Contract - SpawGlass Contractors, Inc. - 8/14/2025 Document A133? - 2019 Exhibit A Guaranteed Maximum Price Amendment This Amendment dated the day of in the year,is incorporated into the accompanying AIA Document A I 33TK--2019,Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the day of in the year(the ADDITIONS AND DELETIONS: "Agreement") The author of this document may (In words, indicate day, month, and year.) have revised the text of the original AIA standard form.An Additions for the following PROJECT: and Deletions Report that notes (Name and address or location) revisions to the standard form text is available from the author and Old Settlers Park Buildout-Package 3C-Rec Center-GMP 2 should be reviewed.A vertical line Old Settlers Park in the left margin of this document 3300 E.Palm Valley Blvd indicates where the author has Round Rock,TX 78665 added to or deleted from the original AIA text. THE OWNER: This document has important legal (Name, legal status, and address) consequences.Consultation with an attorney is encouraged with City of Round Rock respect to its completion or 221 East Main Street,Round Rock,TX 78644 modification. THE CONSTRUCTION MANAGER: AIA Document A201 TM-2017, (Name, legal status, and address) General Conditions of the Contract for Construction,is adopted in this SpawGlass Contractors,Inc. document by reference.Do not use I 1 1 1 Smith Road,Austi,TX 78721 with other general conditions unless this document is modified. TABLE OF ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED AA CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS,AND SUPPLIERS ARTICLE A.1 GUARANTEED MAXIMUM PRICE §A.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 of the Agreement,the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price.As agreed by the Owner and Construction Manager,the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed.The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work,as that term is defined in Article 6 of the Agreement. §A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Seventy-One Million Four Hundred and Ninety-Six Thousand Five Hundred Nineteen Dollars and Zero Cents($71,496,519.00),subject to additions and deductions by �hangeOrder as provided in the Contract Documents. ad as - air AIA Document At 33—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 08:32:19 CDT on 07/10/2025 under Subscription No.20250142682 which expires on 07/05/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (686ec395c41 ddbe9f999cb3d) §A.1.1.2 Itemized Statement of the Guaranteed Maximum Price.Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories,including allowances;the Construction Manager's contingency;alternates; the Construction Manager's Fee;and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the Agreement. (Provide itemized statement below or reference an attachment.) Reference attached GMP package-Tab 06 §A.1.1.3 The Construction Manager's Fee is set forth in Section 6.1.2 of the Agreement. §AAAA The method of adjustment of the Construction Manager's Fee for changes in the Work is set forth in Section 6.1.3 of the Agreement. §A.1,1.5 Alternates §A.1.1.5.1 Alternates,if any,included in the Guaranteed Maximum Price: Item Price §A.1.1.5.2 Subject to the conditions noted below,the following alternates may be accepted by the Owner following execution of this Exhibit A.Upon acceptance,the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that must be met.ror the Owner to accept the alternate.) Item Price Conditions for Acceptance §A.1.1.6 Unit prices,if any: (Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.) Item Units and Limitations Price per Unit($0.00) ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION §A.2.1 The date of commencement of the Work shall be: (Cheek one of the following boxes) [ ] The date of execution of this Amendment. [X] Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) September 3rd,2025 If a date of commencement of the Work is not selected,then the date of commencement shall be the date of execution of this Amendment. §A.2.2 Unless otherwise provided,the Contract Time is the period of time,including authorized adjustments,allotted in the Contract Documents for Substantial Completion of the Work.The Contract Time shall be measured from the date of commencement of the Work. §A.2.3 Substantial Completion §A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents,the Construction Manager shall achieve Substantial Completion of the entire Work: (Cheek one of the following boxes and complete the necessary information) [ ] Not later than( )calendar days from the date of commencement of the Work. [X] By the following date: April 9th,2027 AIA Document A133—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 08:32:19 2 CDT on 07/10/2025 under Subscription No.20250142682 which expires on 07/05/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documentss Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (686ec395c41ddbe9f999cb3d) §A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents,if portions of the Work are to be completed prior to Substantial Completion of the entire Work,the Construction Manager shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date §A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3, liquidated damages,if any,shall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED §A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: §A.3.1.1 The following Supplementary and other Conditions of the Contract: Document Tile Date Pages §A.3.1.2 The following Specifications: (Either list the Specifications here, or refer to an exhibit attached to this Amendment.) Rec Center 95% Technical Specifications as issued by Kimley-Horn in April 2025 Administration and Recreation Center Project Specifications as issued by PBK on April 21, 2025 Rec Center Complex Geotechnical Engineering report as issued by UES Professional Solutions 45, LLC on November 4, 2024 Rec Center Complex Grading Recommendations—Soccer and Practice Fields as issued by UES Professional Solutions 45, LLC on April 25, 2025 Section Title Date Pages §A.3.1.3 The following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Amendment.) Rec Center 95%Technical Specifications as issued by Kimley-Horn in April 2025 Administration and Recreation Center 95%Contract Drawings issued by PBK on April 21,2025 Number Tile Date §A.3.1.4 The Sustainability Plan,if any: (If the Owner identified a Sustainable Objective in the Owner's Criteria, idents the document or documents that comprise the Sustainability Plan by title, date and number ofpages, and include other identing information. The Sustainability Plan identifies and describes the Sustainable Objective;the targeted Sustainable Measures; implementation strategies selected to achieve the Sustainable Measures;the Owner's and Construction Manager's roles and responsibilities associated with achieving the Sustainable Measures;the specific details about design reviews, testing or metrics to verify achievement of each Sustainable Measure;and the Sustainability Documentation required for the Project, as those terms are defined in Exhibit C to the Agreement.) Title Date Pages Other identifying information: §A.3.1.5 Allowances,if any,included in the Guaranteed Maximum Price: (Identify each allowance) AIA Document At 33—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 08:32:19 3 CDT on 07/10/2025 under Subscription No.20250142682 which expires on 07/05/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (686ec395c41ddbe9f999cb3d) Item Price Escalation Allowance $1,055,344.00 §A.3.1.6 Assumptions and clarifications,if any,upon which the Guaranteed Maximum Price is based: (Identify each assumption and clarification.) Reference attached GMP Package-Tab 05 §A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Amendment.) ARTICLE A.4 CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS §AAA The Construction Manager shall retain the consultants,contractors,design professionals,and suppliers,identified below: (List name, discipline, address, and other information.) This Amendment to the Agreement entered into as of the day and year first written above. OWNER(Si Lure) ST UCTIO AGER(Signature) BY:Craig Morgan �/Ycr avid Paden,Austin Division President (Printed name and title) (Printed name and title) AIA Document A133—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 08:32:19 4 CDT on 07/10/2025 under Subscription No.20250142682 which expires on 07/05/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents"Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (686ec395c41ddbe9f999cb3d) Additions and Deletions Report for AIA®Document A 1V— 2019 Exhibit A This Additions and Deletions Report,as defined on page 1 of the associated document,reproduces below all text the author has added to the standard form AIA document in order to complete it,as well as any text the author may have added to or deleted from the original AIA text.Added text is shown underlined.Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document.This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 08:32:19 CDT on 07/10/2025. Changes to original AIA text PAGE 3 Rec Center 95% Technical Specifications as issued by Kimley-Horn in April 2025 Administration and Recreation Center Project Specifications as issued by PBK on April 21, 2025 Rec Center Complex Geotechnical Engineering report as issued by UES Professional Solutions 45, LLC on November 4, 2024 Rec Center Complex Grading Recommendations—Soccer and Practice Fields as issued by UES Professional Solutions 45, LLC on April 25, 2025 Rec Center 95%Technical Specifications as issued by y-Hom in A1261 2025 Administration and Recreation Center 95%Contract Drawings issued by PBK on April 21,2025 PAGE 4 Item Price Escalation Allowance $1,055,344.00 Variable Information PAGE 1 Old Settlers Park Buildout-Package 3C-Rec Center-GMP 2 Old Settlers Park 3300 E.Palm Valley Blvd Round Rock,TX 78665 City of Round Rock 221 East Main Street,Round Rock,TX 78644 SnawGlass Contractors,Inc. Additions and Deletions Report for AIA Document A133—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 08:32:19 CDT on 07/10/2025 under Subscription No.20250142682 which expires on 07/05/2026,is not for resale,is licensed for one- time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (686ec395o41ddbe9f999cb3d) 1111 Smith Road,Austi,TX 78721 § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Seventy-One Million Four Hundred and Ninety-Six Thousand Five Hundred Nineteen Dollars and Zero Cents (S 71,496,519.00 ),subject to additions and deductions by Change Order as provided in the Contract Documents. PAGE 2 Reference attached GMP package-Tab 06 [ ] The date of execution of this Amendment. [X ] Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) September 3rd,2025 [ ] Not later than()calendar days from the date of commencement of the Work. [ X ] By the following date:April 9th,2027 PAGE 4 Reference attached GMP Package-Tab 05 Additions and Deletions Report for AIA Document A133-2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This 2 document was produced at 08:32:19 CDT on 07/10/2025 under Subscription No.20250142682 which expires on 07/05/2026,is not for resale,is licensed for one time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (686ec395c41ddbe9f999cb3d) Certification of Document's Authenticity AIA°Document D401111 — 2003 I,,hereby certify,to the best of my knowledge,information and belief,that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 08:32:19 CDT on 07/10/2025 under Order No.20250142682 from ATA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIAII Document A 133111-2019 Exhibit A, Guaranteed Maximum Price Amendment,other than those additions and deletions shown in the associated Additions and Deletions Re (Sig, �NT (Title) — -- -7 ( 10�ZS (Dated) AIA Document D401—2003.Copyright©1992 and 2003.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 08:32:19 CDT on 07/10/2025 under Order No.20250142682 which expires on 07/05/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (686ec395c4 1 ddbe9f999cb3d) i SpawGlass Providing the Absolute Best Construction Experience VOW 'i ,F a; VOW �` ar r.. TABLE OF CONTENTS TAB 1 TAB 6 BUDGET ESTIMATE OVERVIEW BUDGET PROPOSAL COST BREAKDOWN TAB 2 TAB 7 EXECUTIVE PROJECT SUMMARY MASTER PROJECT SCHEDULE TAB 3 TAB 8 PROJECT TEAM BID/PROPOSAL PACKAGE STRATEGY TAB 4 LIST OF DOCUMENTS TAB 5 ASSUMPTIONS & CLARIFICATIONS .t 4 TAB1 GMP ESTIMATE OVERVIEW f Providing the Absolute Best Construction Experience Project Cost Summary - 95% CD GMP OVERVIEW SpawGlass Contractors, Inc. hereby submits to the City of Round Rock for the use and benefit of the new Old Settler's Park Buildout - Package 3C Rec Center GMP #2, based on the 95% CD Drawings, as follows: 1. The proposed amount for the Direct Cost of the Work: $ 60,305,375 2. General Conditions: $ 1,975,623 3. Builder's Risk Insurance: $ 116,182 4. General Liability Insurance: $ 539,084 5. Payment & Performance Bonds: $ 495,149 6. Subcontractor Default Insurance (1.25%): $ 753,817 7. Warranty: $ 178,741 8. Escalation/Tariffs: $ 1,055,344 9. Construction Manager's Contingency (3.0%): $ 2,144,896 10. Design Progression Contingency (2%): $ 1,429,930 11.Construction Phase Fee (3.50%): $ 2,502,378 12.TOTAL: LINE ITEMS 1 THROUGH 11: $ 71,496,519 TyLelr Wewzel, Tyler Wenzel, Project Executive AB 2 EXECUTIVE PROJECT SUMMARY 4 SpawGlass Executive Summary City of Round Rock — Old Settler's Park Build Out Package 3C — Rec Center 95% CD Drawings 3300 E Palm Valley Blvd Round Rock, TX 78665 Scope of Work The Rec Center 95% CD GMP #2 includes: general conditions, general requirements, structural concrete, site concrete, masonry, structural steel, misc. steel, stairs, millwork, waterproofing, roofing, windows, doors, hardware, metal framing, drywall, metal panels, ceramic tile, flooring, painting, signage allowance, equipment, elevators, ceilings, PEMB, fire sprinklers, plumbing, HVAC, electrical, fire alarm, landscaping, synthetic fields, track and fields. Overview GMP #1 for earthwork and site utilities is already underway. GMP #2 for the balance of scopes is included here. Breaking the packages out allowed the earthwork for the Rec Center to concurrently with the Rock'N River, resulting in a net savings to the city. t ' AB 3 PROJECT TEAM rt FA WAS r �I SpawGlass ORGANIZATION CHART LEGEND Management Support Team Lead/Single Point-of-Contact On-site Team Safety CITY OF ROUND ROCK M Preconstruction/Estimating Support DAVID PADEN TOM MCCLANAHAN DIVISION PRESIDENT JOEY GEORGE ADAM WARDEN OPERATIONS MANAGER ESTIMATOR JUAN MARQUEZ BRIAN CLAXTON SAFETY COORDINATOR BIMNDC COORDINATOR TYLER WENZEL PROJECT EXECUTIVE/ PRECONSTRUCTION SERVICES MANAGER PARKER BLASCHKE HARRISON HOLLEY SENIOR PROJECT MANAGER SENIOR SUPERINTENDENT CHRIS SOTO © ASSISTANT SUPERINTENDENTS ASSISTANT PROJECT MANAGER DAYLON DYESS O ASSISTANT PROJECT MANAGER II] QUALIFY CONTROL COORDINATOR e r; AB 4 LIST OF DOCUMENTS hpA Jill lapplulalw- f � t a . Sp awGlass List of Documents CoRR OSP-Rec Center and Admin Building 95%CD Drawings-GMP#2 SHEET DESCRIPTION REVISION DATE G001-SHEET INDEX 4/21/2025 G002-GENERAL PROJECT INFORMATION 4/21/2025 G010-PROJECT DATA AND CODE REVIEW 4/21/2025 G011-LEVEL 1-LIFE SAFETY EGRESS PLAN-AREA A 4/21/2025 G012-LEVEL 1-LIFE SAFETY EGRESS PLAN-AREA B 4/21/2025 G013-LEVEL 2-LIFE SAFETY EGRESS PLAN-AREA B 4/21/2025 G014-LEVEL 1-LIFE SAFETY EGRESS PLAN-AREA C 4/21/2025 G015-MEZZANINE LEVEL-LIFE SAFETY EGRESS PLAN-AREA C 4/21/2025 G020-ACCESSIBILITY GUIDELINES 4/21/2025 G035-COURT LEVEL FLOOR PLAN-AREA D-SPECIAL CONDITIONS 4/21/2025 A0.01-ARCHITECTURAL LEGENDS 4/21/2025 AS101-ARCHITECTURAL SITE PLAN 4/21/2025 AS711-SITE DETAILS 4/21/2025 AS712-SITE DETAILS 4/21/2025 CA 101 AIRNASIUM SITE PLAN 4/21/2025 CA 201 AIRNASIUM FIELD DRAINAGE PLAN 4/21/2025 CA 301 AIRNASIUM FIELD SUBGRADE GRADING PLAN 4/21/2025 CA 302 AIRNASIUM FIELD STONE GRADING PLAN 4/21/2025 CA 401 AIRNASIUM DETAILS 4/21/2025 A100-GRID GEOMETRY-OVERALL 4/21/2025 A101-SLAB PLAN-AREA A 4/21/2025 A102-SLAB PLAN-AREA B 4/21/2025 A103-SLAB PLAN-AREA C 4/21/2025 A104-SLAB PLAN-AREA D 4/21/2025 A105-SLAB PLAN-LEVEL 2-AREA B 4/21/2025 A106-SLAB PLAN-MEZZANINE-AREA C 4/21/2025 A110-LEVEL 1 FLOOR PLAN-OVERALL 4/21/2025 Alll-LEVEL 1 FLOOR PLAN AREA A 4/21/2025 A112-LEVEL 1 FLOOR PLAN-AREA B 4/21/2025 A113-LEVEL 1 FLOOR PLAN-AREA C 4/21/2025 A114-LEVEL 1 FLOOR PLAN-AREA D 4/21/2025 A120-LEVEL 2 FLOOR PLAN-OVERALL 4/21/2025 A121-LEVEL 2 FLOOR PLAN-AREA