Loading...
R-2026-010 - 1/8/2026 RESOLUTION NO. R-2026-010 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with Cutler Repaving, Inc. for the 2023 Arterial Street Maintenance Program Project, and WHEREAS, the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 3 to the Contract with Cutler Repaving, Inc. for the 2023 Arterial Street Maintenance Program Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. RESOLVED this 8th day of January, 2026. 14 Al CRAIGA Mayor City of R nd Rock,Texas ATTE T: ANN fkANKLIN, City Clerk 0112.20252:492683746691 EXHIBIT Page 1 of 3 A !PP-- Contract Quantity Adjustment/Change Order / ROUND NOCK rev,ou16 Department: Transportation Project Narne: 2023 Arterial SMP Date: 12/4/25 City Project Change Order/Quantity ID Number Adjustment No. 3 Vendor Cutler Repaving,Inc. _ 921 East 27th Lawrence, KS 66046 785-843-1524 Company Name Address Phone No. Justification Add the additional square feet of sidewalk performed.Adjust final field quantities, Add one half month of Traffic Control necessary for the the extra time required to recycle and stripe the additional square yards of pavement on Mays not on the original plans. SUMMARY %Change Original Contract Price: $3,535,880.55 Previous Quantity Adjustment(s): This Quantity Adjustment: $352,379.82 Total Quantity Adjustment(s): $352,379.82 Total Contract Price with Quantity Adjustment(s): $3,888,260.37 Previous Change Order(s): $118,575.37 3.05% This Change Order: $3,000.00 0,080/0 Total Change Order(s)To Date: $121,575.37 3.13% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $4,009,835.74 Difference between Original and Adjusted Contract Prices: $473,955.19 Original Contract Time: Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: New Contract Time: Submitted for Approval Prepared By: Charles R.Veskerna President Cutler Repaving, Inc. L&IA& Signature Printed Name,Title,Company Date Approvals Contractor: � Charles R.Veskema President Cutler Repaving,-Inc. LY4� µ Signature Printed Name,Title, Company Date Dq ai. g M by Rb C'hPCO Reuben Ramirez Rmez Reuben Ramirez, Project Manager 12/9/2025 Manager: c„e- o� -512 N 11 Signature Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Page 2 of Contract Quantity Adjustment/Change Order � ROU NO ROCI( Project Name: 2023 Arterial SMP Quan.Adj./Change Order No.: 3 Chan a Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Davs 30 Inlet LS 1.00 $3,000.00 3,000.00 Page 3 of 3 Contract Quantity Adjustment/Change Order ' AO1/40 N[30t n ]1.15 Project Name: 2023 Arterial SMP Quan.Adj./Change Order No.: 3 Quantity Adjustment Data Contract Time Adjustment Bid Item # Item Description Unit Qty. Unit Price Amount 1 12" Pavement Repair TN 93.59 $150.75 14 108.69 72 2 In-Place Pavement Recycling SY 319.81 $4.25 1,359.19 3 Re uvenator Agent GL 1,577.04 $4.10 6,465.86 4 Surface Milling SY 319.81 $2.60 831.51 5 Type D HMAC Surface TN 1,521.54 $120.25 182 965.19 6 Ede Mill SY 100.00 2.60 260.00 7 R& R Curb&Gutter LF 1.70 76.16 129.47 8 R& R Concrete Sidewalk SF 3,052.00 $21.28 64 946.56 10 Valve Can Adjustment EA 34.00 50.00 (1,700.00) 11 Manhole Adjustment EA 35.00 50.00 (1,750.00) 12 Geogrid Base Reinforcement SY 443.56 $10.00 4,435.60 13 Refl Pav Mrk 6" W BRK LF 2,472.00 $0.92 2,274.24 14 Refl Pav Mrk 6"W Solid LF 578.00 $0.83 479.74 15 Refl Pav Mrk 12" W Solid LF (1,585.00) $5.61 (8,89 .85 16 Refl Pav Mrk 24" W Solid LF 692.00 $20.96 14 504.32 17 Refl Pav Mrk 6"y Solid LF (268.00) $0.83 222.44 18 Refl Pav Mrk 6"Y BRK LF (10.00) $0.92 9,20 19 Refl Pav Mrk 8"W Solid LF 1 2,189.00 $1.72 3,765.08 20 Refl Pav Mrk(W)Only LF 6.00 $302.50 1,815.00 22 Refl Pav Mrk(W) Arrow LF 3.00 $275.00 825.00 23 Type II-B-B RPM EA (7.00) $33.00 231.00 24 Type II-A-A RPM EA 123.00 $6.60 811.80 25 Type I C RPM EA 552.00 $15.35 8,473.20 26 Traffic Control LS 0.50 $48,000.00 24 000.00 29 HMAC Level Up TN (44.63) $160.00 (7,140.80) CO # 2 Extension Error 40 653.60 $352,379.82 72 0 1p, �� x'7-1 . � ._ T _ .t Y1 +dM Imo# • y ,It t '' .. .k• 1 4 , •Jr •��� ,5.-1'1 i� 'tidy-t e1 -S 17� NNW AO .01 1 a v. t *' it l�"� �• ,, .t r,. 4 } `