Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Contract - Myers Concrete Construction - 7/10/2025
CITY OF ROUND ROCK BID COPY/ORIGINAL PARKS & RECREATION DEPARTMENT ROUND ROCK TEXAS Project Manual For: Rock Hollow Park Improvement Project 2025 May, 2025 Prepared By: i Waeltz & Prete......................... Inc. ANTONIO A. PRETE i Civil Engineers �•, 93759 .:��� I�o�. �� E�; 211 N. A.W. Grimes Blvd. /.FS•CENS,.�G�� Round Rock TX 78665 IONAL APPROVED BY F-, 28Apr25 C1 ��T�� � ,� a�I TBPE Firm Registration No F-10308 Rock Hollow Park Improvement Project 2025 TABLE OF CONTENTS Section Description No. of Pages 00020 Notice to Bidders 1 00100 Instructions to Bidders 4 Exhibit A 1 00200 Bid Bond 2 00300 Bid Form 5 00410 Statement of Bidder's Safety Experience 1 00500 Agreement 5 00600 Insurance & Construction Bond Forms Performance & Payment Bond Instructions 1 Insurance Instructions 1 00610 Performance Bond 2 00620 Payment Bond 2 00650 Certificate of Liability Insurance 1 00700 General Conditions 41 00800 Supplemental General Conditions 2 00900 Special Conditions 5 01000 Technical Specifications 6 02000 Plans, Details and Notes Rock Hollow Park - Site Development Plans 8-2016 Table of Contents 00090665 00020 NOTICE TO BIDDERS NOTICE TO BIDDERS Pursuant to the provisions of Texas Government Code, Section 2269.101,it is the intention of the City of Round Rock, Texas ("City"), via this Request for Bids, to select a prime contractor by using the Competitive Bidding Method for the furnishing of all labor, material and equipment and performing of all work for the City project titled Rock Hollow Improvement Project 2025 (project includes stormwater improvements, demolition, concrete flatwork, and revegetation) for the City of Round Rock, Texas ("City"). Online bidding will be utilized via Bonfire at https://roundrocktexas.bonfirehub.com. Online bid services will open for bidding on May 9,2025 at 8:00 a.m. and close on May 27, 2025 at 10:00 a.m. All bidders shall follow submittal instructions at https://roundrocktexas.bonfirehub.com. Hard copies will not be accepted for this solicitation and all bids shall be submitted online at htti)s://roundrocktexas.bonfirehub.com. Bids results will be publicly opened and read aloud on May 27, 2025 at 11:00 a.m. on Microsoft Teams (Meeting ID: 244 655 114 637 0 Passcode: at92ue23)and will be posted online at hMs://roundrocktexas.bonfirehub.com after the public bid opening. No bids may be withdrawn after the scheduled opening time. Plans, Bid Forms, Specifications, and Instructions to Bidders may be obtained at hMs://roundrocktexas.bonfirehub.com/Mortunities. Any questions shall be submitted through Bonfire. Bids must be accompanied by an acceptable bid security as outlined in the Instructions to Bidders, payable to the City of Round Rock, Texas, equal to five percent (5%) of the total bid amount. A copy of the bid security MUST be uploaded with bid documents to hqs://roundrocktexas.bonfirehub.com to be considered responsive. The original bid security document must be provided to the City within three(3)days of a request by the City. In case of ambiguity, duplication, or obscurity in the bids, the City reserves the right to construe the meaning thereof. The City further reserves the right to reject any or all bids and to waive any informalities and irregularities in the bids received. The successful bidder will be expected to execute the City's standard contract and to furnish performance and payment bonds, all as described in the bid documents. Contractors and subcontractors shall pay to laborers, workmen, and mechanics the prevailing wage rates as determined by the City. There is no pre-bid meeting scheduled for this project. Austin American Statesman: May 8, 2025 May 15, 2025 00020 05-2023 Notice to Bidders 4857-7514-4551 Page 1 00100 INSTRUCTIONS TO BIDDERS (E-BID) INSTRUCTIONS TO BIDDERS 1. Prior to submitting any bid, bidders are required to read all drawings (plans), specifications, and all other Project Manual and/or Contract Documents carefully; to inform themselves by their independent research, test and investigation of the difficulties to be encountered and judge for themselves of the accessibility of the Work and all attending circumstances affecting the cost of doing the Work and the time required for its completion and obtain all information required to make a bid. The aforementioned documents may only be obtained from the City's website at the following web address: https://roundrocktexas.bonfirehub.com. 2. Should the bidder find discrepancies in, or omissions from the drawings (plans), specifications, or other Project Manual and/or Contract Documents, or should he be in doubt as to their meaning, he should notify at once the City and obtain clarification or addendum prior to submitting any bid. Any addenda issued will be posted with the documents at the web address mentioned in item 1 above no later than two business days prior to the Bid Opening Date. Prior to submitting a bid,the bidder is responsible for determining if any addenda have been issued and for following any instructions required in any addenda issued. 3. It shall be the responsibility of the bidder to see that his bid is accepted through https:Hroundrocktexas.bonfirehub.com by the time named in the Notice to Bidders. 4. Bids shall be submitted at https://roundrocktexas.bonfirehub.com. Hard copies will not be accepted for this solicitation. 5. Bidders shall be responsible for submitting a copy of the City's Bid Form, Bid Bond Form, and Statement of Bidder's Safety Experience, and any other required documents posted for the Project at https://roundrocktexas.bonfirehub.com. 6. Bids shall be accompanied by a bid security consisting of a certified cashier's check in an amount not less than five percent (5%) of the total maximum bid price, payable without recourse to the City of Round Rock, or bid bond in the same amount from a reliable surety company, as a guarantee that the bidder will enter into a contract and execute performance and payment bonds, as stipulated by item 16 below,within ten(10)days after notice of award of contract to him. A copy of the bid security must be scanned and uploaded with the bid documents and the original must be submitted in an envelope to the City's Project Manager within three days of request by the City. Bids submitted without a bid security may not be considered at the sole discretion of the City. The City will accept electronic performance and payment bonds if they are in compliance with all requirements set forth in this item 16. Page 1 00100 2-2021 Instructions to Biddcrs 4896-6117-2004 7. If awarded the bid, bidder must submit Form 1295 on the Texas Ethics Commission (TEC) Website at https://www.ethics.state.tx.us/whatsnew/elf info form1295.htm and submit the signed Form 1295 to the City Clerk at afranklinAroundrocktexas.gov within ten (10) business days of notification of the award. Instructions for completing a Form 1295 are attached as Exhibit "A" to the Instructions to Bidders. 8. No conditional bids will be accepted. 9. A bidder wishing to withdraw his bid prior to the scheduled bid opening time may do so at https://roundrocktexas.bonfirehub.com. 10. A bidder wishing to revise his bid after prior to the scheduled bid opening time may do so at https://roundrocktexas.bonfirehub.com. No revisions to a bid will be allowed after the scheduled bid opening time. The bidder shall be responsible for ensuring the amount of the bid security is as specified in the Instructions to Bidders. 11. All bid securities will be returned to the respective bidders within twenty-five (25) days after bids are opened, except those which the City elects to hold until the successful bidder has executed the Agreement. Thereafter, all remaining securities, including security of the successful bidder, will be returned within sixty (60) days. 12. Until the award of the contract, the City reserves the right to reject any and all bids and to waive technicalities; to advertise for new bids; or to do the work otherwise when the best interest of the City will be thereby promoted. 13. In case of ambiguity or lack of clarity in the statement of prices in the bids, the City reserves the right to consider the most favorable analysis thereof, or to reject the bid. Unreasonable and/or unbalanced prices submitted in a bid may result in rejection of such bid or other bids. 14. Award of the contract, if awarded, will be made based upon the criteria set forth in Section 2269.055 of the Texas Government Code. In determining the award of a contract under Chapter 2269, the City may consider; 1) the price; 2) the bidder's experience; 3) the quality of the bidder's goods or services; 4) the impact on the ability of the City to comply with rules relating to historically underutilized business; 5) the bidder's safety record; 6) the bidder's proposed personnel; 7)whether the bidder's financial capability is appropriate to the size and scope of the project; and 8) any other relevant factor specifically listed in the request for bids. 15. Award of the contract, if awarded, will be made within sixty (60) days after opening of the bids, and no bidder may withdraw his bid within said sixty (60) day period of time unless a prior award is made. A Notice to Proceed will be issued within sixty (60) days after contract Execution Date as defined in the General Conditions. 16. Within ten (10) days after written notification of award of the contract, the successful bidder must furnish a performance bond and a payment bond in the amount of one hundred percent (100%)of the total Contract Amount. Said performance bond and payment bond shall be from an approved surety company holding a permit from the State of Texas, indicating it is Page 2 00100 2-2021 Instructions to Bidders 4896-6117-2004 authorized and admitted to write surety bonds in this state. In the event the bond exceeds $100,000.00, the surety must also (1) hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or(2) have obtained reinsurance for any liability in excess of$100,000.00 from a reinsurer that is authorized and admitted as a reinsurer in this state and is the holder of a certificate of authority from the United States secretary of the treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. In determining whether the surety or reinsurer holds a valid certificate of authority, the City may rely on the list of companies holding certificates of authority as published in the Federal Register covering the date on which the bond is to be executed. The City will accept electronic performance and payment bonds if they are in compliance with all requirements set forth in this item 16. 17. Failure to execute the Agreement within ten (10) days of written notification of award or failure to furnish the performance bond and payment bond as required by item 16 above,shall be just cause for the annulment of the award. In case of annulment of the award, the bid security shall become the property of the City,not as a penalty,but as liquidated damages. 18. No contract shall be binding upon the City until it has been signed by its Mayor after having been duly authorized to do so by the City Council. 19. The Contractor shall not commence Work under the Agreement until he has furnished certification of all insurance required and such has been approved by the City, nor shall the Contractor allow any Subcontractor to commence work on his subcontract until proof of all similar insurance that is required of the subcontractor has been furnished and approved. The Contractor's insurer shall use the certificate of insurance form included in the bid documents or the standard ACORD form. 20. If the bidder's insurance company is authorized, pursuant to its agreement with bidder, to arrange for the replacement of a loss, rather than by making a cash payment directly to the City, the insurance company must furnish or have furnished by bidder, a performance bond in accordance with Section 2253.021(b), Texas Government Code, and a payment bond in accordance with Section 2253.021(c). 21. Any quantities given in any portion of the Bid Documents, including the drawings (plans), are estimates only, and the actual amount of work required may differ somewhat from the estimates. The basis for payment shall be the actual amount of work done and/or material furnished as specified in the General Conditions. 22. Bids shall be submitted on a separated contract basis. No Texas sales tax shall be included in the prices bid for materials consumed or incorporated into the Work. This contract is issued by an organization which is qualified for exemption pursuant to the provisions of Section 151.309(5) of the Texas Tax Code. The City will issue an exemption certificate to the Contractor. The Contractor must then issue a resale certificate to the material supplier for Page 3 00100 2-2021 Instructions to Bidders 4896-6117-2004 materials purchased. The Contractor must have a valid sales tax permit in order to issue a resale certificate. Upon obtaining consumable materials, the Contractor will issue a resale certificate in lieu of payment of sales tax, and the following conditions shall be observed; 1) The Contractor will transfer title of consumable, but not incorporated, materials to the City at the time and point of receipt by the Contractor; 2) The Contractor will be paid for these consumable materials by the City as soon as practicable. Payment will not be made directly but considered subsidiary to the pertinent bid item. The Contractor's monthly estimate will state that the estimate includes consumables that were received during the month covered by the estimate; and 3) The designated representative of the City must be notified as soon as possible of the receipt of these materials so that an inspection can be made by the representative.Where practical,the materials will be labeled as the property of the City. 23. The Contractor,after execution of the contract and pursuant to Internal Revenue Service(IRS) regulations, shall furnish its Taxpayer Identification Number (TIN) to the City. The Contractor shall provide the appropriate information on a W-9 form (which can be provided by the City upon request). This form shall be submitted directly to the City's Accounts Payable Department to ensure security of the information. 24. If the Bid Form includes Add and/or Deduct Alternate bid items and/or otherwise provides for Alternate bids, the City will determine whether to select or not select one or more of the Add and/or Deduct Alternate bid items and/or Alternate bids at the City's sole discretion and for its greatest advantage. If the City selects any Add and/or Deduct Alternate bid items, the total bid amount will be determined by adding the amount of the selected Add Alternate(s)to and deducting the amount of the selected Deduct Alternate(s) from the Base Bid or the selected Alternate bid. Page 4 00100 2-2021 Instructions to Biddcrs 4896-6117-2004 EXHIBIT "A" FORM 1295 INSTRUCTIONS 1295 Instructions 1295s are located on the Texas Ethics Commission (TEC)website. Please follow these links to view instructions for creating an account and creating a 1295 certificate. • Log into the TEC website and electronically file and submit Form 1295 • Print, sign,scan, or sign electronically,then email the City Clerk at 1295request@roundrocktexas.gov • 1295 must be emailed within 5 business days of receiving notice to stay on the current Council agenda Texas Government Code Sec. 2252.908 requires that prior to a contract being voted on (awarded) by City Council, business entities must disclose interested parties by submitting Form 1295 Certificate of Interested Parties to the Texas Ethics Commission (TEC). 1295 is required when a contract: • requires an action or vote by the governing body of the entity or agency before the contract may be signed; or • has a value of at least$1 million; • is for services that would require a person to register as a lobbyist under Chapter 305. Exemptions: • a contract with a publicly traded business entity, including a wholly owned subsidiary of the business entity; (please notify us at 1295request@roundrocktexas.gov if this is the case) • an interagency contract of a state agency or an institution of higher education; • a contract related to health and human services if: - the value of the contract cannot be determined at the time the contract is executed; and - any qualified vendor is eligible for the contract; • a contract with an electric utility, as that term is defined by Section 31.002, Utilities Code; or • a contract with a gas utility, as that term is defined by Section 121.001, Utilities Code. Voidable contract— HB 1817 Update - effective June 9, 2023 Sec. 2252.908 (f-1) a contract described by Subsection (b) entered into by a governmental entity or state agency is voidable for failure of the business entity to provide the disclosure of interested parties required by this section only if: • the governmental entity or state agency submits to the business entity written notice of the business entity's failure to provide the required disclosure; and • the business entity fails to submit to the governmental entity or state agency the required disclosure on or before the 10th business day after the date the business entity receives the written notice under Subdivision (1) For assistance with creating an account or logging into TEC, contact Technical Assistance. For other questions, contact Ann Franklin, City Clerk, at afranklin@roundrocktexas.gov. Revised 10/17/2023—M.Spinks Page l of 1 00200 BID BOND BID BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Myers Concrete Construction, LP of the City of Vlfimberley County of Hays State of Texas as Principal, and Suretec Insurance Company authorized under the laws of the State of Texas to act as surety on bonds for principals,are held and firmly bound unto the CITY OF ROUND ROCK,TEXAS("Owner"), in the penal sum of Five Percent(5%)of the total amount of the Bid of the Principal submitted to the Owner, for the Work described below; for the payment whereof,well and truly to be made, and the said Principal and Surety do herby bind themselves and their heirs, administrators, executors, successors and assigns, jointly and severally,as follows: In no case shall the liability of the Surety hereunder exceed the sum of( Five Percent of Greatest Amount Bid Dollars($ 5%of G.A.B. ). THE CONDITIONS OF THIS OBLIGATION ARE SUCH that,whereas,the Principal has submitted the above-referenced Bid to the Owner, for construction of the Work under the "Specifications for Construction of Rock Hollow Park Improvement Project 2025 .for which Bids are to be opened at the office of Owner on the 27th day of May 920 25 . NOW,THEREFORE,if the Principal is awarded the Contract,and within the time and manner required under the"Instructions to Bidders,"after the prescribed forms are presented to her/him for signature,enters into a written Agreement substantially in the form contained in the Bid Documents,in accordance with the Bid, and files the two (2) bonds with the Owner, one to guarantee faithful performance and the other to guarantee payment for labor and materials,then this obligation shall be null and void;otherwise,it shall be and remain in full force and effect. If, however, Principal fails to enter into a written Agreement with the Owner in accordance with the Bid or Principal and Surety fail to timely deliver to Owner the performance and payment bonds required by the Bid Documents, Surety within five(5)business days after receipt of a written demand from Owner shall pay to Owner the full penal sum of this Bid Bond,subject to the limitation described herein. In the event that suit is brought upon this Bond by the Owner and judgment is recovered, said Surety shall pay all costs incurred by the Owner in such suit, including a reasonable attorney's fee to be fixed by the Court. IN WITNESS WHEREOF, the said Principal and Surety have signed this instrument on this the 27th day of the month of May 2025 Myers Concrete Construction, LP Suretec Insurance Company Principal Surety Jennifer Webb Printed Name Printed Name By: By: Title: r 'u` Title: ttorney-in-F Address: 230 FM 3237 V Address: 2103 CityWest Blvd., Suite 1300 Wimberley TX 78676 Houston,TX 77042 00200 4-2020 Page 1 Bid Bond 00443638 Resi t Agent of S ty: Signature Scott Burton Printed Name 225 W. Hopkins Street Address San Marcos, TX 78666 City, State,Zip Page 2 00200 4-2020 Bid Bond 00443638 POA#: BID BOND SureTec Insurance Company LIMITED POWER OF ATTORNEY Know AH Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make,constitute and appoint Scott Burton, Shawn Claiborne,Jennifer Webb its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute,acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for,providing the bond penalty does not exceed Ten Million and 00/100 Dollars($10,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate seal of the Company and duly attested by its Secretary,hereby ratifying and confirming all that the said Attorney-in-Fact may do in the premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved, that the President,any Vice-President,any Assistant Vice-President,any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company,to execute,acknowledge and deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved,that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20'of April, 1999.) In Witness Whereof,SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal to be hereto affixed this iem day of August A.D. =4 S aa14 SURETEC INSURANCE COMPANY ,..............r cu•: X q :0 By: W w $ Michael C.K mig,President State of Texas ss: County of Harris :✓ On this 16m day of August , A.D. 2024 before me personally came Michael C.Keimig,to me known,who,being by me duty swom,did depose and say,that he resides in Houston,Texas,that he is President of SURETEC INSURANCE COMPANY,the company described in and which executed the above instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal;that it was so affixed by order of the Board of Directors of said Company;and that he sigr0d+i6+Aun4*ereto by like order. N = Chelsea Turner,Notary Public 10k * - My commission expires July 6,2028 6E 01F I,M.Brent Beaty,Assistant Secretary of SURETEC INSU j I ereby certify that the above and foregoing is a true and correct copy of a Power of Attorney,executed by said Company,which is Si m Wo effect;and furthermore,the resolutions of the Board of Directors,set out in the Power of Attorney are in full force and effect. Given under my hand and the seal of said Company at Houston, Texas this 27th day of May 2025 A.D. A/W-?�ZT M.6ent Beaty,Assisitant Ncretary Any instrument issued in excess of the penalty stated above is totally void and without any validity.4221236 For verification of the authority of this power you may call(713)812-0800 any business day between 8:30 am and 5:00 pm CST. SureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE Statutory Complaint Notice To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a complaint at: 1-866-732-0099. You may also write to the Surety at: SureTec Insurance Company 9500 Arboretum Blvd., Suite 400 Austin, TX 78759 -------------------------------------------------------------------- SIC OS Rider Non-TX Claims Notice rev 07_2022 Page 1 of 1 00300 BID FORM BID FORM - (Revised 23May2025) PROJECT NAME: Rock Hollow Improvement Project 2025 PROJECT LOCATION: Round Rock, Texas OWNER: City of Round Rock, Texas DATE: May 8, 2025 Pursuant to the foregoing Notice to Bidders and Instructions to Bidders, the undersigned bidder hereby Rock Hollow Park Improvement Project 2025 and binds himself on acceptance of this bid to execute the Agreement and bond for completing said Work Any addenda issued will be posted with the Project Manual and/or Contract Documents on the City's website at roundrocktexas.gov/solicitations by the close of business on May 23, 2025 Prior to submitting a bid, the bidder is responsible for determining if any addenda have been issued and for following any instructions in any addenda issued. Bidder acknowledges receipt of the following Addenda by listing Addendum "nun1bC1_" and "date". � 23 Zti BASE BID Rid Quantit Item Description Item Unit and Written Unit Price Unit Price Amount 1 1 LS Total Mobilization Payment complete in place per plans and specs J forfor dollars and cents. 2 243 CY Unclassified Street Excavation, Plan Quantity, (Ref. Technical Specification, Item 6 - "City of Rollin{ Rock Standard Specification Modifications") complete in place per plans and specs ✓ for Oki dollars le and ?, cents. 36 —r S/Revised 23May2025) 00300-9-2015 Page i of 4 Bid Form BASE BID Approx. Kid Quantit Item Description Item v Unit and Written Unit Price Unit Price Amount 235 CY Embankment, Plan Quanitity, (Ref. Technical Specification, Item 6 - "City of Round Rock Standard Specification Modifications") complete in place per plans and specs for tv t- Sx dollars and t '7�c ro cents. 4 565 LF Tree Protection, Type A Chain Link complete in place per plans and specs for s Z Ao«n dollars « and 7.0Vw cents. J 5 1,090 LF Silt Fence for Erosion Control complete in place per plans and specs ✓ foI lu-lc- dollars 0110or and cents. 17- 6 10 LF Rock F3enn c replete in place per plans and specs _ for U w �yj�' ate- dollars e and 17,'•a cents. jU I U/y 7 1 EA Stabilized Construction Entrance corpplete ilace per plans and specs r Nuc. > r S� dollars and ?.•� cents. Oz 37 UZL (Revised 23May2025) 00300-9-2015 Pale 2 of 4Bid Form BASE BID App rox. Hid (luantit Item Description Item Unit and Written Unit Price Unit Price Amount s 14.-(i0 SY Hydro Seeding for Erosion Control complete in place per plans and specs for 0*' - dollars ! ;in(1 era cents. 9 3,345 SF P.C. Concrete Sidewalk, (4" Thick) complete in place per plans and specs for V4- dollars � and cents. Z' qU) jqO 10 1 EA Accessible Ramp cm le in place per plans and specs Jfor T '� (54 A* dollars oo and Z%w cents. I 1 60 LF 10'x3' CIP Box Culvert, including excavation, bedding, backfill, subgrade prep, and all appurtenences complete in place per plans and specs for Ovo- 1"Suwk J- OyA_ dollars OIL nd 7._ti cents. I I� ;qD60 12 12 CY P.C. Concrete Wing Wall for Box Culvert including excavation, bedding, backfill, subgrade pret, and all appurtenences comple e in lace per plans and specs for ( ,�► �,� ot dollars o� �an(I 140./ cents. l �s / qqo - (Revised 23May2025) 00300-9-2015 Page 3 of 4 Bid Form BASE BID Approx. Bid Quantit Item Description Item N Unit and Written Unit Price Unit Price Amount 13 6 CY P.C. Concrete Rip-Rap(5" thick) complete in place per plans and specs fpr Q g.,,rl �' ollars 41 and ?.•w cents. 3 Za ✓ 14 1 LS Removal of Playground Area, including removal of playground equipment, Conc. Curb wall & Sidewalk, gravel, trash bins, benches, signs, and all appurtenences complet i place per plans and specs 4Dr��o► T f�4 y � �aaw, dollars and Zu,. cents. 15 132 LF Pedestrian Handrail Type 'B', and all appurtenences _ corn Itc in ply ce per plans and specs for („�ou.� ri �� dollars �, •� and cents. 16 4,365 SF Removal Concrete Flat Work, (Sidewalk/Curb Ramp& Spillway) complete in place per plans and specs for F-O r dollars u AA n� ✓ and -6era cents. (Revised 23May2025) 00300-9-2015 Page 4 of 4 Bid Fomi Did not use Rev Bid Form from last page. TOTAL BASE BID (Items I thru 15 Materials: L 080 All Other Charges: Z�{ * Total: * Note: This total must be the same amount as shown above for "Total Base Bid" If this bid is accepted, the undersigned agrees to execute the Agreement and provide necessary bonds and insurance certification as per the Instructions to Bidders. The undersigned certifies that the bid prices contained in the bid have been carefully checked and are submitted as correct and final. The Owner reserves the right to reject any or all bids and may waive any infornialities or technicalities. Respectfully Submitted, 2 FAA ?,Z 3 ignature Glue Cv ; �Tk 7867C. Print Name Address �3`F 7 -tau Title 1-eIC1111 lic 4—�t Name of Firm 1Z,7 /,Z s Date Secretary, if Bidder is a Corporation 00200-9-2015 Page 5 of 5 Bid Fonn 00410 STATEMENT OF BIDDER'S SAFETY EXPERIENCE Page 1 00410 8-2014 Statement of Bidder's Safety Experience 00090654 Solicitation Requirements, Contract Forms & Conditions of Contract Statement of Bidder's Safety Experience Section 00410 Bidder must submit a signed Statement of Bidder's Safety Experience form with his Bid; failure to do so will constitute an incomplete Bid that may be rejected. In order to make a responsive Bid, Bidder mast provide evidence that it meets minimum OSHA construction safety program requirements, has not been tined by OSHA for any willfitl safety violations in the past three years, and has a lost time injury rate that doesn't exceed the limits established below. All questions mast be answered and data given must be clear and comprehensive. If necessary, questions may be answered on separate attached sheets. Company Name: 4rrs , Address: r' `62-37 W /T-k -1W - lr Phone: 8 LZ 7 8ewo Completed by: CJ�4 � Date: Z7 1. Does the company have a written construction Safety program? Q1'es ❑No 2. Does the company conduct construction safety inspections? J�Yes ❑No 3. Does the company have an active construction safety-training program? Qs ❑No 4. Has the company been tined by OSHA for any willful safety violations in the past ❑Yes CJ No three years? 5. Does the company have a lost time injury rate of 7.8 for SIC 15,or 7.6 for SIC 16, Bis ❑No or less over the past three years? Attach the company's OSHA 200/300 logs for the past three years. 6. Does the company or affected subcontractors have competent persons in the fol low i n Areas? A. Scaffolding res ❑No El N/A B. Excavation Y s [J No ❑N/A C. Cranes es []No F1 N/A D. Electrical Wyles El No ❑N A E. Fall Protection es E]No F]N/A F. Confined Spaces Yes ❑No ❑N/A 1 hereby certify that the above information is true and correct. Signaturez:'A/ Title Page 1 00410 8-2014 St.ir,:mcnt of Bidder's Safety Experience 00090654 OSHA'S Form 300 (Rev. 0412004) Note:You can type input into this form and save it. Attention: This form contains information relating to Log of Work-Related Because the forms in this recordkeeping package are"fillablejwritable" employee health and must be used in a manner that PDF documents,you can type into the input form fields and protects the confidentiality of employees to the extent Year 20 23 then save your inputs using the free Adobe PDF Reader.In addition, possible while the information is being used for Injuries and Illnesses the forms are programmed to auto-calculate as appropriate. occupational safety and health purposes. U.S. Department of Labor - _ Please Record: Occupational Safety and Health Administration Reminders: Fmm approved OMD no 1218-0176 fnlnnnanwl nfxnn every work-iiia:ed death and obnut every work-related injury or illness that involves loss of •Complete an Injury and Illness incident Report(OSHA Form 301)orequlvalent consciousness,lettncted work activity or job transfer,days nwoy from work,or medical treatment beyond first old. form for each injury or illness recorded on this form.Ifyou're not sure whether EsiAWannam neuro Myers Concrete Construction LP Significant work-related injuries and illnesses that are diagnosed by a physician or licensed health care professronol. case is recordable,call your local OSHA office for help. •Work-related injuries and illnesses that meet any of the specific recording criteria listed in 29 CFR Part 1,004.8 •Feel free to use two lines fora single case dyou need to. through 1904.12. •Complete the 5steps for each case. city Wtmberley State TX personStop 1.Identify the Describe (A) (B) (C) (D) (E) (F) most serious outcome Enter the number o/ ('ave Eroplovee's name .lot,title Date of injur• \'here the event occurred days the injured or ill Select one column: rut. injury Describe injury illness, worker was: (r.)!..11'c(rfi•r) or onset ut !e.);..l.nudinjt deck nosh rad) affected,and ohjrcusnbstancc that Illness directly injured or made person ill le,g, Remained at Work Ir.g.210t .Senmrl degm,huhu,»r ,Xht jorenrnr ham Illness arr'rl•Irnr lurch) Days away Job trans:.. .1h.r record• Away an job (M) Death from work or ra Orlctlon able cease from transfer (G) (HI (I) (J) work restriction �i t; :• ,. Reset j fK) (U (t) (z) (3; (a) (5) �(6) mmrN r dAy 0 O O 0 _ileus _BAYS 0000010 Reset — / 0 0 0 0 00000c I JAY _daYS _BAYS Rene'Reset t,IAy 0 0 0 0 00000c n,rnlll� _AAVs �tlAys _ month I day o 0 0 0 _days _dots 0 0 0 0 0 C Reset -- _ _,-- O O O O mlaah'Jay __dAys _day, 0 00000 day _AAVs _. Reset j_– 0 0 0 0 00 000 C / _days Reset j 0 0 0 0 _days _nAY< 000000 - ------ rmnM-dAy Reset lh 7 day 0 0 0 0 000000 —,ren -- -- mml _flays —d."Reset /_ 0 0 0 0 _ n _days 000000 — m ,nav lth div_ 0 0 0 0 —' -- mm _RAYS _dAys 0 0 00 0 C P.ldn retw,mng h.,drn hw rho c.11ermm ni lmlvnul.m n e<nnured m avcraF Ia.mnulev t<r rc<ry.n<c,malrAhnl;lent io reanex nm ' O O O O O O .n<Inkmms.«ash."M rasher ilii dAa uvedwl.rail c.mt•klc arl.l renew rhe a.11cahnn of ndi to 1'nsue.are nal reyrureJ to Page totals O O O 0 O 0 •.Il '."nl mlmnwhni unit<.iI,LsplaY<a a mvnav valid f rMh rmnnd mm�iw•r II war Mvv any cumman<aMm Ikc,e Add a Form Page --— _p �Nurum•rn ww ale ape`h ul Ihr.d•I•calk.non.,nnlacl rl!S Ihrymrw•m.d I aMr,)ell A fltlice nl tilalrsu.al Analvw.,N.wm Be sure to transfer these totals to are Summary page(Form 300A)before you post it. c 8 c %-ir.a.1.20017msondnm M.•nue.\W,Wastnnl:hm•"1 20210 lh aro w.Ihr nu.plrLA loran m ilia olive _ s g < y S (t) (2) (3) (4) (5) (6) OSHA's Form 300A (Rev.04/2004) Note:You can type input into this form and save it. Because the forms in this recordkeeping package are"tillable/writable" Year 20 23 PDF documents,you can type into the input form fields and Summary of Work-Related Injuries and Illnesses then save your inputs using the free Adobe PDF Reader. U.S.Department of Labor `-�-'— - --. OoeuPsnenaf Safety and Health Administration . 11 establishments covered by Part 1904 must complete this Summary page,even it no work-related injuries or illnesses occurred during the year. Form approved OMIT mt1219.0176 Remember to review the Log to verify that the entries are complete and accurate before completing this summary. Using the Log,count the individual entries you made for each category. Then write the totals below,making sure you've added the entries from every page of the Log.If you had no cases.write"0." Employees,former employees,and their representatives have the right to review the OSHA Form 300 in its entirety. They also have limited access Establishment information to the OSHA Form 301 or its equivalent.See 29 CFR Pall 1904.35,in OSHA's recordkeeping rule,for further details on the access provisions for these forms. reurustanl;smm�ont„arae Myers Concrete Construction succi 2301 FM 3237 Number of Cases 'total number of Total number of Total number of cases 'Total number of LityWimberley stale TX Zip 78676 death, cases with days with job lransfer or other recordable away from work restrictionCBSCS Industry description(e f;.,Manufacture njnuuor•mirk trailers) 0 0 Q Q Concrete Construction (Ca) (H) (() Wl North American Industrial Classification(NAILS)•if known(c.g.,336212) Numbet of 238110 Days Employment information(Ifwnr don't have thesefigures.see the Total number of days Total number of days of IV-Ashety on the neat/gage to estimate.) away from work job transfer or restriction Q Q Annual average number of employees 41 (K) (L) Total hours worked by all employees last year 127,970.00 Sign here Total number of... Knowingly falsifying this document may result in a fine. (M1 I certify that I have examined this document and that to the best of (1)Igjuries 0 _ (4) Poisonings 0 my knowledge the entries arc true,accurate,and complete. (2) Skin disorders 0_ (5) 1leaning loss Q Company executive rifle (3) Respiratory conditions 0 (6) All other illnes+e, Q Phone bate Post this Summary page from February 1 to April 30 of the year following the year covered by the form. Puhhc reP.otmF hunlen for floe colleetwn.,!inlmm:eron rs e,I. n d h,average SM munne+Par re+Pumq incftuhng nrrw to review the mstntctwnv,uarch and gatltar the data needed,and conx+lctc atsf n•vu•w tlw cnikctwn of mGnntauon I.....m.me twr teymttd to—r-.1 to the cullcnwn nl In Io ntatwn unl.•e.o diydays a a.—my vand 0hl9 enntrol rt min•r If you I.