B 4/21/2025 A122-MEZZANINE LEVEL FLOOR PLAN-AREA C 4/21/2025 A123-LEVEL 2 FLOOR PLAN-BRIDGE 4/21/2025 A123 ALT#1-LEVEL 2 FLOOR PLAN-BRIDGE 4/21/2025 A210-LEVEL 1 CEILING PLAN-OVERALL 4/21/2025 A211-LEVEL 1 CEILING PLAN -AREA A 4/21/2025 A212-LEVEL 1 CEILING PLAN-AREA B 4/21/2025 A213-LEVEL 1 CEILING PLAN-AREA C 4/21/2025 A214-LEVEL 1 CEILING PLAN-AREA D 4/21/2025 A220-LEVEL 2 CEILING PLAN-OVERALL 4/21/2025 A221-LEVEL 2 CEILING PLAN-AREA B 4/21/2025 A222-MEZZANINE LEVEL CEILING PLAN-AREA C 4/21/2025 A301-ROOF PLAN-OVERALL 4/21/2025 A301A-ROOF PLAN-AREA A 4/21/2025 A301B-ROOF PLAN-AREA B 4/21/2025 A301C-ROOF PLAN-AREA C 4/21/2025 A301D-ROOF PLAN-AREA D 4/21/2025 A311-ROOF DETAILS(MOD.BIT) 4/21/2025 A312-ROOF DETAILS(METAL PANEL) 4/21/2025 A401-ENLARGED FLOOR PLANS 4/21/2025 A402-ENLARGED FLOOR PLANS 4/21/2025 A405-ENLARGED CEILING PLANS 4/21/2025 A410-ENLARGED STAIRS 4/21/2025 A411-ENLARGED STAIRS 4/21/2025 A412-ENLARGED STAIRS 4/21/2025 A413-ENLARGED STAIRS 4/21/2025 A414-ENLARGED STAIRS 4/21/2025 A415-ENLARGED STAIRS 4/21/2025 A430-STAIRS DETAILS 4/21/2025 A500-MATERIALS SELECTION SUMMARY-EXTERIOR 4/21/2025 A501-EXTERIOR ELEVATIONS-OVERALL 4/21/2025 A511-EXTERIOR ELEVATIONS-AREA A 4/21/2025 A512-EXTERIOR ELEVATIONS-AREA A 4/21/2025 A513-EXTERIOR ELEVATIONS-AREA B 4/21/2025 A514-EXTERIOR ELEVATIONS-AREA B 4/21/2025 A515-EXTERIOR ELEVATIONS-AREA B 4/21/2025 A516-EXTERIOR ELEVATIONS-AREA C 4/21/2025 A517-EXTERIOR ELEVATIONS-AREA C 4/21/2025 A518-EXTERIOR ELEVATIONS-AREA D 4/21/2025 A519-EXTERIOR ELEVATIONS-AREA D 4/21/2025 A520-EXTERIOR ELEVATIONS-BRIDGE 4/21/2025 A521-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A522-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A523-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A524-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A525-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A526-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A527-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A528-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A529-ENLARGED EXTERIOR ELEVATIONS 4/21/2025 A601-BUILDING SECTIONS 4/21/2025 A602-BUILDING SECTIONS 4/21/2025 A603-BUILDING SECTIONS 4/21/2025 A604-BUILDING SECTIONS 4/21/2025 A621-WALL SECTIONS AREA B 4/21/2025 A622-WALL SECTIONS AREA B 4/21/2025 A623-WALL SECTIONS AREA B 4/21/2025 A624-WALL SECTIONS AREA C 4/21/2025 A625-WALL SECTIONS AREA C 4/21/2025 A626-WALL SECTIONS AREA C 4/21/2025 A627-WALL SECTIONS AREA D 4/21/2025 A628-WALL SECTIONS AREA D 4/21/2025 A701-PLAN DETAILS-EXTERIOR-AREA B 4/21/2025 A702-PLAN DETAILS-EXTERIOR-AREA B 4/21/2025 A703-PLAN DETAILS-EXTERIOR-AREA B 4/21/2025 A704-PLAN DETAILS INTERIOR-AREA B 4/21/2025 A705-PLAN DETAILS INTERIOR-AREA B 4/21/2025 A706-PLAN DETAILS EXTERIOR-AREA C 4/21/2025 A707-PLAN DETAILS EXTERIOR-AREA C 4/21/2025 A708-PLAN DETAILS EXTERIOR-AREA C 4/21/2025 A709-PLAN DETAILS EXTERIOR-AREA C 4/21/2025 A710-PLAN DETAILS INTERIOR-AREA C 4/21/2025 A711-PLAN DETAILS INTERIOR-AREA C 4/21/2025 A712-PLAN DETAILS EXTERIOR-AREA D 4/21/2025 A713-PLAN DETAILS INTERIOR-AREA D 4/21/2025 A715-WALL SECTIONS DETAILS 4/21/2025 A716-WALL SECTIONS DETAILS 4/21/2025 A717-WALL SECTIONS DETAILS 4/21/2025 A718-WALL SECTIONS DETAILS 4/21/2025 A719-WALL SECTIONS DETAILS 4/21/2025 A720-WALL SECTIONS DETAILS 4/21/2025 A725-ENLARGED DETAILS-PORTALS 4/21/2025 A726-ENLARGED DETAILS-PORTALS 4/21/2025 A727-ENLARGED DETAILS-RECEPTION 4/21/2025 A728-ENLARGED DETAILS-RECEPTION 4/21/2025 A729-ENLARGED DETAILS-RECEPTION 4/21/2025 A731-DETAILS-SHOWER 4/21/2025 A732-DETAILS-METAL FABRICATION 4/21/2025 A733-ELEVATION-METAL FABRICATION 4/21/2025 A734-DETAILS- METAL FABRICATION 4/21/2025 A735-CEILING DETAILS 4/21/2025 A740-PLINTH DETAILS 4/21/2025 A801-PARTITION TYPES 4/21/2025 A801A-PARTITION TYPES 4/21/2025 A801B-PARTITION TYPES 4/21/2025 A802-PARTITION HEAD AND FRAMING DETAILS 4/21/2025 A810-DOOR SCHEDULES AND TYPES 4/21/2025 A811-DOOR DETAILS 4/21/2025 A820-GLAZING TYPES EXTERIOR 4/21/2025 A821-GLAZING TYPES INTERIOR 4/21/2025 A831-GLAZING&LOUVER DETAILS 4/21/2025 A840-CASEWORK TYPES 4/21/2025 A841-CASEWORK SCHEDULE 4/21/2025 A844-MILLWORK DETAILS 4/21/2025 A845-MILLWORK DETAILS 4/21/2025 A900-LEVEL 1 FINISH FLOOR PLAN-OVERALL 4/21/2025 A901-LEVEL 1 FINISH FLOOR PLAN-AREA A 4/21/2025 A902-LEVEL 1 FINISH FLOOR PLAN-AREA B 4/21/2025 A903-LEVEL 1 FINISH FLOOR PLAN-AREA C 4/21/2025 A904-LEVEL 1 FINISH FLOOR PLAN-AREA D 4/21/2025 A905-LEVEL 2 FINISH FLOOR PLAN-OVERALL 4/21/2025 A906-LEVEL 2 FINISH FLOOR PLAN-AREA B 4/21/2025 A907-MEZZANINE LEVEL FINISH FLOOR PLAN-AREA C 4/21/2025 A908-STRIPING PLAN-AREA C 4/21/2025 A910-ROOM FINISH SCHEDULE&TRANSITION DETAILS 4/21/2025 A911-MATERIALS SELECTION SUMMARY-INTERIORS 4/21/2025 A920-INTERIOR ELEVATIONS AREA A 4/21/2025 A921-INTERIOR ELEVATIONS AREA A 4/21/2025 A922-INTERIOR ELEVATIONS AREA B 4/21/2025 A923-INTERIOR ELEVATIONS AREA B 4/21/2025 A924-INTERIOR ELEVATIONS AREA B 4/21/2025 A925-INTERIOR ELEVATIONS AREA B-LEVEL 2 4/21/2025 A926-INTERIOR ELEVATIONS AREA C 4/21/2025 A927-INTERIOR ELEVATIONS AREA C 4/21/2025 A928-INTERIOR ELEVATIONS AREA C 4/21/2025 A929-INTERIOR ELEVATIONS AREA C 4/21/2025 A930-INTERIOR ELEVATIONS AREA C 4/21/2025 A931-INTERIOR ELEVATIONS AREA C 4/21/2025 A932-INTERIOR ELEVATIONS AREA C-MEZZANINE 4/21/2025 A936-INTERIOR ELEVATIONS AREA D 4/21/2025 A937-INTERIOR ELEVATIONS AREA D 4/21/2025 A938-INTERIOR ELEVATIONS AREA D 4/21/2025 AE01-FITNESS EQUIPMENT PLANS 4/21/2025 S-000-31)VIEW&SHEET LIST 4/21/2025 S-010-GENERAL NOTES 4/21/2025 S-011-GENERAL NOTES 4/21/2025 S-012-GENERAL NOTES 4/21/2025 S-013-GENERAL SUBGRADE NOTES AND TYP DETAILS 4/21/2025 S-101-COMPOSITE FOUNDATION PLAN 4/21/2025 S-101A-FOUNDATION PLAN-AREA A 4/21/2025 S-1016-FOUNDATION PLAN-AREA B 4/21/2025 S-101C-FOUNDATION PLAN-AREA C 4/21/2025 S-101D-FOUNDATION PLAN-AREA D 4/21/2025 S-101M-FOUNDATION PLAN-MISC 4/21/2025 S-102-COMPOSITE SECOND FLOOR FRAMING PLAN 4/21/2025 S-102B-SECOND FLOOR AND LOW ROOF FRAMING PLAN-AREA B 4/21/2025 S-102C-MEZZANINE AND LOW ROOF FRAMING PLAN-AREA C 4/21/2025 S-102D-LOW ROOF FRAMING PLAN-AREA D 4/21/2025 S-102M-MEZZANINE AND LOW ROOF FRAMING PLAN-MISC 4/21/2025 S-103-COMPOSITE ROOF FRAMING PLAN 4/21/2025 S-103A-ROOF FRAMING PLAN-AREA A 4/21/2025 S-103B 1-ROOF FRAMING PLAN-AREA B 4/21/2025 S-103C-ROOF FRAMING PLAN-AREA C 4/21/2025 S-300-AND STL REINF NOTES AND TYP DETAILS 4/21/2025 S-301-SLAB-ON-GRADE NOTES AND TYP DETAILS 4/21/2025 S-302-GENERAL GRADE BEAM NOTES AND TYP DETAILS 4/21/2025 S-302A-GENERAL GRADE BEAM NOTES AND TYP DETAILS 4/21/2025 S-303-GENERAL FOUNDATION NOTES AND TYP DETAILS 4/21/2025 S-304-GENERAL FOUNDATION NOTES AND TYP DETAILS 4/21/2025 S-310-FOUNDATION DETAILS 4/21/2025 S-311-FOUNDATION DETAILS 4/21/2025 S-312-FOUNDATION DETAILS 4/21/2025 S-313-FOUNDATION DETAILS(CMU) 4/21/2025 S-314-FOUNDATION DETAILS(CMU) 4/21/2025 S-315-ELEVATOR PIT DETAILS 4/21/2025 S-320-FOUNDATION SECTIONS AND DETAILS 4/21/2025 S-400-GENERAL CMU NOTES AND TYP DETAILS 4/21/2025 S-401-GENERAL CMU NOTES AND TYP DETAILS 4/21/2025 S-402-MISC CMU DETAILS 4/21/2025 S-403-MISC CMU DETAILS 4/21/2025 S-500-GENERAL STEEL NOTES AND TYP DETAILS 4/21/2025 S-500MB-PEMB NOTES&DETAILS 4/21/2025 S-501-GENERAL STEEL NOTES AND TYP DETAILS 4/21/2025 S-502-GENERAL STEEL NOTES AND TYP DETAILS 4/21/2025 S-503-GENERAL STEEL CONNECTION NOTES AND TYP DETAILS 4/21/2025 S-504-COMPOSITE STEEL NOTES AND TYP DETAILS 4/21/2025 S-505-COMPOSITE STEEL NOTES AND TYP DETAILS 4/21/2025 S-506-GENERAL STEEL NOTES AND TYP DETAILS 4/21/2025 S-507-GENERAL STEEL NOTES AND TYP DETAILS 4/21/2025 S-508-GENERAL STEEL NOTES AND TYP DETAILS 4/21/2025 S-509-TYPICAL STEEL DECK DETAILS 4/21/2025 S-510-COMPOSITE FRAMING DETAILS 4/21/2025 S-511-COMPOSITE FRAMING DETAILS 4/21/2025 S-512-COMPOSITE FRAMING DETAILS 4/21/2025 S-520-ROOF FRAMING DETAILS 4/21/2025 S-521-ROOF FRAMING DETAILS 4/21/2025 S-523-ROOF FRAMING DETAILS 4/21/2025 S-524-ROOF FRAMING DETAILS 4/21/2025 S-526-ROOF FRAMING DETAILS 4/21/2025 S-527-ROOF FRAMING DETAILS 4/21/2025 S-530-ADMIN BUILDING SECTIONS 4/21/2025 S-531-ADMIN BUILDING SECTIONS 4/21/2025 S-532-REC BUILDING SECTIONS 4/21/2025 S-533-REC BUILDING SECTIONS 4/21/2025 S-534-REC BUILDING SECTIONS 4/21/2025 S-600-TYPICAL WIND BRACING ELEVATIONS 4/21/2025 S-610-TYPICAL WIND BRACING DETAILS 4/21/2025 