Contract - Braun and Butler Construction, Inc. - 5/8/2025 Pagc 1 of 1 Contract Quantity Adjustment/Change Order na,Nonocx :. rev.01 16 Department: General Services Project Name: Griffith Remodel and Paseo Project Date: 4/4/25 City Project Change Order/Quantity ID Number Adjustment No. 1 Vendor Braun and Bulter Construction Inc. 300 Hazelwood Street, Suite 100, Leander,TX 78641 512-837 2882 Company Name Address Phone No. Justification Replace and repair 19 windows identified during construction as failing. During construction windows along the South and East side of the building were discovered to be leaking causing mold in the walls of the structure. This change order is to replace the windows with like shape to maintain the historical appearance but address the failing window seals, caulking, Flashing,and waterproofing. SUMMARY Amount %Change Original Contract Price: $15,031,728.00 Previous Quantity Adjustment(s): This Quantity Adjustment: $0.00 Total Quantity Adjustment(s): $0.00 s tM Total Contrail Price with Quantity Adjustment(s): $15,031,728,00 - Previous Chanqe Order(s): $0.00 0% This Change Order: $303,932.00 2% Total Change Order(s)To Date: $303,932.00 2% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $15,335,660.00 3j Difference between Original and Adjusted Contract Prices: $303,932.00 Original Contract Time: 518 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 518 Submitted for Approval Prepared By: Richard Will,Building Construction Manager,City of Round Rock Y�51�202s" Signature Printed Name, Title,Company Date Approvals Architect: r Andrew Green,Associate,McKinney York Architects 04/04/2025 ure Printed Name, Title, Company Date Contractor: I ilj/!2X�L- C �Cnv1C �/7/Z Signature Printed Name, Title,Company Date City Project Manager: C 611 Cl 7 2 Sig Lure Printed Name,Title Date Mayor/CityAZ %/ S/0 Manager V Sig ature Printed me, Tit eJ Date a,0s - iy Page 2 of Contract Quantity Adjustment/Change Order 101-0 L Project Name: Griffith Remodel and Paseo Project Quan. Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount a 2 19 Windows and Flashing 1 1 $303,932.00 $303,932.00 0 $0.00 $0.00 $0.00 $0.00 0.001 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Job Name: ith & Paseo 1979 Windows & Masonry 19 Date: 1/14/2025 Tooth-out Masonry Braun&Butler CONSTRUCTION Miscellaneous Labor Material Total Mhrs Qty Unit UP Amount UP Amount UP Amount 0 1 General Conditions 0 Front End Plan Work 1 Is 3,250 3250 3,250 Senior Project Manager 0 wk 850 0 0 Project Manager 0 wk 1,8501 0 0 Truck Expense 0 wk 275 0 0 Superintendent 4 wk 3,950 15800 15,800 Truck Expense 4 wk 500 2000 2,000 Interim Cleanup Labor 48 mhrs 32 1536 1,536 Project Office Clerical Support 4 wk 800 3200 3,200 0 Job Office Supplies 0 mo 100 0 0 ]Telephone/Computer Service 2 mo 950 1,900 1,900 Drinking Water 0 mo 150 0 0 Plan Reproduction 0.1s 250 0 0 Dum ster Service 8 ea 9501 7,600 1 7,600 Chemical Toilet each 0 mo 425 0 0 Rentals 1 Is 3,000 3,000 3,000 0 0 1.0 Allowances 0 contractor's contingency 20,000 20,000 0 DIV 2 - EXISTING CONDITIONS 0 0 2 40 Masonry Removal &Abatement 35,820 35,820 Tooth out V around window locations 0 2.50 Existing Concealed: Microbial-Remediation 38,130 38,130 0 DIV 4 - MASONRY 0 0 4.0 Masonry Reinstallation 30,560 30,560 0 DIV 5 -METALS 0 0 5 50 Metal Fabrications (lintels) 10,799 10,799 0 DIV 6 -WOOD, PLASTICS, COMPOSITES 0 0 6.10 Rough Carpentry for Masonry support 3,000 3,000 O.peninq Coverings after removal 3,000 3,000 0 6.20 Finish Carpentry @ window sills 5,000 5,000 0 DIV 7 -THERMAL & MOISTURE PROTECTION 0 0 7 10 Damp proofing and Waterproofing 7,200 7,200 0 7.60 Flashing and Sheet Metal 12,500 12,500 1979 Proposal Summary 1.14.25-Tooth-out masonry Takeoff Summary Job Name: th & Paseo 1979 Windows & Masonry 19 Date: 1/14/2025 Tooth-out Masonry Braun&Butler CON STRVCTZON Miscellaneous Labor Material Total Mhrs Qty Unit UP FAmount UP Amount UP Amount 0 7 90 Interior Joint Protection 8,280 8,280 0 DIV 8 -OPENINGS 0 0 8.50 Windows 0 0 New Window Material Installation 58,253 58,253 0 DIV 9 -FINISHES 0 0 9.10 Blocking, Sheathing, Drywall, Cornerbead j 5,000 5,000 0 9.90 Paint& Coatings lintels 2,500 2,500 0 0 Temporary Fence 250 If 9 2,250 2,250 Traffic Control Plan & Devices 1 Is 3,500 3,500 0 Project Insurance 3,590 3,590 0 0 SUBTOTAL 261,882 25,786 0 287,668 CM Fee 1 3.75%1 10,788 Total Before Bond 298,455 Bond Cost es=1 1 5,477 Sales tax on Material 1 0.00%1 0 Sales tax on Total 0.00% 0 SUMMARY TOTAL 303,932 1979 Proposal Summary 1.14.25-Tooth-out masonry Takeoff Summary