-any nnnx•m.alwnn thou•e+nn 1-m any othrr"P.,n of thn data culls.hon,r.wtact US Ocpanntenl of I.ahm OSIIA Office of Stanxncal Mnlyxr+,K<nt X1644.200(•ort tu.nwn Avemtc.NV. N:nhml•Imt.IN'20110 14,not.end the enutPlcteA Ibnrt to tin+nffiec OSHA's Form 300A (Rey 0112004) Note:You can type input into this/ornl and save if. Summary Because file forms in this recordkeepmg pac*age are'fllableiwreahlc' Year 20 13 of Work-Related Injuries and Illnesses Pan save your npu;s [teem the AdohelPDF Readeform fields r U.S. Department o/ Caber olr we•r.on•r s•nry•nil NHIM Itlmrmrh•nCn AN establishments Covered by Part 1904 must complete this Summary page,even if no work-relafed Injuries or"messes occurred during the year Remember to review the Log to verily(hat the entries are c Using the Log,count the individual entries you Marto for ocl hocaregnrycThenPwrite the totals re ebe ow•ting I making stile every page of the Log.N you had no cases.write b." n9 you've added the entries from Employees.former employees.and their representatives have the right to FV(vlew the OSHA Form 3001n its eniuely. they atso hdve limited access Establishment information to the OSHA Form 301 or its egllivelont.See 29 CFR Pan 1904.35.In OSHA's recdrtkeeping rule•for further details on the access provisions for those forms •v.aWn.Awww,w.n• Myers Concrete Construction LP Number of Cases ,level 2301 FM 3237 Total numlx:r of Total number of Total number of c:lscsTotal number of r,,,,Wlrnberley State TX /or 78676 deaths cases with days w11h lull transfer nr ud,cr rccordablc :Tway from work restrictionelse. Indwir,dcacriptum p'} 161lr W."1"',of nvllPr fon(hdrlrnl Q O Q Concrete Construction IJ) Nunh Amerman Inda.n rel Cla.ssifaaunn(NAICS1.d known(c.0.331.21:1 •. 238110 Total number of da's Total number of days of Employment information 111 cuu lon'I hue.•Ih, illi.,. away from\Volk lob transfer lir Icslticlton 11'url.,hw,nil rho,n,nr rhll'r to,'nlru011 I O O Annual accrare numher of en,pfuIca, 41 (Kl (LI Talar hours worked by all cmp4r�cc•la.l vc.,r 96.770.0(1 Sign here Total number of... Knoell in);ly falsfh•ing this A/lcument mac result in /fine. (M) (�)Injuries Q I ecni v that 1 haw czammed frits d cument andK nd that , best of N) Poisonings Q in,, ri d, Ibc chin cx are ink.acrul.nc.and compltic (2)Skin disorders QQ (5) 1lcanng los. _ �;�• (r mthly Cl,cc tell V'i Title Q Pho (3)Rcspirakrrycundilions Q (61 All ot5�2-847-8000 her Olnessc, ne 01/02/2024 Da1c Post fhls Summary Page from February 1 to April 30 of the year following the year covered by the form. PAI.rrr,mw,,;hvdrn kr,h,.rnllerrwy,n(mlon.n,w.n n cvrm.ad a n.�nrc 9 m-onr•i+r n.pw,x.taw lulure r,onr,n m sv,Ar .rom„A•,e aM r••vw.r,IA•rwi;.r.wr o,minrrrW..n Rnww.•n m wrd A•rc.,w rAr cnl4cr "W""an.sr'lh. 1 ranc�r l6•L,rr o 1 J,w.l Reset rwewerna alwwa r1i.e rnrrraAa--,),yMr ay.rr.,d,M.•lea nikr�nn. ww,m.n,ornwrww,wrka•n dnf.,an■,wncwuy r.l•I nMh rww'.i W+lanrbw,or 70:10 Mnrin a ow»4,cd 41••nna�„nl I.hm.Ih11A rMnc u(\,a„nw•al Arulyon,ft-In1\.lwaa,-Iw,r n,U•o,•n A�.r.,r,V W' rw.ro,d A•mn r.•rho naw, OSHA's Farm 300 .:2004) Note:You can type input into this form and save it. Log 0 Work-Related Because the forms m this recordkeepinq packa0e are'Sf4ible:wnta)NO' Attention:This form contains information relating to PDF documents,you can type into the input form fields and employee health and must be used m a manner that ro Injuries and Illnesses the forms, i puts ustn toe free eaAicdobe D aFeadeI.In addition, protects the confidentiality OI employees to the extent Year 20 23 ppropaale possible while the information Is being used for occupational safety and health purposes. U.S. Department of Labor Please Record: - oeruosnsna.ssrwry.nil Nw.nn n.r..........lon •Infolmaign ulroul evrry wcNk•rel,111d dmlh nrnt"bract rvPry worA-rriulW aqury,or illrn•+s char mvulve+to%%of Rsrnindets: confrlootnrafk-rlatedwrvk MfrwlyorloblransMr,doy+away hmm worM,mmrdrrolomtmrnl heyondlnatrnd ora for rorhfm�u�o lnri.rrc ordrdlon Innrfairies ll ynu'rPnor nxrwnrfhrrr. �••rrn..rl•r••..,rr�<rn :.t.�� r C Jf or rqulm/en! •Srgnifrcanl wark•rPMfrdinaurtsand iilnelsn rbdf ale dwinn+edby n phynrrnn or hcensedheNur care Mnlrlunnrtl ra+enrr;omahM.rnllyourlo:al�HA pNrrrfnrnrlp !ua!warun,nrcam., Myers Concrete CronSlrUGtlOn�P •Work•reloted Injurlrs and lffnrnrs that nwel nay of thr sprrlfic recording rrllPril!peed in 19 OR Part Ion/3 through 1904 l; •frrl Per to use I"hops for atingle roa d you rrrrd to. •Conlpk•fr fill$+tep,/areashraa,•. C^„Wimberley TX 101 (C) (D) (E) r, „• Lmployn'a namr Job title Ilalc ar injury "hrsa lbr rrrnl ria•omit ..___. Later lho nunrbor or Ikxrred.injury c lisui101in"s,pan+nr trrr+l, N.oys Ms Injurm/or ill SrMu one column tr.p,11}ldrrl nr nnarl of lay ln.ahne Jai k n.,nb rn,ll ■fketrA,and ohjecumhaante chat w Mer was: Nlneaa dirrdlt iaiurnl or madecrag - Ir i, /Ill Sr.�nwd dl•l:rrr In..n•.rn"Virl hrrrurlra rrr.m Rwmalnnd of Wor, nr•l+lrrrr lrnrhl Deis' `o.,r 'o, nlub om..r.nr, rTy o M r. .omnran a ;G) i11) (l� 11. .ark, rsshlelior, Reset IKn 1 O O O O 11) (z, (3) (n) (s) (6) Reset _nn 000000 -- --- — - --- _I o 0 0 0 000000 / nw 000000 Reset -- � _nor• _na - O O O o- O OO o 000000 rwr,w•oar o 0 0 0 Reset —InO O .< r, 000000 Reset — ,r— — O O 000000 I 0 0 0 0 w-�rnwy 000000 __ewr•. _aa,: Reset O o 0 - wer.r•.ar 000000 - - -- - r. -- 0 0 0 0 --^a rrrn law, 000000 rWrin rclxwwr ewra.n pr rLN:.•ll.crun.{rnh.mrnww r.a,rrwr O O O O --•hW _ata u,rJ 4i..1r.l;,la rwnwr+ r< nJ 000000 �m,rw<,nm+,.r.waA amt rnb<r Ore rW,n.r4J.,wd<, hr yxrn,rw,.pwlw,rnaw u•i.•a.,�i D 0 O O O '<,r<rw,lb+f,r crJYanon M,wlnn,u+xw,.,M:<• w,air,nJr.,n.iFr<..14,rw,.r�(wrmm�x•n.r:rw.n n<w^rrJx,rJ i.. /r.]QC totilS O O rnMi....... yNalJOMn..wwMnum r Ir..w�a.raw..,w Add a Form Page _ 0 0 0 0 0 0 nrw<U rn nin d.r„+•dk,rnw...wr I��Iw nnrrn.rl{a,xw nG1�+1aw<.rrYMnr,a M,I,n.M...m N.7Na.fart l'<.wnx,w,A•r.,r.NN',N'a.M,Ir..w-M'7uI In ,owYJrIN b,ww ___PPP;” An SUT In nan SrPr f.,Pan lotlla to TP Sun,na rY pips IF—]fIJAI Dolorr yarr M,r (1) (1) (J) (4) 151 IC,) OSHA's Form 300 (Rev 01/2004) Nfsave an type input into this form and save it. Attention:This form contains information relating to Log of Work-Related berms in this recordkeeping package are•fillable/writable' employee health and must be used in a manner that PDs,you can type into the input form fields and protects the confidentiality of employees to the extent Year 20 22 theinputs using the free Adobe PDF Reader.In addition, possible while the information is being used for In-uries and Illnesses therogrammed to auto-calculate as appropriate. U.S.Department of tabor occupational safety and health purposes. oo up.u"er s.r ry and rl..hh a•1mi..letr.ti— You must record information about every work-related death and about every work-related injury or illness(hat involves loss or consciousness,restricted work activity orjob transfer,days away from work,or medical treatment beyond first aid You must also record significant work-related injuries and illnesses that are diagnosed by a physidan a FOnO°I'v1Oad okllf^o 121141176 licensed health care professional. You must also record work-related injuries and illnesses that meet any of Me specific recording cntena listed in 29 CFR Part 1904.8Myers Concrete Construction LP through 1904 12.Feel free to use two lines fora single case/f you need to. You must complete an Injury and Illness Incident Report(OSHA Form 301)or equivalent form for Esraob,hnrd name each injury or illness recorded on this form.If you're not sure whether a case is recordable,call your local OSHA office for help. - cry wmberley slat. Tx Identify the-person —_I I Describe the case Classify the case (A) (e) (C) (D) (E) (F) . r _ C.sc basedan the mo�t 50FIG"s outcome for Enter U.e number o/ F;m ployee's name Job lisle Dale of injury \Where the event occurred Describe injury or illnns,part,of bodycase: toys the injured or Select Ur'Jgjurr'ootumn er i,y.,0"Ver/ or onset of le X.,1raeling disk/nlnh end) affected,and object/substance that Ul worker was: choose am type of absess: illness dirrelly injured or made pen"ill(e.g. - _. - . .-- .- -.'•."•'' -` _. C__ =• TU z-.. '��saor x. .rttssz:'^•.mac r -_-• re.g., 2 10) .4•ror.l degn•e M1nrvu nn"ghr Jon urm Jrtlm RemdnN at wah (M) .rn•rrlenr tr.rch) s o•y..wr7r ler tralnler other resent Away On(eh Death from work w n.vl.11— .rile ea... /ram I.. — CC -3 I P }$@@pJh W-k Ml11.Uea C 1 g < (G) (H) 0) (J) (K) (L) (1) (2) (3) (4) (5) I6) Reset / I Inonln d.y r_ r r \/fir d.y, day, l r r \ \ r d.rs —e.n \/'� oMn/tlrY s r t t — l/'� r r l/'� l/'� Reset / ma In r ear Resl r r r ear, an l r r r r r et r //� (/� no Inrtlay r r r tl.n day, r r r r r r Reset — r r r Lwmn/tl.y r /are —aan l r r r r 1 Reset — C C r r mown/tly l d•Y. e•n /� r r r r l l Reset / — a In r der r l r 1 —aaYr —d.yr rrrrrr Reset I //�� IroMn day \ r \ r —a•n —can Reset rrrrr r mon 1,Ids, r r r r d•Y. tl•n r r r r r r Reset n/ — C r n omtl•y r r —den —ears r r r r r r Page totals 10� I'ublk �a.11.y h-J-Inr Ihlc a,�11 vinn of mnnrmdnn I,�dlnlMaJ 1..,ttaF 14In minu•n 1 le, �_ 10 ,11 InYmcl.w...mch.nd vulM the aloe-,.d J.ami u r_ww rw dlc mllala.l of n M`nt'ev:ll•nnC Ilnlc m la,ru c i.y�„nd In Inr i1a;er1 of In/.%na.11o.urtica.a JI 1If I 14yer1.arc la+mrylml.. to c.nmMc,nr.,m what a -I+,r II...J.Ia c. M n.a cu,rnlM..Id 1lhfll u.11l.i nmaur If)awl h.vc 1S1 r Ileclnn 1 111arvinwNfLah,eI1AlMInxW Wall.led .I Anakal,1t.un Save Input Add a Form Page UE 3F Q' N-% J,3.11.�.1Y1h11MM1 A�a,alr.VN',lYnh.IrYn.1%nnl'�1:II1[I 11,mY acrd the uaerh•wt rnmu b Juc,Ao1 d rs. w (1) (2) (3) (4) (5) (6) OSHA's Form 300A (Rev.01/2004) Note:You can type input into this form and save it. Because the forms in this recordkeeping package are'fillable/writable• Year 2041 PDF documents,you can type into the input form fields and Summary of Work-Related Injuries and Illnesses then save your inputs using the free Adobe PDF Reader U.S.Department of Labor 5.1e.,..n.Nee-ft.,r�,,.r.�.rf.. . All establishments covered by Part 1904 must complete this Summary page,even rl no work-related injuries or illnesses occurred during the year. Fmm teppmtcd 0Ma no1216-rt176 Remember to review the Log to verily that the entries are complete and accurate before completing this summary. Using the Log,count the individual entries you made for each category. Then write the totals below,making sure you've added the entries from Establishment information every page of the Log.Ifyou had no cases,write'0." Myers Concrete Construction LP Employees,former employees,and their representatives have the right to review the OSHA Form 300 in its entirety. They also have limited access to the OSHA Form 301 or its equivalent. See 29 CFR Part 1904.35,In OSHA's recordkeeping rule,for further details on the access provisions for 2301 FM 3237 these forms. Street Number of Cases City Wimberley state Tx dip 78676 Industry description(e.g.,Munitloclure ofmnlor Irtak Irtfilenr) Total number of Total number of Total number ofcases Total number of Concrete Construction deaths cases with days with job transfer or other recordable / ) away from work restriction cases Standard Industrial Classification(SI('),If known(,,.g,371 c) O Q 5200 (G) (H) h) (J) OR North American Industrial Classification(NAILS),if known(e.g.,336212) Number of Dayl Total number days Total number ri days of job Employment information(If von rilon't lune dreae ficnn•s..cee floe away from work transferor restriction H%ri.%hect on/lie next lwjxe to eslirnrde.) Annual average nufntxxr of employees 45 (R) (L) Total hours worked by all employees last year 144683 Injury and illness Types Sign here Total number of... Knowingly ralsirying this document may result in a fine. (M) (1) Injuries lJ (4) Poisonings �/ I cert if that 1 have ammed this document and that to the hest of my k wledge the tries arc true,accurate,and col fete. (Z)Skin disorders (5) )tearing loss (3)Respiratory conditions Company execf ve Title t t (8) All other illnesses Phone 0 Date 0 a/ �O Post this summary page from February 1 to April 30 of the year following the year covered by the form. S8V@ �r1pUt Ihtbhc reporting en burdfor the,collectionmfo of rntetion rte btinteted tom stege to rrtmutue per mspootee ukludma time to n:v the mstmetretee.,each tend aaher the dal.and d.end coin P'111:: ktc and ree int the utlteewm of mLnremun Perone art not m4urrcd 10 rnpond to the colkdmn of mfomutmn unlen n draplm r•curmmh,ethd OMR control numher Iryou hara tem %V -g s elnul thcec nlMttics or m�ruhcr ap Its til thn due cnllcnum,Inman GS U;prtmcm ter Lslwu,OSTIA fMrcc of Smmtwel And.rte,Ronin N-74N,tat('unahwe.n,\r untie,N\V. lVmlun{ton,Uf 2412 111 lb not.end the completed loon.to iMn oRmemwj 00500 AGREEMENT City of Round Rock, Texas Contract Forms Standard Form of Agreement: Section 00500 City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor AGREEMENT made as of the ('+'`1)day of in the year 20 27 BETWEEN the Owner: City of Round Rock,Texas(hereafter"Owner"or"City") 221 East Main Street Round Rock,Texas 78664 and the Contractor Myers Concrete Construction,LP ("Contractor") 2301 FM 3237 Wimberley,TX,United States-78676 The Project is described as: Rock Hollow Park Improvement Project 2025 The Engineer is: Antonio A.Prete,P.E. Waeltz&Prete,Inc. 211 N.A.W.Grimes Blvd. Round Rock,TX 78665 For and in consideration of the mutual terms, conditions and covenants of this Agreement and all accompanying documents between Owner and Contractor, the receipt and sufficiency of which are hereby acknowledged,Owner and Contractor agree as follows: ARTICLE I THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement,Conditions of the Contract(General,Supplementary and other Conditions),Drawings,Specifications,Addenda issued prior to execution of this Agreement,other documents listed in this Agreement and Modifications issued after execution of this Agreement;these form the Contract,and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations or agreements, either written or oral.An enumeration of the Contract Documents,other than Modifications,appears in Article 7. ARTICLE 2 THE WORK OF THIS CONTRACT Contractor shall fully execute the Work described in the Contract Documents,except to the extent specifically indicated in the Contract Documents to be the responsibility of others. 00500 4-2020 Page 1 of 5 Standard Form of Agreement 00443647 ARTICLE 3 DATE OF COMMENCEMENT;DATE OF SUBSTANTIAL COMPLETION;DATE OF FINAL COMPLETION 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a Notice to Proceed issued by Owner. 3.2 The Contract Time shall be measured from the date delineated in the Notice to Proceed. 3.3 Contractor shall commence Work within Ten 10 calendar days from the date delineated in the Notice to Proceed. 3.4 Contractor shall achieve Substantial Completion of the items of Work listed on Attachment A to this Agreement no later than One Hundred Twe1( 20 )calendar days from issuance by Owner of Notice to Proceed, and Contractor shall achieve Substantial Completion of the entire Work no later than One Hundred Twenty 120 )calendar days from issuance by Owner of Notice to Proceed,subject to adjustments of this Contract Time as provided in the Contract Documents. 3.5 If Contractor fails to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s)specified for Substantial Completion in the Agreement,Contractor shall pay to Owner,as liquidated damages, the sum of five hundred and No/100 Dollars($ 500.00 ) for each calendar day that Substantial Completion is delayed after the date(s) specified for Substantial Completion. It is hereby agreed that the liquidated damages to which Owner is entitled hereunder are a reasonable forecast of just compensation for the harm that would be caused by Contractor's failure to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s)specified for Substantial Completion in the Agreement and is not a penalty. It is agreed that the harm that would be caused by such failure, which includes loss of expected use of the Project areas,provision of alternative storage facilities and rescheduling of moving and occupancy dates,is one that is incapable or very difficult of accurate estimation.It is hereby agreed that if Substantial Completion of the Work(or any portion thereof)is not achieved on or before thirty(30)days after the date(s) specified for Substantial Completion in the Agreement, the Owner shall have the option to either collect liquidated damages as set forth herein or to thereafter rely on its remedies under the Contract Documents and at law and in equity, including without limitation, the recovery of actual damages. The date(s) specified for Substantial Completion of the Work(or any portion thereof)in the Agreement shall be subject to adjustment as provided in the Contract Documents. 3.6 Contractor shall achieve Final Completion of the entire Work no later than One Hundred Fifty 1( 50 )calendar days from issuance by Owner of Notice to Proceed. ARTICLE 4 CONTRACT SUM 4.1 Owner shall pay Contractor the Contract Sum in current funds for Contractor's full and complete performance of the Work and all of Contractor's obligations under this Agreement. The Contract Sum shall be Two hundred sixty-eight thousand three hundred four dollars and zero cents ($268, 304.00 ),subject to additions and deductions as provided in the Contract Documents. 4.2 Does the Contract Sum include alternates which are described in the Bid Form? No X Yes .If yes,please provide details below: Nec 00500 4-2020 Page 2 of 5 Standard Form of Agreement 00443647 ARTICLE 5 PAYMENTS 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to Engineer and Owner by Contractor,and Certificates for Payment issued by Engineer and not disputed by Owner and/or Owner's lender,Owner shall make progress payments on account of the Contract Sum to Contractor as provided below, in Article 14 of the General Conditions, and elsewhere in the Contract Documents. 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. 5.13 Provided that an Application for Payment is received by Engineer and Owner, and Engineer issues a Certificate of Payment not later than the tenth (10th) day of a month, Owner shall make payment to Contractor of amounts approved by the Owner not later than the tenth(10th)day of the next month.If an Application for Payment is received by Engineer and Owner after the application date fixed above,payment shall be made by Owner not later than one month after the Engineer issues a Certificate for Payment. The Owner shall not have any obligation to pay any amount covered by the Engineer's Certificate for Payment that is disputed by the Owner. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by Contractor in accordance with the Contract Documents.The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as Engineer and Owner may require.This schedule,unless objected to by Engineer or Owner, shall be used as a basis for reviewing Contractor's Applications for Payment. 5.1.5 Applications for Payment shall warrant the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as provided in Article 14 of the General Conditions. 5.1.7 Except with Owner's prior written approval, Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by Owner to Contractor when: .1 Contractor has fully performed the Contract except for Contractor's responsibility to correct Work, and to satisfy other requirements,if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by Engineer and approved by the Owner. 5.2.2 Owner's final payment to Contractor shall be made no later than thirty (30) days after the issuance of Engineer's final Certificate for Payment. In no event shall final payment be required to be made prior to thirty(30) days after all Work on the Contract has been fully performed.Defects in the Work discovered prior to final payment shall be treated as non-conforming Work and shall be corrected by Contractor prior to final payment,and shall not be treated as warranty items. ARTICLE 6 TERMINATION OR SUSPENSION 6.1 The Contract may be terminated by Owner or Contractor as provided in Article 15 of the General Conditions. 00500 4-2020 Page 3 of 5 Standard Form of Agreement 00443647 6.2 The Work may be suspended by Owner as provided in Article 15 of the General Conditions. ARTICLE 7 ENUMERATION OF CONTRACT DOCUMENTS 7.1 The Contract Documents,except for Modifications issued after execution of this Agreement,are enumerated as follows: 7.1.1 The Agreement is this executed version of the City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor,as modified. 7.1.2 The General Conditions are the "City of Round Rock Contract Forms 00700," General Conditions, as modified. 7.1.3 The Supplementary,Special,and other Conditions of the Contract are those contained in the Project Manual dated Mav ?0?r% 7.1.4 The Specifications are those contained in the Project Manual dated Mav 0?S 7.1.5 The Drawings,if any,are those contained in the Project Manual dated Mav ?0?1; 7.1.6 The Insurance&Construction Bond Forms of the Contract are those contained in the Project Manual dated May. 2025 7.1.7 The Notice to Bidders,Instructions to Bidders,Bid Form,and Addenda,if any,are those contained in the Project Manual dated May. 2025 7.1.8 If this Agreement covers construction involving federal funds, thereby requiring inclusion of mandated contract clauses, such federally required clauses are those contained in the "City of Round Rock Contract Forms 03000,"Federally Required Contract Clauses,as modified. 7.1.9 Other documents,if any,forming part of the Contract Documents are as follows: None ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of any document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 Owner's representative is: Katie Baker,PLA City of Round Rock 301 W.Bagdad Ave.#250 IRound Rock,TX 78664 8.3 Contractor's representative is: PM s2?o I 8.4 Neither Owner's nor Contractor's representative shall be changed without ten(10)days'written notice to the other party. J 00500 4-2020 Page 4 of 5 Standard Form of Agreement 00443647 J J 8.5 Waiver of any breach of this Agreement shall not constitute waiver of any subsequent breach. 8.6 Owner agrees to pay Contractor from available funds for satisfactory performance of this Agreement in accordance with the bid or proposal submitted therefor,subject to proper additions and deductions,all as provided in the General Conditions, Supplemental Conditions, and Special Conditions of this Agreement, and Owner agrees to make payments on account thereof as provided therein. Lack of funds shall render this Agreement null and void to the extent funds are not available. This Agreement is a commitment of City of Round Rock's current revenues only. 8.7 Although this Agreement is drawn by Owner,both parties hereto expressly agree and assert that,in the event of any dispute over its meaning or application,this Agreement shall be interpreted reasonably and fairly,and neither more strongly for nor against either party. 8.8 This Agreement shall be enforceable in Round Rock,Texas,and if legal action is necessary by either party with respect to the enforcement of any or all of the terns or conditions herein,exclusive venue for same shall lie in Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8.9 Both parties hereby expressly agree that no claims or disputes between the parties arising out of or relating to this Agreement or a breach thereof shall be decided by an arbitration proceeding,including without limitation,any proceeding under the Federal Arbitration Act(9 USC Section 1-14)or any applicable state arbitration statute. 8.10 The parties, by execution of this Agreement, bind themselves, their heirs, successors, assigns, and legal representatives for the full and faithful performance of the terms and provisions hereof. This Agreement is entered into as of the day and year first written above and is executed in at least two(2) original copies,of which one is to be delivered to Owner. OWNER CONTRACTOR CITY OF U CK,T XAS Myers ncrete C nstruction,LP Printed N Craig M;1 r n Printed Name: andy Myers Title Mayor Title: VP/Member Date Signed: ,l 1�Z5 Date Signed: 7/29/2025 AT ST: � i MA L Ci Clerk FOR CITY,APPROVED AS TO . ttomey 00500 4-2020 Page 5 of 5 Standard Form of Agreement 00443647 00600 INSURANCE AND CONSTRUCTION BOND FORMS BONDS AND INSURANCE INSTRUCTIONS Instruction Sheet 1. Insurance Company must be licensed by State of Texas. 2. Agent signing bonds must be licensed in Texas. 3. Agent signing bonds must have Power of Attorney on behalf of insurance company. 4. If Agent signing bonds has Power of Attorney, but not licensed in Texas, then the bond must be counter-signed by Texas local recording agent. ALL THE ABOVE INFORMATION CAN BE FOUND AT Texas Department of Insurance website—www.tdi.state.tx.us 5. Make sure the dollar amount on both Performance and Payment Bonds match the amount of the Agreement & Bid Form Sheet. 6. Both Performance and Payment Bonds should be signed by Authorized Person. If the contractor is a corporation, then it should be signed by the President or the Vice-President. If the contractor is not incorporated, then it may be signed by the Owner. Please state the title of the authorized person. CERTIFICATE OF LIABILITY INSURANCE Instruction Sheet 1. CERTIFICATE OF LIABILITY INSURANCE FORM The City of Round Rock's Certificate of Liability Insurance form provided herein or a standard ACORD form. 2. PRODUCER and INSURED-Please list name,address,phone number and e-mail. 3. COMPANIES AFFORDING COVERAGE — TDI number required. The TDI number can be obtained from the Texas Dept of Insurance Website: hM://www.tdi.state.tx.us/. —Company Lookup. Note:Exception to this rule.In certain instances where there is unusual risks involved,Surplus Lines Insurance Carriers can be used.Below are the guidelines: a. Insurance Company does not have to be"licensed in Texas".but they do have to be"elirible for a Texas license." Please verify with the Texas Dept of Insurance Website:htto://www.tdi.state.tx.us/.—Company Lookup b. Policy has to be written by licensed surplus lines Aeent. Also verify with the Texas Dept of Insurance Website:hM://www.tdi.state.tx.us/-Agent Lookup 4. TYPES OF INSURANCE COVERAGE— CONSTRUCTION CONTRACT: Please double check the General Conditions and the Supplemental General Conditions for the types and amounts of insurance required. The Supplemental General Conditions usually state the following: a. Business Automobile Liability Insurance b. Workers' Compensation and Employers' Liability Insurance C. Commercial General Liability Insurance d. Builders' Risk Insurance— (Generally required for all "vertical" construction. Check with Project Manager for requirements.) FOR ALL OTHER CONTRACTS, PLEASE REFER TO THE INSURANCE SECTION FOR TYPE OF INSURANCE REQUIRED. (For example Engineering Service Contracts usually require"professional liability insurance".) 5. EFFECTIVE DATE &EXPIRATION DATE Please make sure dates are current. 6. City of Round Rock must be listed on the Certificate of Insurance as an additional insured (except Workers Compensation and Builders Risk). 7. Certificate must indicate that the insurance Company must give the City of Round Rock notice of any changes,cancellation, etc. at least thirty(30)days prior to date of change. 8. Make sure Certificate is signed by an Agent Licensed in the State of Texas, this can also be found on the Texas Department of Insurance website—www.tdi.state.tx.us—Agent Lookup. PERFORMANCE BOND THE STATE OF TEXAS § Bond No:4479727 § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Myers Concrete Construction, LP , of the City of Wimberley County of Hays , and State of Texas , as Principal, and Suretec Insurance Company authorized under the law of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto the CITY OF ROUND ROCK,TEXAS (Owner), in the penal sum of Two hundred sixty-eight three hundred four dollars and zero cents Dollars ($268,304.00 ) for the payment whereof, well and truly to be made the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally,by these presents: WHEREAS,the Principal has ntered into a certain written Agreement with the Owner dated the y day of , 20Z5to which the Agreement is hereby referred to and made a part hereof as fully an to the same extent as if copied at length herein consisting of: Rock Hollow Park Improvement Project 2025 NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Agreement and shall, in all respects, duly and faithfully observe and perform all and singular the covenants, conditions and agreements in and by said Agreement, agreed and covenanted by the Principal to be observed and performed, including but not limited to, the repair of any and all defects in said work occasioned by and resulting from defects in materials furnished by or workmanship of,the Principal in performing the Work covered by said Agreement and occurring within a period of twelve (12) months from the date of Final Completion and all other covenants and conditions, according to the true intent and meaning of said Agreement and the Plans and Specifications hereto annexed,then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. Page 1 0061042020 Performance Bond 00443639 PERFORMANCE BOND(continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the Plans, Specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond,and it does hereby waive notice of any such change,extension of time, alteration or addition to the terns of the Agreement, or to the work to be performed thereunder. If Principal fails to faithfully perform said Agreement, Surety, after receipt of written notice of Principal's default,shall perform all of Principal's duties and obligations under the Agreement. If, within ten (10) days after receipt of such notice from Owner, Surety does not commence to complete the obligations of Principal with a contractor acceptable to Owner and diligently complete the performance of the Principal's duties and obligations,Owner shall have the right but not the obligation to have the duties and obligations of Principal performed. In such event, Surety shall pay to Owner,upon demand,all costs, expenses and damages sustained by Owner as a result of Principal's failure to perform its duties and obligations under the Agreement up to the total sum of this Performance Bond, plus all costs and expenses, including attorney's fees and expert and consultant fees incurred by Owner to enforce its rights under this Performance Bond. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this 29th day of July , 2025 . Myers Concrete Construction, LP Suretec Insurance Company Principal Surety C, JASE t3s-i2--,•J Shawn Claiborne Printed Name Printed Name 134 By: �11[x.�oG�9 t�D Tit e' b1�EC� oNsA►an(.,t-,Z Title: Attorney-in-Fact Address: 2301 FM 3237 Address: 2103 CityWest Blvd., Suite 1300 Wimberley,TX 78676 Houston,TX 77042 R dent Agent of Surety: Signature Scott Burton Printed Name 225 W. Hopkins Street Address San Marcos, TX 78666 City, State&Zip Code Page 2 00610 42020 Performance Bond 00443639 PAYMENT BOND THE STATE OF TEXAS § Bond No: 4479727 § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Myers Concrete Construction,LP , of the City of Wimberley County of Hays , and State of Texas , as Principal, and Suretec Insurance Company authorized under the laws of the State of Texas to act as Surety on Bonds for Principals,are held and firmly bound unto the CITY OF ROUND ROCK, TEXAS (OWNER), and all subcontractors, workers, laborers, mechanics and suppliers as their interest may appear, all of whom shall have the right to sue upon this bond, in the penal sum of Two hundred sixty-eight three hundred four dollars and zero cents Dollars($ 268,304.00 ) for the payment whereof,well and truly be made the said Principal and Surety bind themselves and their heirs, administrators, executors, successors, and assigns,jointly and severally,by these presents: WHEREAS,the 4'nclpal has ntered into a certain written Agreement with the Owner,dated the y of , 207,5'to which Agreement is hereby referred to and made a part hereof as fully Into the same extent as if copied at length herein consisting of: Rock Hollow Park Improvement Proiect 2025 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall well and truly pay all subcontractors, workers, laborers, mechanics, and suppliers, all monies to them owing by said Principals for subcontracts,work, labor,equipment,supplies and materials done and furnished for the construction of the improvements of said Agreement, then this obligation shall be and become null and void;otherwise to remain in full force and effect. PROVIDED, HOWEVER,that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. Page 1 00620 04-2020 Payment Bond 00437699 PAYMENT BOND (continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the plans, specifications or drawings accompanying the same shall in anywise affect its obligation on this bond,and it does hereby waive notice of any such change,extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this Instrument this 29th —day of July , 20 25. Myers Concrete Construction,LP Suretec Insurance Company Principal Surety GB�s� �Cza�,^/ Shawn Claiborne Printed Name Printed Name , � Z Title: D'P mar, ons' hxAx, ,a4-_oEe_ Title: Attorney-in-Fact Address:2301 FM 3237 Address: 2103 CityWest Blvd., Suite 1300 Wimberley, TX 78676 Houston,TX 77042 R s dent Agent of S Signature Scott Burton Printed Name 225 W.Hopkins Street Address San Marcos,TX 78666 City, State&Zip Code Page 2 006201-2020 Payment Bond 00090656 POA#: 4479727 SureTec Insurance Company LIMITED POWER OF ATTORNEY Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents make,constitute and appoint Scott Burton, Shawn Claiborne,Jennifer Webb its true and lawful Attorney-in-fact,with full power and authority hereby conferred in its name,place and stead,to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for,providing the bond penalty does not exceed Ten Million and 00/100 Dollars($10,000,000.00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President, sealed with the corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney-in-Fact may do in the premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec Insurance Company: Be it Resolved, that the President, any Vice-President,any Assistant Vice-President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney-in-Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and deliver,any and all bonds,recognizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20`h of April, 1999.) In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seal to be hereto affixed this 16th day of August A.D. 2024 SURETEC INSURANCE COMPANY SUAN RC, ��:: P .1, By. w W i D Michael C.K mig,President 6t State of Texas ss: y'''.. ,spa County of Harris �* On this 16th day of August A.D. 2024 before me personally came Michael C.Keimig,to me known,who,being by me duly sworn,did depose and say,that he resides in Houston,Texas,that he is President of SURETEC INSURANCE COMPANY,the company described in and which executed the above instrument;that he knows the seal of said Company;that the seal affixed to said instrument is such corporate seal; that it was so affixed by order of the Board of Directors of said Company;and that he sigr`ydi►iviAAlinigrereto by like order. t50P�e���9 '- :'2 `t�iF:iTGeJ - Chelsea Turner,Notary Public My commission expires July 6,2028 OF I,M.Brent Beaty,Assistant Secretary of SURETEC INSU jft& ereby certify that the above and foregoing is a true and correct copy of a Power of Attorney,executed by said Company,which is ri W/162�effect;and furthermore,the resolutions of the Board of Directors, set out in the Power of Attorney are in full force and effect. 01P'001111`'" Given under my hand and the seal of said Company at Houston, Texas this 29th day of July 2025 , A.D. A ZT M. rent Beaty,Assisitant§ecretary Any instrument issued in excess of the penalty stated above is totally void and without any validity.4221235 For verification of the authority of this power you may call(713)812-0800 any business day between 8:30 am and 5:00 pm CST. SureTec Insurance Company THIS BOND RIDER CONTAINS IMPORTANT COVERAGE Statutory Complaint Notice To obtain information or make a complaint: You may call the Surety's toll free telephone number for information or to make a complaint at: 1-866-732-0099. You may also write to the Surety at: SureTec Insurance Company 9500 Arboretum Blvd., Suite 400 Austin, TX 78759 -------------------------------------------------------------------- SIC OS Rider Non-TX Claims Notice rev 07_2022 Page 1 of 1 A� ® CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) O 07/29/2025 ITHIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). 