XS-513-COMPOSITE FRAMING DETAILS 4/21/2025 XS-514-COMPOSITE FRAMING DETAILS 4/21/2025 XS-522-ROOF FRAMING DETAILS-CMU 4/21/2025 XS-525-ROOF FRAMING DETAILS-CMU 4/21/2025 XS-540-ROOF TRUSS PROFILES AND DETAILS 4/21/2025 XS-700-TYPICAL LADDER DETAILS 4/21/2025 AG01-SIGNAGE&GRAPHICS PLANS 4/21/2025 AG02-SIGNAGE&GRAPHICS PLANS 4/21/2025 AG03-SIGNAGE&GRAPHICS PLANS 4/21/2025 AQ0.0-POOL REFERENCE PLAN 4/21/2025 AQ1.0-POOL STRUCTURAL PLANS 4/21/2025 AQ1.1-POOL STRUCTURAL NOTES AND DETAIL 4/21/2025 AQ1.2-POOL STRUCTURAL SECTIONS 4/21/2025 AQ2.0-WELLNESS POOL PLAN&SECTIONS 4/21/2025 AQ2.1-WELLNESS POOL DETAILS 4/21/2025 AQ3.0-COLD PLUNGE POOL PLAN&SECTIONS 4/21/2025 AQ3.1-COLD PLUNGE POOL DETAILS 4/21/2025 AQ4.0-POOL SUCTION PIPING PLAN 4/21/2025 AQ4.1-POOL RETURN PIPING PLAN 4/21/2025 AQ5.0-POOL MECHANICAL ROOM NOTES&SCHEDULES 4/21/2025 AQ5.1-POOL MECHANICAL PLANS&SECTIONS 4/21/2025 AQ5.2-POOL MECHANICAL DETAILS 4/21/2025 AQ5.3-POOL MECHANICAL DETAILS 4/21/2025 AQ5.4-POOL MECHANICAL DETAILS 4/21/2025 AQ6.0-POOL SYSTEMS SCHEMATICS 4/21/2025 M000-MECHANICAL ISOMETRIC VIEW 4/21/2025 M 111-MECHANICAL LEVEL 1 FLOOR PLAN-AREA A&B 4/21/2025 M112-MECHANICAL LEVEL 1 FLOOR PLAN-AREA C&D 4/21/2025 M 121-MECHANICAL LEVEL 2 FLOOR PLAN-AREA B 4/21/2025 M 122-MECHANICAL LEVEL 2 FLOOR PLAN-AREA C 4/21/2025 M211-MECHANICAL LEVEL 1 PIPING PLAN-AREA B 4/21/2025 M212-MECHANICAL LEVEL 1 PIPING PLAN-AREA C&D 4/21/2025 M221-MECHANICAL LEVEL 2 PIPING PLAN-AREA B 4/21/2025 M222-MECHANICAL LEVEL 2 PIPING PLAN-AREA C EQUIPMENT 4/21/2025 M301-MECHANICAL ROOF PLAN-OVERALL 4/21/2025 M401-MECHANICAL DETAILS 4/21/2025 M402-MECHANICAL DETAILS 4/21/2025 M501-MECHANICAL SCHEDULES 4/21/2025 M502-MECHANICAL SCHEDULES 4/21/2025 M601-MECHANICAL SCHEMATICS 4/21/2025 M602-MECHANICAL VRF SYSTEM PIPING SCHEMATICS 4/21/2025 E000-LEGEND,NOTES,AND ABBREVIATIONS 4/21/2025 E001-LEGEND,NOTES,AND ABBREVIATIONS 4/21/2025 E100-ELECTRICAL SITE PLAN 4/21/2025 E111-ELECTRICAL POWER LEVEL 1 FLOOR PLAN-AREA A 4/21/2025 E112-ELECTRICAL POWER LEVEL 1 FLOOR PLAN-AREA B 4/21/2025 E113-ELECTRICAL POWER LEVEL 1 FLOOR PLAN-AREA C 4/21/2025 E114-ELECTRICAL POWER LEVEL 1 FLOOR PLAN-AREA D 4/21/2025 E115-ELECTRICAL POWER LEVEL 1 CEILING PLAN-AREAA 4/21/2025 E116-ELECTRICAL POWER LEVEL 1 CEILING PLAN-AREA B 4/21/2025 E117-ELECTRICAL POWER LEVEL 1 CEILING PLAN-AREA C 4/21/2025 E118-ELECTRICAL POWER LEVEL 1 CEILING PLAN-AREA D 4/21/2025 E121-ELECTRICAL POWER LEVEL 2 FLOOR PLAN-AREA B 4/21/2025 E122-ELECTRICAL POWER LEVEL 2 FLOOR PLAN-AREA C 4/21/2025 E123-ELECTRICAL POWER ROOF PLAN-AREA B 4/21/2025 E124-ELECTRICAL POWER ROOF PLAN-AREA D 4/21/2025 E125-ELECTRICAL POWER LEVEL 2 CEILING PLAN-AREA B 4/21/2025 E126-ELECTRICAL POWER LEVEL 2 CEILING PLAN-AREA C 4/21/2025 E211-ELECTRICAL LIGHTING LEVEL 1 CEILING PLAN-AREAA 4/21/2025 E212-ELECTRICAL LIGHTING LEVEL 1 CEILING PLAN-AREA B 4/21/2025 E213-ELECTRICAL LIGHTING LEVEL 1 CEILING PLAN-AREA C&D 4/21/2025 E221-ELECTRICAL LIGHTING LEVEL 2 CEILING PLAN-AREA B 4/21/2025 E222-ELECTRICAL LIGHTING LEVEL 2 CEILING PLAN-AREA C 4/21/2025 E311-FIRE ALARM LEVEL 1 CEILING PLAN-AREA A&B 4/21/2025 E312-FIRE ALARM LEVEL 1 CEILING PLAN-AREA C&D 4/21/2025 E320-FIRE ALARM LEVEL 2 CEILING PLAN-OVERALL 4/21/2025 E500-ELECTRICAL RISER DIAGRAM 4/21/2025 E501-PANEL SCHEDULE 4/21/2025 E502-PANEL SCHEDULE 4/21/2025 E600-LIGHTING FIXTURE SCHEDULE 4/21/2025 E601-ELECTRICAL DETAILS 4/21/2025 E602-ELECTRICAL DETAILS 4/21/2025 E603-ELECTRICAL DETAILS 4/21/2025 E604-ELECTRICAL DETAILS 4/21/2025 E605-ELECTRICAL DETAILS 4/21/2025 FP101-FIRE PROTECTION FLOOR PLANS 4/21/2025 FP401-FIRE PROTECTION DETAILS 4/21/2025 P100-PLUMBING SITE PLAN 4/21/2025 P101-PLUMBING UNDERGROUND FLOOR PLAN-AREA A&B 4/21/2025 P102-PLUMBING UNDERGROUND FLOOR PLAN-AREA C&D 4/21/2025 P111-PLUMBING LEVEL 1 FLOOR PLAN-AREA A&B 4/21/2025 P112-PLUMBING LEVEL 1 FLOOR PLAN-AREA C&D 4/21/2025 P121-PLUMBING LEVEL 2 FLOOR PLAN-AREA B 4/21/2025 P122-PLUMBING LEVEL 2 FLOOR PLAN-AREA C 4/21/2025 P301-PLUMBING ROOF PLAN-OVERALL 4/21/2025 P401-PLUMBING DETAILS AND SCHEDULES 4/21/2025 P402-PLUMBING DETAILS AND SCHEDULES 4/21/2025 P403-PLUMBING DETAILS AND SCHEDULES 4/21/2025 G-0.1-GENERAL NOTES 4/21/2025 C-1.0-EROSION CONTROL PLAN 4/21/2025 C-1.1-EROSION CONTROL PLAN 4/21/2025 C-1.2-EROSION CONTROL PLAN 4/21/2025 C-1.3-EROSION CONTROL PLAN 4/21/2025 C-2.0-GRADING PLAN 4/21/2025 C-2.1-GRADING PLAN 4/21/2025 C-2.2-GRADING&DRAINAGE PLAN 4/21/2025 C-3.0-STORM PLAN 4/21/2025 C-3.1-STORM PLAN 4/21/2025 C-4.0-UTILITY PLAN 4/21/2025 C-4.1-UTILITY PLAN 4/21/2025 C-4.2-C-4.2 UTILITY PLAN 4/21/2025 C-5.0-PAVING PLAN 4/21/2025 C-5.1-PAVING PLAN 4/21/2025 C-6.0-CONSTRUCTION DETAILS 4/21/2025 C-6.1-CONSTRUCTION DETAILS 4/21/2025 L-0.0-LANDSCAPE OVERALL PLAN 4/21/2025 L-1.0-EXISTING CONDITIONS 4/21/2025 L-2.0-DEMOLITION PLAN 4/21/2025 L-2.1-DEMOLITION PLAN 4/21/2025 L-2.2-DEMOLITION PLAN 4/21/2025 L-2.3-DEMOLITION PLAN 4/21/2025 L-2.4-DEMOLITION PLAN 4/21/2025 L-2.5-DEMOLITION PLAN 4/21/2025 L-3.0-SITE PLAN ENLARGEMENT 4/21/2025 L-4.0-SITE DETAILS 4/21/2025 L-4.1-SITE DETAILS 4/21/2025 L-4.2-SITE DETAILS 4/21/2025 L-4.3-SITE DETAILS 4/21/2025 L-4.4-SITE DETAILS 4/21/2025 L-4.5-SITE CUTSHEETS 4/21/2025 L-5.0-LANDSCAPE PLAN 4/21/2025 L-5.1-LANDSCAPE PLAN 4/21/2025 L-5.2-LANDSCAPE PLAN 4/21/2025 L-5.3-LANDSCAPE PLAN 4/21/2025 L-5.4-LANDSCAPE PLAN 4/21/2025 L-5.5-LANDSCAPE PLAN 4/21/2025 L-5.6-PLANT SCHEDULE 4/21/2025 L-6.0-LANDSCAPE DETAILS 4/21/2025 L-7.0-IRRIGATION PLAN 4/21/2025 L-7.1-IRRIGATION PLAN 4/21/2025 L-7.2-IRRIGATION PLAN 4/21/2025 L-7.3-IRRIGATION PLAN 4/21/2025 L-7.4-IRRIGATION PLAN 4/21/2025 L-7.5-IRRIGATION PLAN 4/21/2025 L-7.6-IRRIGATION PLAN 4/21/2025 L-7.7-RRIGATION NOTES&SCHEDULE 4/21/2025 L-8.0-IRRIGATION DETAILS 4/21/2025 L-8.1-IRRIGATION SPECIFICATIONS 4/21/2025 PF-0.0-PLAYING FIELD OVERALL PLAN 4/21/2025 PF-1.0-PLAYING FIELD FENCING&NETTING PLAN NORTH 4/21/2025 PF-1.I-PLAYING FIELD FENCING&NETTING PLAN SOUTH 4/21/2025 PF-2.0-PLAYING FIELD LAYOUT&MATERIALS PLAN 4/21/2025 PF-2.I-PLAYING FIELD LAYOUT&MATERIALS PLAN 4/21/2025 PF-2.2-PLAYING FIELD LAYOUT&MATERIALS PLAN 4/21/2025 PF-2.3-PLAYING FIELD LAYOUT&MATERIALS PLAN 4/21/2025 PF-3.0-PLAYING FIELD GRADING PLAN 4/21/2025 PF-3.I-PLAYING FIELD GRADING PLAN 4/21/2025 PF-3.2-PLAYING FIELD GRADING PLAN 4/21/2025 PF-3.3-PLAYING FIELD GRADING PLAN 4/21/2025 PF-4.0-PLAYING FIELD SUBDRAINAGE PLAN 4/21/2025 PF-4.I-PLAYING FIELD SUBDRAINAGE PLAN 4/21/2025 PF-4.2-PLAYING FIELD SUBDRAINAGE PLAN 4/21/2025 PF-5.0-PLAYING FIELD DETAILS 4/21/2025 PF-5.I-PLAYING FIELD DETAILS 4/21/2025 PF-5.2-PLAYING FIELD DETAILS 4/21/2025 PF-5.3-PLAYING FIELD DETAILS 4/21/2025 PF-5.4-PLAYING FIELD DETAILS 4/21/2025 PF-5.5-PLAYING FIELD DETAILS 4/21/2025 PF-5.6-PLAYING FIELD DETAILS 4/21/2025 PF-6.0-PLAYING FIELD CUTSHEETS 4/21/2025 PF-6.I-PLAYING FIELD CUTSHEETS 4/21/2025 PF-6.2-PLAYING FIELD CUTSHEETS 4/21/2025 PF-6.3-PLAYING FIELD CUTSHEETS 4/21/2025 AS-1-RECREATION CENTER COMPLEX RESTROOM GENERAL NOTES 4/21/2025 AS-2-RECREATION CENTER COMPLEX RESTROOM FOUNDATION PLAN 4/21/2025 AS-3-RECREATION CENTER COMPLEX RESTROOM ROOF FRAMING PLAN 4/21/2025 AS-4-RECREATION CENTER COMPLEX RESTROOM FOUNDATION DETAILS 4/21/2025 AS-5-RECREATION CENTER COMPLEX RESTROOM ROOF FRAMING DETAILS 4/21/2025 A.101-RECREATION CENTER COMPLEX RESTROOM FLOOR PLAN 4/21/2025 A.102-RECREATION CENTER COMPLEX RESTROOM REFLECTED PLAN 4/21/2025 A.103-RECREATION CENTER COMPLEX RESTROOM ROOF PLAN 4/21/2025 A.104-RECREATION CENTER COMPLEX RESTROOM FLOOR PLAN 4/21/2025 A.201-RECREATION CENTER COMPLEX RESTROOM EXTERIOR ELEVATIONS 4/21/2025 A.301-RECREATION CENTER COMPLEX RESTROOM BUILDING CROSS SECTIONS 4/21/2025 A.401-RECREATION CENTER COMPLEX RESTROOM INTERIOR ELEVATIONS 4/21/2025 A.501-RECREATION CENTER COMPLEX RESTROOM WALL SECTIONS 4/21/2025 A.502-ROCKIN'RIVER PUMP FILTRATION/RESTROOM BUILDING DOOR DETAILS 4/21/2025 A.601-ROCKIN'RIVER PUMP FILTRATION/RESTROOM BUILDING SCHEDULES 4/21/2025 A.701-ROCKIN'RIVER PUMP FILTRATION/RESTROOM BUILDING SCHEDULES 4/21/2025 M-1 SHEET NUMBER-RECREATION CENTER OMPLEX RESTROOM- HVAC 4/21/2025 M-2 SHEET NUMBER-DETAILS-HVAC 4/21/2025 P-1-RECREATION CENTER COMPLEX RESTROOM BUILDING-PLUMBING 4/21/2025 P-2 SHEET NUMBER-NOTES&DETAILS- PLUMBING 4/21/2025 E-O-ELECTRICAL SYMBOL LEGEND 4/21/2025 E-1-OVERALL SITE PLAN-ELECTRICAL 4/21/2025 E-2-TRACK&FIELD COMPLEX PLAN-ELECTRICAL 4/21/2025 E-3-TRACK&FIELD COMPLEX PLAN-SPECIAL SYSTEMS 4/21/2025 E-4-NORTH SOCCER FIELDS PLAN-ELECTRICAL 4/21/2025 E-5-PARKING LOT PLAN-ELECTRICAL 4/21/2025 E-6-RESTROOM BUILDING PLANS-ELECTRICAL 4/21/2025 E-7-ELECTRICAL RISER DIAGRAM 4/21/2025 1 , t , J fflJ �,� SII 3 r 4 rp 0.. SP , wGIass Providing the Absolute Best Construction Experience Assumptions and Clarifications City of Round Rock — Old Settler's Park Build Out Package 3C — Rec Center BUIDLINGS 95% CD Drawings 3300 E Palm Valley Blvd Round Rock, TX 78665 GENERAL QUALIFICATIONS 1. Kimley Horn and Associates, Inc. is the civil engineer/prime consultant of record. 