0 2 0 0 4 $870 5870 95%Design Phase a Prepare Revised Plan Sheets 24 4 Be 48 0 0 164 $28 180 -- $28.180 b Prepare Opinion of Probable Conslruclion Cost 1 0 4 0 0 n 5 $990 _- $990 c oA/oC 8 2 0 0 0 it 1G S2 430 $2430 e Design Submittal 0 4 0 0 D 5 S1 240 $1 240 3 100%Design Phase b Prepare Revised Pan Sheets 12 0 36 0 0 0 48 $9 660 $9 660 c oA/oC B 2 16 12 0 0 38 $6650 __ $6650 e Design Submittal— 2 0 2 0 0 0 4 $870 $870 Subtotal Task 2 I 8 270 80 1 0 0 437 582,720.00 $150. $82.870 Teaft m I M Page D-1 of 1