1RODUCER CONTACT Jennifer Webb NAME: I Benchmark Insurance Group,Inc. PHONE (512)754-2700 FAX (512)754-2717 A/C.No Ext: A/C,No): 225 West Hopkins EE-MAIIess: JWebb@Benchmark-Ins.com ADDR DO BOX 1687 INSURER(S)AFFORDING COVERAGE NAIC# San Marcos TX 78667-1687 INSURERA: Cincinnati Insurance Companies 10677 ENSURED INSURER B: Texas Mutual Insurance Company 22945 Myers Concrete Construction,LP INSURER C: Endurance American Insurance Company 10641 I 2301 FM 3237 INSURER D: INSURER E Wmberley TX 78676 INSURER F: 'OVERAGES CERTIFICATE NUMBER: CL2542405944 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ITR POLICY Y EFF POLICY EXP LIMITS LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER MMIDD MM/DD/YYYY X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE � OCCUR PREMISES Ea occurrence $ 500,000 MED EXP(Any one person) $ 10,000 A Y Y ENP 0533937 04/25/2025 04/25/2026 PERSONAL&ADV INJURY $ 1,000,000 GEN'LAGGREGATE LIMITAPPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY [g PRO LOC PRODUCTS-COMP/OPAGG $ 2.000,000 JECT OTHER: $ AUTOMOBILE LIABILITY COMEa accidentSBINED INGLE LIMIT $ 1,000,000 X ANYAUTO BODILY INJURY(Per person) $ A OWNED SCHEDULED Y Y EBA 0533937 04/25/2025 04/25/2026 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident TX UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 3,000,000 A EXCESS LIAB CLAIMS-MADE Y Y ENP 0533937 04/25/2025 04/25/2026 AGGREGATE $ 3,000,000 DED I X1 RETENTION$ 0 $ WORKERS COMPENSATION AND EMPLOYERS'LIABILITY X STATUTE ERPER H YIN 1,000,000 ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ B OFFICERIMEMBER EXCLUDED? N N/A Y 0001156496 04/25/2025 04/25/2026 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ I Each Occurrence 5,000,000 Excess Liability-Follow Form C Y Y EXC30036390602 04/25/2025 04/25/2026 Aggregate 5,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) IProject:Rock Hollow Park Improvement Project 2025 City of Round Rock,Texas and all parties required by written contract are named as additional insureds on all policies except workers compensation and a Waiver of Subrogation in favor of same,per blanket forms attached.A blanket waiver of subrogation applies on the Work Comp. General Liability is Primary and Non-Contributory.Commercial Umbrella follows form according to the terms,conditions,and endorsements found in the policy. 30 days notice will be Iprovided to the certificate holder if the company cancels the policy prior to the expiration date for any reason other than non-payment of premium. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN City of Round Rock,Texas ACCORDANCE WITH THE POLICY PROVISIONS. I 221 East Main Street AUTHORIZED REPRESENTATIVE Round Rock TX 78664 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. r CinciPlus° BUSINESS AUTO XC+® (EXPANDED COVERAGE PLUS) ENDORSEMENT This endorsement modifies insurance provided by the following: BUSINESS AUTO COVERAGE FORM With respect to the coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. A. Blanket Waiver of Subrogation This provision does not apply unless the valid SECTION IV - BUSINESS AUTO CONDI- written contract has been: TIONS, A. Loss Conditions, 5. Transfer of 1. Executed prior to the accident causing Rights of Recovery Against Others to Us is "bodily injury"or"property damage",- and amended by the addition of the following: 2. Is still in force at the time of the "accident" We waive any right of recovery we may have causing "bodily injury" or "property dam- against any person or organization because of age". payments we make for "bodily injury" or "property damage" arising out of the operation D. Employee Hired Auto of a covered "auto" when you have assumed 1. Changes in Liability Coverage liability for such "bodily injury" or "property damage" under an "insured contract", provid- The following is added to the SECTION II ed the "bodily injury" or "property damage" oc- - LIABILITY COVERAGE, A. Coverage, curs subsequent to the execution or the "in- 1.Who is an Insured: sured contract". An "employee" of yours is an "insured" B. Noncontributory Insurance while operating an "auto" hired or rented under a contract or agreement in that SECTION IV - BUSINESS AUTO CONDI- "employee's" name, with your permission, TIONS, B. General Conditions, 5. Other In- while performing duties related to the surance c. is deleted in its entirety and re- conduct of your business. placed by the following: c. Regardless of the provisions of Par- 2. Changes in General Conditions agraph a. above, this Coverage SECTION IV - BUSINESS AUTO CON- Form's Liability Coverage is primary DITIONS, B. General Conditions, 5. and we will not seek contribution Other Insurance is deleted in its entirety from any other insurance for any Iia- and replaced by the following: bility assumed under an "insured contract" that requires liability to be b. For Hired Auto Physical Damage assumed on a primary noncontributo- Coverage the following are deemed ry basis. to be covered "autos"you own: C. Additional Insured by Contract (1) Any covered "auto" you lease, hire, rent or borrow; and SECTION II - LIABILITY COVERAGE, A. Coverage, 1. Who is an Insured is amended (2) Any covered "auto" hired or to include as an insured any person or organi- rented by your "employee" under zation for whom you have agreed in a valid a contract in that individual "em- written contract to provide insurance as af- ployee's" name, with your per- forded by this policy. mission, while performing duties related to the conduct of your This provision is limited to the scope of the business. valid written contract. Includes copyrighted material of ISO AA 288 06 20 Properties, Inc., with its permission. Page 1 of 4 However, any "auto" that is leased, a. Is effective on the date of acquisition hired, rented or borrowed with a driver or formation, and is afforded for 180 is not a covered "auto". days after such date; E. Audio, Visual and Data Electronic Equip- b. Does not apply to "bodily injury' or ment "property damage" resulting from an SECTION III - PHYSICAL DAMAGE COV- "accident" that occurred before you acquired or formed the organization; ERAGE, C. Limit of Insurance is amended by adding the following: c. Does not apply to any newly acquired or formed organization that is a joint 4. The most we will pay for all "loss" to au- venture or partnership, and dio, visual or data electronic equipment and any accessories used with this d. Does not apply to an insured under equipment as a result of any one "acci- any other automobile liability policy or dent" is the lesser of: would be an insured under such a policy but for the termination of such a. The actual cash value of the dam- policy or the exhaustion of such poli- aged or stolen property as of the time cys limits of insurance. of the"accident" 3. Any of your "employees" while using a b. The cost of repairing or replacing the covered "auto" in your business or your damaged or stolen property with oth- personal affairs, provided you do not own, er property of like kind and quality; or hire or borrow that"auto". c. $2.500. G. Liability Coverage Extensions - Supple- Provided the equipment, at the time of the mentary Payments -Higher Limits "loss" is: SECTION II - LIABILITY COVERAGE, A. a. Permanently installed in or upon the Coverage, 2. Coverage Extensions, a. Sup- covered "auto" in a housing, opening plementary Payments is amended by: or other location that is not normally 1. Replacing the $2,000 Limit of Insurance used by the "auto" manufacturer for for bail bonds with $4,000 in (2); and the installation of such equipment; 2. Replacing the $250 Limit of Insurance for b. Removable from a permanently in- reasonable expenses with $500 in (4). stalled housing unit as described in Paragraph 2.a.above; or H. Amended Fellow Employee Exclusion c. An integral part of such equipment. SECTION II - LIABILITY COVERAGE, B. Ex- clusions, 5. Fellow Employee is modified as follows: SECTION II - LIABILITY COVERAGE, A. Exclusion 5. Fellow Employee is deleted. Coverage, 1. Who is an Insured is amended by adding the following I. Hired Auto - Physical Damage The following are "insureds": If hired "autos" are covered "autos"for Liability Coverage, then Comprehensive and Collision 1. Any subsidiary which is a legally incorpo- Physical Damage Coverages as provided un- rated entity of which you own a financial der SECTION III - PHYSICAL DAMAGE interest of more than 50% of the voting COVERAGE of this Coverage Part are ex- stock on the effective date of this cover- tended to "autos" you hire, subject to the fol- age form. lowing: However, the insurance afforded by this 1. The most we will pay for "loss" to any provision does not apply to any subsidiary hired "auto" is $50,000 or the actual cash that is an "insured" under any other au- value or cost to repair or replace, which- tomobile liability policy or would be an "in- ever is the least, minus a deductible. sured" under such policy but for termina- tion of such policy or the exhaustion of 2. The deductible will be equal to the largest such policy's limits of insurance. deductible applicable to any owned "auto" for that coverage, or $1,000, whichever is 2. Any organization that is newly acquired or less. formed by you and over which you main- tain majority ownership. The insurance 3. Hired Auto - Physical Damage coverage provided by this provision: is excess over any other collectible insur- ance. Includes copyrighted material of ISO AA 288 06 20 Properties, Inc.. with its permission. Page 2 of 4 4. Subject to the above limit, deductible, and K. Transportation Expense-Higher Limits excess provisions we will provide cover- SECTION III - PHYSICAL DAMAGE COV- age equal to the broadest coverage appli- cable to any covered "auto" you own in- ERAGE, A. Coverage, 4. Coverage Exten- sured under this policy. sions is amended by replacing $20 per day with $50 per day, and $600 maximum with Coverage includes loss of use of that hired au- $1,500 maximum in Extension a. Transpor- to, provided it results from an "accident" for tation Expenses. which you are legally liable and as a result of which a monetary loss is sustained by the L. Airbag Coverage leasing or rental concern. The most we will SECTION III - PHYSICAL DAMAGE COV- pay for any one"accident"is$3,000. ERAGE, B. Exclusions, 3.a. is amended by If a limit for Hired Auto - Physical Damage is adding the following: shown in the Schedule, then that limit replac- However, the mechanical and electrical es, and is not added to, the $50,000 limit indi- breakdown portion of this exclusion does not cated above and the deductibles shown in the apply to the accidental discharge of an airbag. Schedule are applicable. This coverage for airbags is excess over any J. Rental Reimbursement other collectible insurance or warranty. SECTION III - PHYSICAL DAMAGE COV- M. Loan or Lease Gap Coverage ERAGE is amended by adding the following: 1. SECTION III - PHYSICAL DAMAGE 1. We will pay for rental reimbursement ex- COVERAGE, C. Limit of Insurance is penses incurred by you for the rental of deleted in its entirety and replaced by the an"auto"because of a 'loss"to a covered following, but only for private passenger "auto". Payment applies in addition to the type"autos"with an original loan or lease, otherwise applicable amount of each cov- and only in the event of a 'total loss" to erage you have on a covered "auto". No such a private passenger type"auto": deductible applies to this coverage. a. The most we will pay for"loss" in any 2. We will pay only for those expenses in- one"accident"is the greater of: curred during the policy period beginning (1) The amount due under the terms 24 hours after the "loss" and ending, re- of the lease or loan to which gardless of the policy's expiration, with your covered private passenger the lesser of the following number of type "auto"is subject, but will not days: include: a. The number of days reasonably re- (a) Overdue lease or loan pay- quired to repair the covered "auto". If ments; "loss" is caused by theft, this number of days is added to the number of (b) Financial penalties imposed days it takes to locate the covered under the lease due to high "auto"and return it to you; or mileage, excessive use or b. 30 days. abnormal wear and tear; Security 3. Our payment is limited to the lesser of the (c) funded bydeposits the lessor;not re- following amounts: (d) Costs for extended warran- a. Necessary and actual expenses in- ties, Credit Life Insurance, curred; or Health, Accident or Disabil- b. $50 per day. ity Insurance purchased with the loan or lease; and 4. This coverage does not apply while there are spare or reserve "autos" available to (e) Carry-over balances from you for your operations. previous loans or leases, or 5. We will pay under this coverage only that (2) Actual cash value of the stolen amount of your rental reimbursement ex- or damaged property. penses which is not already provided for b. An adjustment for depreciation and under SECTION III - PHYSICAL DAM- physical condition will be made in de- AGE COVERAGE, A. Coverage, 4. termining actual cash value at the Coverage Extensions. time of"loss". Includes copyrighted material of ISO AA 288 06 20 Properties, Inc., with its permission. Page 3 of 4 2. SECTION V - DEFINITIONS is amended P. Unintentional Failure to Disclose Hazards by adding the following, but only for the SECTION IV - BUSINESS AUTO CONDI- purposes of this Loan or Lease Gap TIONS B. , Coverage: General Conditions 2. Conceal- ment, Misrepresentation or Fraud is "Total loss" means a "loss" in which the amended by adding the following: cost of repairs plus the salvage value ex- ceeds the actual cash value. However, if you unintentionally fail to disclose any hazards existing on the effective date of N. Glass Repair-Waiver of Deductible this Coverage Form, we will not deny cover- SECTION III - PHYSICAL DAMAGE COV- age under this Coverage Form because of such failure. ERAGE, D. Deductible is amended by adding the following: Q. Mental Anguish Resulting from Bodily Inju- No deductible applies to glass damage if the ry glass is repaired in a manner acceptable to us SECTION V - DEFINITIONS, C. "Bodily inju- rather than replaced. ry" is deleted in its entirety and replaced by O. Duties in the Event of an Accident, Claim, the following: Suit or Loss-Amended "Bodily injury' means bodily injury, sickness or SECTION IV - BUSINESS AUTO CONDI- disease sustained by a person, including men- TIONS, A. Loss Conditions, 2. Duties in the tal anguish and death sustained by the same person that results from such bodily injury, Event of Accident, Claim, Suit or Loss,a.is sickness or disease. "Bodily injury" does not amended by adding the following: include mental anguish or death that does not This condition applies only when the "acci- result from bodily injury, sickness or disease. dent"or'loss"is known to: R. Coverage for Certain Operations in Con- t. You, if you are an individual; nection with Railroads 2. A partner, if you are a partnership; With respect to the use of a covered "auto" in operations for or affecting a railroad: 3. An executive officer or insurance manag- er, if you are a corporation; or 1. SECTION V - DEFINITIONS H. "Insured contract", 1.c. is deleted in its entirety and 4. A member or manager, if you are a lim- replaced by the following: ited liability company. c. An easement or license agreement; 2. SECTION V - DEFINITIONS, H. "Insured contract", 2.a. is deleted. Includes copyrighted material of ISO AA 288 06 20 Properties, Inc., with its permission. Page 4 of 4 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTORS' COMMERCIAL GENERAL LIABILITY BROADENED ENDORSEMENT - TEXAS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Endorsement-Table of Contents: Coverage: Begins on Page: 1. Employee Benefit Liability Coverage.......................................................................................2 2. Unintentional Failure To Disclose Hazards......................................••• ••••.......................8 3. Damage To Premises Rented To You......................................................................................8 4. Supplementary Payments...................................................................................................... 10 5. Medical Payments................................................................................................................... 10 6. 180 Day Coverage For Newly Formed Or Acquired Organizations ................................... 10 7. Waiver Of Subrogation........................................................................................................... 10 8. Automatic Additional Insured -Specified Relationships: .................. 10 (a) Managers Or Lessors Of Premises (b) Lessor Of Leased Equipment (c) Vendors (d) State Or Governmental Agency Or Subdivision Or Political Subdivision - Permits Or Authorizations Relating To Premises (e) Mortgagee,Assignee Or Receiver 9. Property Damage To Borrowed Equipment......................................................................... 13 10. Employees As Insureds - Specified Health Care Services And Good Samaritan Services.... ........... ................... ............................................................ ........................ 14 11. Broadened Notice Of Occurrence......................................................................................... 14 12. Nonowned Aircraft.................................................................................................................. 14 13. Bodily Injury Redefined.......................................................................................................... 15 14. Expected Or Intended Injury Redefined ................................................ 15 15. Former Employees As Insureds..................................................................................... .. .. 15 16. Voluntary Property Damage Coverage and Care, Custody Or Control Liability Coverage.................................................................................................................................. 15 17. Broadened Contractual Liability -Work Within 50' Of Railroad Property 17 18. Alienated Premises................................................................................................................. 17 B. Limits Of Insurance: The Commercial General Liability Limits of Insurance apply to the insurance provided by this endorse- ment, except as provided below: 1. Employee Benefit Liability Coverage Each Employee Limit: $1,000,000 Aggregate Limit: $3,000,000 Deductible Amount: $ 1,000 3. Damage To Premises Rented To You The lesser of: a. The Each Occurrence Limit shown in the Declarations; or b. $500,000 unless otherwise stated $ 4. Supplementary Payments a. Bail Bonds: $2,500 b. Loss Of Earnings: $ 500 Includes copyrighted material of Insurance GA 233 TX 09 20 Services Office, Inc., with its permission. Page 1 of 17 5. Medical Payments Medical Expense Limit: $10,000 9. Property Damage To Borrowed Equipment Each Occurrence Limit: $10,000 Deductible Amount: $ 250 16. Voluntary Property Damage Coverage (Coverage D) and Care, Custody Or Control Liability Coverage Limits Of Insurance Voluntary Property Damage Coverage: $1,000 Each Occurrence $5,000 Aggregate Care, Custody Or Control Liability Coverage: $5,000 Each Occurrence unless otherwise stated $ Deductible Amount(Each Occurrence) Voluntary Property Damage Coverage: $250 Care, Custody Or Control Liability Coverage: $250 unless otherwise stated $ COVERAGE PREMIUM BASIS RATE ADVANCE PREMIUM (a) Area (For Limits in Excess of (For Limits in Excess of (b) Payroll $5,000) $5,000) (c) Gross Sales (d) Units e Other Care, Custody Or Control $ Liability TOTAL ANNUAL PREMIUM C. Coverages 1) The amount we will pay for damages is limited 1. Employee Benefit Liability Coverage as described in C. Cov- a. The following is added to Section I - erages, 1. Employee Coverages: Benefit Liability Cover- age, c. Limits Of Insur- EMPLOYEE BENEFIT LIABILITY ance of this endorse- COVERAGE ment; and (1) Insuring Agreement 2) Our right and duty to (a) We will pay those sums that defend ends when we the insured becomes legally have used up the appli- cable limit of insurance obligated to pay as damag- in the payment of judg- es caused by any act, error ments or settlements. or omission of the insured, or of any other person for No other obligation or liabil- whose acts the insured is ity to pay sums or perform legally liable, to which this acts or services is covered insurance applies. We will unless explicitly provided for have the right and duty to under Supplementary Pay- defend the insured against ments. any "suit" seeking those damages. However, we will (b) This insurance applies to have no duty to defend damages only if the act, er- against any "suit' seeking ror or omission is negligently damages to which this in- committed in the "admin- surance does not apply. We istration" of your "employee may, at our discretion, in- benefit program'; and vestigate any report of an 1) Occurs during the policy act, error or omission and period; or settle any claim or"suit' that may result. But: Includes copyrighted material of Insurance GA 233 TX 09 20 Services Office, Inc., with its permission. Page 2 of 17 der the Internal Revenue (c) A limited liability company, Code or any similar state or you are an insured. Your local law. members are also insureds, but only with respect to the (j) Employment-Related Prac- conduct of your business. tices Your managers are in- Any liability arising out of sureds, but only with respect any: to their duties as your man- agers. 1) Refusal to employ; (d) An organization other than a 2) Termination of employ- partnership, joint venture or ment; limited liability company, you are an insured. Your "execu- 3) Coercion, demotion, tive officers" and directors evaluation, reassign- are insureds, but only with ment, discipline, defa- respect to their duties as mation, harassment, your officers or directors. humiliation, discrimina- Your stockholders are also tion or other employ- insureds, but only with re- ment-related practices, spect to their liability as acts or omissions; or stockholders. 4) Consequential liability (e) A trust, you are an insured. as a result of 1), 2)or 3) Your trustees are also in- above. sureds, but only with respect This exclusion applies to their duties as trustees. whether the insured may be (2) Each of the following is also an held liable as an employer insured: or in any other capacity and to any obligation to share (a) Each of your "employees" damages with or repay who is or was authorized to someone else who must pay administer your "employee damages because of the in- benefit program"; jury. (b) Any persons, organizations (3) Supplementary Payments or"employees" having prop- er temporary authorization Section I - Supplementary ry y- to administer your "employ- ments - Coverages A and B also ee benefit program" if you apply to this Coverage, however die, but only until your legal 1.b. and 2. of the Supplementary representative is appointed; Payments provision do not apply. or b. Who Is An Insured (c) Your legal representative if As respects Employee Benefit Liabil- you die, but only with re- ity Coverage, Section II -Who Is An spect to duties as such. That Insured is replaced by the following: representative will have all your rights and duties under (1) If you are designated in the Dec- this Coverage Part. larations as: (3) Any organization you newly ac- (a) An individual, you and your quire or form, other than a part- spouse are insureds, but on- nership, joint venture or limited ly with respect to the con- liability company, and over which duct of a business of which you maintain ownership or major- you are the sole owner. ity interest, will qualify as a Named Insured if no other similar (b) A partnership or joint ven- insurance applies to that organi- ture, you are an insured. zation. However, coverage under Your members, your part- this provision: ners, and their spouses are also insureds but only with (a) Is afforded only until the respect to the conduct of 180th day after you acquire your business. or form the organization or Includes copyrighted material of Insurance GA 233 TX 09 20 Services Office, Inc., with its permission. Page 4 of 17 tification of the action taken, ceived in connec- you shall promptly reim- tion with the daim burse us for such part of the or"suit'; Deductble Amount as we have paid. (2) Authorize us to ob- tain records and d. Additional Conditions other information; As respects Employee Benefit Liabil- (3) Cooperate with us ity Coverage, Section IV - Commer- in the investigation cial General Liability Conditions is or settlement of the amended as follows: claim or defense (1) Item 2. Duties In The Event Of against the "suit; Occurrence, Offense, Claim Or and Suit is replaced by the following: (4) Assist us, upon our 2. Duties In The Event Of An request, in the en- forcement of any Act, Error, Omission, Claim Or Suit right against any person or organi- a. You must see to it that zation which may we are notified as soon be liable to the In- as practicable of an act, sured because of error or omission which an act, error or may result in a daim. omission to which To the extent possible, this insurance may notice should include: also apply. (1) What the act, error d. No insured will, except or omission was at that insured's own and when it oc- cost, voluntarily make a curred; and payment, assume any obligation, or incur any (2) The names and expense without our addresses of any- consent. one who may suf- fer damages as a (2) Item 4. Other Insurance is re- result of the act, placed by the following: error or omission. 4. Other Insurance b. If a daim is made or If other valid and collectible "suit' is brought against insurance is available to the any insured, you must: insured for a loss we cover (1) Immediately record under this Employee Benefit the specifics of the Liability Coverage, our obli- claim or "suit' and gations are limited as fol- the date received; lows: and a. Primary Insurance (2) Notify us as soon This insurance is prima- as practicable. ry except when c. below You must see to it that applies. If this insurance we receive written no- is primary, our obliga- tice of the daim or"suit" tions are not affected as soon as practicable. unless any of the other insurance is also prima- c. You and any other in- ry. Then, we will share volved insured must: with all that other insur- (1) Immediately send ance by the method de- us copies of any scribed in Paragraph b. below. demands, notices, summonses or le- gal papers re- Includes copyrighted material of Insurance GA 233 TX 09 20 Services Office, Inc., with its permission. Page 6 of 17 fits are made generally 2. Unintentional Failure To Disclose Haz- available to all "employ- ards ees" who are eligible under the plan for such Section IV-Commercial General Liabil- benefits; ity Conditions, 6. Representations is amended by the addition of the following: c. Unemployment insur- ance, social security Based on our dependence upon your rep- benefits, workers' com- resentations as to existing hazards, if un- pensation and disability intentionally you should fail to disclose all benefits; and such hazards at the inception date of your policy, we will not reject coverage under d. Vacation plans, includ- this Coverage Part based solely on such ing buy and sell pro- failure. grams; leave of ab- sence programs, includ- 3. Damage To Premises Rented To You ing military, maternity, a, The last paragraph of 2. Exclusions family, and civil leave; under Section I -Coverage A-Bod- tuition assistance plans; ily Injury And Property Damage Li- transportation and ability is replaced by the following: health dub subsidies. Exclusions c.through n. do not apply 4. "First effective date" means to damage by fire, explosion, light- the date upon which cover- ning, smoke or soot to premises while age was first effected in rented to you or temporarily occupied series of uninterrupted re-- by you with permission of the owner, newals of insurance cover- for which the amount we will pay is age. limited to the Damage To Premises (2) The following definitions are de- Rented To You Limit as described in leted in their entirety and re- Section III- Limits Of Insurance. placed by the following: b. The insurance provided under Sec- 5. "Employee" means a person tion I- Coverage A- Bodily Injury And actively employed, formerly Property Damage Liability applies to employed, on leave of ab- "property damage" arising out of wa- sence or disabled, or retired. ter damage to premises that are both "Employee" includes a rented to and occupied by you. "leased worker". "Employee" As respects Water Damage Legal Li- does not include a "tempo- ability, as provided in Paragraph 3.b. rary worker". above: 18. "Suit"means a civil proceed- The exclusions under Section I - ing in which money damag- Coverage A - Bodily Injury And Prop- es because of an act, error erty Damage Liability, 2. Exclusions, or omission to which this in- other than i. War and the Nuclear surance applies are alleged. Energy Liability Exclusion (Broad "Suit"includes: Form), are deleted and the following a. An arbitration proceed- are added: ing in which such dam- This insurance does not apply to: ages are claimed and to which the insured must (a) "Property damage": submit or does submit with our consent; (i) Assumed in any contract or agreement; or b. Any other alternative dispute resolution pro- (ii) Caused by or resulting from any ceeding in which such of the following: damages are claimed 1) Wear and tear; and to which the in- sured submits with our 2) Rust or other corrosion, de- consent; or cay, deterioration, hidden or c. An appeal of a civil pro- latent defect or any quality in property that causes it to ceeding. damage or destroy itself, Includes copyrighted material of Insurance GA 233 TX 09 20 Services Office, Inc., with its permission. Page 8 of 17 bonds required because of accidents (1) Any person(s) or organization(s) or traffic law violations arising out of described in Paragraph 8.a.(2) of the use of any vehicle to which the this endorsement (hereinafter re- Bodily Injury Liability Coverage ap- ferred to as additional insured) plies. We do not have to furnish these whom you are required to add as bonds. an additional insured under this Coverage Part by reason of a b. Paragraph 1.d. is replaced by the fol- written contract, written agree- lowing: ment, written permit or written All reasonable expenses incurred by authorization. the insured at our request to assist us (2) Only the following persons or Or- in the investigation or defense of the ganizations are additional in- claim or"suit', including actual loss of sureds under this endorsement, earnings up to the limit shown in Sec- and insurance coverage provided tion B. Limits Of Insurance, 4.b. Loss to such additional insureds is lim- Of Earnings of this endorsement per ited as provided herein: day because of time off from work. 5. Medical Payments (a) Premises ers Or Lessors Of es The Medical Expense Limit of Any One The manager or lessor of a Person as shown in the Declarations is premises leased to you you amended to the limit shown in Section B. are required per Paragraph Limits Of Insurance, 5. Medical Payments 8.a.(1) of this endorsement of this endorsement. to provide insurance, but on- 6. 180 Day Coverage For Newly Formed ly with respect to liability for Or Acquired Organizations bodily injury", "property damage" or personal and Section II - Who Is An Insured is advertising injury"caused, in amended as follows: whole or in part, by you or those acting on your behalf Subparagraph a. of Paragraph 3. is re- in connection with the own- placed by the following: ership, maintenance or use a. Coverage under this provision is af- of that part of the premises forded only until the 180th day after leased to you, subject to the you acquire or form the organization following additional exclu- or the end of the policy period, sions: whichever is earlier; This insurance does not ap- 7. Waiver Of Subrogation ply to: Section IV -Commercial General Liabil- (i) Any "occurrence" which ity Conditions, 8. Transfer Of Rights Of takes place after you Recovery Against Others To Us is cease to be a tenant in amended by the addition of the following: that premises; We waive any right of recovery against (i) Structural alterations, any additional insured under this en- new construction or dorsement, because of any payment we demolition operations make under this endorsement, to whom performed by or on be- the insured has waived its right of recov- half of such additional ery in a written contract, written agree- insured. ment, written permit or written authoriza- (b) Lessor Of Leased Equip- tion. Such waiver by us applies only to ment the extent that the insured has waived its right of recovery against such additional Any person(s) or organiza- insured prior to loss. tion(s) from whom you lease equipment you are required 8. Automatic Additional Insured - Speci- per Paragraph 8.a.(1) of this fied Relationships endorsement to provide in- a. The following is added to Section II - surance. Such person(s) or Who Is An Insured: organization(s) are insureds only with respect to liability for "bodily injury", "property Includes copyrighted material of Insurance GA 233 TX 09 20 Services Office, Inc., with its permission. Page 10 of 17 (c)(i)4) or 6) of division has issued a permit this endorse- or authorization in connec- ment; or tion with premises you own, b) Such inspec- rent or control and to which tions, aclust- this insurance applies: ments, tests or (i) The existence, mainte- servicing as nance, repair, construc- the vendor has tion, erection or removal agreed to of advertising signs, make or nor- awnings, canopies, cel- mally under- lar entrances, coal takes to make holes, driveways, uran- in the usual holes, marquees, hoist course of away openings, side- business, in walk vaults, street ban- connection ners or decorations and with the distri- similar exposures; bution or sale of the prod- (i) The construction, erec- ucts. tion or removal of eleva- tors; or (i) This insurance does not apply to any insured (ii) The ownership, mainte- person or organization: nance or use of any el- evators covered by this 1) From whom you insurance. have acquired such products, or (e) Mortgagee, Assignee Or any ingredient, part Receiver or container, enter- Any person or organization ing into, accompa- you are required per Para- nying or containing graph 8.a.(1) of this en- such products; or dorsement to provide insur- 2) When liability in- ance, but only with respect cluded within the to their liability as mortga- "products- gee, assignee or receiver completed opera- and arising out of the own- tions hazard" has ership, maintenance or use been excluded un- of the premises by you. der this Coverage However, this insurance Part with respect to does not apply to structural such products. alterations, new construction and demolition operations (d) State Or Governmental performed by or for that per- Agency Or Subdivision Or son or organization. Political Subdivision - Permits Or Authorizations (3) The insurance afforded to addi- Relating To Premises tional insureds described in Par- agraph 8.a.(1) of this endorse- Any state or governmental ment: agency or subdivision or po- litical subdivision you are (a) Only applies to the extent required per Paragraph permitted by law; 8.a.(1) of this endorsement (b) Will not be broader than that to provide insurance, subject which you are required by to the following additional the written contract, written provision: agreement, written permit or This insurance applies only written authorization to pro- with respect to the following vide for such additional in- hazards for which the state sured; and or governmental agency or (c) Does not apply to any per- subdivision or political sub- son, organization, vendor, Includes copyrighted material of Insurance GA 233 TX 09 20 Services Office, Inc., with its permission. Page 12 of 17 (b) Claims made or "suits" 11. Broadened Notice Of Occurrence brought; or Paragraph a. of Condition 2. Duties In (c) Persons or organizations The Event Of Occurrence, Offense, making claims or bringing Claim Or Suit under Section IV - Com- "suits". mercial General Liability Conditions is (2) Deductible Clause replaced by the following: (a) Our obligation to pay dam- a. You must see to it that we are notified as soon as practicable of an "occur- ages on your behalf applies rence"or an offense which may result only to the amount of dam- in a claim. To the extent possible, no- ages for each "occurrence" tice should include: which are in excess of the Deductible Amount shown in (1) How, when and where the "oc- Section B. Limits Of Insur- currence"or offense took place; ance, 9. Property Damage To Borrowed Equipment of (2) The names and addresses of this endorsement. The limits any injured persons and wit- of insurance will not be re- nesses; and duoed by the application of (3) The nature and location of any such deductible amount. injury or damage arising out of (b) Section IV - Commercial the "occurrence"or offense. General Liability Conditions, This requirement applies only when 2. Duties In The Event Of the "occurrence" or offense is known Occurrence, Offense, Claim to any insured listed under Paragraph Or Suit, applies to each 1.of Section II - Who Is An Insured or claim or "suit' irrespective of any "employee" authorized by you to the amount. give or receive notice of an "occur- (c) We may pay any part or all rence"or offense. of the deductible amount to 12. Nonowned Aircraft effect settlement of any claim or "suit' and, upon no- The following is added to Exclusion 2.g. tification of the action taken, Aircraft, Auto Or Watercraft under Sec- you shall promptly reim- tion I - Coverage A - Bodily Injury And burse us for such part of the Property Damage Liability: deductible amount as has been paid by us. This exclusion does not apply to an air- craft you do not own, provided that.