2. Based on an anticipated NTP of August 2025. 3. The baseline schedule is based on a 5-day work week. 4. Normal working hours have been included from 7:00 AM to 5:30 PM unless otherwise noted, with exception to early concrete operations as deemed necessary. It is also assumed that work can occur on a 7 day a week schedule if required. 5. In order to subcontract scopes of work in a timely manner to meet the construction schedule it is assumed that buyout packages will be reviewed within 5 business days of their submission. 6. LEED Certifications or Green Building Programs are not incorporated into the project. 7. Builders Risk Insurance is provided by SpawGlass. Builder's Risk deductible to be paid from contractors' contingency. 8. Performance & Payment Bonds are provided by SpawGlass. 9. General Liability is provided by SpawGlass. 10. Proposal assumes that the specified material and equipment are available as required to meet the schedule. If they are not available as required, we assume the Owner/Architect will authorize alternate material or equipment selections. 11. Owner must accept GMP within 30 calendar days, at which time pricing may expire. 12. General conditions were originally based on one overall project and GMP during the RFP/RFQ time, and not as later outlined by the City. Any general conditions savings or losses from this package are to be rolled into the other GMP packages. SPECIFIC QUALIFICATIONS Division 01 — General Requirements and General Conditions 1. SpawGlass general requirements assume an 18-month project construction schedule. 2. SpawGlass general conditions are included in the cost reports under Indirect Costs WBS. 3. Construction photos will be taken on a regular basis by SpawGlass. Digital files will be provided monthly. Aerial photos will also be taken. 4. As-Built drawings, record drawings and record submittals will be kept in electronic format. These files will be accessible to all on the jobsite. 5. Reasonable repairs or damage caused by contractor(s) will be funded from the CM Contingency if funds remain. 6. Dimensional Control for the Project is included. 7. Individual non-photographic hard hat stickers for workers will be utilized. Assumptions and Clarifications 8. On-site construction facilities have been included in this proposal. 9. Temporary barriers and enclosures are included to delineate construction zone from the public. 10. Construction cleaning and waste management have been included. 11. City fees related to tree mitigation are to be by the Owner. 12. No sound/vibration monitoring included. 13. Dust control included in GR's. Division 02 — Existing Conditions 1 NA Division 03 — Concrete 1. Concrete includes all building and structural. 2. Class B finish. 3. Gym seating is priced as cast in place concrete with Geofoam fill. 4. The drilled piers are priced as straight shaft with an assumed depth of 25' to bearing stratum with embedment into the bearing surface of 2X the pier diameter. 5. Formed grade beams are not included. 6. Casing of Piers is not included. 7. Rock Excavation only included for the Rec and Admin Center Elevator Pits 8. Rebar included at sidewalks per City of Round Rock detail (#4s at 12" o.c.e.w.) 9. Xypex or any other waterproofing/repealing admixtures are excluded. 10. Straight cement mix designs are not included. 11. Fuel prices above $3.50 per gallon are not included. 12. Standard sidewalk is included at the areas noted as 40ft storage container 13. $10,000 allowance included for specialty finish concrete at hydrotherapy room pending design. 14. Includes corner spread footings at 3 storage containers. Division 04 — Masonry 1. Stone Veneer is priced at an allowance of $160/TN for chopped Cream Limestone Random Ashlar pattern. 2. Modular brick veneer is priced with an allowance of$1,000/ 1,000 bricks. 3. No veneer wall at CIP stem wall adjacent to speed track. Division 05 — Metals 1. Includes SS cable railing as shown. 2. TNEMEC carried under painting scope. Assumptions and Clarifications 9" 3. Joists are quoted with standard deflection limits. Special deflections noted on drawings for basketball goals, volleyball nets, partition curtains, and folding partitions are specifically excluded. 4. Gym equipment and accessory supports not sized on structural drawings are excluded 5. AESS processes are not included. 6. Specified manufacturer for drink railing and similar railings in the recreation building court area could not meet production for the schedule. A budget is included for a similar system. 7. Galvanized material is included within the Area D area shown on G035 (Hydrotherapy to mechanical yard). Division 06 — Wood, Plastics, and Composites 1. Includes millwork as shown. 2. Wood blocking on the exterior and interior of the buildings as needed. Division 07 — Thermal and Moisture Protection 1. Includes joint sealants, weather barrier, waterproofing for the buildings and structures. 2. Includes rigid insulation around the exterior building envelope walls. 3. Traffic coating at Level 2 walkway has been included. Division 08 — Openings 1. An allowance has been provided for Doors/Hardware sets not specified in the Door/Hardware Schedule. Includes $30,000 allowance for electronic openings. 2. Assumed hybrid rate for glazed openings, not specifically curtainwall or storefront. 3. Specification 08 33 32 calls for the Overhead Coiling Door to be a Fire Rated and Smoke Control assembly with an STC rating of 26. This is not a possible system. We have included an overhead coiling door system with an STC rating of 28 and the fire and smoke rating is excluded. 4. The mechanical screen wall has been included as Ruskin Model EV811 as an approved manufacturer per the specifications. If the Ametco Phoenix system is to be included, an additional $300,000 will need to be added to the GMP. Division 09 — Finishes 1. Includes all finishes shown. 2. Excludes level 5 paint finish not at wall graphics. 3. ACT 1 is included as Rockfon Pacific 220 (2x2) in 9/16"grid. 4. ACT 4 is included as Rockfon Cinema 1200 (2x2) in 9/16" grid. 5. We have substituted the Rockfon Circle Clouds for Armstrong Soundscapes Circle Clouds as the Rockfon Circle Clouds are unavailable in the United States. 6. TURF blades have been included per RCP's. 7. Tectum square edge panels in Natural color are included. 8. ACT 2 and 3 are indicated on the finish plans but are not called out on the drawings and have been excluded. 9. ACP-2 is indicated on the finish plan but is not called out on the drawings and has been excluded. Assumptions and Clarifications 10. TNEMEC primer and paint have been included at all exposed steel and steel in non-conditioned space per documents. Division 10 - Specialties 1. Includes toilet accessories, fire extinguishers, Knox Boxes, and signage. 2. Excludes 10 82 00 - Prefinished Aluminum Equipment Screens as they are not shown in the drawings and are being carried in Division 8. 3. RFID Electronic Locking for Lockers - access bracelets included at 3.30/unit. Access cards can be provided in lieu of bracelets for 1.60/unit. Base Bid includes 117 access bracelets (one per locker). 4. Includes 750K allowance for signage including Digitally Printed Vinyl Wall Graphics and level 5 finish at wall graphics. 20k added to the 750k allowance to be allocated for level 5 finish. Division it - Equipment 1. Includes in-ground pools at hydrotherapy. 2. Excludes cricket equipment or layout at 4 pack. 3. "Provided by Owner" equipment for track and fields to be furnished and installed by Owner. This includes steeplechase equipment, soccer goals, pole vault landing area, high jump landing area, high jump standards, etc. 4. Includes (1) score board, at gym. 5. Gymnasium includes wall pads. 6. Airnasium includes padding on the building columns. 