Contract - Cash Construction Company - 4/24/2025 Page I of 3 Contract Quantity Adjustment/Change Order _f?-I!—1. R,GL 16 Department: Public Works Project Name: Gattis School Road Segment 3 Date: 3/13/25 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Cash Construction Company 217 Kingston Lacy Blvd 512-251-7872 Company Name Address Phone No. Justification Please see attached backup. SUMMARY Amount %Change Original Contract Price: $26,735,973.35 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $111,762.70 Total Quantity Adjustment(s): $111,762.70 Total Contract Price with Quantity Adjustment(s): r $26,847,736.05 Previous Change Order(s): $0.00 0% This Change Order: $43,932.64 0% Total Change Order(s)To Date: $43,932.64 0% Adjusted Contract Price (Original Contract Price Plus Quantity Adjustments)Plus Change Order(s)]: $26,891,668.69 Difference between Original and Adjusted Contract Prices: $155,695.34 Original Contract Time: 700 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 18 New Contract Time: 718 Submitted for Approval Prepared By: i _� �/ Scott Blanda, Project Manager, Cash Construction 3/13/25 Signature Printed Name,Title,Company Date Approvals Contractor: � Scott Blanda, Project Manager, Cash Construction 3/13/25 Signature Printed Name,Title,Company Date City Project Manager: u ,.— 3 -.21-26— Signatu Printed Name,Ttle Date Mayor/City , Manager -2 2— Signaturf PrinteoAame,Trtld Date 1'age 2 of Contract Quantity Adjustment/Change Order l Ib Project Name: Gattis School Road Segment 3 Quan,Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) 1 CPR#1-Ped Poles at Double Creek EA 2 $2,250.00 $4,500.00 1 PDisconnect Temporary Wet Connect for L- F, Backfill w/Concrete Encasement, Re-sequence crew to areas of work not in current phase of construction. Crew relocated from WL-C to WL-G while WL-F was in 2 re-design. LS 1 $15,044.04 $15,044.04 2 3 CPR#2-Add-Re-stocking Fee of 30"Encasement LS 1 $12,763.60 $12,763.60 0 CPR#3-Pole Relocations Due to Conflict with 4 Available Work LS 1 $11,625.00 $11,625.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $43,932.641 3 Project Name: Gattis School Road Segment 3 Quan.Adj./Change Order No.: 1 Page 3 of 3 Contract Quantity Adjustment/Change Order Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty. Unit Price Amount tnayci CPR#2-EXISTING BID ITEM-ENC PIPE STL(1/2 IN WW-13(505) THICK)42-IN DIA(OC)(ALL DEPTHS) LF 1 147 $467.00 $68,649.00 3 CPR#2-EXISTING BID ITEM-PIPE(CL 250 RJ DI OR WW-21(510) PVC C900)20-IN DIA(DALL DEPTHS)E&B LF 12 $280.00 $3,360.00 0 CPR#2-EXISTING BID ITEM-WET CONNECTION(20- WW-33(510) IN DIA X 20-IN DIA) EA 2 $4,370.00 $8,740.00 1 CPR#2-CREDIT-EXISTING BID ITEM-ENC PIPE WW-11(505) STL(1/2 IN THICK)30-IN DIA(OC)(ALL DEPTHS) LF -130 $272.00 -$35,360.00 0 CPR#2-EXISTING BID ITEM-FLOWABLE BACKFILL WW-1 401 AT NEW BID ITEM PRICE PER RFI 31 CY 10 $243.00 $2,430.00 0 CPR#4-EXISTING BID ITEM-JACKING OR BORING ww-3(501) 18-IN STEEL PIPE 7/16 IN THICK LF 40 $565.00 $22,600.00 3 01 530-6004 CPR#5-EXISTING BID ITEM-DRIVEWAYS(CONC) SY 122 $102.00 $12,444.00 1 CPR#5-EXISTING BID ITEM-CONC CURB&GUTTER 529-6008 (TY II) LF 86 $22.00 $1,892.00 1 CPR#5-EXISTING BID ITEM REMOVING CONC 104-6017 (DRIVEWAYS) SY 295 $10.00 $2,950.00 1 CPR#5-EXISTING BID ITEM REMOVING CONC 104-6029 (CURB OR CURB&GUTTER) LF 210 $7.00 $1,470.00 1 216-6001 CPR#5-EXISTING BID ITEM PROOF ROLLING HR 5 $638.00 $3,190.00 0 531-6002 CPR#5-EXISTING BID ITEM-CONC SIDEWALKS(5") SY 15 $76.00 $1,140.00 1 CPR#5-EXISTING BID ITEM-REMOVING CONC 104-6036 SIDEWALK OR RAMP SY 61 $10.00 $610.00 0 CPR#6-EXISTING BID ITEM-RIPRAP(STONE 432-6031 PROTECTION)(12 IN) CY 75 $239.00 $17,925.00 3 CPR#7-EXISTING BID ITEM-CEM STABIL BKFIL 400-6005 (replaced with flowable backfill) CY -1142 $243.00 -$277,506.00 0 CPR#7-EXISTING BID ITEM-FLOWABLE BACKFILL (reversing original bid item price and replacing it with the cement stablized backfill price to use in lieu of the WW-1(401) cement stablized backfill per RFI 31) CY -4.7 $302.00 -$1,419.40 0 CPR#7-EXISTING BID ITEM @ NEW PRICE PER RFI 31-FLOWABLE BACKFILL(replacing the original bid item price with the cement stablized backfill price as WW-1(401) CLSM will be used in lieu of cement stablized base) CY 1146.7 $243.00 $278,648.10 0 T TA 111762.70 is