- 10. hat:10. Employees As Insureds - Specified Health Care Services And Good Samar- a. The pilot in command holds a current itan Services effective certificate, issued by a duly constituted authority of the United Paragraph 2.a.(1)(d) under Section II - States of America or Canada, desig- Who Is An Insured does not apply to: nating that person as a commercial or 1) Your "employees" who provide pro- airline transport pilot; fessional health care services on your b. The aircraft is rented with a trained, behalf as a duly licensed nurse, paid crew; and emergency medical technician or paramedic in the jurisdiction where an c. The aircraft does not transport per- "occurrence" or offense to which this sons or cargo for a charge. insurance applies takes place; or 13. Bodily Injury Redefined 2) Your "employees" or "volunteer work- Section V - Definitions, 3. "Bodily injury' ers", other than an employed or vol- is replaced by the following: unteer doctor, providing first aid or good samaritan services during their 3. "Bodily injury' means bodily harm or work hours for you will be deemed to injury, sickness, disease, disability, be acting within the scope of their humiliation, shock, fright, mental un- employment by you or performing du- guish or mental injury, including care, ties related to the conduct of your loss of services or death resulting business. from any of these at any time. Includes copyrighted material of Insurance GA 233 TX 09 20 Services Office, Inc., with its permission. Page 14 of 17 formation, fads or pro- and Care, Custody Or Control grams, stored as or on, cre- Liability Coverage in this en- ated or used on, transmitted dorsement. These limits are in- to or from computer soft- clusive of, and not in addition to, ware, including systems and the limits being replaced. The applications software, hard Limits of Insurance shown in the or floppy disks, CD-ROMs, Schedule fix the most we will pay tapes, drives, cells, data regardless of the number of: processing devices or any other media which are used (a) Insureds; with electronically controlled (b) Claims made or "suits" equipment. brought;or b. Care, Custody Or Control Liability (c) Persons or organizations Coverage making claims or bringing For purposes of the coverage provid- "suits". ed by Care, Custody Or Control Lia- (2) (a) Subject to (3) below, the bility Coverage in this endorsement Voluntary Property Damage only: Coverage Each Occurrence (1) Section I - Coverage A - Bodily Limit Of Insurance is the Injury And Property Damage Lia- most we will pay for the sum bility, 2. Exclusions, j. Damage of damages under Voluntary To Property, Paragraphs (3), (4) Property Damage Coverage; and (5) do not apply to "property (b) The Care, Custody Or Con- damage" to the property of oth- trol Liability Coverage Each ers described therein. Occurrence Limit Of Insur- (2) It shall be your duty, not our duty, ance is the most we will pay to defend any claim or "suit" to for the sum of damages un- which this insurance applies. der Care, Custody Or Con- No other obligation or liability to trol Liability Coverage; pay sums or perform acts or ser- because of all "property damage" vices is covered. arising out of any one "occur- rence". This Paragraph (2) supersedes any provision in the Coverage (3) The Voluntary Property Damage Part to the contrary. Coverage, Aggregate Limit Of Insurance is the most we will pay (3) "Property damage" for which for the sum of all damages under Care, Custody Or Control Liabil- Voluntary Property Damage ity Coverage provides coverage Coverage. This limit applies sep- shall be deemed to be caused by arately to each "coverage term". an "occurrence" but shall not serve to limit or restrict the ap- (4) Deductible Clause plicability of any exclusion for (a) Our obligation to pay dam- "property damage" under this ages on your behalf applies Coverage Part. only to the amount of dam- c. Limits Of Insurance And Deducti- ages for each "occurrence" bles which are in excess of the Deductible Amount shown in For purposes of the coverage provid- Section B. Limits Of Insur- ed by Voluntary Property Damage ance, 16.Voluntary Property Coverage and Care, Custody Or Con- Damage Coverage and trol Liability Coverage, Section III - Care, Custody Or Control Limits Of Insurance is amended to Liability Coverage. The lim- include the following: its of insurance will not be (1) The Limits of Insurance shown in reduced by the applicationof such Deductible Amount. the Declarations are replaced by the limits shown in Section B. (b) Section IV - Commercial Limits Of Insurance, 16. Volun- General Liability Conditions, tary Property Damage Coverage 2. Duties In The Event Of Includes copyrighted material of Insurance GA 233 TX 09 20 Services Office, Inc., with its permission. Page 16 of 17 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTORS ADDITIONAL INSURED - AUTOMATIC STATUS AND AUTOMATIC WAIVER OF SUBROGATION WHEN REQUIRED IN WRITTEN CONTRACT, AGREEMENT, PERMIT OR AUTHORIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Additional Insured - Owners, Lessees Or cluded in the "products-completed Contractors - Automatic Status For Other operations hazard", but only if Parties When Required In Written Contract Or Agreement With You (1) The Coverage Part to which this endorsement is attached pro- 1. Section II - Who Is An Insured is vides coverage for"bodily injury" amended to include as an additional in- or "property damage" included sured any person or organization you within the "products-completed have agreed in writing in a contract or operations hazard'; and agreement to add as an additional in- sured on this Coverage Part. Such per- (2) The written contract or written son(s) or organization(s) is an additional agreement requires you pro- insured only with respect to liability for: vide additional insured coverage included within the "products- a. "Bodily injury', "property damage" or completed operations hazard" "personal and advertising injury" for that person or organization. caused, in whole or in part, by the performance of your ongoing opera- If the written contract or written agreement requires you to provide tions by you or on your behalf, under that written contract or written additional insured coverage included agreement. Ongoing operations does within the "products-completed oper- not apply to "bodily injury"or"proper- ations hazard" for a specked length of damage"occurring after: of time for that person or organiza- tion, the "bodily injury" or "property (1) All work, including materials, damage" must occur prior to the ex- parts or equipment furnished in piration of that period of time in order connection with such work, on for this insurance to apply. the project (other than service, maintenance or repairs) to be If the written contract or written performed by or on behalf of the agreement requires you to provide additional insured(s) at the lova- additional insured coverage for a tion of the covered operations person or organization per only ISO has been completed; or additional insured endorsement form number CG 20 10, without specifying (2) That portion of'your work"out of an edition date, and without specifi- which the injury or damage aris- cally requiring additional insured es has been put to its intended coverage included within the "prod- use by any person or organiza- ucts-completed operations hazard", tion other than another contrac- this Paragraph b. does not apply to for or subcontractor engaged in that person or organization. performing operations for a prin- cipal as a part of the same pro- 2. If the written contract or written agree- ject; and ment described in Paragraph 1. above specifically requires you to provide addi- b. "Bodily injury' or "property damage" tional insured coverage to that person or caused, in whole or in part, by 'your organization: work" performed under that written n- a. Arising out of your ongoing opera- contract or written agreement and itions or arising out of'your work'; or Includes copyrighted material of Insurance GA 472 05 20 Services Office, Inc., with its permission. Page 1 of 3 This insurance applies only if the "bodily inju- scribed in Paragraph A. or B. that this in- ry" or "property damage" occurs, or the "per- surance would be primary to any other in- sonal and advertising injury' offense is com- surance available to the additional in- mitted: sured. 1. During the policy period; and As used in this endorsement, wrap-up insur- ance means a centralized insurance program 2. Subsequent to your execution of the writ- under which one party has secured either in- ten contract or written agreement, or the surance or self-insurance covering some or all issuance of a written permit or written au- of the contractors or subcontractors perform- thorization, described in Paragraphs A. ing work on one or more specific project(s). and B. F. Except when G. below applies, the following is Primary And Noncontributory Insurance added to Section IV - Commercial General When Required By Written Contract, Liability Conditions, Other Insurance, and Agreement, Permit Or Authorization supersedes any provision to the contrary: Except when wrap-up insurance applies to the claim or "suit' on behalf of the additional in- When Other Additional Insured Coverage sured, this insurance is primary to and will not Applies On An Excess Basis seek contribution from any other insurance This insurance is primary to other insurance available to the additional insured described in available to the additional insured described in Paragraphs A.and B. provided that: Paragraphs A.and B.except: 1. The additional insured is a Named In- 1. As otherwise provided in Section IV - sured under such other insurance; and Commercial General Liability Condi- 2. You have agreed in writing in a contract, tions, Other Insurance, b. Excess In- agreement, permit or authorization de- surance; or scribed in Paragraph A. or B. that this in- 2. For any other valid and collectible insur- surance would be primary and would not ance available to the additional insured as seek contribution from any other insur- an additional insured on another insur- ance available to the additional insured. ance policy that is written on an excess As used in this endorsement, wrap-up insur- basis. In such case, this insurance is also ance means a centralized insurance program excess. under which one party has secured either in- G. The following is added to Section IV - Com- surance or self-insurance covering some or all mercial General Liability Conditions, Other of the contractors or subcontractors perform- Insurance, and supersedes any provision to ing work on one or more specific project(s). the contrary: N. Section IV - Commercial General Liability Primary Insurance When Required By Writ- Conditions, Transfer Of Rights Of Recov- ten Contract, Agreement, Permit Or Au- ery Against Others To Us is amended by the thorization addition of the following: Except when wrap-up insurance applies to the Waiver of Subrogation claim or "suit' on behalf of the additional in- We waive any right of recovery against any sured, this insurance is primary to any other additional insured under this endorsement, insurance available to the additional insured because of any payment we make under this described in Paragraphs A. and B. provided endorsement, to whom the insured has that: waived its right of recovery in a written con- 1. The additional insured is a Named In- tract, written agreement, written permit or writ- sured under such other insurance; and ten authorization. Such waiver by us applies only to the extent that the insured has waived 2. You have agreed in writing in a contract, its right of recovery against such additional in- agreement, permit or authorization de- sured prior to loss. Includes copyrighted material of Insurance GA 472 05 20 Services Office, Inc., with its permission. Page 3 of 3 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - CG 20 37 07 04 - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Location And Description Of Completed Or Organization(s): Operations: 1.Any person or organization for whom you are Any location at which work or operations were performed performing operations when you and such person or by you or on your behalf organization have agreed in writing in a contract or agreement that such person or organization can be added as an additional insured on your policy. 2.Any person or organization you are required to add as an additional insured under the contract or agreement in Paragraph 1 above. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Section II - Who Is An Insured is amended to in- clude as an additional insured the person(s) or organ- ization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the loca- tion designated and described in the schedule of this endorsement performed for that additional insured and included in the "products-completed operations hazard". CG 20 37 07 04 © ISO Properties, Inc., 2004 Includes copyrighted material of Insurance GA 4519 05 20 Services Office, Inc., with its permission. Page 1 of 1 of"bodily injury"or"property damage" included doned and then restarted, or if the authorized in the "products-completed operations hazard" contracting parties deviate from plans, blue- will reduce the Products-completed Operations prints, designs, specifications or timetables, Aggregate Limit, and not reduce the General the project will still be deemed to be the same Aggregate Limit nor the Designated Construc- construction project. tion Project General Aggregate Limit. E. The provisions of Section III - Limits Of Insur- D. If the applicable designated construction pro- ance not otherwise modified by this endorse- ject has been abandoned, delayed, or aban- ment shall continue to apply as stipulated. CG 25 03 05 09 ©Insurance Services Office, Inc., 2008 Page 2 of 2 ❑ 00700 GENERAL CONDITIONS City of Round Rock Contract Forms General Conditions Section 00700 TABLE OF CONTENTS OF GENERAL CONDITIONS Article Page Number& Title Number 1. DEFINITIONS.................................................................................................................................................2 2. PRELIMINARY MATTERS.............................................................................................................................5 3. CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE........................................................................7 4. AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS..........................................................................................................8 5. BONDS AND INSURANCE............................................................................................................................10 6. CONTRACTOR'S RESPONSIBILITIES.........................................................................................................16 7. OTHER WORK ..............................................................................................................................................24 8. OWNER'S RESPONSIBILITIES....................................................................................................................25 9. ENGINEER/ARCHITECT'S STATUS DURING CONSTRUCTION...............................................................26 10. CHANGES IN THE WORK ............................................................................................................................27 11. CHANGE OF CONTRACT AMOUNT............................................................................................................28 12. CHANGE OF CONTRACT TIMES.................................................................................................................31 13. TESTS AND INSPECTIONS; AND CORRECTION OR REMOVAL OF DEFECTIVE WORK........................................................................................................32 14. PAYMENTS TO CONTRACTOR AND COMPLETION .................................................................................35 15. SUSPENSION OF WORK AND TERMINATION...........................................................................................39 16. DISPUTE RESOLUTION ...............................................................................................................................41 17 RIGHT TO AUDIT..........................................................................................................................................42 18. MISCELLANEOUS.........................................................................................................................................43 00700 04-2020 Page 1 General Conditions 00443641 GENERAL CONDITIONS ARTICLE 1 -DEFINITIONS Whenever used in these General Conditions or in the other Contract Documents,the term printed with initial capital letters or all capital letters, including the term's singular and plural forms, will have the meaning indicated in the definitions below or as defined in these General Conditions or other Contract Documents: 1.1 Addenda - Written or graphic instruments issued prior to the receipt of Proposals or the opening of Bids that clarify, correct or change the proposal or bidding requirements or the Contract Documents. 1.2 Agreement- Prescribed form, referenced as Section 00500. 1.3 Alternative Dispute Resolution -The process by which a disputed Claim may be settled if the OWNER and the CONTRACTOR cannot reach an agreement between themselves, as an alternative to litigation. 1.4 Bid - Proposal of bidder on prescribed forms setting forth prices for performing the Work described in the Contract Documents. 1.5 Bid Documents-The advertisement or invitation for bids, instructions to bidders, the bid form, the Contract Documents and Addenda. 1.6 Calendar Day-Any day of the week; no days being excepted. Work on Saturdays, Sundays, and/or Legal Holidays shall only be conducted with prior express written consent of the OWNER. 1.7 Change Directive-A written directive to the CONTRACTOR, signed by the OWNER, ordering a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Amount or Contract Time, or both. A Change Directive may be used in the absence of total agreement on the terms of a Change Order. A Change Directive does not change the Contract Amount or Contract Time, but is evidence that the parties expect that the change directed or documented by a Change Directive will be incorporated in a subsequently issued Change Order. 1.8 Change Orders - Written agreements entered into between the CONTRACTOR and the OWNER authorizing an addition,deletion,or revision to the Contract, issued on or after the Execution Date of the Agreement and within the Contract term. 1.9 Claim - A written demand seeking, as a matter of right, adjustment or interpretation of Contract terms, payment of money, extension of time or other relief with respect to the terms of the Contract. 1.10 Contract - The Contract represents the entire and integrated agreement between the OWNER and the CONTRACTOR for performance of the Work, as evidenced by the Contract Documents. 1.11 Contract Amount-The amount payable by the OWNER to the CONTRACTOR for completion of the Work in accordance with the Contract Documents. 1.12 Contract Documents — Includes the Invitation to Bid, Instructions to Bidders, Agreement, General Conditions, Supplemental General Conditions, Special Conditions, Specifications, Project Manual, Drawings, Addenda and Change Orders. 1.13 Contract Time-The number of days allowed for completion of the Work as defined by the Contract. When any period is referred to in days, it will be computed to exclude the first and include the last day of such period. A day of twenty-four(24) hours measured from midnight to the next midnight will constitute a day. 1.14 CONTRACTOR - The individual, firm, corporation, or other business entity with whom the OWNER has entered into the Contract. 00700 04-2020 Page 2 General Conditions 1.15 Drawings - Those portions of the Contract Documents which are graphic representations of the scope, extent and character of the Work to be furnished and performed by the CONTRACTOR and which have been approved by the OWNER. Drawings may include plans, elevations, sections, details, schedules and diagrams. Shop Drawings are not Drawings as so defined. 1.16 Engineer/Architect (E/A - The OWNER's design professional identified as such in the Agreement. The titles of"Architect/Engineer," "Architect"and "Engineer" used in the Contract Documents shall be read the same as Engineer/Architect (E/A). Nothing contained in the Contract Documents shall create any contractual or agency relationship between E/A and the CONTRACTOR. 1.17 Equal - The terms "equal" or"approved equal" shall have the same meaning. 1.18 Execution Date - Date of last signature of the parties to the Agreement. 1.19 Field Order - A written order issued by Owner's Representative which orders minor changes in the Work and which does not involve a change in the Contract Amount or the Contract Time. 1.20 Final Acceptance—The stage in the Contract process when, in the OWNER's opinion, Final Completion of the Work has been attained and a Certificate of Acceptance approved by the OWNER is issued. 1.21 Final Completion - The stage in the progress of the Work when, in the OWNER's opinion, the entire Work has been completed, the CONTRACTOR's obligations under the Contract Documents have been fulfilled, and the OWNER is processing or has made final payment to the CONTRACTOR, as evidenced by a Certificate of Acceptance approved by the OWNER. 1.22 Inspector- The authorized representative of any regulatory agency that has jurisdiction over any portion of the Work. 1.23 Legal Holidays 1.23.1 The following are recognized by the OWNER: Holiday Date Observed New Year's Day January 1 Martin Luther King, Jr.'s Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Veteran's Day November 11 Thanksgiving Day Fourth Thursday in November Friday after Thanksgiving Friday after Thanksgiving Christmas Eve December 24 Christmas Day December 25 00700 04-2020 Page 3 General Conditions 1.23.2 If a Legal Holiday falls on Saturday, it will be observed on the preceding Friday. If a Legal Holiday falls on Sunday, it will be observed on the following Monday. 1.23.3 If Christmas Eve falls on a Saturday or a Sunday, the preceding Friday is observed as the Christmas Eve holiday. 1.23.4 If Christmas Day falls on a Saturday or a Sunday, the following Monday is observed as the Christmas Day holiday. 1.24 Milestones-A significant event specified in the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work. 1.25 Notice to Proceed - A Written Notice given by the OWNER to the CONTRACTOR notifying the CONTRACTOR to commence the Work and which may also fix the date on which the Contract Times will commence to run and on which the CONTRACTOR shall start to perform the CONTRACTOR's obligations under the Contract Documents. 1.26 OWNER—The City of Round Rock, Texas, a municipal corporation, home-rule city and political subdivision organized and existing under the laws of the State of Texas, acting through the City Manager or his/her designee, officers, agents or employees to administer design and construction of the Project. 1.27 Owner's Representative -The designated representative of the OWNER. 1.28 Partial Occupancy or Use - Use by the OWNER of a partially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. 1.29 Project - The total construction of which the Work to be provided under the Contract Documents may be the whole, or a part, as indicated elsewhere in the Contract Documents. 1.30 Project Manual - That portion of the Contract Documents which may include the following: introductory information; bidding requirements, Contract forms and General and Supplemental General Conditions; General Requirements; Specifications; Drawings; Project Safety Manual; and Addenda. 1.31 Proposal — Proposal of Offeror, on prescribed forms setting forth prices for performing the Work described in the Contract Documents. 1.32 Proposal Documents—The advertisement or invitation for Proposals, Instruction to Offerors, the Proposal form, the Contract Documents and Addenda. 1.33 Resident Project Representative - The authorized representative of E/A who may be assigned to the site or any part thereof. 1.34 Shop Drawings - All drawings, diagrams, illustrations, schedules and other data or information which are specifically prepared or assembled by or for the CONTRACTOR and submitted by the CONTRACTOR as required by the Contract Documents. 1.35 Specifications - Those portions of the Contract Documents consisting of written technical descriptions as applied to the Work, which set forth to the CONTRACTOR, in detail, the requirements which must be met by all materials, equipment, construction systems, standards, workmanship, equipment and services in order to render a completed and useful project. 1.36 Substantial Completion - The stage in the progress of the Work when the Work, or designated portions thereof, may still require minor modifications or adjustments but, in the OWNER's opinion,the Work has progressed to the point such that all parts of the Work under consideration are fully operational and the beneficial use and occupancy of which can be assumed by the Owner, as evidenced by a Certificate of Substantial Completion approved by the OWNER. 00700 04-2020 Page 4 General Conditions 1.37 Subcontractor-An individual, firm, or corporation having a direct contract with the CONTRACTOR for the performance of a part of the Work. 1.38 Sub-subcontractor-A person or entity who has a direct or indirect contract with a Subcontractor or a Sub- subcontractor of any tier to perform a portion of the Work. 1.39 Superintendent - The representative of the CONTRACTOR authorized in writing to receive and fulfill instructions from Owner's Representative, and who shall supervise and direct construction of the Work. 1.40 Supplemental General Conditions - The part of the Contract Documents which either amends or supplements the General Conditions. All General Conditions which are not so amended or so supplemented shall be considered as remaining in full force and effect. 1.41 Supplier-An individual or entity having a direct contract with the CONTRACTOR or with any Subcontractor or Sub-subcontractor to furnish materials or equipment to be incorporated in the Work by the CONTRACTOR or any Subcontractor. 1.42 Time Extension Request-An approved request for time extension on a form acceptable to the OWNER. 1.43 Work - The entire completed construction, or the various separately identifiable parts thereof, required to be furnished under the Contract Documents. 1.44 Working Day - Any day of the week, not including Saturdays, Sundays, or Legal Holidays, in which conditions not under the CONTRACTOR's control will permit work for at least seven (7) hours of the Working Times. Upon authorization by the Owner's Representative, work on Saturdays, Sundays and/or Legal Holidays may be allowed and, in that event, a Working Day will be counted for each such day. 1.45 Working Times — Times of day(s) during which work may be performed. Unless authorized by Owner's Representative, all Work shall be performed between 7:00 a.m. and 6:00 p.m. on weekdays and, if previously authorized as provided for in paragraph 1.44 or paragraph 1.6 herein, as applicable, between 9:00 a.m. and 6:00 p.m. on Saturdays, Sundays or Legal Holidays. When the CONTRACTOR has been authorized to perform Work during hours outside Working Times, such hours shall be considered time worked on Working Day contracts. Notwithstanding the preceding, emergency work may be done without prior permission only as provided in paragraph 6.11.5 herein. 1.46 Written Notice-Written communication between the OWNER and the CONTRACTOR. Written Notice shall be deemed to have been duly served if delivered in person to Owner's Representative or to the CONTRACTOR's duly authorized representative, or if such Written Notice is delivered to or sent by registered or certified mail to the attention of Owner's Representative or to the CONTRACTOR's duly authorized representative at the last business address known to the party giving notice. ARTICLE 2 - PRELIMINARY MATTERS 2.1 Delivery of Agreement, Bonds, Insurance, and Other Documentation: Within ten (10) Calendar Days after written notification of award of Contract, the CONTRACTOR shall deliver to the OWNER signed Agreement, Bond(s), Insurance Certificate(s) and other documentation required for execution of the Contract. 2.2 Copies of Documents: The OWNER shall furnish to the CONTRACTOR two (2) copies of the Contract Documents unless otherwise specified. 00700 04-2020 Page 5 General Conditions 2.3 Commencement of Contract Times; Notice to Proceed: The Contract Time(s) commence on the date indicated in the Agreement or in the Notice to Proceed. Notice to Proceed will be given at any time within sixty(60) Calendar Days after the Execution Date of the Agreement, unless extended by written agreement of the parties. 2.4 Before Starting Construction: 2.4.1 No Work shall be done at the site prior to the preconstruction conference without the OWNER's approval. Before undertaking each part of the Work, the CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements. The CONTRACTOR shall promptly report in writing to Owner's Representative any conflict, error, ambiguity or discrepancy which the CONTRACTOR may discover and shall obtain a written interpretation or clarification from Owner's Representative before proceeding with any Work affected thereby. The CONTRACTOR shall be liable to the OWNER for failure to report any conflict, error, ambiguity or discrepancy in the Contract Documents of which the CONTRACTOR knew or reasonably should have known. 2.4.2 The CONTRACTOR shall submit the following to Owner's Representative for review and approval no later than the preconstruction conference: .1 a preliminary progress schedule indicating the times (number of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract Documents, identifying when all Subcontractors will be utilized, and taking into consideration any limitations on Working Hours; .2 a preliminary schedule of Shop Drawing and sample submittals; .3 a preliminary schedule of values for all of the Work, subdivided into component parts in sufficient detail to serve as the basis for progress payments during construction. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work. The preliminary schedule of values submitted by the CONTRACTOR should include a reasonable estimation of value of each item included and shall not contain disproportionate values assigned to any item or items; .4 a letter designating CONTRACTOR's Superintendent; .5 a letter from the CONTRACTOR and Subcontractor(s) listing any salaried specialists; .6 if applicable, a letter designating the "Competent Person(s)" on general safety and trench safety measures; .7 if applicable, a trench safety system plan; .8 if applicable, a plan illustrating proposed locations of temporary facilities; .9 if applicable, a traffic control plan; .10 a completed Non-Use of Asbestos Affidavit (Prior to Construction); and .11 if applicable, a letter designating the Texas Registered Professional Land Surveyor for layout of the Work. 2.5 Preconstruction Conference: Prior to commencement of Work at the site, a preconstruction conference attended by the CONTRACTOR, Owner's Representative and others will be held. 00700 04-2020 Page 6 General Conditions 2.6 Initially Acceptable Schedules: Unless otherwise provided in the Contract Documents, the CONTRACTOR shall obtain approval of Owner's Representative on final versions of the schedules submitted in accordance with paragraph 2.4.2 before the first progress payment will be made to the CONTRACTOR. The progress schedule must provide for an orderly progression of the Work to completion within any specified Milestones and Contract Times. Acceptance of the schedule by Owner's Representative will neither impose on Owner's Representative responsibility for the sequencing, scheduling or progress of the Work nor interfere with or relieve the CONTRACTOR from the CONTRACTOR's full responsibility therefor. The CONTRACTOR's schedule of Shop Drawings and sample submissions must provide an arrangement agreeable to the parties for reviewing and processing the required submittals. 2.7 Electronic Transmittals: 2.7.1 Except as otherwise stated elsewhere in the Contract Documents, the OWNER, E/A, and CONTRACTOR may transmit, and shall except, Project-related correspondence, texts, data, documents, drawings, information, and graphics, including but not limited to Shop Drawings and other submittals, in electronic media or digital format, either directly, or through access to a secure Project website. 2.7.2 When transmitting items in electronic media or digital format, the transmitting party makes no representations as to long term compatibility, usability, or readability of the items resulting from the recipient's use of software application packages, operating systems, or computer hardware differing from those used in the drafting or transmittal of the items. ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.1 Intent: 3.1.1 The intent of the Contract Documents is to include all information necessary for the proper execution and completion of the Work by the CONTRACTOR. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all. In cases of disagreement, the following order of precedence shall govern (top item receiving priority of interpretation): Change Orders Modifications to the Contract Documents made after the Execution Date Signed Agreement Addenda to the Contract Documents Special Conditions Supplemental General Conditions General Conditions Other Bidding Requirements and Contract Forms Special Provisions to the Standard Technical Specifications Special Specifications Standard Technical Specifications Drawings (figured dimensions shall govern over scaled dimensions) Project Safety manual, if applicable 3.1.2 Unless otherwise stated in the Contract Documents,words which have well-known technical or construction industry meanings are used in the Contract Documents in accordance with such recognized meanings. 3.2 Reporting and Resolving Discrepancies: Prior to commencing the Work, the CONTRACTOR shall review the Contract Documents for the purpose of discovering any conflict, error, ambiguity or discrepancy in the Contract Documents. If, at any time, the CONTRACTOR discovers any conflict, error, ambiguity or discrepancy within the Contract Documents or between the Contract Documents and any provisions of any such law or regulation applicable to the performance of the Work 00700 04-2020 Page 7 General Conditions or of any such standard, specification, manual or code or instructions of any Supplier, the CONTRACTOR shall immediately report it to Owner's Representative in writing, and the CONTRACTOR shall not proceed with the Work affected thereby until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in paragraph 3.3.1 or paragraph 3.3.2. The CONTRACTOR shall be liable to the OWNER for failure to report any such conflict, error, ambiguity or discrepancy of which the CONTRACTOR knew or reasonably should have known. 3.3 Amending and Supplementing Contract Documents: 3.3.1 The Contract Documents may be amended to provide for additions, deletions and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: .1 Change Order. .2 Change Directive. 3.3.2 In addition, the requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, in one or more of the following ways: .1 Field Order. .2 Review of a Shop Drawing or sample. .3 Written interpretation or clarification. 