7. Includes $50,000 allowance for appliances. Division 12 - Furnishings 1. FF&E by CoRR. 2. Gym seating is included. 3. Screening and graphics around Airnasium by Owner. 4. Playing field wind screen by Owner. Division 13 - Special Construction 1. PEMB - Airnasium Building with Sun Skirting Around Perimeter. 2. Includes galvanized PEMB structural components. Division 14 - Conveying Equipment 1. Machine Room-less 3,500 LB traction elevators Division 21 - Fire Suppression 1. Wet sprinkler system is included for the Administration and Recreation Buildings, 2. Airnasium includes dry pipe fire suppression system fed from Admin building. 3. The covered Terrace area does not include fire sprinkler coverage as this is intended to be a pedestrian walkway. 4. No fire pump included. Assumptions and Clarifications Division 22 - Plumbing 1. Includes all plumbing as shown. 2. Includes UG gas piping from Kenny Fort to Rec Center, and then from Rec Center to Admin Building. Division 23 - HVAC and Controls 1. Includes all HVAC as shown. 2. Includes furnishing and installing "Big Ass" fans as specified. This includes the essence and powerfoil. Division 26 - Electrical 1. Building and Structure Electrical included. 2. Festoon lights are future/by Owner. 3. Musco lights to be provided by Owner, installed by electrician. Division 27 - Communications 1. Infrastructure and raceways for LV. No conductors or equipment, to be provided by City. 2. All low voltage cabling, devices, terminations, and switches to be provided and installed by CoRR. 3. The fire alarm system is included in the estimate. Division 28 - Electronic Safety & Security 1. No security included; infrastructure only. Wiring and devices by CoRR. Division 31 - Earthwork 1. Excludes clearing, excavation and embankment, building pads and asphalt paving as they were included in GMP 1. Division 32 - Exterior Improvements 1. Includes landscape, irrigation, irrigation sleeves. 2. Trees to be supplied by the City of Round Rock for installation by contractor. 3. Includes importing and placing 6"of sandy loam soil for lawn areas. 4. Includes 12"of imported soil for planting beds. 5. Includes Synthetic Turf within the Hatched area on the Airnasium drawing Sheet A111. Assumptions and Clarifications 6. Airnasium fencing is priced as 8' High with one manual slide gate. 7. 6' Padding on Airnasium Columns is included. (Not Fencing) 8. Includes natural turf and synthetic turf playing fields, drainage, and irrigation systems. 9. Includes reference points "Tick Marks" for multisport layout markings. 10. Includes supplying and installing track and field equipment unless noted to be by Owner. 11. No FIFA certification on 4-Pack soccer fields included. 12. Includes all Site Concrete, Retaining Walls, Fencing, and Gates. 13. Includes Paving, Seat Walls, Integral Color and Covered Walkways at Plaza between Rec and Admin. Division 33 - Utilities 1. Cost for site utility division is to fund cost overruns from GMP #1, as outlined in COR #4. EXCLUSIONS 1. Permits, by Owner. 2. LEED documentation and Submittals. 3. We have not included the following items as we assume, they will be provided in a timely manner by the Owner at no cost to SpawGlass: a. Materials Testing Services b. Excludes all local electrical utility fees for permanent power 4. Preconstruction costs for the Project are not included in this budget. S. Contaminated soils - hauling or disposal ,� BUDGET PROPOSAL COST +�� � BREAKDOWN '9 � -•mai SpawGlass Providing Absolute Construction Experience I il♦ Summary Report Recreation Center Buildings and Site Improvements - GMP Revision 01 95% GMP Revision 01 Estimate Date: 06/30/2025 Documents Date: 04/21/2025 Project Size (SF): 112,954 Project #: 3023121.03C Project Location: Round Rock Lead Estimator: Tom McClanahan ITEM COST COST I SF % OF TOTAL General Requirements (1,690,000 SF) 1,086,284 0.64 1 1.52 % Site Improvements (510,327 SF) 3,140,130 6.15 4.39 Track and Field (516,134 SF) 9,764,669 18.92 13.66 Four Pack Soccer Fields (663,539 SF) 6,936,759 10.45 9.70 % Remote Restroom Building (1,686 SF) 1,051,165 623.47 1.47 % Airnasium - Covered Turf, Court, and Pickleball 2,589,909 123.93 3.62 % Administration Building (29,763 SF) ! 14,876,123 499.82 20.81 % Recreation Center (39,956 SF) 20,860,335 522.08 29.18 % Indirect Costs 11,191,144 99.08 15.65 % Total Cost $ 71,496,519 $ 632.97 100.00 % Recreation Center Buildings and Site Improvements - GMP Revision 01 Estimate Date: 06/30/2025 95% GMP Revision 01 Page 1 of 1 Documents Date: 04/21/2025 Recap Report Recreation Center Buildings and Site Improvements - GMP Revision 01 95% GMP Revision 01 Estimate Date: 06/30/2025 Documents Date: 04/21/2025 Project Size (SF): 112,954 Project #: 3023121.03C Project Location: Round Rock Lead Estimator: Tom McClanahan ITEM COST COST I SF % OF TOTAL General Requirements (1,690,000 SF) 1,086,284 0.64 1.52 % Div. 01 - General Requirements 1,086,284 0.64 100.00 Site Improvements (510,327 SF) 3,140,130 6.15 4.39 % Div. 04 - Masonry 64,000 0.13 2.04 % --- ---- -- ---- Div. 05 - Metals 85,024 0.17 2.71 % Div. 10 - Specialties 88,151 0.17 2.81 % Div. 26 - Electrical ——--_—- - __-_ L 585,275 1.15 18.64 % — Div. 32 - Exterior Improvements 2,087,861 4.09 66.49 % Div. 33 - Utilities 229,819 0.45 7.32 Track and Field (516,134 SF) 9,764,669 18.92 13.66 % Div. 05 - Metals 291,624 0.57 2.99 % Div. 07 -Thermal &Moisture Protection i -- --- 45,782 0.09 0.47 % Div. 09 - Finishes 12,252 0.02 0.13 % Div. 12 - Furnishings 40,000 1 0.08 0.41 Div. 26 - Electrical i 867,847 1.68 8.89 % Div. 32 - Exterior Improvements 8,507,165 16.48 87.12 % Four Pack Soccer Fields (663,539 SF) 6,936,759 10.45 9.70 Div. 07 - Thermal & Moisture Protection j 6,446 0.01 i 0.09 % Div. 26 - Electrical I 344,190 0.52 —� 4.96 % Div. 32 - Exterior Improvements 6,586,123 9.93 94.95 % Remote Restroom Building (1,686 SF) 1,051,165 623.47 1.47 % Div. 03 - Concrete 40,566 24.06 3.86 Div. 04 - Masonry 86,000 51.01 8.18 % Div. 06 -Wood, Plastics&Composites 90,514 53.69 8.61 % Div. 07 -Thermal &Moisture Protection 89,575 53.13 8.52 % Recreation Center Buildings and Site Improvements - GMP Revision 01 Estimate Date: 0613012025 95% GMP Revision 01 Page 1 of 4 Documents Date: 0412112025 ITEM COST COST I SF % OF TOTAL Div. 08 - Openings 46,522 27.59 4.43 % Div. 09 - Finishes 53,744 31.88 i 5.110/0 Div. 10 - Specialties 59,245 35.14 5.64 Div. 22 - Plumbing 264,000 156.58 25.11 Div. 23 - Heating,Ventilating&Air Conditioning ! 71,000 42.11 - 6.75 Div. 26 - Electrical 250,000 148.28 23.78 Airnasium - Covered Turf, Court, and 2,589,909 123.93 3.62 % Pickleball (20,898 SF) Div. 03 - Concrete 453,750 1 21.71 17.52 % Div. 06 - Wood, Plastics & Composites 4,400 0.21 i 0.17 % _Div. 07 -Thermal &Moisture Protection _ - 639 ( 0.03 0.02 % Div. 09 - Finishes 99,1855�- 4.75 3.83% Div. 10 - Specialties 700 0.03 _- 0.03 % Div. 13 - Special Construction 865,311 41.41 33.41 % Div. 21 - Fire Suppression 107,946 5.17 4.17 % Div. 23 - Heating, Ventilating &Air Conditioning - -1 71,000 3.40 j 2.74% Div. 26 - Electrical 335,900 16.07 12.97 % Div. 28 - Electronic Safety &Security 67,100 3.21 2.59 % Div. 32 - Exterior Improvements 583,979 27.94 22.55 Administration Building (29,763 SF) 14,876,123 499.82 20.81 % Div. 03 - Concrete 966,881 32.49 6.50 % Div. 04 - Masonry 159,000 5.34 1.07 % Div. 05 - Metals 2,473,937 83.12 16.63 % Div. 06 - Wood, Plastics &Composites 221,924 7.46 1.49 % Div. 07 - Thermal & Moisture Protection 1,611,788 54.15 10.83 % Div. 08 - Openings 981,467 32.98 6.60 % Div. 09 - Finishes 1,600,791 53.78 10.76 % Div. 10 - Specialties _ 431,261 - 14.49 2.90 % - Div. 11 - Equipment 50,000 1.68 0.34 Div. 12 - Furnishings 14,275 0.48 0.10 Div. 14 - Conveying Equipment 118,900 3.99 0.80 Div. 21 - Fire Suppression 198,266 6.66 1.33 % Div. 22 - Plumbing 871,250 29.27 5.86 % Div. 23 - Heating,Ventilating &Air Conditioning 2,099,000 70.52 14.11 % Div. 26 - Electrical - 2,986,605 100.35 20.08 Recreation Center Buildings and Site Improvements - GMP Revision 01 Estimate Date: 06/30/2025 95% GMP Revision 01 Page 2 of 4 Documents Date: 0412112025 ITEM COST