3.4 Reuse of Documents Prohibited: The CONTRACTOR and any Subcontractor or Supplier or other person or organization performing or furnishing any of the Work under a direct or indirect contract with the OWNER: (i) shall not have or acquire any title to or ownership rights in any of the Drawings, Specifications or other documents (or copies of any thereof) prepared by or bearing the seal of E/A or E/A's consultants, and (ii) shall not reuse any of such Drawings, Specifications, other documents or copies on extensions of the Project or any other project without written consent of the OWNER and E/A. ARTICLE 4-AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS 4.1 Availability of Lands: The OWNER shall furnish, as indicated in the Contract Documents, all required rights to use the lands upon which the Work is to be performed, rights-of-way and easements for access thereto, and such other lands which are designated for the use of the CONTRACTOR. The OWNER shall identify any encumbrances or restrictions not of general application but specifically related to use of lands so furnished with which the CONTRACTOR will have to comply in performing the Work. Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by the OWNER, unless otherwise provided in the Contract Documents. If the OWNER fails to furnish these lands, rights-of-way or easements in a timely manner, the CONTRACTOR may make a Claim for adjustments in the Contract Times. The CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment. 4.2 Subsurface and Physical Conditions: 4.2.1 The CONTRACTOR hereby covenants that it has examined the site of the proposed Work and is familiar with all of the conditions surrounding construction of the Project, having conducted all inquiries, tests and investigations deemed necessary and proper. Unless the CONTRACTOR, prior to the execution of the Agreement, has notified the OWNER in writing of any condition of the site of the proposed Work that would adversely impact 00700 04-2020 Page 8 General Conditions the performance of the Work by the CONTRACTOR, CONTRACTOR covenants that there are no conditions at the site of the proposed work which would adversely impact the performance of Work by the CONTRACTOR. 4.2.2 If conditions are encountered at the site which are (1) subsurface or otherwise concealed physical conditions that differ materially from those indicated in the Contract Documents or(2) unknown physical conditions of an unusual nature, that differ materially from those normally encountered in the type of work being performed under this Contract, then notice by the observing party shall be given to the other party promptly before conditions are disturbed and in no event later than seven (7) calendar days after first observance of the conditions. Owner's Representative will promptly investigate such conditions with E/A and, if they differ materially and cause an increase or decrease in the CONTRACTOR's cost of, or time required for, performance of any part of the Work, OWNER will consider an equitable adjustment in the Contract Amount or Contract Time, or both. If Owner's Representative determines that the conditions at the site are not materially different from those indicated in the Contract Documents and that no change in the terms of the Contract is justified, the CONTRACTOR shall be notified in writing, stating the reasons. Any disputes arising from Owner's Representative's determination shall be resolved in accordance with Article 16. 4.2.3 Notwithstanding any other provision of this Contract, the CONTRACTOR shall be solely responsible for the location and protection of any and all public lines and utility customer service lines in the Work area. For the purposes of this section, "public lines"means the utility distribution and supply system within public rights-of-way or easements, and "utility customer service lines" (service) means any utility line connecting a utility customer to the utility distribution system. Generally, existing service connections within right-of-way or easements are not shown on the Drawings. The CONTRACTOR shall notify the OWNER and "One Call"and exercise due care to locate and to mark, uncover or otherwise protect all such lines in the construction zone and any of the CONTRACTOR's work or storage areas. The CONTRACTOR's obligation hereunder shall be primary and nondelegable. The CONTRACTOR shall indemnify or reimburse the OWNER for such expenses or costs (including fines that may be levied against the OWNER) that may result from unauthorized or accidental damage to all public lines and utility customer service lines in the Work area.The OWNER reserves the right to repair such damage the CONTRACTOR may cause, at the CONTRACTOR's expense. 4.2.4 The CONTRACTOR shall take reasonable precaution to avoid disturbing primitive records and antiquities of archaeological, paleontological or historical significance. No objects of this nature shall be disturbed without written permission of the OWNER and the Texas Department of Antiquities Protection. When such objects are uncovered unexpectedly, the CONTRACTOR shall stop all Work in close proximity and notify Owner's Representative and the Texas Department of Antiquities Protection of their presence and shall not disturb them until written permission and permit to do so is granted.All primitive rights and antiquities uncovered on the OWNER's property shall remain property of the State of Texas, the Texas Department of Antiquities Protection conforming to the Texas Natural Resources Code. If it is determined by the OWNER, in consultation with the Texas Department of Antiquities Protection,that exploration or excavation of primitive records or antiquities on Project site is necessary to avoid loss, the CONTRACTOR shall cooperate in salvage work attendant to preservation. If the Work stoppage or salvage work causes an increase in the CONTRACTOR's cost of, or time required for, performance of the Work, the Contract Amount and/or Contract Time may be equitably adjusted. 4.3 Reference Points: Unless otherwise specified, the OWNER will furnish all reference points, benchmarks, survey monuments, and control points which, in the OWNER's opinion,are suitable for laying out the Work. Such benchmarks and reference points will be placed at intervals not to exceed 1,500 feet. All reference points, benchmarks, survey monuments and control points shall be carefully preserved by the CONTRACTOR by use of flags, laths or other appropriate measures and, in case of destruction or removal by the CONTRACTOR or its employees, such reference points, benchmarks, survey monuments, and control points shall be replaced by a Registered Professional Land Surveyor at the CONTRACTOR's expense. When reference points, benchmarks, survey monuments, or control points are in conflict with the Work, then reestablishment will be the OWNER's responsibility during or upon completion of the Work. 4.4 Hazardous Materials: 00700 04-2020 Page 9 General Conditions 4.4.1 The OWNER shall be responsible for any hazardous material uncovered or revealed at the site which was not shown, indicated or identified in the Contract Documents to be within the scope of the Work and which may present a substantial danger to persons or property exposed thereto in connection with the Work at the site. The CONTRACTOR shall immediately notify Owner's Representative of any suspected hazardous materials encountered before or during performance of the Work and shall take all necessary precautions to avoid further disturbance of the materials. 4.4.2 The CONTRACTOR shall be responsible for any hazardous materials brought to the site by the CONTRACTOR, Subcontractor, Suppliers or anyone else for whom the CONTRACTOR is responsible. 4.4.3 No asbestos-containing materials shall be incorporated into the Work or brought on the Project site without prior approval of the OWNER. 4.4.4 TO THE FULLEST EXTENT PERMITTED BY LAWS AND REGULATIONS, CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS OWNER, AND ITS COUNCIL MEMBERS, EMPLOYEES, AGENTS, AND CONSULTANTS FROM AND AGAINST ALL CLAIMS, COSTS, LOSSES, AND DAMAGES (INCLUDING BUT NOT LIMITED TO ALL FEES AND CHARGES OF ENGINEERS, ARCHITECTS, ATTORNEYS, AND OTHER PROFESSIONALS AND ALL COURT OR ARBITRATION OR OTHER DISPUTE RESOLUTION COSTS) ARISING OUT OF OR RELATING TO FAILURE TO CONTROL, CONTAIN OR REMOVE A HAZARDOUS MATERIAL BROUGHT TO THE SITE BY CONTRACTOR OR BY ANYONE FOR WHOM CONTRACTOR IS RESPONSIBLE, OR TO A HAZARDOUS ENVIRONMENTAL CONDITION CREATED BY CONTRACTOR OR BY ANYONE FOR WHOM CONTRACTOR IS RESPONSIBLE. ARTICLE 5 - BONDS AND INSURANCE 5.1 Surety and Insurance Companies: All bonds and insurance required by the Contract Documents shall be obtained from solvent surety or insurance companies that are duly licensed by the State of Texas and authorized to issue bonds or insurance policies for the limits and coverages required by the Contract Documents. The bonds shall be in a form acceptable to the OWNER and shall be issued by a surety which complies with the requirements of Chapter 3503, Texas Insurance Code (2005) and which is otherwise acceptable to the OWNER. OWNER may require the surety to obtain reinsurance for any portion of the risk that exceeds 10% of the surety's capital and surplus. For bonds exceeding $100,000, the surety must also hold a certificate of authority from the U.S. Secretary of the Treasury or have obtained reinsurance from a reinsurer that is authorized as a reinsurer in Texas and holds a certificate of authority from the U.S. Secretary of the Treasury. 5.2 Workers' Compensation Insurance Coverage: 5.2.1 Definitions: .1 Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on the Project, for the duration of the Project. .2 Duration of the Project - includes the time from the beginning of the Work on the Project until the CONTRACTOR's/ person's Work on the Project has been completed and accepted by the OWNER. .3 Persons providing services on the Project ("subcontractor" herein) - includes all persons or entities performing all or part of the services the CONTRACTOR has undertaken to perform on the Project, regardless of whether that person contracted directly with the CONTRACTOR and regardless of whether that person has employees. This includes, by way of illustration and not of limitation, 00700 04-2020 Page 10 General Conditions independent contractors, Subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the Project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. 5.2.2 The CONTRACTOR shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the CONTRACTOR providing services on the Project, for the duration of the Project. 5.2.3 The OWNER will not execute the Contract prior to the CONTRACTOR providing all required certificates of coverage. 5.2.4 If the coverage period shown on the CONTRACTOR's current certificate of coverage ends during the duration of the Project, the CONTRACTOR must, prior to the end of the coverage period, file a new certificate of coverage with the OWNER showing that coverage has been extended. 5.2.5 The CONTRACTOR shall obtain from each person providing services on the Project, and provide to the OWNER: .1 a certificate of coverage, prior to that person beginning Work on the Project, so the OWNER will have on file certificates of coverage showing coverage for all persons providing services on the Project; and .2 no later than seven (7)days after receipt by the CONTRACTOR, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. 5.2.6 The CONTRACTOR shall retain all required certificates of coverage for the duration of the Project and for one (1)year thereafter. 5.2.7 The CONTRACTOR shall notify the OWNER in writing by certified mail or personal delivery within ten (10) days after the CONTRACTOR knew or should have known of any change that materially affects the provision of coverage of any person providing services on the Project. 5.2.8 The CONTRACTOR shall post at its office or on each Project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. 5.2.9 The CONTRACTOR shall contractually require each person with whom it contracts to provide services on a Project to: .1 provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the Project, for the duration of the Project; .2 provide to the CONTRACTOR, prior to that person beginning Work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project, for the duration of the Project; .3 provide the CONTRACTOR, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 00700 04-2020 Page 11 General Conditions .4 obtain from each other person with whom it contracts, and provide to the CONTRACTOR: a) a certificate of coverage, prior to the other person beginning Work on the Project; and b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; .5 retain all required certificates of coverage on file for the duration of the Project and for one (1) year thereafter; .6 notify the OWNER in writing by certified mail or personal delivery within ten (10)days after the person knew or should have known of any change that materially affects the provision of coverage of any person providing services on the Project; and .7 contractually require each person with whom it contracts, to perform as required by paragraphs 5.2.9.1 - 5.2.9.7, with the certificates of coverage to be provided to the person for whom they are providing services. 5.2.10 By signing this Contract or providing or causing to be provided a certificate of coverage, the CONTRACTOR is representing to the OWNER that all employees of the CONTRACTOR who will provide services on the Project will be covered by workers'compensation coverage for the duration of the Project,that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the CONTRACTOR to administrative penalties, criminal penalties, civil penalties, or other civil actions. 5.2.11 The CONTRACTOR's failure to comply with any of these provisions is a breach of Contract by the CONTRACTOR which entitles the OWNER to declare the Contract void if the CONTRACTOR does not remedy the breach within ten (10)days after receipt of notice of breach from the OWNER. 5.3 Contractor Insurance Requirements: For specific bond requirements and additional insurance requirements, refer to the Supplemental General Conditions. 5.3.1.1 General Requirements: .1 CONTRACTOR shall carry insurance in the types and amounts indicated below for the duration of the Contract, which shall include items owned by OWNER in the care, custody and control of CONTRACTOR prior to and during construction and warranty period. .2 CONTRACTOR must complete and forward the required Certificates of Insurance to OWNER before the Contract is executed as verification of coverage required below. CONTRACTOR shall not commence Work until the required insurance is obtained and until such insurance has been reviewed by OWNER. Approval of insurance by OWNER shall not relieve or decrease the liability of CONTRACTOR hereunder and shall not be construed to be a limitation of liability on the part of CONTRACTOR. CONTRACTOR must also complete and forward the required Certificates of Insurance to OWNER whenever a previously identified policy period has expired as verification of continuing coverage. .3 CONTRACTOR's insurance coverage is to be written by companies licensed to do business in the State of Texas at the time the policies are issued and shall be written by companies with A.M. Best ratings of B+VII or better, except for hazardous material insurance which shall be written by companies with A.M. Best ratings of A-or better. 00700 04-2020 Page 12 General Conditions .4 All endorsements naming the OWNER as additional insured, waivers, and notices of cancellation endorsements as well as the Certificate of Insurance shall indicate: City of Round Rock, 221 E. Main St., Round Rock, Texas 78664. .5 The "other" insurance clause shall not apply to the OWNER where the OWNER is an additional insured shown on any policy. It is intended that policies required in the Contract, covering both OWNER and CONTRACTOR, shall be considered primary coverage as applicable. .6 If insurance policies are not written for amounts specified below, CONTRACTOR shall carry Umbrella or Excess Liability Insurance for any differences in amounts specified. If Excess Liability Insurance is provided, it shall follow the form of the primary coverage. .7 OWNER shall be entitled, upon request and without expense, to receive certified copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modification of particular policy terms, conditions, limitations, or exclusions except where policy provisions are established by law or regulations binding upon either of the parties hereto or the underwriter on any such policies. .8 OWNER reserves the right to review the insurance requirements set forth during the effective period of this Contract and to make reasonable adjustments to insurance coverage, limits, and exclusions when deemed necessary and prudent by OWNER based upon changes in statutory law, court decisions, the claims history of the industry or financial condition of the insurance company as well as CONTRACTOR. .9 CONTRACTOR shall not cause any insurance to be canceled nor permit any insurance to lapse during the term of the Contract or as required in the Contract. .10 CONTRACTOR shall be responsible for premiums, deductibles and self-insured retentions, if any, stated in policies. All deductibles or self-insured retentions shall be disclosed on the Certificate of Insurance. .11 CONTRACTOR shall provide OWNER thirty (30) days written notice of erosion of the aggregate limits below occurrence limits for all applicable coverages indicted within the Contract. .12 If OWNER-owned property is being transported or stored off-site by CONTRACTOR, then the appropriate property policy will be endorsed for transit and storage in an amount sufficient to protect OWNER's property. .13 The insurance coverages required under this contract are required minimums and are not intended to limit the responsibility or liability of CONTRACTOR. 5.3.1.2 Business Automobile Liability Insurance. Provide coverage for all owned, non-owned and hired vehicles. The policy shall contain the following endorsements in favor of OWNER: a) Waiver of Subrogation endorsement TE 2046A; b) 30 day Notice of Cancellation endorsement TE 0202A; and c) Additional Insured endorsement TE 9901 B. Provide coverage in the following types and amounts: 00700 04-2020 Page 13 General Conditions .1 A minimum combined single limit of$500,000 per occurrence for bodily injury and property damage. Alternate acceptable limits are $250,000 bodily injury per person, $500,000 bodily injury per occurrence and at least$100,000 property damage liability each accident. 5.3.1.3 Workers'Compensation and Employers' Liability Insurance: Coverage shall be consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Section 401). CONTRACTOR shall assure compliance with this Statute by submitting two (2) copies of a standard certificate of coverage (e.g. ACCORD form) to Owner's Representative for every person providing services on the Project as acceptable proof of coverage. The required Certificate of Insurance must be presented as evidence of coverage for CONTRACTOR. Workers' Compensation Insurance coverage written by the Texas Workers Compensation Fund is acceptable to OWNER. CONTRACTOR's policy shall apply to the State of Texas and include these endorsements in favor of OWNER: a) Waiver of Subrogation, form WC 420304; and b) 30 day Notice of Cancellation, form WC 420601. The minimum policy limits for Employers' Liability Insurance coverage shall be as follows: .1 $100,000 bodily injury per accident, $500,000 bodily injury by disease policy limit and $100,000 bodily injury by disease each employee. 5.3.1.4 Commercial General Liability Insurance. The Policy shall contain the following provisions: a) Blanket contractual liability coverage for liability assumed under the Contract and all contracts relative to this Project. b) Completed Operations/Products Liability for the duration of the warranty period. c) Explosion, Collapse and Underground (X, C & U)coverage. d) Independent Contractors coverage. e) Aggregate limits of insurance per project, endorsement CG 2503. f) OWNER listed as an additional insured, endorsement CG 2010. g) 30 day notice of cancellation in favor of OWNER, endorsement CG 0205. h) Waiver of Transfer of Recovery Against Others in favor of OWNER, endorsement CG 2404. Provide coverages A&B with minimum limits as follows: .1 A combined bodily injury and property damage limit of$500,000 per occurrence. 5.3.1.5 Builders' Risk Insurance. CONTRACTOR shall maintain Builders' Risk Insurance or Installation Insurance on an all risk physical loss form in the Contract Amount. Coverage shall continue until the Work is accepted by OWNER. OWNER shall be a loss payee on the policy. If off site storage is permitted, coverage shall include transit and storage in an amount sufficient to protect property being transported or stored. 5.4 Bonds: 00700 04-2020 Page 14 General Conditions 5.4.1 General. .1 Bonds, when required, shall be executed on forms furnished by or acceptable to OWNER. All bonds signed by an agent must be accompanied by a certified copy of such agent's authority to act. .2 If the surety on any bond furnished by CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of the preceding paragraph, CONTRACTOR shall within ten (10)days thereafter substitute another bond and surety, both of which must be acceptable to OWNER. .3 When Performance Bonds and/or Payment Bonds are required, each shall be issued in an amount of one hundred percent (100%) of the Contract Amount as security for the faithful performance and/or payment of all CONTRACTOR's obligations under the Contract Documents. Performance Bonds and Payment Bonds shall be issued by a solvent surety company authorized to do business in the State of Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law. Any surety duly authorized to do business in Texas may write Performance and Payment Bonds on a project without reinsurance to the limit of 10 percent of its capital and surplus. Such a surety must reinsure any obligations over 10 percent. .4 If CONTRACTOR has failed to obtain or maintain a required bond, OWNER may exclude the CONTRACTOR from the site of the Project and exercise OWNER's suspension and/or termination rights under the Contract Documents. 5.4.2 Performance Bond. .1 If the Contract Amount exceeds $100,000, CONTRACTOR shall furnish OWNER with a Performance Bond in the form set out by OWNER. .2 If the Contract Amount exceeds $25,000 but is less than or equal to $100,000, CONTRACTOR shall furnish OWNER with a Performance Bond in the form set out by OWNER, unless the original Contract Time is 60 Calendar Days/40 Working Days or less, in which case CONTRACTOR can agree to the following terms and conditions for payment in lieu of providing a Performance Bond: no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER; CONTRACTOR shall be entitled to receive 95%of the Contract Amount following Final Completion, and the remaining 5%of the Contract Amount following the one year warranty period. .3 If the Contract Amount is less than or equal to $25,000, CONTRACTOR will not be required to furnish a Performance Bond; provided that no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER under the following terms and conditions: CONTRACTOR shall be entitled to receive 95%of the Contract Amount following Final Completion, and the remaining 5%of the Contract Amount following the one year warranty period. .4 If a Performance Bond is required to be furnished, it shall extend for the one year warranty period. 5.4.3 Payment Bond. .1 If the Contract Amount exceeds $50,000, CONTRACTOR shall furnish OWNER with a Payment Bond in the form set out by OWNER. .2 If the Contract Amount is less than or equal to $50,000, CONTRACTOR will not be required to furnish a Payment Bond; provided that no money will be paid to CONTRACTOR until completion and acceptance of the Work by OWNER under the terms and conditions specified in paragraph 5.4.2.3. 00700 04-2020 Page 15 General Conditions ARTICLE 6 -CONTRACTOR'S RESPONSIBILITIES 6.1 Supervision and Superintendence: 6.1.1 The CONTRACTOR shall supervise, inspect and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Unless otherwise directed by the OWNER in the Contract Documents, the CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. The CONTRACTOR shall be responsible to see that the completed Work complies accurately with the Contract Documents. 6.1.2 The CONTRACTOR shall have an English-speaking, competent Superintendent on the Work at all times that work is in progress. Upon request of Owner's Representative, the CONTRACTOR shall present the resume of the proposed Superintendent to Owner's Representative showing evidence of experience and successful superintendence and direction of work of a similar scale and complexity. If, in the opinion of Owner's Representative, the proposed Superintendent does not indicate sufficient experience in line with the Work, he/she will not be allowed to be the designated Superintendent for the Work. The Superintendent shall not be replaced without Written Notice to Owner's Representative. If the CONTRACTOR deems it necessary to replace the Superintendent, the CONTRACTOR shall provide the necessary information for approval, as stated above, on the proposed new Superintendent. A qualified substitute Superintendent may be designated in the event that the designated Superintendent is temporarily away from the Work, but not to exceed a time limit acceptable to Owner's Representative. The CONTRACTOR shall replace the Superintendent upon the OWNER's request in the event the Superintendent is unable to perform to the OWNER's satisfaction. The Superintendent will be the CONTRACTOR's representative on the Work and shall have the authority to act on behalf of the CONTRACTOR. All communications given to the Superintendent shall be as binding as if given to the CONTRACTOR. Either the CONTRACTOR or the Superintendent shall provide an emergency and home telephone number at which one or the other may be reached if necessary when work is not in progress. 6.2 Labor, Materials and Equipment: 6.2.1 The CONTRACTOR agrees to employ only orderly and competent workers, skillful in performance of the type of Work required under this Contract. The CONTRACTOR, Subcontractors, Sub-subcontractors, and their employees may not use or possess any firearms, alcoholic or other intoxicating beverages, illegal drugs or controlled substances while on the job or on the OWNER's property, nor may such workers be intoxicated, or under the influence of alcohol or drugs, on the job. If the OWNER or Owner's Representative notifies the CONTRACTOR that any worker is incompetent, disorderly or disobedient, has knowingly or repeatedly violated safety regulations, has possessed any firearms, or has possessed or was under the influence of alcohol or drugs on the job, the CONTRACTOR shall immediately remove such worker from performing Contract Work, and may not employ such worker again on Contract Work without the OWNER's prior written consent. The CONTRACTOR shall at all times maintain good discipline and order on or off the site in all matters pertaining to the Project. The CONTRACTOR shall pay workers no less than the wage rates established in Section 00900, and maintain weekly payroll reports as evidence thereof. 6.2.2 Unless otherwise specified, the CONTRACTOR shall provide and pay for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals necessary for the furnishing, performance, re-testing of defective work, start-up and completion of the Work. 6.2.3 All materials and equipment shall be of good quality and new (including new products made of recycled materials), except as otherwise provided in the Contract Documents. If required by Owner's Representative, the CONTRACTOR shall furnish satisfactory evidence (reports of required tests, manufacturer's certificates of compliance with material requirements, mill reports, etc.) as to the kind, quantity and quality of materials and equipment. All materials and equipment shall be applied, installed, connected, erected, used, cleaned and conditioned in accordance with instructions of the applicable Supplier, except as otherwise provided in the Contract Documents. 00700 04-2020 Page 16 General Conditions 6.2.4 Substitutes and "Approved Equal" Items: 6.2.4.1 Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function and quality required. Unless the specification or description contains words reading that no like, equivalent or"approved equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to Owner's Representative under the following circumstances: .1 "Approved Equal": If, in the OWNER's sole discretion, an item of material or an item of equipment proposed by the CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by the OWNER as an "approved equal" item, in which case review of the proposed item may, in the OWNER's sole discretion, be accomplished without compliance with some or all of the requirements for evaluation of proposed substitute items. The CONTRACTOR shall provide the OWNER with the documentation required for the OWNER to make its determination. .2 Substitute Items: If, in the OWNER's sole discretion, an item of material or an item of equipment proposed by the CONTRACTOR does not qualify as an "approved equal" item under paragraph 6.2.4.1.1, then it will be considered a proposed substitute item. The CONTRACTOR shall submit sufficient information to allow the OWNER to determine that the item of material or item of equipment proposed is essentially equivalent to that named and a substitute therefor. 6.2.4.2 Substitute Construction Methods and Procedures: If a specific means, method, technique, sequence or procedure of construction is shown or indicated in and expressly required by the Contract Documents, the CONTRACTOR may with prior approval of the OWNER furnish or utilize a substitute means, method, technique, sequence, or procedure of construction. The CONTRACTOR shall submit sufficient information to Owner's Representative to allow the OWNER, in the OWNER's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. 6.2.4.3 OWNER's Evaluation: The OWNER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to paragraph 6.2.4.1.1 and paragraph 6.2.4.1.2. The OWNER will be the sole judge of acceptability. No "approved equal" or substitute shall be ordered, installed, or utilized until the OWNER's review is complete, which will be evidenced by either a Change Order or completion of the Shop Drawing review procedure. The OWNER may require the CONTRACTOR to furnish at the CONTRACTOR's expense a special performance guarantee or other surety bond with respect to any"approved equal"or substitute. The OWNER shall not be responsible for any delay due to review time for any "approved equal" or substitute. 6.2.4.4 CONTRACTOR's Expense: All data to be provided by the CONTRACTOR in support of any proposed "approved equal" or substitute item will be at the CONTRACTOR's expense. 6.2.5 The CONTRACTOR agrees to assign to the OWNER any rights it may have to bring antitrust suits against its Suppliers for overcharges on materials incorporated in the Project growing out of illegal price fixing agreements. The CONTRACTOR further agrees to cooperate with the OWNER should the OWNER wish to prosecute suits against Suppliers for illegal price fixing. 6.3 Progress Schedule: Unless otherwise directed, the CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.6 as it may be adjusted from time to time as provided below: .1 The CONTRACTOR shall submit to Owner's Representative for acceptance proposed adjustments in the progress schedule that will not change the Contract Times or Milestones. Such adjustments will conform generally to the progress schedule then in effect. 00700 04-2020 Page 17 General Conditions .2 Proposed adjustments in the progress schedule that will change the Contract Times or Milestones shall be submitted in accordance with the requirements of Article 12. Such adjustments may only be made by a Change Order or Time Extension Request in accordance with Article 12. 6.4 Concerning Subcontractors, Suppliers and Others: 6.4.1 Assignment: The CONTRACTOR agrees to retain direct control of and give direct attention to the fulfillment of this Contract. The CONTRACTOR agrees not to, by Power of Attorney or otherwise, assign said Contract without the prior written consent of the OWNER. 6.4.2 Award of Subcontracts for Portions of the Work: The CONTRACTOR shall not employ any Subcontractor, Supplier or other person or organization, whether initially or as a substitute, against whom the OWNER may have reasonable objection. The CONTRACTOR must provide the OWNER with a list of all Subcontractors, Suppliers, or other persons or organizations it will use in the Work, and such list must be provided prior to the preconstruction conference. Should the OWNER have objections, the OWNER will communicate such objections by Written Notice. If the OWNER requires a change without good cause of any Subcontractor, person or organization previously accepted by OWNER, the Contract Amount may be increased or decreased by the difference in the cost occasioned by any such change, and an appropriate Change Order shall be issued. The CONTRACTOR shall not substitute any Subcontractor, person or organization that has been accepted by the OWNER, unless the substitute has been accepted in writing by the OWNER. No acceptance by the OWNER of any Subcontractor, Supplier or other person or organization shall constitute a waiver of any right of the OWNER to reject defective Work. 6.4.3 The CONTRACTOR shall enter into written agreements with all Subcontractors and Suppliers which specifically bind the Subcontractors or Suppliers to the applicable terms and conditions of the Contract Documents for the benefit of the OWNER and E/A. The OWNER reserves the right to specify that certain requirements shall be adhered to by all Subcontractors and Sub-subcontractors as indicated in other portions of the Contract Documents and these requirements shall be made a portion of the agreement between the CONTRACTOR and Subcontractor or Supplier. 6.4.4 The CONTRACTOR shall be fully responsible to the OWNER for all acts and omissions of the Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with the CONTRACTOR just as the CONTRACTOR is responsible for the CONTRACTOR's own acts and omissions. Nothing in the Contract Documents shall create for the benefit of any such Subcontractor, Supplier or other person or organization any contractual relationship between the OWNER and any such Subcontractor, Supplier or other person or organization, nor shall it create any obligation on the part of the OWNER or E/A to pay or to see to the payment of any amounts due any such Subcontractor, Supplier or other person or organization except as may otherwise be required by laws and regulations. 6.4.5 The CONTRACTOR shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers and other persons and organizations performing or furnishing any of the Work under a direct or indirect contract with the CONTRACTOR. The CONTRACTOR shall require all Subcontractors, Suppliers and such other persons and organizations performing or furnishing any of the Work to communicate with Owner's Representative through the CONTRACTOR. 6.4.6 The divisions and sections of the Specifications and the identifications of any Drawings shall not control the CONTRACTOR in dividing or delineating the Work to be performed by any specific trade. 6.4.7 The CONTRACTOR shall pay each Subcontractor and Supplier their appropriate share of payments made to the CONTRACTOR not later than ten (10) Days after the CONTRACTOR's receipt of payment from the OWNER. 6.5 Patent Fees and Royalties: 6.5.1 The CONTRACTOR shall be responsible at all times for compliance with applicable patents or copyrights encompassing, in whole or in part, any design, device, material, or process utilized, directly or indirectly, in the performance of the Work or the formulation or presentation of its Bid. 00700 04-2020 Page 18 General Conditions 6.5.2 The CONTRACTOR shall pay all royalties and license fees and shall provide, prior to commencement of Work hereunder and at all times during the performance of same, for lawful use of any design, device, material or process covered by letters, patent or copyright by suitable legal agreement with the patentee, copyright holder, or their duly authorized representative whether or not a particular design, device, material, or process is specified by the OWNER. 6.5.3 The CONTRACTOR shall defend all suits or claims for infringement of any patent or copyright and shall indemnify and save the OWNER harmless from any and all claims, costs, losses, expenses and damages(including but not limited to attorney's fees and consultant fees), direct or indirect, arising with respect to the CONTRACTOR's process in the formulation of its bid or the performance of the Work or otherwise arising in connection therewith. The OWNER reserves the right to provide its own defense, with counsel of its own choosing, to any suit or claim of infringement of any patent or copyright in which event the CONTRACTOR shall indemnify and save harmless the OWNER from all costs and expenses of such defense as well as satisfaction of all judgments entered against the OWNER. 