COST I SF % OF TOTAL Div. 28 - Electronic Safety & Security 90,777 3.05 0.61 Recreation Center (39,956 SF) 20,860,335 522.08 29.18010 Div. 03 - Concrete 1,350,248 -33.79 I 6.47 % Div. 04- Masonry 460,700 11.53 1 2.21 % Div. 05 - Metals 3,090,538 77.35 14.82 % Div. 06 - Wood, Plastics&Composites 171,235 4.29 — 0.82 % Div. 07 - Thermal & Moisture Protection 2,382,480 ; 59.63 11.42 % Div. 08 -Openings i 541,289 13.55 2.59 % Div. 09 - Finishes 2,271,731 56.86 10.89 % ------------- — — Div. 10 - Specialties 514,436 12.88 2.47 % Div. 11 - Equipment 447,427 11.20 2.14 % Div. 12 - Furnishings 68,904 1.72 0.33 % Div. 13 - Special Construction j 995,000 i 24.90 4.77 % Div. 14 - Conveying Equipment j 118,900 2.98 0.57 % Div. 21 - Fire Suppression 176,675 4.42 0.85 % Div. 22 - Plumbing 1,434,250 35.90 6.88 Div. 23 - Heating,Ventilating &Air Conditioning 2,790,000 69.83 13.37 % Div. 26 - Electrical 3,924,657 98.22 18.81 % Div. 28 - Electronic Safety &Security 121,866 3.05 0.58 % Recreation Center Buildings and Site Improvements - GMP Revision 01 Estimate Date: 0613012025 95% GMP Revision 01 Page 3 of 4 Documents Date: 0412112025 ITEM COST COST I SF % OF TOTAL Indirect Costs 11,191,144 99.08 15.65010 General Conditions 1,975,623 i 17.49 2.76 Builder's Risk Insurance 116,182 1.03 0.16 % General Liability Insurance 539,084 4.77 0.75 % Payment and Performance Bonds r 495,149 ' 4.38 0.69 % Subcontractor Default Insurance (SDI): 753,817 6.67 1.05 % Warranty 178,741 f 1.58 , 0.25 % Escalation 1,055,344 j 9.34 1.48 % Contractor's Contingency 2,144,896 j 18.99 3.00 Owner's Design Progression Contingency 1,429,930 12.66 2.00 Overhead and Profit 2,502,378 22.15 3.50 % Total Cost $ 71,496,519 $ 632.97 100.000/0 Recreation Center Buildings and Site Improvements - GMP Revision 01 Estimate Date: 0613012025 95% GMP Revision 01 Page 4 of 4 Documents Date: 0412112025 Recap Report Recreation Center Buildings and Site Improvements - GMP Revision 01 95% GMP Revision 01 Estimate Date: 06/30/2025 Documents Date: 04/21/2025 Project Size (SF): 112,954 Project #: 3023121.03C Project Location: Round Rock Lead Estimator: Tom McClanahan ITEM COST COST I SF % OF TOTAL General Requirements (1,690,000 SF) 1,086,284 0.64 1.52 % General Requirements 700,784 0.41 64.51 % Allowances 385,500 0.23 35.49 % Site Improvements (510,327 SF) 3,140,130 6.15 4.39 % Masonry/ Stone 64,000 I 0.13 2.04 % Structural/Miscellaneous Steel 85,024 0.17 2.71 % Protective Covers/Sunscreens 88,151 0.17 2.81 % Electrical 585,275 1.15 18.64 % Site Concrete 852,234 1.67 27.14 % Fences/ Gates 175,000 0.34 5.57 % Retaining Walls 1 17,250 1 0.03 0.55 % Site Fumishings 1 132,579 0.26 4.22 % Landscaping / Irrigation 910,798 1.78 29.01 % Site Utilities 229,819 0.45 1 7.32 % Track and Field (516,134 SF) 9,764,669 18.92 13.66 % Structural/Miscellaneous Steel 291,624 0.57 2.99 % Waterproofing / Dampproofing / Joint Sealants i 45,782 0.09 0.47 % Painting/ Wall Coverings 12,252 0.02 0.13 % Bleachers/Grandstands ; 40,000 0.08 0.41 % Electrical 867,847 1.68 8.89 % Site Concrete 284,895 0.55 1 2.92 % — Athletic/Recreational Surfaces T 7,513,520 14.56 76.95 % Retaining Walls 708,750 1.37 7.26 % Four Pack Soccer Fields (663,539 SF) 6,936,759 10.45 9.70 % Waterproofing / Dampproofing / Joint Sealants 6,446 0.01 0.09 % Recreation Center Buildings and Site Improvements - GMP Revision 01 Estimate Date:06/30/2025 95% GMP Revision 01 Page 1 of 5 Documents Date:04/21/2025 ITEM COST COST I SF % OF TOTAL Electrical 344,190 0.52 4.96 Site Concrete 102,293 0.15 1.47 % Athletic/Recreational Surfaces 5,907,480 8.90 j 85.16 % Retaining Walls 576,350 0.87 8.31 % Remote Restroom Building (1,686 SF) 1,051,165 623.47 1.47 % Cast-In-Place Concrete (Building) 40,566 24.06 3.86 % Masonry / Stone 86,000 51.01 i 8.18 Wood Framing I 73,100 43.36 6.95 % Architectural Woodwork 17,414 10.33 1.66 % Waterproofing/ Dampprooflng/Joint Sealants 15,654 9.28 1.49 % Roofing 73,921 43.84 7.03 Doors/ Frames/ Hardware 32,522 19.29 3.09 Louvers/Vents C 14,000 8.30 1.33 % Painting/Wall Coverings 49,007 29.07 4.66 % Concrete Floor Finishes ! 4,737 2.81 0.45 % Signage/Identification Devices 20,000 11.86 -� 1.90 % Toilet Compartments/Accessories 38,405 22.78 3.65 % Fire Protection Specialties - 839 0.50 0.08 % Plumbing i 264,000 156.58 25.11 % HVAC 71,000 42.11 ' 6.75 % Electrical 250,000 148.28 23.78 % Airnasium - Covered Turf, Court, and 2,589,909 123.93 3.62 Pickleball (20,898 SF) Cast-In-Place Concrete (Building) 453,750 21.71 17.52 Wood Blocking ; 4,400 0.21 0.17 % Waterproofing / Dampproofing / Joint Sealants 639 0.03 0.02 % Painting/ Wall Coverings I 99,185 j 4.75 3.83 % Fre Protection Specialties 700 0.03 0.03 % Pre-Engineered Metal Buildings 865,311 41.41 33.41 % Fire Suppression 107,946 5.17 4.17 % HVAC 71,000 3.40 2.74 % Electrical 335,900 16.07 12.97 % Fire Alarm Systems 67,100 3.21 2.59 % Athletic/Recreational Surfaces 583,979 I 27.94 22.55 Administration Building (29,763 SF) 14,876,123 499.82 20.81 % Recreation Center Buildings and Site Improvements - GMP Revision 01 Estimate Date: 0613012025 95% GMP Revision 01 Page 2 of 5 Documents Date:0412112025 ITEM COST COST I SF % OF TOTAL Cast-In-Place Concrete (Building) 966,881 32.49 6.50 % Masonry/ Stone 159,000 5.34 I 1.07 % Structural/Miscellaneous Steel 2,149,360 72.22 14.45 % Stainless Steel/Aluminum Fabrications -324,577 _ 10.91 2.18 % Wood Blocking 20,467 0.69 0.14% Architectural Woodwork 199,555 6.70 ( 1.34% FRP Panels / Plastic Fabrications 1,902 0.06 0.01 % Waterproofing/ Dampproofing/Joint Sealants 409,061 13.74 2.75 % Metal Wall Panels --� 843,367 28.34 S.67 % Roofing 359,360 12.07 2.42% Doors/ Frames / Hardware 337,901 11.35 j 2.27 % Storefronts/Glass/Curtain Walls 643,566 21.62 I 4.33 Drywall 992,350 33.34 6.67 % Tile _ 163,331 5.49 1.10% Carpet/Resilient Flooring 176,432 5.93 1.19 % Painting/ Wall Coverings 263,681 8.86 1.77 % Concrete Floor Finishes 4,997 0.17 0.03 % Signage/ Identification Devices 330,000 11.09 2.22 % Toilet Compartments/Accessories 18,972 0.64 0.13 % Wall/Corner Guards 3,500 0.12 0.02 Fire Protection Specialties 4,197 0.14 0.03 % - ---------------- --- �-------- --------- ----- Protective Covers/ Sunscreens 74,592 2.51 0.50 % Appliances 50,000 1.68 0.34 % Window Treatments 14,275 j 0.48 0.10 % Elevators 118,900 3.99 0.80 % Fire Suppression 198,266 6.66 1.33 % Plumbing 871,250 29.27 5.86% HVAC 2,099,000 70.52 14.11 % -- Electrical --- ------------ -- - 2,986,605 100.35 20.08 % Fire Alarm Systems 90,777 3.05 0.61 % Recreation Center (39,956 SF) 20,860,335 522.08 29.18 6.47 %I Cast-In-Place Concrete (Building) 1,350,248 33.79- _ - F _ - - Masonry/Stone 460,70011 11.53 2.21 % Structural/Miscellaneous Steel 2,670,716 66.84 12.80 % Stainless Steel/Aluminum Fabrications 419,822 10.51 2.01 0/6 Recreation Center Buildings and Site Improvements- GMP Revision 01 Estimate Date:06/30/2025 95% GMP Revision 01 Page 3 of 5 Documents Date: 0412112025 ITEM COST COST I SF % OF TOTAL Wood Blocking 47,614 1.19 0.23 Architectural Woodwork 122,280 3.06 0.59 FRP Panels/ Plastic Fabrications 1,341 0.03 0.01 Waterproofing / Dampproofing / Joint Sealants 789,169 19.75 3.78 Metal Wall Panels 982,198 24.58 4.71 Roofing 611,112 15.29 2.93 Doors/ Frames / Hardware 40,000 1.00 0.19 OH/Coiling Doors / Grilles 17,632 0.44 0.08 Storefronts / Glass / Curtain Walls 483,657 12.10 2.32 Drywall 1,066,835 26.70 5.11 Tile 214,066 5.36 1.03 Athletic Sports Flooring 412,135 10.31 1.98 Carpet/Resilient Flooring 53,333 1.33 0.26 Painting / Wall Coverings 521,515 13.05 2.50 Concrete Floor Finishes 3,847 0.10 0.02 Signage / Identification Devices 400,000 10.01 1.92 Toilet Compartments/Accessories 20,158 0.50 0.10 Wall/Corner Guards 3,500 0.09 0.02 Fire Protection Specialties 3,358 0.08 0.02 Lockers 87,420 2.19 0.42 Security/Vault Equipment 209,689 5.25 1.01 Athletic/Therapy Equipment 237,738 5.95 1,14 % Window Treatments 49,880 1.25 0.24 Bleachers / Grandstands 19,024 0.48 0.09 Swimming Pools 995,000 24.90 4.77 Elevators 118,900 2.98 0.57 Fire Suppression 176,675 4.42 0.85 Plumbing 1,434,250 35.90 6.88 HVAC 2,790,000 69.83 13.37 Electrical 3,924,657 98.22 18.81 Fire Alarm Systems 121,866 3.05 0.58 Recreation Center Buildings and Site Improvements - GMP Revision 01 Estimate Date:06/30/2025 95% GMP Revision 01 Page 4 of 5 Documents Date:04/21/2025 ITEM COST COST I SF % OF TOTAL Costsindirect General Conditions j 1,975,623 i_ 17.49 2.76 % Builder's Risk Insurance j 116,182 1.03 i 0.16 % General Uability Insurance 539,084 I 4.77 0.75 % Payment and Performance Bonds 495,149 L 4.38 �— 069 % Subcontractor Default Insurance (SDI): 753,817 6.67 1.05 % Warranty 178,741 1.58 i 0.25 % — Escalation 1,055,344 9.34 1.48 % ------------- ------ Contractor's Contingency 2,144,896 18.99 3.00 % Owner's Design Progression Contingency _ 1,429,930 12.66 2.00 % Overhead and Profit 2,502,378 i 22.15 3.50 % Total Cost $ 71,496,519 $ 632.97 100.000/0 Recreation Center Buildings and Site Improvements - GMP Revision 01 Estimate Date:06/30/2025 95% GMP Revision 01 Page 5 of 5 Documents Date: 04/2112025 AB 7 MASTER PROJECT SCHEDULE IN i i i SpawGlass 1 • E > y y y y y y �)qyp • D D D D_ • O O � � ��1pO� b FD � �.