6.5.4 The OWNER shall have the right to stop the Work and/or terminate this Agreement at any time in the event the CONTRACTOR fails to disclose to the OWNER that the CONTRACTOR's work methodology includes the use of any infringing design, device, material or process. 6.6 Permits, Fees: Unless otherwise provided in the Supplemental General Conditions, the CONTRACTOR shall obtain and pay for all construction permits, licenses and fees required for prosecution of the Work. OWNER will obtain and pay for the following permits, licenses and/or fees, if required: .1 Site Development Permit. .2 Building Permit(s). .3 Texas Department of Transportation permit for work in State rights-of-way. .4 Railroad Utility License Agreement. 6.7 Laws and Regulations: 6.7.1 The CONTRACTOR shall give all notices and comply with all laws and regulations applicable to furnishing and performing the Work. Except where otherwise expressly required by applicable laws and regulations, neither the OWNER nor E/A shall be responsible for monitoring the CONTRACTOR's compliance with any laws and regulations. 6.7.2 The CONTRACTOR shall plan and execute its operations in compliance with all applicable Federal, State and local laws and regulations, including those concerning control and abatement of water pollution and prevention and control of air pollution. 6.7.3 If the CONTRACTOR performs any Work that it is contrary to laws or regulations, then the CONTRACTOR shall bear and shall indemnify, defend and hold OWNER harmless from all claims, costs, losses and damages arising therefrom; however, it shall not be the CONTRACTOR's primary responsibility to make certain that the Specifications and Drawings are in accordance with laws and regulations, but this does not relieve the CONTRACTOR of the CONTRACTOR's obligations under Article 3. 6.8 Taxes: 6.8.1 The CONTRACTOR shall pay all sales, consumer, use and other similar taxes required to be paid by the CONTRACTOR in accordance with the laws and regulations of the State of Texas. 00700 04-2020 Page 19 General Conditions 6.8.2 The OWNER is an exempt organization as defined by Chapter 11 of the Property Tax Code of Texas and is thereby exempt from payment of Sales Tax under Chapter 151, Limited Use Sales, Excise and Use Tax, Texas Tax Code, and Chapter 321, Texas Tax Code. 6.9 Use of Premises: 6.9.1 The CONTRACTOR shall confine construction equipment, the storage of materials and equipment and the operations of workers to the site and land and areas identified in and permitted by the Contract Documents and other land and areas permitted by laws and regulations, rights-of-way, permits and easements, and shall not unreasonably encumber the premises with construction equipment or other materials or equipment. The CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any adjacent land or areas, resulting from the performance of the Work. Should any claim be made by any such owner or occupant because of the performance of the Work, the CONTRACTOR shall promptly settle with such other party by negotiation or otherwise resolve the claim by dispute resolution proceeding or at law. The CONTRACTOR shall indemnify, defend and hold harmless the OWNER, E/A, E/A's consultants and anyone directly or indirectly employed by any of them from and against all claims, costs, losses and damages (including court costs and reasonable attorneys' fees) arising out of or resulting from any claim or action, legal or equitable, brought by any such owner or occupant against the OWNER, E/A or any other party indemnified hereunder to the extent caused by or based upon performance of the Work or failure to perform the Work. 6.9.2 During the progress of the Work and on a daily basis, the CONTRACTOR shall keep the premises free from accumulations of waste materials, rubbish and other debris resulting from the Work. At the completion of the Work, the CONTRACTOR shall remove all waste materials, rubbish and debris from and about the premises as well as all tools, appliances, construction equipment and machinery and surplus materials. The CONTRACTOR shall leave the site clean and ready for occupancy by the OWNER at Substantial Completion of the Work. The CONTRACTOR shall, at a minimum, restore to original condition all property not designated for alteration by the Contact Documents. 6.9.3 The CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall the CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.10 Record Documents: The CONTRACTOR shall maintain in a safe place at the site, or other location acceptable to the OWNER, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Change Directives, Field Orders and written interpretations and clarifications (issued pursuant to paragraph 9.5) in good order and annotated to show all changes made during construction. These record documents, together with all final samples and all final Shop Drawings,will be available to the OWNER and E/A for reference during performance of the Work. Upon Substantial Completion of the Work, these record documents, samples and Shop Drawings showing the final "as built" construction of the Project shall be promptly delivered to Owner's Representative. 6.11 Safety and Protection: 6.11.1 The CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Upon request, and prior to installation of measures, the CONTRACTOR shall submit a site security and safety plan for approval by the OWNER. By reviewing the plan or making recommendations or comments, the OWNER will not assume liability nor will the CONTRACTOR be relieved of liability for damage, injury or loss. The CONTRACTOR shall take all necessary precautions for the safety of and shall provide the necessary protection to prevent damage, injury or loss to: .1 all persons on the Work site or who may be affected by the Work; .2 all the Work and materials and equipment to be incorporated therein, whether in storage on or off the site; and 00700 04-2020 Page 20 General Conditions .3 other property at the site or adjacent thereto, including but not limited to, trees, shrubs, lawns, walks, pavements, roadways, structures, utilities and underground facilities not designated for removal, relocation or replacement in the course of construction. 6.11.2 The CONTRACTOR shall comply with all applicable laws and regulations of any public body having jurisdiction for safety of persons or property or to protect them from damage, injury or loss; and shall erect and maintain all necessary safeguards for such safety and protection. The CONTRACTOR shall notify owners of adjacent property and of underground facilities, and utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation and replacement of their property. All damage, injury or loss to any property referred to in paragraph 6.11.1.2 and paragraph 6.11.1.3 caused, directly or indirectly, in whole or in part, by the CONTRACTOR, Subcontractor, Supplier or any person or organization directly or indirectly employed by any of them to perform or furnish any of the Work or anyone for whose acts any of them may be responsible, shall be remedied by the CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of the OWNER, or E/A, or E/A's consultant or anyone employed by any of them or anyone for whose acts any of them may be responsible, and not attributable, directly or indirectly, in whole or in part, to the faults or negligence of the CONTRACTOR or any Subcontractor, Supplier or other person or organization directly or indirectly employed by any of them). The CONTRACTOR's duties and responsibilities for safety and protection of the Work shall continue until such time as all the Work is completed and Owner's Representative has issued a notice to the OWNER and the CONTRACTOR in accordance with Article 14 that the Work is acceptable (except as otherwise expressly provided in connection with Substantial Completion). 6.11.3 Safety Representative: The CONTRACTOR shall designate a qualified and experienced safety representative at the site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs. Upon request of the OWNER, the CONTRACTOR shall provide certifications or other documentation of the safety representative's qualifications. At a minimum, the safety representative shall have received the OSHA thirty (30) hour training and a certificate evidencing that the safety representative has received such training within the last five (5) years shall be provided to the OWNER's representative. 6.11.4 Hazard Communication Programs: The CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the site in accordance with laws and regulations. 6.11.5 Emergencies: 6.11.5.1 In emergencies affecting the safety or protection of persons or the Work at the site or adjacent thereto, the CONTRACTOR, without special instruction or authorization from the OWNER or E/A, is obligated to act reasonably to prevent threatened damage, injury or loss and to mitigate damage or loss to the Work. The CONTRACTOR shall give Owner's Representative prompt written notice if the CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby. If Owner's Representative determines that a change in the Contract Documents is required because of the action taken by the CONTRACTOR in response to such an emergency, a Change Directive or Change Order will be issued to document the consequences of such action; otherwise the OWNER will not be responsible for the CONTRACTOR's emergency action. 6.11.5.2 Authorized agents of the CONTRACTOR shall respond immediately to call-out at any time of any day or night when circumstances warrant the presence on Project site of the CONTRACTOR or its agent to protect the Work or adjacent property from damage, restriction or limitation or to take such action or measures pertaining to the Work as may be necessary to provide for the safety of the public. Should the CONTRACTOR and/or its agent fail to respond and take action to alleviate such an emergency situation, the OWNER may direct other forces to take action as necessary to remedy the emergency condition, and the OWNER will deduct any cost of such remedial action from the funds due to the CONTRACTOR under this Contract. 6.11.5.3 In the event there is an accident involving injury to any individual on or near the Work, the CONTRACTOR shall notify Owner's Representative within twenty-four (24) hours of the event and shall be responsible for recording the location of the event and the circumstances surrounding the event through 00700 04-2020 Page 21 General Conditions photographs, interviewing witnesses, obtaining medical reports and other documentation that describes the event. Copies of such documentation shall be provided to Owner's Representative, for the OWNER's and E/A's records, within forty-eight (48) hours of the event. 6.12 Continuing the Work: The CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with the OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as the OWNER and the CONTRACTOR may agree in writing. 6.13 CONTRACTOR's General Warranty and Guarantee: 6.13.1 The CONTRACTOR warrants and guarantees to the OWNER that all Work will be performed in a good and workmanlike manner in accordance with the Contract Documents and will not be defective. The CONTRACTOR's warranty and guarantee hereunder excludes defects or damage caused by: .1 abuse, modification or improper maintenance or operation by persons other than the CONTRACTOR, Subcontractors or Suppliers; or .2 normal wear and tear under normal usage. 6.13.2 The CONTRACTOR's obligation to perform and complete the Work in a good and workmanlike manner in accordance with the Contract Documents shall be absolute. None of the following will constitute acceptance of Work not in accordance with the Contract Documents or a release of the CONTRACTOR's obligation to perform the Work in accordance with the Contract Documents: .1 observations by Owner's Representative and/or E/A; .2 recommendation of any progress or final payment by Owner's Representative; .3 the issuance of a certificate of Substantial Completion or any payment by the OWNER to the CONTRACTOR under the Contract Documents; .4 use or occupancy of the Work or any part thereof by the OWNER; .5 any acceptance by the OWNER or any failure to do so; .6 any review of a Shop Drawing or sample submittal; .7 any inspection, test or approval by others; or .8 any correction of defective Work by the OWNER. .9 the failure of the OWNER, E/A or any other person or entity acting on behalf of the OWNER or E/A to observe, detect or discover any defect in the Work or any non-conformance of the Work with any requirement of the Contract Documents. CONTRACTOR hereby waives any claim or defense to any claim by the OWNER that any failure by the OWNER, E/A, or any other person or entity acting on behalf of the OWNER or E/A to observe, detect or discover any defect in the Work relieves or releases, in whole or in part, CONTRACTOR from any obligations or responsibility for the correction of such defects or any other obligation of CONTRACTOR under the Contract Documents. 6.14 Indemnification: 00700 04-2020 Page 22 General Conditions 6.14.1 TO THE FULLEST EXTENT PERMITTED BY LAW, AND IN ADDITION TO ANY OTHER OBLIGATIONS OF CONTRACTOR UNDER THE CONTRACT OR OTHERWISE, CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS OWNER, ITS COUNCIL MEMBERS , EMPLOYEES, AGENTS, AND CONSULTANTS INCLUDING, BUT NOT LIMITED TO THE E/A (THE "INDEMNIFIED PARTIES" OR INDEMNIFIED PARTY", FROM AND AGAINST ALL CLAIMS, COSTS, LOSSES, AND DAMAGES (INCLUDING BUT NOT LIMITED TO ALL FEES AND CHARGES OF ENGINEERS, ARCHITECTS, ATTORNEYS, CONSULTANTS, EXPERTS AND OTHER PROFESSIONALS AND ALL COURT OR ARBITRATION OR OTHER DISPUTE RESOLUTION COSTS) ARISING OUT OF OR RELATING TO THE PERFORMANCE OF THE WORK, REGARDLESS OF WHETHER SUCH CLAIMS, COSTS, LOSSES, AND DAMAGES ARE CAUSED, IN WHOLE OR IN PARTY BY THE ACTS, ACTIONS, ERRORS OR OMISSIONS OF AN INDEMNIFIED PARTY. BECAUSE OWNER IS A MUNICIPALITY, THE TERMS AND PROVISIONS OF SUBCHAPTER C OF CHAPTER 151 OF THE TEXAS INSURANCE CODE ("CHAPTER 151") DOES NOT APPLY TO THE OWNER. IF, HOWEVER, ANY PROVISION OF CHAPTER 151 APPLIES TO THE OWNER, IT IS THE INTENT OF THE OWNER THAT IF THE PROVISIONS OF CHAPTER 151 DO APPLY, NOTHING HEREIN SHALL IMPOSE ANY REQUIREMENTS ON CONTRACTOR THAT ARE PROHIBITED BY CHAPTER 151 AND THAT ANY OF THE PROVISIONS HEREOF THAT ARE NOT PROHIBITED BY CHAPTER 151 SHALL REMAIN IN FULL FORCE AND EFFECT. ACCORDINGLY, IN THE EVENT THAT IN CONSTRUING AND INTERPRETING THE CONTRACT DOCUMENTS, A COURT OF COMPETENT JURISDICTION OR, IF APPLICABLE, AN ARBITRATOR, DETERMINES THAT CHAPTER 151 APPLIES TO THE OWNER, THEN THE COURT OR ARBITRATOR SHALL REFORM THE PROVISIONS HEREOF SO AS TO COMPLY WITH CHAPTER 151 AND SUCH REFORMATION SHALL NOT AFFECT THE VALIDITY OF ANY PROVISIONS HEREOF THAT ARE NOT PROHIBITED BY CHAPTER 151. 6.14.2 The indemnification obligation under paragraph 6.14.1 shall not be limited in any way by any limitation on the amount or type of damages, or compensation or benefits payable by or for the CONTRACTOR or any such Subcontractor, Supplier or other person or organization under workers'compensation acts, disability benefit acts or other employee benefit acts. 6.14.3 The obligations of the CONTRACTOR under paragraph 6.14.1 shall not extend to the liability of the OWNER, E/A, E/A's consultants, and their officers, directors, partners, employees or agents caused primarily by negligent preparation of maps, drawings, surveys, designs or specifications upon which is placed the applicable state-authorized design professional seal of the OWNER's, E/A's or E/A's consultant's officers, directors, partners, employees or agents. 6.14.4 In the event the CONTRACTOR fails to follow the OWNER's directives concerning use of the site, scheduling or course of construction, or engages in other conduct which proximately causes damage to property based on inverse condemnation or otherwise, then and in that event, the CONTRACTOR shall indemnify the OWNER against all costs resulting from such claims. 6.14.5 In the event the CONTRACTOR unreasonably delays progress of the work being done by others on the site so as to cause loss for which the OWNER becomes liable, then the CONTRACTOR shall reimburse the OWNER for such loss. 6.15 Survival of Obligations: All representations, indemnifications, warranties and guarantees made in, required by or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion and acceptance of the Work and termination or completion of the Agreement. 6.16 Losses from Natural Causes: Unless otherwise specified, all loss or damage to the CONTRACTOR arising out of the nature of the Work to be done or from action of the elements, floods or from unforeseeable circumstances in prosecution of the Work or from 00700 04-2020 Page 23 General Conditions unusual obstructions or difficulties which may be encountered in prosecution of the Work, shall be sustained and borne by the CONTRACTOR at its own cost and expense. 6.17 Notice of Claim: Should the CONTRACTOR suffer injury or damage to person or property because of any error, omission or act of the OWNER or of any of the OWNER's employees or agents or others for whose acts the OWNER is liable, a Claim will be made to the other party within thirty (30) calendar days of the event giving rise to such injury or damage. The provisions of this paragraph 6.17 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations, statute of repose, or any other provision of the Contract Documents. 6.18 Liquidated Damages: At set forth in the Agreement, paragraph 1.2,the CONTRACTOR or its Surety shall be liable for Liquidated Damages for the CONTRACTOR's failure to timely complete the Work or any portion thereof within the Contract Time. See Supplemental Conditions for amount of Liquidated Damages. ARTICLE 7 -OTHER WORK 7.1 The OWNER may perform other work related to the Project at the site by the OWNER's own forces, or let other contracts therefor, or have other work performed by utility owners. If the CONTRACTOR believes that delay or additional cost is involved because of such action by the OWNER, the CONTRACTOR may make a Claim as provided in Article 11 or Article 12. 7.2 The CONTRACTOR shall afford other contractors who are in a contract with the OWNER and each utility owner (and the OWNER, if the OWNER is performing the additional work with the OWNER's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly connect and coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, the CONTRACTOR shall do all cutting, fitting and patching of the Work that may be required to make its several parts come together properly and integrate with such other work. The CONTRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of Owner's Representative and the other contractors whose work will be affected. The CONTRACTOR shall promptly remedy damage caused by the CONTRACTOR to completed or partially completed construction or to property of the OWNER or separate contractors. 7.3 If the proper execution or results of any part of the CONTRACTOR's Work depends upon work performed by others under this Article 7, the CONTRACTOR shall inspect such other work and promptly report to Owner's Representative in writing any delays, defects or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of the CONTRACTOR's Work. The CONTRACTOR's failure to report will constitute an acceptance of such other work as fit and proper for integration with the CONTRACTOR's Work except for latent or non-apparent defects and deficiencies in such other work. 7.4 The OWNER shall provide for coordination of the activities of the OWNER's own forces and of each separate contractor with the Work of the CONTRACTOR, who shall cooperate with them. The CONTRACTOR shall participate with other separate contractors and Owner's Representative in reviewing their construction schedules when directed to do so. The CONTRACTOR shall make any revisions to the construction schedule deemed necessary after a joint review and mutual agreement. The construction schedules shall then constitute the schedules to be used by the CONTRACTOR, separate contractors and the OWNER until subsequently revised. 7.5 Unless otherwise stated herein, costs caused by delays or by improperly timed activities or defective construction shall be borne by the party responsible therefor. 7.6 If CONTRACTOR damages,delays, disrupts or interferes with the work of any other contractor, or any utility owner performing other work at or adjacent to the site of the Project, through CONTRACTOR's failure to take reasonable and customary measures to avoid such impacts, or if any claim arising out of CONTRACTOR's actions, 00700 04-2020 Page 24 General Conditions inactions or negligence in performance of the Work at or adjacent to the site of the Project is made by any such other contractor or utility owner against CONTRACTOR, OWNER, or E/A, then CONTRACTOR shall (1) promptly attempt to settle the claim as to all parties through negotiations with such other contractor or utility owner, or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law, and (2)INDEMNIFY AND HOLD HARMLESS THE INDEMNIFIED PARTIES, INCLUDING, BUT NOT LIMITED TO THE E/A FROM AND AGAINST ANY SUCH CLAIMS,AND AGAINST ALL COSTS, LOSSES,AND DAMAGES (INCLUDING BUT NOT LIMITED TO ALL FEES AND CHARGES OF ENGINEERS, ARCHITECTS, ATTORNEYS, AND OTHER PROFESSIONALS AND ALL COURT OR ARBITRATION OR OTHER DISPUTE RESOLUTION COSTS) ARISING OUT OF OR RELATING TO SUCH DAMAGE, DELAY, DISRUPTION, OR INTERFERENCE. ARTICLE 8 -OWNER'S RESPONSIBILITIES 8.1 Prior to the start of construction, the OWNER will designate in writing a person or entity to act as Owner's Representative during construction. Except as otherwise provided in these General Conditions, the OWNER shall issue all communications to the CONTRACTOR through Owner's Representative. 8.2 The OWNER will not supervise, direct, control or have authority over or be responsible for the CONTRACTOR's means, methods, techniques, sequences or procedures of construction or the safety precautions and programs incident thereto. The OWNER is not responsible for any failure of the CONTRACTOR to comply with laws and regulations applicable to furnishing or performing the Work. The OWNER is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. Failure or omission of the OWNER to discover, or object to or condemn any defective Work or material shall not release the CONTRACTOR from the obligation to properly and fully perform the Contract. 8.3 The OWNER is not responsible for the acts or omissions of the CONTRACTOR, or of any Subcontractor, any Supplier, or of any other person or organization performing or furnishing any of the Work. 8.4 Information or services under the OWNER's control shall be furnished by the OWNER with reasonable promptness to avoid delay in the orderly progress of the Work. 8.5 The foregoing are in addition to other duties and responsibilities of the OWNER enumerated herein and especially those in respect to Article 4 (Availability of Lands; Subsurface and Physical Conditions; Reference Points), Article 7 (Other Work) and Article 14 (Payments to the CONTRACTOR and Completion). 8.6 Notice of Claim: Should the OWNER suffer injury or damage to person or property because of any error, omission or act of the CONTRACTOR or of any of the CONTRACTOR's employees or agents or others for whose acts the CONTRACTOR is liable, a notice of such injury or damage will be sent to the CONTRACTOR within thirty (30) calendar days of the event giving rise to such injury or damage. The provisions of this paragraph 8.6 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitations or statute of repose. 8.7 The OWNER is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. The failure or omission of the OWNER, E/A or any other person or entity acting on behalf of the OWNER or the E/A to observe, detect, discover, or object to or condemn any defective Work or material shall not release the CONTRACTOR from CONTRACTOR's obligation to properly and fully perform the Work pursuant to the Contract Documents. The OWNER shall not be responsible for the acts, errors or omissions of the CONTRACTOR, or any Subcontractor, Supplier or any other person or entity performing or furnishing any of the Work on behalf of the CONTRACTOR. ARTICLE 9 - ENGINEER/ARCHITECT'S STATUS DURING CONSTRUCTION 9.1 E/A's Authority and Responsibilities: 9.1.1 The duties and responsibilities and the limitations of authority of E/A during construction are set forth in the Contract Documents and shall not be extended without written consent of the OWNER and E/A. The assignment 00700 04-2020 Page 25 General Conditions of any authority, duties or responsibilities to E/A under the Contract Documents, or under any agreement between the OWNER and E/A, or any undertaking, exercise or performance thereof by E/A, is intended to be for the sole and exclusive benefit of the OWNER and is not for the benefit of the CONTRACTOR, Subcontractor, Sub- subcontractor, Supplier, or any other person or organization, or for any surety or employee or agent of any of them. 9.1.2 E/A will not supervise, direct, control or have authority over or be responsible for the CONTRACTOR's means, methods, techniques, sequences or procedures of construction, or the safety precautions and programs incident thereto. E/A is not responsible for any failure of the CONTRACTOR to comply with laws and regulations applicable to the furnishing or performing the Work. E/A is not responsible for the CONTRACTOR's failure to perform or furnish the Work in accordance with the Contract Documents. Failure or omission of E/A to discover, or object to or condemn any defective Work or material shall not release the CONTRACTOR from the obligation to properly and fully perform the Work. 9.1.3 E/A is not responsible for the acts or omissions of the CONTRACTOR, or of any Subcontractor, any Supplier, or of any other person or organization performing or furnishing any of the Work. 9.1.4 If the OWNER so directs, E/A will review the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, bonds and certificates of inspection,tests and approvals and other documentation required to be delivered by Article 14, but only to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests and approvals that the results certified indicate compliance with, the Contract Documents. 9.1.5 The limitations upon authority and responsibility set forth in this paragraph 9.1 shall also apply to E/A's Consultants, Resident Project Representative and assistants. 9.2 E/A as Owner's Representative: 9.2.1 E/A may be designated as Owner's Representative under paragraph 8.1. 9.3 Visits to Site: If the OWNER so directs, E/A will make visits to the site at intervals appropriate to the various stages of construction as is necessary in order to observe as an experienced and qualified design professional the progress that has been made and the quality of the various aspects of the CONTRACTOR's executed Work. Based on information obtained during such visits and observations, E/A will endeavor for the benefit of the OWNER to determine if the Work is proceeding in accordance with the Contract Documents. E/A will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. E/A's efforts will be directed toward providing for the OWNER a greater degree of confidence that the completed Work will conform to the Contract Documents. On the basis of such visits and on-site observations, E/A will keep the OWNER informed of the progress of the Work and will endeavor to guard the OWNER against defective Work. E/A's visits and on-site observations are subject to all the limitations on E/A's authority and responsibility set forth in paragraph 9.1. 9.4 Project Representative: If the OWNER and E/A agree, E/A will furnish a Resident Project Representative to assist E/A in providing more continuous observation of the Work. The responsibilities and authority and limitations of any such Resident Project Representative and assistants will be as provided in paragraph 9.1 and in the Supplemental General Conditions. The OWNER may designate another representative or agent to represent the OWNER at the site who is not E/A, E/A's consultant, agent or employee. 9.5 Clarifications and Interpretations: E/A may determine that written clarifications or interpretations of the requirements of the Contract Documents (in the form of drawings or otherwise) are necessary. Such written clarifications or interpretations will be consistent with the intent of and reasonably inferable from the Contract Documents,will be issued with reasonable promptness by Owner's Representative and will be binding on the OWNER and the CONTRACTOR. If the OWNER or the 00700 04-2020 Page 26 General Conditions CONTRACTOR believes that a written clarification or interpretation justifies an adjustment in the Contract Amount or the Contract Times, the OWNER or the CONTRACTOR may make a Claim therefor as provided in Article 11 or Article 12. 9.6 Rejecting Defective Work: E/A may recommend that the OWNER disapprove or reject Work which E/A believes to be defective, or believes will not produce a completed Project that conforms to the Contract Documents or will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. ARTICLE 10 -CHANGES IN THE WORK 10.1 Changes: 10.1.1 Without invalidating the Contract and without notice to any surety, the OWNER, at anytime or from time to time, may order additions, deletions or revisions in the Work. Such changes in the Work will be authorized by Change Order, Change Directive or Field Order. 10.1.2 Changes in the Work shall be performed under applicable provisions of the Contract Documents, and the CONTRACTOR shall proceed promptly, unless otherwise provided in the Change Order, Change Directive or Field Order. 10.1.3 The CONTRACTOR shall not be entitled to an increase in the Contract Amount or an extension of the Contract Times with respect to any Work performed that is not required by the Contract Documents as amended, modified and supplemented as provided in paragraph 3.3.1 and paragraph 3.3.2, except in the case of an emergency as provided in paragraph 6.11.5 or in the case of uncovering Work as provided in paragraph 13.4. 10.1.4 Except in the case of an emergency as provided in paragraph 6.11.5, a Change Order or Change Directive is required before the CONTRACTOR commences any activities associated with a change in the Work which, in the CONTRACTOR's opinion, will result in a change in the Contract Amount and/or Contract Times. 10.1.5 If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Amount or Contract Times) is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be the CONTRACTOR's responsibility, and the amount of each applicable Bond will be adjusted accordingly. 10.2 Change Orders: 10.2.1 The OWNER and the CONTRACTOR shall execute appropriate written Change Orders covering: .1 a change in the Work; .2 the amount of the adjustment in the Contract Amount, if any; and .3 the extent of the adjustment in the Contract Time, if any. 10.2.2 An executed Change Order shall represent the complete, equitable, and final amount of adjustment in the Contract Amount and/or Contract Time owed to the CONTRACTOR or the OWNER as a result of the occurrence or event causing the change in the Work encompassed by the Change Order. 10.3 Change Directives: 10.3.1 The OWNER may by written Change Directive,without invalidating the Contract,order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Amount 00700 04-2020 Page 27 General Conditions and Contract Time being adjusted as necessary. A Change Directive shall be used in the absence of complete and prompt agreement on the terms of a Change Order. 10.3.2 If the Change Directive provides for an adjustment to the Contract Amount, the adjustment shall be based on the method provided for in paragraph 11.5. 10.3.3 A Change Directive shall be recorded later by preparation and execution of an appropriate Change Order. 10.3.4 Upon receipt of a Change Directive, CONTRACTOR shall promptly proceed with the change in the Work involved. 10.4 Field Order: 10.4.1 Owner's Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Amount or the Contract Times and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These shall be accomplished by written Field Order and shall be binding on the OWNER and on the CONTRACTOR who shall perform the Work involved promptly. 10.4.2 If the CONTRACTOR believes that a Field Order would require an adjustment in the Contract Amount and/or Contract Times, the CONTRACTOR shall make written request to Owner's Representative for a Change Order. Any request by the CONTRACTOR for an adjustment in Contract Amount and/or Contract Times shall be made in writing prior to beginning the work covered by the Field Order. 10.5 No Damages for Delay: Except as otherwise provided in the Contract Documents, the CONTRACTOR shall receive no compensation for delays or hindrances to the Work. If delay is caused by specific orders given by the OWNER to stop Work for reasons for which the CONTRACTOR is not responsible, or such delay is not caused by active interference in the Work by OWNER for reasons for which the CONTRACTOR is not responsible, then such delay will entitle the CONTRACTOR only to an equivalent extension of time, the CONTRACTOR's application for which shall, however, be subject to approval of the OWNER. No such extension of time shall release the CONTRACTOR or surety on its performance bond from all the CONTRACTOR's obligations hereunder which shall remain in full force until discharge of the Contract. ARTICLE 11 - CHANGE OF CONTRACT AMOUNT 11.1 The Contract Amount is stated in the Agreement and, including authorized adjustments, is the total amount payable by the OWNER to the CONTRACTOR for performance of the Work under the Contract Documents. 11.2 The original Contract Amount may not be increased by more than twenty-five percent (25%) and it may not be decreased more than twenty-five percent (25%)without the consent of the CONTRACTOR to such decrease. 11.3 The Contract Amount shall only be changed by a Change Order. Any claim for an adjustment in the Contract Amount shall be made by Written Notice delivered by the party making the Claim to the other party promptly (but in no event later than thirty(30)calendar days)after the start of the occurrence or event giving rise to the Claim and stating the general nature of the Claim. Notice of the amount of the Claim with supporting data shall be delivered within thirty (30) calendar days after Written Notice of Claim is delivered by claimant, and shall represent that the adjustment claimed covers all known amounts to which claimant is entitled as a result of said occurrence or event. If the OWNER and the CONTRACTOR cannot otherwise agree, all Claims for adjustment in the Contract Amount shall be determined as set out in Article 16. 11.4 Determination of Value of Work: 00700 04-2020 Page 28 General Conditions I 11.4.1 The value of any Work covered by a Change Order or of any Claim for an adjustment in the Contract Amount will be determined by one or more of the following methods: .1 by application of unit prices contained in the Contract Documents to the quantities of the items involved. .2 by a mutually agreed lump sum properly itemized and supported by sufficient substantiating data to permit evaluation. .3 by cost of Work plus the CONTRACTOR's fee for all overhead costs and profit(determined as provided in paragraph 11.5). 11.4.2 Before using the method described in paragraph 11.4.1.3, the OWNER and the CONTRACTOR agree to negotiate a Change Order using the methods identified in paragraph 11.4.1.1 and paragraph 11.4.1.2, as appropriate, to determine the adjustment in the Contract Amount. 11.5 Cost of Work: If neither of the methods defined in paragraph 11.4.1.1 or paragraph 11.4.1.2 can be agreed upon before a change in the Work is commenced which will result in an adjustment in the Contract Amount, the OWNER may issue a Change Directive to the CONTRACTOR. If the OWNER elects to issue a Change Directive, CONTRACTOR shall perform the Changed Work and payment will be made as follows: .1 For all personnel, the CONTRACTOR will receive the rate or wage specified in the prevailing wage rates established in Section 00900 for each hour that said personnel are actually engaged in such Work, to which will be added an amount equal to twenty-five percent (25%) of the sum thereof as compensation for the CONTRACTOR's and any affected Subcontractor's total overhead and profit. No separate charge will be made by the CONTRACTOR for organization or overhead expenses. For the cost of premiums on public liability insurance, workers' compensation insurance, social security and unemployment insurance, an amount equal to fifty-five percent (55%) of the wages paid personnel, excluding the twenty-five(25%)compensation provided above,will be paid to the CONTRACTOR. The actual cost of the CONTRACTOR's bond(s) on the extra Work will be paid based on invoices from surety. No charge for superintendence will be made unless considered necessary and ordered by the OWNER. .2 The CONTRACTOR will receive the actual cost, including freight charges, of the materials used on such Work, to which costs will be added a sum equal to twenty-five percent (25%) thereof as compensation for the CONTRACTOR's and any affected Subcontractor's total overhead and profit. In case material invoices indicate a discount may be taken, the actual cost will be the invoice price minus the discount. .3 For machinery, trucks, power tools, or other similar equipment agreed to be necessary by the OWNER and the CONTRACTOR, the OWNER will allow the CONTRACTOR the rate as given in the latest edition of the Associated General Contractors of America "Contractor's Equipment Cost Guide" as published by Dataquest for each hour that said tools or equipment are in use on such work, which rate includes the cost of fuel, lubricants and repairs. No additional compensation will be allowed on the equipment for the CONTRACTOR's overhead and profit. .4 The compensation, as herein provided for, shall be received by the CONTRACTOR and any affected Subcontractor as payment in full for work done by Change Directive and will include use of small tools, and total overhead expense and profit. The CONTRACTOR and the Owner's Representative shall compare records of work done by Change Directive at the end of each day. Copies of these records will be made upon forms provided for this purpose by the OWNER and signed by both Owner's Representative and the CONTRACTOR, with one (1) copy being retained by the OWNER and one (1) by the CONTRACTOR. Refusal by the CONTRACTOR to sign these records within two (2) working days of presentation does not invalidate the accuracy of the record. 00700 04-2020 Page 29 General Conditions 11.6 Unit Price Work: 11.6.1 Where the Contract Documents provide that all or part of the Work is to be unit price Work, initially the Contract Amount will be deemed to include for all unit price work an amount equal to the sum of the established unit price for each separately identified item of unit price work times the estimated quantity of each item as indicated in the Bid. The estimated quantities of items of unit price work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Amount. Determinations of the actual quantities and classifications of unit price work performed by the CONTRACTOR will be made by Owner's Representative. Owner's Representative will review with the CONTRACTOR the preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application for Payment or otherwise). 11.6.2 When "plan quantity" is indicated for a bid item, the CONTRACTOR shall be paid the amount specified in the Contract Documents without any measurements. 11.6.3 Each unit price will be deemed to include an amount considered by the CONTRACTOR to be adequate to cover the CONTRACTOR's overhead and profit for each separately identified item. 11.6.4 A Major Item is any individual bid item in the Bid that has a total cost equal to or greater than five percent (5%) of the original Contract Amount or $50,000, whichever is greater, computed on the basis of bid quantities and Contract unit prices. 11.6.5 The OWNER or the CONTRACTOR may make a Claim for an adjustment in the Contract Amount in accordance with Article 11 if: .1 the actual quantity of any Major Item should become as much as twenty percent (20%) more than or twenty percent (20%) less than in the Bid; or .2 The CONTRACTOR presents proper documentation contesting the accuracy of "plan quantity," and Owner's Representative verifies quantity and determines original quantity is in error by five percent (5%) or more. 11.6.6 Right to Verify Information: The CONTRACTOR agrees that any designated representative of the OWNER shall have the right to examine the CONTRACTOR's records to verify the accuracy and appropriateness of the pricing data used to price change proposals. Even after a Change Order Proposal has been approved, the CONTRACTOR agrees that if the OWNER later determines the cost and pricing data submitted was inaccurate, incomplete, not current or not in compliance with the terms of this Agreement regarding pricing of change orders, then an appropriate contract price reduction will be made. 11.6.7 Pricing Information Requirements: The CONTRACTOR agrees to provide and require all subcontractors to provide a breakdown of allowable labor and labor burden cost information as outlined herein. This information will be used to evaluate the potential cost of labor and labor burden related to change order work. It is intended that this information represent an accurate estimate of the CONTRACTOR's actual labor and labor burden cost components. This information is not intended to establish fixed billing or change order pricing labor rates. However, at the time change orders are priced the submitted cost data for labor rates may be used to price change order work. The accuracy of any such agreed-upon labor cost components used to price change orders will be subject to later audit. Approved change order amounts may be adjusted later to correct the impact of inaccurate labor cost components if the agreed-upon labor cost components are determined to be inaccurate. ARTICLE 12 - CHANGE OF CONTRACT TIMES 12.1 Working Day and Calendar Day Contracts: 12.1.1 The Contract Times (or Milestones) shall only be changed by Change Order or Time Extension Request duly executed by both the CONTRACTOR and Owner's Representative. Any claim for an adjustment of the Contract Times(or Milestones)shall be made by Written Notice delivered by the party making the Claim to the other 00700 04-2020 Page 30 General Conditions party promptly (but in no event later than thirty (30) calendar days) after the start of the occurrence or event giving rise to the delay and stating the general nature of the delay. Notice of the extent of the delay with supporting data shall be delivered within thirty (30) calendar days after Written Notice of Claim is delivered by claimant, and shall represent that the adjustment claimed is the entire adjustment to which claimant is entitled as a result of said occurrence or event. If the OWNER and the CONTRACTOR cannot otherwise agree, all Claims for adjustment in the Contract Times (or Milestones)shall be determined as set out in Article 16. No Claim for an adjustment in the Contract Times (or Milestones)will be valid if not submitted in accordance with the requirements of this paragraph. 12.1.2 When the CONTRACTOR is at fault and the OWNER stops the Work so that corrections in the Work can be made by the CONTRACTOR, then no extension in time will be allowed. 12.1.3 When the CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay for which the CONTRACTOR is not responsible, an extension of the Contract Times (or Milestones) in an amount equal to the time lost due to such delay will be considered by OWNER. Any extension of the Contract Time shall be the CONTRACTOR's sole and exclusive remedy for such delay. However, adverse weather shall not be considered justification for extension of Contract Times on Calendar Day contracts, except as provided for in paragraph 12.2. 12.1.4 The OWNER will consider time extension requests and may grant the CONTRACTOR an extension of time because of: .1 Changes ordered in the Work which justify additional time. .2 Failure of materials or products being at the Project site due to delays in transportation or failures of Suppliers,for which the CONTRACTOR, a Subcontractor or a Supplier is not responsible. The request for an extension of time shall be supported by a recitation of acts demonstrating that such delays were beyond the control of the CONTRACTOR, a Subcontractor or a Supplier including but not limited to, the CONTRACTOR's, the Subcontractor's or the Supplier's efforts to overcome such delays documented as follows: a) Copy of purchase order for delayed item(s) indicating date ordered by the CONTRACTOR/Subcontractor and date purchase order received by Supplier. b) If item(s) require Shop Drawings or other submittal information in accordance with the Contract Documents, provide record of date submittal(s) forwarded to Owner's Representative, date submittal(s) returned to the CONTRACTOR, and date submittal(s)forwarded to Supplier. c) Copy of document(s) from Supplier, on Supplier's letterhead, indicating date(s) item(s) would be ready for shipment and/or actual shipment date(s). d) Copies of all correspondence between the CONTRACTOR/Subcontractor and Supplier indicating the CONTRACTOR/Subcontractor's efforts to expedite item(s). e) If item(s) are being purchased by a Subcontractor, provision of meeting notes, correspondence, and the like which reflect the CONTRACTOR's efforts with the Subcontractor to expedite delivery of the item(s). .3 When acts of the OWNER, E/A, utility owners or other contractors employed by the OWNER delay progress of work through no fault of the CONTRACTOR. .4 When the CONTRACTOR is delayed by strikes, lockouts, fires, losses from natural causes, or other unavoidable cause or causes beyond the CONTRACTOR's control. 12.2 Calendar Day Contracts: 00700 04-2020 Page 31 General Conditions Under a Calendar Day Contract, the CONTRACTOR may also be granted an extension of time because of unusual inclement weather that is beyond the normal weather expected for the Williamson and Travis Counties,Texas area. Normal weather which prevents the CONTRACTOR from performing Work is expected during a Calendar Day Contract, and is not a justification for an extension of time. The following delineates the number of days per month for which, for purposes of Calendar Day Contracts, expected normal weather will prevent performance of Work: January.......................... 7 days February........................ 7 days March............................. 7 days April............................... 7 days May................................ 8 days June................................ 6 days July................................. 6 days August........................... 5 days September..................... 7 days October.......................... 7 days November..................... 7 days December...................... 7 days Days per month exceeding the number shown above may be credited as Rain Days if a Claim is made in accordance with paragraph 12.1.1 and meets the following definition: a "Rain Day" is any day in which a weather event occurs at the site and is sufficient to prevent the CONTRACTOR from performing units of Work critical to maintaining the project schedule during the entire day. ARTICLE 13 -TESTS AND INSPECTIONS: AND CORRECTION OR REMOVAL OF DEFECTIVE WORK 13.1 Notice of Defects: Prompt notice of all defective Work of which the OWNER or E/A has actual knowledge will be given to the CONTRACTOR. All defective Work may be rejected or corrected as provided for in Article 13. 13.2 Access to Work: The OWNER, E/A, E/A's Consultants, other representatives and personnel of the OWNER, independent testing laboratories and governmental agencies having jurisdiction will have unrestricted physical access to the Work site for observing, inspecting and testing. The CONTRACTOR shall provide them proper and safe conditions for such access, and advise them of the CONTRACTOR's site safety procedures and programs so that they may comply therewith as applicable. 13.3 Tests and Inspections: 13.3.1 The CONTRACTOR shall give timely notice of readiness of the Work for all required inspections, tests or approvals, and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. 13.3.2 The OWNER shall employ and pay for services of an independent testing laboratory to perform all inspections, tests or approvals required by the Contract Documents except: .1 for inspections, tests or approvals covered by paragraph 13.3.3 below; .2 for reinspecting or retesting defective Work; and .3 as otherwise specifically provided in the Contract Documents. All testing laboratories shall be those selected by the OWNER. 00700 04-2020 Page 32 General Conditions 13.3.3 If laws or regulations of any public body having jurisdiction require any Work (or part thereof)specifically to be inspected, tested or approved by an employee or other representative of such public body, the CONTRACTOR shall assume full responsibility for arranging and obtaining such inspections, tests or approvals, pay all costs in connection therewith and furnish Owner's Representative the required certificates of inspection or approval. The CONTRACTOR shall also be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests or approvals required for the OWNER's and E/A's review of materials or equipment to be incorporated in the Work, or of materials, mix designs or equipment submitted for review prior to the CONTRACTOR's purchase thereof for incorporation in the Work. 13.4 Uncovering Work: 13.4.1 If any Work (or the work of others) that is to be inspected, tested or approved is covered by the CONTRACTOR without concurrence of Owner's Representative, or if any Work is covered contrary to the written request of Owner's Representative, it must, if requested by Owner's Representative, be uncovered and recovered at the CONTRACTOR's expense. 13.4.2 If Owner's Representative considers it necessary or advisable that covered Work be observed, inspected or tested, the CONTRACTOR shall uncover, expose or otherwise make available for observation, inspection or testing that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective, the CONTRACTOR shall pay all claims, costs, losses and damages caused by, arising out of or resulting from such uncovering, exposure, observation, inspection and testing and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and the OWNER shall be entitled to an appropriate decrease in the Contract Amount, and may make a Claim therefor as provided in Article 11. If, however, such Work is not found to be defective, the CONTRACTOR shall be allowed an increase in the Contract Amount or an extension of the Contract Times (or Milestones), or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement and reconstruction; and the CONTRACTOR may make a Claim therefor as provided in Article 11 and Article 12. 13.5 OWNER May Stop the Work: 13.5.1 If the Work is defective, or the CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment, or fails to furnish or perform the Work in such a way that the completed Work will conform to the Contract Documents, the OWNER may order the CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of the OWNER to stop the Work shall not give rise to any duty on the part of the OWNER to exercise this right for the benefit of the CONTRACTOR or any surety or other party. 13.5.2 If the CONTRACTOR fails to correct defective Work or submit a satisfactory plan to take corrective action, with procedure and time schedule, the OWNER may order the CONTRACTOR to stop the Work, or any portion thereof, until cause for such order has been eliminated, or take any other action permitted by this Contract. A notice to stop the Work, based on defects, shall not stop calendar or working days charged to the Project. 00700 04-2020 Page 33 General Conditions 13.6 Correction or Removal of Defective Work: If required by the OWNER,the CONTRACTOR shall promptly,as directed,either correct all defective Work,whether or not fabricated, installed or completed, or, if the Work has been rejected by Owner's Representative, remove it from the site and replace it with Work that is not defective.The CONTRACTOR shall correct or remove and replace defective Work, or submit a plan of action detailing how the deficiency will be corrected, within the time frame identified in the notice of defective Work. The CONTRACTOR shall pay all claims, costs, losses and damages caused by or resulting from such correction or removal (including but not limited to all costs of repair or replacement of work of others), including but not limited to all consultant, engineering, expert and attorney's fees incurred by the OWNER as a result of such defective work or as necessary for OWNER to investigate such defective Work and/or to determine the appropriate means or methods to address or correct such defective Work. The OWNER shall have the right, in OWNER's sole discretion, to have the E/A or other consultant specify the means and methods that will be followed to correct or address any defective Work. If the OWNER specifies a means or method by which the defective Work will be addressed or corrected, the CONTRACTOR shall perform the specified work necessary to address or correct the defective Work at CONTRACTOR's sole cost and expense. 13.7 Warranty period: 13.7.1 If, at any time after the date of Substantial Completion or such longer period of time as may be prescribed by laws or regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defective, the CONTRACTOR shall promptly, without cost to the OWNER and in accordance with the OWNER's written instructions: (i) correct such defective Work, or, if it has been rejected by the OWNER, remove it from the site and replace it with Work that is not defective, and (ii) satisfactorily correct or remove and replace any damage to other Work or the work of others resulting therefrom. If the CONTRACTOR does not promptly comply with the terms of such instructions, or in an emergency where delay would cause serious risk of loss or damage, the OWNER may have the defective Work corrected or the rejected Work removed and replaced, and all claims, costs, losses and damages caused by or resulting from such removal and replacement (including but not limited to all costs of repair or replacement of work of others and all consultant, expert and attorney's fees incurred by OWNER)will be paid by the CONTRACTOR. 13.7.2 In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all the Work, the warranty period for that item may start to run from an earlier date if so provided in the Contract Documents and agreed to by OWNER. 13.8 OWNER May Correct Defective Work: If the CONTRACTOR fails within a reasonable time after Written Notice of the OWNER to correct defective Work, or to remove and replace rejected Work, or if the CONTRACTOR fails to perform the Work in accordance with the Contract Documents, or if the CONTRACTOR fails to comply with any other provision of the Contract Documents, the OWNER may, after seven (7) calendar days' Written Notice to the CONTRACTOR, correct and remedy any such deficiency. If, in the opinion of Owner's Representative, significant progress has not been made during this seven(7)calendar day period to correct the deficiency,the OWNER may exercise any actions necessary to remedy the deficiency. In exercising the rights and remedies under this paragraph,the OWNER shall proceed expeditiously. In connection with such corrective and remedial action, the OWNER may exclude the CONTRACTOR from all or part of the site, take possession of all or part of the Work, and suspend the CONTRACTOR's services related thereto, and incorporate in the Work all materials and equipment stored at the site or for which the OWNER has paid the CONTRACTOR but which are stored elsewhere. The CONTRACTOR shall allow the OWNER, its agents and employees,the OWNER's other contractors, E/A and E/A's consultants access to the site to enable the OWNER to exercise the rights and remedies under this paragraph. All claims, costs, losses and damages incurred or sustained by the OWNER in exercising such rights and remedies will be charged against the CONTRACTOR and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the 00700 04-2020 Page 34 General Conditions Work. Such claims, costs, losses and damages will include but not be limited to all costs of repair or replacement of work of others destroyed or damaged by correction, removal or replacement of the CONTRACTOR's defective Work and any and all consultant, expert and attorneys fees incurred by OWNER as a result of OWNER's correction of defective WORK. The CONTRACTOR shall not be allowed an extension of the Contract Times (or Milestones), or claims of damage because of any delay in the performance of the Work attributable to the exercise by the OWNER of the OWNER's rights and remedies hereunder. 13.9 ACCEPTANCE OF DEFECTIVE WORK If, instead of requiring correction or removal and replacement of defective Work, OWNER prefers to accept it, OWNER may do so. CONTRACTOR shall pay all claims, costs, losses, and damages attributable to OWNER's evaluation of and determination to accept such defective Work, including but not limited to any expert, engineering or other consultant's fees incurred by the OWNER to investigate such defective Work and/or to determine the appropriate means or methods and work necessary to allow OWNER to accept the defective Work and CONTRACTOR shall pay for all work required to be performed to allow OWNER to accept the defective Work and any estimated costs, expenses and damages OWNER may sustain in the future as a result of accepting the defective Work, including any diminution in value of the Project as a result of accepting the defective Work. If any such acceptance occurs prior to final payment, the necessary revisions in the Contract Documents with respect to the Work shall be incorporated in a Change Order. If the parties are unable to agree as to the decrease in the Contract Price, then OWNER may impose a reasonable set-off against payments due under the Contract Documents. If the acceptance of defective Work occurs after final payment, CONTRACTOR shall pay to OWNER the above described costs, expenses and damages incurred by OWNER as a result of OWNER's acceptance of defective Work. ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION 14.1 Application for Progress Payment: 14.1.1 Not more than once per month, the CONTRACTOR shall submit to Owner's Representative for review an Application for Payment, in a form acceptable to the OWNER, filled out and signed by the CONTRACTOR covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents or as required by OWNER. 14.1.2 Such applications shall not include requests for payment on account of changes in the Work which have been properly authorized by Change Directives but not yet included in Change Orders. 14.1.3 Such applications shall not include requests for payment of amounts the CONTRACTOR does not intend to pay to a Subcontractor or Supplier because of a dispute or other reason. 14.1.4 Owner will not pay for materials or equipment not incorporated in the Work but delivered and suitably stored at the site or at another location. Payment will be made by Owner only for Work completed in accordance with the Contract Documents. 14.1.5 Where the original Contract Amount is less than $400,000, the OWNER will pay to the CONTRACTOR the total amount of approved Application for Payment, less ten percent (10%)of the amount thereof, which ten percent (10%)will be retained until final payment, less all previous payments and less all sums that may be retained by the OWNER under the terms of this Agreement. Where the original Contract Amount is$400,000 or more, the OWNER will pay to the CONTRACTOR the total amount of approved Application for Payment, less five percent (5%) of the amount thereof, which five percent(5%)will be retained until final payment, less all previous payments and less all sums that may be retained by the OWNER under the terms of this Agreement. In either case, if the Work is near completion and delay occurs due to no fault or neglect of the CONTRACTOR, the OWNER may pay a portion of the retained amount to the CONTRACTOR. The CONTRACTOR, at the OWNER's option, may be relieved of the obligation to complete the Work and, thereupon, the CONTRACTOR shall receive payment of the balance due under the Contract subject to the conditions stated under paragraph 15.2. 00700 04-2020 Page 35 General Conditions 14.1.6 Applications for Payment shall include the following documentation: .1 updated progress schedule; .2 monthly subcontractor report; and .3 any other documentation required under the Supplemental General Conditions. 14.2 CONTRACTOR's Warranty of Title: The CONTRACTOR warrants and guarantees that title to all Work, materials and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to the OWNER not later than the time of payment to the CONTRACTOR free and clear of all liens. 14.3 Review of Applications for Progress Payment: 14.3.1 Owner's Representative will, within seven (7) calendar days after receipt of each Application for Payment, either indicate a recommendation for payment and forward the Application for processing by the OWNER, or return the Application to the CONTRACTOR indicating Owner's Representative's reasons for refusing to recommend payment. In the latter case, the CONTRACTOR may make the necessary corrections and resubmit the Application. 14.3.2 Owner's Representative's recommendation of any payment requested in an Application for Payment will constitute a representation by Owner's Representative, based upon Owner's Representative's on-site observations of the executed Work and on Owner's Representative's review of the Application for Payment and the accompanying data and schedules, that to the best of Owner's Representative's knowledge, information and belief: .1 the Work has progressed to the point indicated; and .2 the quality of the Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents, to a final determination of quantities and classifications for unit price Work, and to any other qualifications stated in the recommendation). 14.3.3 By recommending any such payment, Owner's Representative will not thereby be deemed to have represented that: .1 inspections have been made to check the quality or the quantity of the Work or that the Work has been performed in accordance with the Contract Documents; .2 examination has been made to ascertain how or for what purpose the CONTRACTOR has used money previously paid on account of the Contract Amount; .3 the CONTRACTOR's construction means, methods, techniques, sequences or procedures have been reviewed; or .4 that there may not be other matters or issues between the parties that might entitle the CONTRACTOR to be paid additionally by the OWNER or entitle the OWNER to withhold payment to the CONTRACTOR. 14.4 Decisions to Withhold Payment: 14.4.1 The OWNER may withhold or nullify the whole or part of any payment to such extent as maybe necessary on account of: .1 defective Work not remedied; 00700 04-2020 Page 36 General Conditions .2 reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Amount; .3 damage to the OWNER or another contractor; .4 reasonable evidence that the Work will not be completed within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay; .5 failure of the CONTRACTOR to submit a schedule of values in accordance with the Contract Documents; .6 failure of the CONTRACTOR to submit a submittal schedule in accordance with the Contract Documents; .7 failure of the CONTRACTOR to submit or update construction schedules in accordance with the Contract Documents; .8 failure of the CONTRACTOR to maintain a record of changes on drawings and documents; .9 failure of the CONTRACTOR to maintain weekly payroll reports; .10 failure of the CONTRACTOR to submit monthly subcontractor reports; .11 the CONTRACTOR's neglect or unsatisfactory prosecution of the Work, including failure to clean up; or .12 failure of the CONTRACTOR to comply with any provision of the Contract Documents. .13 OWNER's disagreement with the recommendation of the Owner's Representative, provided the OWNER has provided a Written Notice to the CONTRACTOR specifying the reasons why OWNER does not agree with such recommendation. 14.4.2 When the above reasons for withholding payment are removed, the CONTRACTOR shall resubmit a statement for the value of Work performed. Payment will be made within thirty (30) calendar days of receipt of approved Application for Payment. 14.5 Delayed Payments: Should the OWNER fail to make payment to the CONTRACTOR of a sum named in any Application for Payment with which OWNER agrees and has approved for payment within thirty (30) calendar days after the day on which the OWNER received the mutually acceptable Application for Payment, then the OWNER will pay to the CONTRACTOR, in addition to the sum shown as due by such Application for Payment, interest thereon at the rate of one percent (1%) per month from date due until fully paid, which shall fully liquidate any injury to the CONTRACTOR growing out of such delay in payment. 14.6 Arrears: No money shall be paid by the OWNER upon any claim, debt, demand or account whatsoever, to any person, firm or corporation who is in arrears to the OWNER; and the OWNER shall be entitled to counterclaim and offset against any such debt, claim, demand or account so in arrears and no assignment or transfer of such debt, claim, demand or account, shall affect the right of the OWNER to so offset said amounts, and associated penalties and interest if applicable, against the same. 00700 04-2020 Page 37 General Conditions 14.7 Substantial Completion: 14.7.1 If a Certificate of Occupancy is required by public authorities having jurisdiction over the Work, said certificate shall be issued before the Work or any portion thereof is considered substantially complete. When the CONTRACTOR considers that the Work, or a portion thereof which the OWNER agrees to accept separately, is substantially complete, the CONTRACTOR shall notify Owner's Representative and request a determination as to whether the Work or designated portion thereof is substantially complete. If Owner's Representative does not consider the Work substantially complete, Owner's Representative will notify the CONTRACTOR giving reasons therefor. Failure on the OWNER's part to list a reason does not alter the responsibility of the CONTRACTOR to complete all Work in accordance with the Contract Documents. After satisfactorily completing items identified by Owner's Representative, the CONTRACTOR shall then submit another request for Owner's Representative to determine substantial completion. If Owner's Representative considers the Work substantially complete, Owner's Representative will prepare and deliver a certificate of Substantial Completion which shall establish the date of Substantial Completion, shall include a punch list of items to be completed or corrected before final payment, shall establish the time within which the CONTRACTOR shall finish the punch list, and shall establish responsibilities of the OWNER and the CONTRACTOR for security, maintenance, heat, utilities, damage to the Work, warranty and insurance. Failure to include an item on the punch list does not alter the responsibility of the CONTRACTOR to complete all Work in accordance with the Contract Documents. The certificate of Substantial Completion shall be signed by the OWNER and the CONTRACTOR to evidence acceptance of the responsibilities assigned to them in such certificate. 14.7.2 The OWNER shall have the right to exclude the CONTRACTOR from the Work after the date of Substantial Completion, but the OWNER will allow the CONTRACTOR reasonable access to complete or correct items on the punch list. 14.8 Partial Utilization: The OWNER, at the OWNER's sole option, shall have the right to take possession of and use any completed or partially completed portion of the Work regardless of the time for completing the entire Work. The OWNER's exercise of such use and possession shall not be construed to mean that the OWNER acknowledges that any part of the Work so possessed and used is substantially complete or that it is accepted by OWNER, and the OWNER's exercise of such use and possession shall not relieve the CONTRACTOR of its responsibility to complete all Work in accordance with the Contract Documents. 14.9 Final Inspection: Upon Written Notice from the CONTRACTOR that the entire Work or an agreed portion thereof is complete, Owner's Representative will make a final inspection with the CONTRACTOR and provide Written Notice of all particulars in which this inspection reveals that the Work is incomplete or defective. The CONTRACTOR shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 14.10 Final Application for Payment: The CONTRACTOR may make application for final payment following the procedure for progress payments after the CONTRACTOR has completed all such corrections to the satisfaction of Owner's Representative and delivered the following documents: .1 Three (3) complete operating and maintenance manuals, each containing maintenance and operating instructions, schedules, guarantees, and other documentation required by the Contract Documents; .2 Record documents (as provided in paragraph 6.10); .3 Consent of surety, if any, to final payment. If surety is not provided, complete and legally effective releases or waivers (satisfactory to the OWNER) of all claims arising out of or filed in connection with the Work; 00700 04-2020 Page 38 General Conditions .4 Certificate evidencing that insurance required by the Supplemental General Conditions will remain in force after final payment and through any warranty period; .5 Non-Use of Asbestos Affidavit (After Construction); and .6 Any other documentation called for in the Contract Documents. 14.11 Final Payment and Acceptance: 14.11.1 If, on the basis of observation of the Work during construction, final inspection, and review of the final Application for Payment and accompanying documentation as required by the Contract Documents, Owner's Representative is satisfied that the Work has been completed and the CONTRACTOR's other obligations under the Contract Documents have been fulfilled, Owner's Representative will recommend the final Application for Payment and thereby notify the OWNER. If the OWNER agrees with the recommendation of the Owner's Representative, the OWNER will pay to the CONTRACTOR the balance due the CONTRACTOR under the terms of the Contract. 14.11.2 As Contract Time is measured to Final Completion, Owner's Representative will issue a letter of final acceptance to the CONTRACTOR which establishes the Final Completion date and initiates any warranty period. 14.11.3 Final payment is considered to have taken place when the CONTRACTOR or any of its representatives negotiates the OWNER's final payment check, whether labeled final or not, for cash or deposits check in any financial institution for its monetary return. 14.12 Waiver of Claims: The making and acceptance of final payment will constitute: .1 a waiver of claims by the OWNER against the CONTRACTOR, except claims arising from unsettled claims, from defective Work appearing after final inspection, from failure to comply with the Contract Documents or the terms of any warranty specified therein, or from the CONTRACTOR's continuing obligations under the Contract Documents; and .2 a waiver of all claims by the CONTRACTOR against the OWNER other than those previously made in writing and still unsettled. ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION 15.1 OWNER May Suspend Work Without Cause and for Convenience: At any time and without cause and for convenience, the OWNER may suspend the Work or any portion thereof for a period of not more than ninety(90)calendar days by written agreement or by Written Notice to the CONTRACTOR which will fix the date on which the Work will be resumed. The CONTRACTOR shall resume the Work on the date so fixed. The CONTRACTOR may be allowed an adjustment in the Contract Amount or an extension of the Contract Times, or both, directly attributable to any such suspension if the CONTRACTOR makes an approved Claim therefor as provided in Article 11 and Article 12. 15.2 OWNER May Terminate Without Cause: Upon seven (7) calendar days' Written Notice to the CONTRACTOR, the OWNER may, without cause and without prejudice to any right or remedy of the OWNER, elect to terminate the Agreement. In such case, the CONTRACTOR shall be paid (without duplication of any items): .1 for completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination; 00700 04-2020 Page 39 General Conditions .2 for all claims incurred in settlement of terminated contracts with Suppliers, Subcontractors, and others. The CONTRACTOR agrees to negotiate in good faith with Subcontractors, Suppliers and others to mitigate the OWNER's cost CONTRACTOR shall include in any subcontract or purchase order language that provides that if the Agreement is terminated without cause, the Subcontractor and Suppliers will only be paid for work performed or materials and equipment supplied and shall not have any other claims against CONTRACTOR or OWNER; CONTRACTOR shall not be paid for any profit or overhead for Work not completed. 15.3 OWNER May Terminate With Cause: 15.3.1 Upon the occurrence of any one or more of the following events: .1 if the CONTRACTOR persistently fails to perform the Work in accordance with the Contract Documents; .2 if the CONTRACTOR disregards laws or regulations of any public body having jurisdiction; .3 if the CONTRACTOR disregards the authority of Owner's Representative; .4 if the CONTRACTOR makes fraudulent statements; .5 if the CONTRACTOR fails to maintain a work force adequate to accomplish the Work within the Contract Time; .6 if the CONTRACTOR fails to make adequate progress and endangers successful completion of the Contract; or .7 if the CONTRACTOR otherwise violates any provisions of the Contract Documents; The OWNER may, after giving the CONTRACTOR (and the surety, if any) seven (7) calendar days' Written Notice terminate the services of the CONTRACTOR. The OWNER, at its option, may proceed with negotiation with surety for completion of the Work. Alternatively,the OWNER may under these circumstances exclude the CONTRACTOR from the site and take possession of the Work (without liability to the CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the site or for which the OWNER has paid the CONTRACTOR but which are stored elsewhere, and finish the Work as the OWNER may deem expedient. In such case the CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Amount exceeds all claims, costs, losses and damages sustained by the OWNER arising out of or resulting from completing the Work, such excess will be paid to the CONTRACTOR. If such claims, costs, losses and damage exceed such unpaid balance, the CONTRACTOR or surety shall pay the difference to the OWNER. 15.3.2 Where the CONTRACTOR's services have been so terminated by the OWNER, the termination will not affect any rights or remedies of the OWNER against the CONTRACTOR and surety then existing or which may thereafter accrue. Any retention or payment of amounts due the CONTRACTOR by the OWNER will not release the CONTRACTOR from liability. In the event the OWNER terminates the Contract with cause, the OWNER may reject any and all bids submitted by the CONTRACTOR for up to three (3) years. 00700 04-2020 Page 40 General Conditions 15.4 CONTRACTOR May Stop Work or Terminate: If through no act or fault of the CONTRACTOR,the Work is suspended for a period of more than ninety(90)calendar days by the OWNER or under an order of court or other public authority, or (except during disputes) Owner's Representative fails to forward for processing any mutually acceptable Application for Payment within thirty (30) calendar days after it is submitted, or(except during disputes)the OWNER fails for sixty (60)calendar days after it is submitted to pay the CONTRACTOR any sum finally determined by the OWNER to be due, then the CONTRACTOR may, upon seven(7)calendar days'Written Notice to the OWNER,and provided the OWNER does not remedy such suspension or failure within that time, terminate the Agreement and recover from the OWNER payment on the same terms as provided in paragraph 15.2. In lieu of terminating the Agreement and without prejudice to any other right or remedy, if(except during disputes)Owner's Representative has failed to forward for processing any mutually acceptable Application for Payment within thirty(30)calendar days after it is submitted, or (except during disputes) the OWNER has failed for sixty (60) calendar days after it is submitted to pay the CONTRACTOR any sum finally determined by the OWNER to be due, the CONTRACTOR may upon seven (7) calendar days' Written Notice to the OWNER stop the Work until payment of all such amounts due the CONTRACTOR, including interest thereon. The provisions of this paragraph 15.4 are not intended to preclude the CONTRACTOR from making a Claim under Article 11 and Article 12 for an increase in Contract Amount or Contract Times or otherwise for expenses or damage directly attributable to the CONTRACTOR's stopping Work as permitted by this paragraph. ARTICLE 16 -DISPUTE RESOLUTION 16.1 Filing of Claims: 16.1.1 Claims arising from the circumstances identified in paragraphs 3.2, 4.1, 4.2.2, 4.2.4, 6.4.2, 6.11.5.2, 6.17, 7.5, 8.6, 9.5, 10.4.2, 13.8, 15.1, 15.2, 15.3,or 15.4, or other occurrences or events,shall be made by Written Notice delivered by the party making the Claim to the other party within thirty (30) calendar days after the start of the occurrence or event giving rise to the Claim and stating the general nature of the Claim. Notice of the amount of the Claim with supporting data shall be delivered within thirty (30) calendar days after Written Notice of Claim is delivered by claimant and shall represent that the adjustment claimed covers all known amounts to which claimant is entitled. 16.1.2 Within thirty(30)calendar days of receipt of notice of the amount of the Claim with supporting data, Owner's Representative and the CONTRACTOR shall meet to discuss the Claim, after which an offer of settlement or notification of no settlement offer will be made to claimant. If claimant is not satisfied with the proposal presented, claimant shall have thirty(30)calendar days in which to: .1 submit additional supporting data requested by the other party; .2 modify the initial Claim; or .3 request Alternative Dispute Resolution. 16.2 Alternative Dispute Resolution: 16.2.1 If a dispute exists concerning a Claim, the parties agree to use the following procedure prior to pursuing any other available remedies. The OWNER reserves the right to include E/A as a party. 16.2.2 Negotiating with Previously Uninvolved Personnel: Either party may make a written request for a meeting to be held between representatives of each party within fourteen (14) calendar days of the request or such later period that the parties may agree to. Each party shall endeavor to include, at a minimum, one (1) previously uninvolved senior level decision maker empowered to negotiate on behalf of their organization. The purpose of this and subsequent meetings will be good faith negotiations of the matters constituting the dispute. Negotiations shall be concluded within thirty(30)calendar days of the first meeting, unless mutually agreed otherwise. This step may 00700 04-2020 Page 41 General Conditions be waived by written agreement of both parties, in which event the parties may proceed directly to mediation as described below. 16.2.3 Mediation: 16.2.3.1 If the procedure described in paragraph 16.2.2 proves unsuccessful or is waived pursuant to its terms, the parties shall initiate the mediation process. The parties agree to select within thirty (30) calendar days one (1) mediator trained in mediation skills, to assist with resolution of the dispute. The OWNER and the CONTRACTOR agree to act in good faith in the selection of the mediator and to give consideration to qualified individuals nominated to act as mediator. Nothing in this agreement prevents the parties from relying on the skills of a person who also is trained in the subject matter of the dispute and/or a contract interpretation expert. 16.2.3.2 Mediation is a forum in which an impartial person, the mediator, facilitates communication between parties to promote reconciliation, settlement, or understanding among them. The parties hereby agree that mediation, at a minimum, shall provide for 1)conducting an on-site investigation, if appropriate, by the mediator for fact-gathering purposes, 2) a meeting of all parties for the exchange of points of view and 3) separate meetings between the mediator and each party to the dispute for the formulation of resolution alternatives. The parties agree to participate in mediation in good faith for up to thirty(30)calendar days from the date of the first mediation session, unless mutually agreed otherwise. Should the parties fail to reach a resolution of the dispute through mediation, then each party is released to pursue other remedies available to them. ARTICLE 17—RIGHT TO AUDIT 17.1 Right to Audit: Whenever the OWNER enters into any type of contractual arrangement with the CONTRACTOR, then the CONTRACTOR's "records" shall upon reasonable notice be open to inspection and subject to audit and/or reproduction during normal business working hours. The OWNER's representative, or an outside representative engaged by the OWNER, may perform such audits. The CONTRACTOR shall maintain all records relating to this Agreement for four (4) years from the date of final payment under this Agreement, or until pending litigation has been completely and fully resolved, whichever occurs later. 17.1.1 The OWNER shall have the exclusive right to examine the records of the CONTRACTOR. The term "records"as referred to herein shall include any and all information, materials and data of every kind and character, including without limitation records, books, papers, documents, contracts, schedules,commitments, arrangements, notes, daily diaries, reports, drawings, receipts, vouchers and memoranda, and any and all other agreements, sources of information and matters that may, in the OWNER's judgment, have any bearing on or pertain to any matters, rights, duties or obligations under or covered by any contract document. Such records shall include (hard copy, as well as computer-readable data if it can be made available), written policies and procedures, time sheets, payroll registers, cancelled checks, personnel file data, correspondence, general ledger entries, and any other record in the CONTRACTOR's possession which may have a bearing on matters of interest to the OWNER in connection with the CONTRACTOR's dealings with the OWNER(all of the foregoing are hereinafter referred to as "records"). In addition,the CONTRACTOR shall permit interviews of employees as well as agents, representatives, vendors, subcontractors and other third parties paid by the CONTRACTOR to the extent necessary to adequately permit evaluation and verification of the following: a) The CONTRACTOR's compliance with contract requirements; b) The CONTRACTOR's compliance with the OWNER'S business ethics policies; and c) If necessary, the extent of the Work performed by the CONTRACTOR at the time of contract termination. 17.1.2 The CONTRACTOR shall require all payees(examples of payees include subcontractors, insurance agents, material suppliers, etc.) to comply with the provisions of this Article 17 by securing the requirements hereof in a 00700 04-2020 Page 42 General Conditions written agreement between the CONTRACTOR and payee. Such requirements include a flow-down right of audit provision in contracts with payees that also apply to subcontractors and sub-subcontractors, material suppliers, etc. The CONTRACTOR shall cooperate fully and shall require Related Parties and all of the CONTRACTOR's subcontractors to cooperate fully in furnishing or in making available to the OWNER from time to time whenever requested, in an expeditious manner, any and all such information, materials, and data. 17.1.3 The OWNER's authorized representative or designee shall have reasonable access to the CONTRACTOR's facilities, shall be allowed to interview all current or former employees to discuss matters pertinent to the performance of this Agreement, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with this Article 17. 17.1.4 If an audit inspection or examination in accordance with this Article 17 discloses overpricing or overcharges of any nature by the CONTRACTOR to the OWNER in excess of one-half of one percent (.5%) of the total contract billings, then the reasonable actual cost of the OWNER's audit shall be reimbursed to the OWNER by the CONTRACTOR. Any adjustments and/or payments,which must be made as a result of any such audit or inspection of the CONTRACTOR's invoices and/or records, shall be made within a reasonable amount of time (not to exceed 90 days)from presentation of the OWNER's findings to the CONTRACTOR. 17.1.5 The CONTRACTOR shall take reasonable actions to prevent any actions or conditions which could result in a conflict with the OWNER's best interests. These obligations shall apply to the activities of the CONTRACTOR's employees, agents, subcontractors, etc. in their dealings and relations with the OWNER's current and former employees and their relatives. For example, the CONTRACTOR's employees, agents or subcontractors should not make or provide to be made any employment, gifts, extravagant entertainment, payments, loans or other considerations to the OWNER's representatives, employees or their relatives. 17.1.6 It is also understood and agreed by the CONTRACTOR that any solicitation of gifts or any other item of value by anyone representing the OWNER is to be reported within two (2) business working days to the OWNER at the following telephone number: 512-218-5401. Failure to report any such solicitations or offers shall be deemed a material breach of contract entitling the OWNER to pursue damages resulting from the failure to comply with this provision. ARTICLE 18— MISCELLANEOUS 18.1 Venue: In the event of any suit at law or in equity involving the Contract, venue shall be in Williamson County, Texas and the laws of the state of Texas shall apply to Contract interpretation and enforcement. 18.2 Extent of Agreement: This Contract represents the entire and integrated agreement between the OWNER and the CONTRACTOR and supersedes all prior negotiations, representations or agreements, either written or oral. 18.3 Cumulative Remedies: The rights and remedies available to the parties are not to be construed in any way as a limitation of any rights and remedies available to any or all of them which are otherwise imposed or available by laws or regulations, by special warranty or guarantees or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply. 00700 04-2020 Page 43 General Conditions 18.4 Severability: If any word, phrase, clause, sentence or provision of the Contract, or the application of same to any person or set of circumstances is for any reason held to be unconstitutional, invalid or unenforceable,that finding shall only effect such word, phrase, clause, sentence or provision, and such finding shall not effect the remaining portions of this Contract; this being the intent of the parties in entering into the Contract; and all provisions of the Contract are declared to be severable for this purpose. 18.5 Independent Contractor The Contract shall not be construed as creating an employer/employee relationship,a partnership,or a joint venture. The CONTRACTOR's services shall be those of an independent contractor. The CONTRACTOR agrees and understands that the Contract does not grant any rights or privileges established for employees of the OWNER. 18.6 Prohibition of Gratuities The OWNER may, by Written Notice to the CONTRACTOR, terminate the Contract without liability if is determined by the OWNER that gratuities were offered or given by the CONTRACTOR or any agent or representative of the CONTRACTOR to any officer or employee of the OWNER with a view toward securing the Contract or securing favorable treatment with respect to the awarding or amending or the making of any determinations with respect to the performing of such Contract. In the event the Contract is terminated by the OWNER pursuant to this provision, the OWNER shall be entitled, in addition to any other rights and remedies, to recover or withhold the amount of the cost incurred by the CONTRACTOR in providing such gratuities. 18.7 Prohibition Against Personal Interest in Contracts No officer,employee, independent consultant, or elected official of the OWNER who is involved in the development, evaluation, or decision-making process of the performance of any solicitation shall have a financial interest, direct or indirect, in the Contract resulting from that solicitation. Any violation of this provision, with the knowledge, expressed or implied, of the CONTRACTOR shall render the Contract voidable by the OWNER. End of General Conditions 00700 04-2020 Page 44 General Conditions 00800 SUPPLEMENTAL GENERAL CONDITIONS City of Round Rock Contract Forms Supplemental General Conditions Section 00800 SUPPLEMENTAL GENERAL CONDITIONS TO AGREEMENT FOR CONSTRUCTION SERVICES The Supplemental General Conditions contained herein shall amend or supplement the General Conditions, Section 00700. ARTICLE 1 -DEFINITIONS 1.16 Engineer/Architect(E/A): Add the following: Name (Representative): Antonio A. Prete, P.E. Firm: Waeltz & Prete, Inc Address: 211 N. A.W. Grimes City, State, Zip: Round Rock, TX 78665 Telephone: 512-505-8953 Facsimile: N/A Email: tony(a,w-pinc.com 1.27 Owner's Representative: Add the following: Name: Katie Baker, PLA Title: Parks Development Manalaer Address: 301 W. Bal;dad Ave #250 City, State, Zip: Round Rock, TX 78664 Telephone: 512-218-5540 Facsimile: N/A Email: kbaker(a,roundrocktexas.s?ov ARTICLE 6 -CONTRACTOR'S RESPONSIBILITIES 6.18 Liquidated Damages Add the following: 1. CONTRACTOR SHALL PAY LIQUIDATED DAMAGES IN THE AMOUNT OF rive rtunureu AND NO/100 DOLLARS $D'Ju•u'J PER DAY FOR EACH DAY BEYOND THE DATE ESTABLISHED THEREFOR THAT THE CONTRACTOR FAILS TO ACHIEVE SUBSTANTIAL COMPLETION, AND FOR WHICH OWNER IS UNABLE TO UTILIZE THE IMPROVEMENTS AND FACILITIES DUE TO THE FAILURE OF CONTRACTOR TO HAVE ACHIEVED SUBSTANTIAL COMPLETION IN ACCORDANCE WITH THE CONTRACT. END OF SUPPLEMENTAL GENERAL CONDITIONS Page 1 00800 10-2015 Supplemental General Conditions 00090669 00900 SPECIAL CONDITIONS SECTION 01-INFORMATION 01-01 COPIES OF PLANS AND SPECIFICATIONS FURNISHED The Agreement will be prepared in not less than two (2) (original signed) sets. The OWNER will furnish to the CONTRACTOR one (1) copy of conforming Contract Documents and Specifications unless otherwise requested. 01-02 GOVERNING CODES All construction as provided for under the Contract Documents shall be governed by any existing Resolutions, Codes and Ordinances, and any subsequent amendments or revisions thereto as set forth by the OWNER. 01-03 LOCATION The location of work shall be as set forth in the Notice to Bidders and as indicated in the Contract Documents. 01-04 USAGE OF WATER All water used during construction shall be provided by the OWNER and shall be metered. The OWNER shall specify the location from which the CONTRACTOR is to procure water.The CONTRACTOR shall be responsible for obtaining a bulk water permit from the OWNER and providing all apparatus necessary for procuring,storing, transporting and using water during construction.The CONTRACTOR shall strive to use no more water than reasonable to perform the work associated with this Contract and shall avoid waste.The CONTRACTOR will be required to pay for all water used if it is found that waste is occurring during construction. SECTION 02-SPECIAL CONSIDERATIONS 02-01 CROSSING UTILITIES Prior to commencing the Work associated with this Contract, it shall be the CONTRACTOR's responsibility to make arrangements with the owners of utility companies to uncover their particular utility lines or otherwise confirm their location. Certain utility companies perform such services at their own expense,however,where such is not the case,the CONTRACTOR will cause such work to be done at his own expense. 02-02 UTILITY SERVICES FOR CONSTRUCTION The CONTRACTOR will be responsible for providing its own utility services while performing the Work associated with this Contract. Provision of said utility services shall be subsidiary to the various bid items and no additional payment will be made for this item. 00900-4-2020 Page 1 Special Conditions 00443643 02-03 WAGE RATES Wage Rates(Information From Chapter 2258,Texas Government Code Title 10) 2288.021.Duty of Government Entity to Pay Prevailing Wage Rates a. The State or any political subdivision of the State shall pay a worker employed by it or on behalf of it: (1) not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the work is performed;and (2) not less than the general prevailing rate of per diem wages for legal holiday and overtime work. b. Subsection(a)does not apply to maintenance work. C. A worker is employed on a public work for the purposes of this section if a Contractor or Subcontractor in the execution of a contract for the public work with the State, a political subdivision of the State or any officer or public body of the State or a political subdivision of the State, employs the worker. 2258.023. Prevailing Wage Rates to be Paid by Contractor and Subcontractor; Penalty a. The contractor who is awarded a contract by a public body, or a Subcontractor of the Contractor, shall pay not less than the rates determined under Section 2258.022 to a worker employed by it in the execution of the contract. b. A Contractor or Subcontractor who violates this section shall pay to the state or a political subdivision of the state on whose behalf the contract is made, $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the contract.A public body awarding a contract shall specify this penalty in the contract. C. A contractor or subcontractor does not violate this section if a public body awarding a contract does not determine the prevailing wage rates, and specify the rates in the contract as provided by Section 2258.022. d. The public body shall use any money collected under this section to offset the costs incurred in the administration of this chapter. e. A municipality is entitled to collect a penalty under this section only if the municipality has a population of more than 10,000. 009004-2020 Page 2 Special Conditions 00443643 2258.051. Duty of Public Body to Hear Complaints and Withhold Payment A public body awarding a contract, and an agent or officer of the public body, shall: 1. take cognizance of complaints of all violations of this chapter committed in the execution of the contract; and 2. withhold money forfeited or required to be withheld under this Chapter from the payments to the Contractor under the contract, except that the public body may not withhold money from other than the final payment without determination by the public body that there is good cause to believe that the Contractor has violated this chapter. Applicable wage rates to be used in Williamson and/or Travis County may be obtained from the U.S. Department of Labor website at the following web addresses: Construction Types: Heavy (Sewer/Water Treating Plant and Sewer/Incidental to Highway) hqp://www.wdol.gov/wdol/scafiles/davisbacon/TX33.dvb?v--O Construction Types: Heavy and Highway hqp://www.wdol.jzov/wdol/scafiles/davisbacon/TX16.dvb?v--O Construction Type: Building ht V://www.wdol.gov/wdol/scafiles/davisbacon/TX76.dvb?v=1 02-04 LEMaT OF FINANCIAL RESOURCES The OWNER has a limited amount of financial resources committed to this Project; therefore, it shall be understood by all bidders that the OWNER may be required to change and/or delete any items which it may feel is necessary to accomplish all or part of the scope of work within its limit of financial resources. CONTRACTOR shall be entitled to no claim for damages or anticipated profits on any portion of work that may be omitted. At any time during the duration of this contract, the OWNER reserves the right to omit any work from this contract.Unit prices for all items previously approved in this contract shall be used to delete or add work per change order. 02-05 LIMITS OF WORK AND PAYMENT It shall be the obligation of the CONTRACTOR to complete all work included in this Contract, so authorized by the OWNER, as described in the contract documents and technical specifications. All items of work not specifically paid for in the bid proposal shall be included in the unit price bids. Any question arising as to the limits of work shall be left up to the interpretation of the E/A. 00900-4-2020 Page 3 Special Conditions 00443643 02-06 LAND FOR WORK OWNER provides, as indicated on Drawings, land upon which work is to be done, right- of-way for access to same and such other lands that are designated for the use of the CONTRACTOR. CONTRACTOR provides,at his expense and without liability of OWNER, any additional land and access thereto that may be required for his construction operations,temporary construction facilities, or for storage of materials. 02-07 DEVIATIONS OCCASIONED BY UTILITY STRUCTURES Whenever existing utilities, not indicated on the Drawings, present obstructions to grade and alignment of proposed improvements immediately notify engineer, who without delay, will determine if existing utilities are to be relocated, or grade and alignment of proposed improvements changed. Where necessary to move existing utilities and appurtenances as determined by the E/A, the E/A and CONTRACTOR will make relocation arrangements with the utility owner. The OWNER will not be liable for delay costs or damages due to relocations of utilities which hinder progress of the work. 02-08 CONSTRUCTION STAKING All construction staking required to complete the work associated with this contract shall be provided by the CONTRACTOR. The CONTRACTOR shall be responsible for determining the layout and extent of staking necessary to construct the improvements to the lines and grades shown in the Drawings and such staking shall be satisfactory to the E/A. The CONTRACTOR shall consult with the E/A and Owners Representative in the field for assistance as necessary. Sufficient staking materials and equipment shall be provided by the CONTRACTOR including but not limited to:paint, flagging,laths,hubs,blue tops,nails,hammers,measuring chains or tapes,transits and levels. The CONTRACTOR shall be responsible for setting and marking control and off-set points for measuring distances and angles, for shooting levels,and for any other items pertaining to construction staking. This item shall not be paid for separately and shall be considered subsidiary to other bid items. 00900-4-2020 Page 4 Special Conditions 00443643 SECTION 03-ACCESS AND TRAFFIC CONTROL Access shall be provided for the public and emergency vehicles at all possible times. When it becomes necessary to restrict access, the CONTRACTOR shall notify the OWNER and coordinate with the OWNER, all applicable agencies (i.e. Fire Department,E.M.S.,Public Works,etc.),residents,and affected parties. If emergency access is required during the work and such access is being hindered by the work, the CONTRACTOR will suspend the work if necessary, and otherwise endeavor to assist emergency personnel in accessing a location restricted by the work. Unless otherwise approved by the E/A, at the end of each day all lanes of traffic shall be opened to the public. The CONTRACTOR shall ensure compliance at all times with the accepted Traffic Control Plan for the project and shall be responsible for all maintenance, signing and safety precautions necessary for traffic control. These items shall be included in the bid item Traffic Control. 00900-4-2020 Page 5 Special Conditions 00443643 01000 TECHNICAL SPECIFICATIONS ITEM 1 GENERAL DESCRIPTION 1.01 SCOPE OF WORK The Work covered by these Specifications consists of furnishing all labor, equipment, appliances, materials and performing all operations in connection with the inspection and testing, complete in accordance with the Plans, and subject to the terms and conditions of the Contract Documents. 1.02 GOVERNING TECHNICAL SPECIFICATIONS STREET, WATER, SEWER AND DRAINAGE IMPROVEMENTS The Round Rock Standard Specification Criteria Manual is hereby referred to and included in this contract as fully and to the same extent as if copied at length herein, and shall be applied to this project unless modified elsewhere as discussed below. The aforementioned Criteria Manual is the "Standard Specifications" section of the City of Round Rock Design and Construction Standards. The Standard Specifications may be accessed from the City of Round Rock website (www.roundrocktexas.gov) at the following web address: www.roundrocktexas.gov/dacs. Any adjustments,alterations,or additional information regarding Governing Technical Specifications are contained in the Plans (Drawings), Details and Notes described in Section 02000 of the Project Manual or are included in Attachment A at the end of this Technical Specifications Section. ITEM 2 CONTROL OF WORK 2.01 CLEAN-UP 2.01.1 CONSTRUCTION SITE During construction, the CONTRACTOR shall keep the site free and clean from all rubbish and debris and shall clean-up the site promptly when notified to do so by the E/A. The CONTRACTOR shall,at its own expense,maintain the streets and roads free from dust, mud, excess earth or debris which constitutes a nuisance or danger to the public using the thoroughfare, or the occupants of adjacent properties. Care shall be taken to prevent spillage on streets and roads over which hauling is done, and any such spillage or debris deposited on streets, due to the CONTRACTOR's operations, shall be immediately removed. Page 1 01000-4-2020 Technical Specifications 00443645 2.01.2 BACKWORK The CONTRACTOR shall coordinate his operations in such a manner as to prevent the amount of clean-up and completion of back works from becoming excessive. Should such a condition exist,the E/A may order all or portions of the work to cease and refuse to allow any work to commence until the back work is done to the E/A's satisfaction. 2.02 GRADING The CONTRACTOR shall do such grading in and adjacent to the construction area associated with this contract as may be necessary to leave such areas in a neat and satisfactory condition approved by the E/A. ITEM 3 EXAMINATION AND REVIEW 3.01 EXAMINATION OF WORK The work covered under this Contract shall be examined and reviewed by the E/A, representatives of all governmental entities which have jurisdiction, and the Owner's Representative. The quality of material and the quality of installation of the improvements shall be to the satisfaction of the E/A. It shall be the CONTRACTOR's responsibility for the construction methods and safety precautions in the undertaking of this Contract. 3.02 NOTIFICATION The E/A and the OWNER must be notified a minimum of 24-hours in advance of beginning construction,testing,or requiring presence of the E/A,Owner's or Owner's Representative. 3.03 CONSTRUCTION STAKING The E/A shall furnish the CONTRACTOR reference points and benchmarks that, in the E/A's opinion, provide sufficient information for the CONTRACTOR to perform construction staking. 3.04 PROTECTION OF STAKES,MARKS,ETC. All engineering and surveyor's stakes,marks,property comers, etc., shall be carefully preserved by the CONTRACTOR, and in case of destruction or removal during the course of this project, such stakes, marks, property comers, etc., shall be replaced by the CONTRACTOR at the CONTRACTOR's sole expense. Page 2 01000-4-2020 Technical Specifications 00443645 ITEM 4 PROTECTION AND PRECAUTION 4.01 WORK IN FREEZING WEATHER Portions of the work may continue as directed by the E/A. 4.02 PROTECTION OF TREES,PLANTS AND SHRUBS The CONTRACTOR shall take necessary precautions to preserve all existing trees, plants and shrubs but where it is justifiable and necessary the CONTRACTOR may remove trees and plants for construction right-of-way but only with approval of the E/A. 4.03 TRAFFIC CONTROL MEASURES AND BARRICADES Traffic control measures and barricades shall be installed in accordance with the Texas Manual of Uniform Traffic Control Devices and in other locations deemed necessary by the E/A, for the protection life and property. Under no circumstances will any existing road be permitted to remain closed over a weekend. No separate pay will be made for this item. Costs for this item shall be subsidiary to other items of work. 4.04 PROPERTY LINES AND MONUMENTS The CONTRACTOR shall be responsible for the protection,reference and resetting of property comer monuments if disturbed. 4.05 DISPOSAL OF SURPLUS MATERIAL The CONTRACTOR shall at his own expense, make arrangement for the disposal of surplus material, such as rock,trees,brush and other unwanted backfill materials. 4.06 CONTRACTOR'S USE OF PREMISES The Contractor shall,at his own expense,provide additional space as necessary for his operations and storage of materials. ITEM 5 MATERIALS 5.01 TRADE NAMES Except as specified otherwise, wherever in the specifications an article or class of material is designated by a trade name or by the name or catalog number of any maker, patentee,manufacturer,or dealer,such designations shall be taken as intending to mean and specify the articles described or another equal thereto in quality, finish, and serviceability for the purpose intended, as may be determined and judged by the E/A in his sole discretion. 5.02 MATERIALS AND WORKMANSHIP No material which has been used by the CONTRACTOR for any temporary purpose whatever is to be incorporated in the permanent structure without the written consent of the E/A. Where materials or equipment are specified by a trade or brand name, it is not the intention of the OWNER to discriminate against an equal product of another Page 3 01000-4-2020 Technical Specifications 00443645 manufacturer, but rather to set a definite standard of quality for performance, and to establish an equal basis for the evaluation of bids. Where the words "equivalent", "proper" or"equal to"are used,they shall be understood to mean that the item referred to shall be "proper",the "equivalent" of, or"equal to" some other item, in the opinion or judgment of the E/A. Unless otherwise specified, all materials shall be the best of their respective kinds and shall be in all cases fully equal to approved samples. Notwithstanding that the words "or equal to" or other such expressions may be used in the specifications in connection with a material, manufactured article or process, the material, article or process specifically designated shall be used, unless a substitute is approved in writing by the E/A, and the E/A will have the right to require the use of such specifically designated material, article or process. Page 4 01000-4-2020 Technical Specifications 00443645 ITEM 6 CITY OF ROUND ROCK STANDARD SPECIFICATION MODIFICATIONS Wherever the term "street" is used in the Round Rock Standard Specifications, it shall be construed to include construction within the Limits of Construction as shown on the plan set. Wherever the term "right-of-way" is used in the Round Rock Standard Specifications, it shall be construed to include the Limit of Construction as shown on the plan set. 6.01 CITY OF ROUND ROCK STANDARD SPECIFICATION NO. 110 (STREET EXCAVATION) 110.5 Measurement All accepted street excavation will be measured as follows: Measurement of the excavation and grading is based upon the area within the Limits of Construction. The measurement is a "PLAN QUANTITY". No separate measurement shall be made. 110.6 Payment This item will be paid for at the contract unit bid price for "Unclassified Street Excavation, Plan Quantity", as provided under measurement as included in the bid. The bid price shall include full compensation for all work herein specified, including specifications Item NOS. 101, "Preparing Right of Way", 102, "Clearing and Grubbing", 104, "Removing Portland Cement Concrete", 201, "Subgrade Preparation" and 236, "Proof Rolling", and the furnishing of all materials, equipment, tools, labor and incidentals necessary to complete the work. Payment will be made under the following: Pay Item: "Unclassified Street Excavation, Plan Quantity", Per Cubic yard. 6.02 CITY OF ROUND ROCK STANDARD SPECIFICATION NO. 132 (EMBANKMENT) 110.5 Measurement All accepted embankment will be measured as follows: Page 5 01000-4-2020 Technical Specifications 00443645 Measurement of the embankment and grading is based upon the area within the Limits of Construction. The measurement is a "PLAN QUANTITY". No separate measurement shall be made. 110.6 Payment This item will be paid for at the contract unit bid price for "Embankment, Plan Quantity", as provided under measurement as included in the bid. The bid price shall include full compensation for all work herein specified, including specifications Item NOS. 101, "Preparing Right of Way", 102, "Clearing and Grubbing", 104, "Removing Portland Cement Concrete" 201, "Subgrade Preparation" and 236, "Proof Rolling", and the furnishing of all materials, equipment, tools, labor and incidentals necessary to complete the work. Payment will be made under the following: Pay Item: "Embankment, Plan Quantity",Per Cubic yard. Page 6 010004-2020 Technical Specifications 00443645 02000 PLANS, DETAILS AND NOTES If applicable, insert reference(s) to project plans; details; and notes See Attached Construction Plans - "Rock Hollow Park" Technical Specifications: DACS - Standard Specifications Criteria Manual TxDOT - Standard Specifications for Construction & Maintenance of Highways, Streets, & Bridges (Latest Edition) * Note to Bidder- In case of conflicting Technical Specifications, the more stringent specification shall apply. The Engineer shall make the final determination.