�pOp .ppO t�t�� ZmmD � • O � � �i � �' � � �Qt ' � N {Jp� pp�1 O O O O O O H O O O O O •, • • J � O H O S O O O O S O gg H' • O - � O O O O O O O O � � • V • a pair n •� 9 S O O A O O n C 0 L71 2 m T m m A N Sn P W gg 31 C m ps g B s a do m S Lip 8 a 91 � a o g — — — — — — O — — O m � � V1 O N — — X 0 0 0 0 O� 0 0 0 0 0 Oi O� � — 0 0 - — — — O — N — — — — — — 0 0 0 O A r o 0 0 0 0 0 0 0 0 0 0 — — O N 41 D U1 N N > > D D D D D - y > D D D D > D V1 °1 D D D D i O N N — —' _ — N N N • O O V N N N O O. W � � V � O� ON+ � � ONi N y III��U KNl D D D D t>� D D D D D D. D - D = q # g � IBJ N Ill IBJ NN N NN N N NN NN (N� N r V N V NN �NJ NN NN NN IJ IV �J N �NJ N (� (� U, N N � N NlaCD � CA OCO) g O O O 0 0 0 0 pq pq gq pq qq O O 0 0 0 O O O O O O O O O O O p 00 2e G� Xq d� C � - N V .7CD ......................... _ -._.._-_.._ .t-..-_�.._ _._ _____.._. ._r_. ._t.__ __.;..... _ __ H± ---------- ------------------------------------ ,.d..� -,- ........... ..................................... '• -- .. -4'�- ------------ ------� ........_..._ ....... g 2 dd a1 gpg; — _ t......... ..... .... S --- . ..>y._D.p .. ...�.. _ - .3. - .............. ` . .. .... ---........... .....-. O a ®� ° — g ........... ......I.... f . -•...-------- •....---•.----- .... ...........g.. . - m t ............. ......... ...... — ....:: A.. • h---' .. ._....•.................../:.._--..._........y..-' - �.-3__ _.... ... .... .. ,..................h•- ...._.._...±.................1 - �_ _.-.._..__... - _. .. .. .._ • .................h.... S.....................____............ ----.. -.-_-- _-.--- .----------'..... m s � D D D N O N O'' 4 VNi uNi Nj N n .(/1. D � � � � TI ➢ D 4l Tl � �1 2 m O N ; ofi c � m m m m m m m m m m y m 2g v v v a v a C e e e F a 3 N 2 _ _ $ 9 3 3 a w LO 1 a 0 0 0 3 a LO F E E I m � � a 0 O 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N� O O O O O O O O O O O O O y A P NN N N N N N N N N N AJ NN N N N N N N N f3 8 D A3NN UI N U tNl N U N U N U D U U U U U U U N U U U U U U D U U U U U U U U U U U D D D N $ NNNNNN $ N �PNNNoNNNNN NNNNNNNgNNNN � NN � N ONi ON91 1p i O O O N O N g g N O O N O O O N O c l A m p m y o o p o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 op op o > ;e A , e . a' oe ae e $ e �e a ;e ae g . -e ae ;e ae X e e . ;e a ;e ;e e : se X u � . w N � - n -..._..._.�._._... ...._•_•••__-_•................................�.....__..._.......__._•...._....._._,__........_._._......._......_.....__ m • • • • • : i N ...... ._._..... :----------------- ------------ : ....._... t t i 7 ....._ ------------------ .................. -------------------1--------..--------l..................!_.-.-- ----------- .................. ................................................ .�... .............................. ................... ._......i-----------------•j...............-t� -.-...-_._.-%_.__-._._....-....; .--.--..........i ._ ----------- _.._... ------------------ ................ y C ........... ------------------ ........._._- - --------------- ------------------ .-..._...----------------_.y..................j . -----------......:................ . ...............e..................t....• . fl U 0 Q :.... — -- . . . .. -•-- o- o- o- D..fl.. a m �Q* a m. ..L:. .......... an y - ! .�-'a 111111-�� •_�-_ -.��a.�.3p. � 4j:,r�.0..� .._..__... ............. a .. . o a,o ...... .......... C N- • -. ..... ........................... .t.. .. . ...............j............ .._ _. - y _jj.j._............._..y..:-'--..._..._._. ..................j.. ......... ... ... ........... . .-. .j.............. ......................... .. h------------------M------------------1------------------1------------------ ...............:.j_..._...__._.. ....:............ . ----------------------------------j------------------j---••••••-.-..••••j..................j..................y.................. j._...........- Axtl ID Actift Now original Remaininc Actual start Finish Late Start Late Finish Activity% Total F M A M J J A 5 0 N D J F M A M J J A S 0 N D J F M A' Duration Duration Duration Complete Float A1620 Area Structural Steel Pmc;uia enl 50 50 0 12-Nov-25 27.11an-26 09.hti-26 18Sep-26 0% 184 :��': NeeA Sbtu rat Stahel F3oWtenlent A1360 Rydmthempy Pool Equipment Procurement 100 100 0 24-Sep-25 17-Feb-26 07-Apr-26 25-&V-260% 134 L. f!Y0olbePY Poe)E4*1-i� : A9720 RTU Proa,rement 100 100 0 O7-0d-25 24-Feb-26 09-Jun-26 27{kt-2s 0% 173 RJU Oroqurej It- - - A1650 Bevalm or Proaseenl 180 180 0 24Ssp-25 10Jun-26 O&Jun-26 19-Feb-27 0% 177 E ft""M" A1050 SG Reop of 90%CDs 103.14.2025 1 0 1 14-Mar-25A 14-Mar-25A 22,Aug-25 22.4q,25 100% r SG. of 110%CDy 103.14.2028 A7060 SG Revlawd90%CD's 5 0 6 17-Mar-25A 24-Mar-25A 22Jurg-25 22AUg-25 100% •:96 aem%cb's : A 1090 SG Reavpt d 100%Grading Plans 104.04 2025 1 0 1 04-Apr-25 A 04-Apr-25 A 224,,-25 22-AAV-25 100% A9360 SG Receipt of 100%Utility Plans 104.21 2025 1 0 1 21 Aver-25 A 21-Apr-25A 16-Sep-25 16-Sap-25 100% : r:SCj R4u1jt of l0Q%V*F`*ns j 04.21 j5 A1150 SG Receipt of 95%CD's 104 22-2025 1 0 1 22,4pr-25A 22-Apr-25A 22-Aug-25 22-AAV-25 100% i r:SG RO-ipt of 95%COY)04:72.2078 A9160 SG Re~of 95%CD's 5 0 6 22-Apr-25A 29-Apr-25A 22AW25 22-Aug,25 100% ■ 8G or MCD* A9370 Review 8 of 100%U Plans Av!B7` __ _ 1 Pricing }]� 5 0 12 22,4pr-25A 07 25A Ot-0d-25 014)p-25 100% ` ` �. i P'dd�B d;tOii%lilt t PWre--- - - - -------,-_ AB3f{0 100%Utility Shop Drawing B Pricing Approval by Desgn Team 5 0 11 09-May-25 A 23-May-25A 01-Od-25 010ct-25 100% :- 1 %Utoy Shop,Drjoirp bP*V�lppJ i by D�lgrl Tejm A1180 SG GMP Creation Process off of 95%CD 20 0 20 30-Apr-25A 28-May-25A 22-/urg25 22-ALQ-25 100% imW S 3 GMP C*00 PAocs"o1T o194%CD's A3030 GMP M2 SG Review 6 Submission to CORR 10 0 8 29-hW25 A 09-Jun-25 A 22-Aug-25 22-Aug-25 100% i MAP 04 SG Roim*8 PubjriiMbri to PopR AN80 CORR Review of 95%Storm Plan PdcN 10 0 10 03-Jun-25A 16Jun-25A 16Sep-25 116Sep-25 100% � � � : Ca: : 1. 1 88%:9tolni. I Pel. . A9310 PSK Submission of 95%CD's to CoRR for Required Permits 40 1 40 02-May-25A 30-Jun-25 24-00145 24-Oct-25 97.5% 82 ; ; : PO4M PSK 9ubl dmia'at 88%CD,''s 10 CORKforR ur*d Pbmft A9880 SG Racegt d 100%Storm Plan XX.XX2025 1 1 0 30 -25 30-Jun-25 18Sep-25 16 25 0% 54 8Ga FOlospt Qf A9170 CORR RevbN/Preeei itaton d SG GMP to City Counsel ForAppmval 45 30 15 09J 0 un-25A 11-Aug-25 22-Aug-25 03c1-25 33.33% 38 OAR F�eWpWPla �ll**°rWkNPW CVr COu°4°t titin A1340 SG Receipt of 100%CD's 1)0CYY.2025 1 1 0 12-Aug-25 12-AAV-25 D6-0c1,25 0640d-25 0% 36 :r 6Ci(tegs�o(?80tLC �70�V1[20�6 A1390 SG Review of 100%CD's 5 5 0 12A"W25 16,149-25 060d-25 1000-25 0% 38 ; ; : : :a:SGRMllll1afi00KCDW A1420 Pricing F—ass6CORR PrrngApprovalforChangesMade n100%CD's 10 10 0 19ALV25 02Sep25 13-0cl-25 244M-25 0% 38 WmWit100% COnShl1011Dn 424 356 76 12-Mar-25A 20-Nov-26 17-Sep-25 17-Mar-27 79 ----:C . A9440 BIM PfeConetnrdhm Kick-017 Meeting 1 1 0 10Sep-25 10Sep25 084)ec 25 OB-Deo25 0% Rl 'AR. . . ANN Prebr inary BIM Model Creation 20 20 0 11Sep-25 08001-25 09-Deo-25 08,lan-26 0% 81 ; :a* oleo 41V 6M MQ-O-P* A8480 Pfellmi nary BIM Model Coordination 8 Alterations 20 20 0 090d-25 0544ov-25 Dg-Jan-26 05-Feb-26 0% 81 : : i iha�lYljry QIM;MoQel�°°!dneboii&A lteiatriM t .�la 7MY C�SOO PrtPour S - _._ -...... AW70 A ore B 30G Pre Pour BIM Scan end bBdfration(UG MEP) 5 5 0 OB-Nov-25 12AJov-25 06-Feb-26 12-Feb-26 0% 61 BIM Scdn Bind Verification a}GW, ; A8480 Area CID SOG P-Pour BIM Scan and Varlicaton(UG MEP) 5 5 0 07-Nov-25 13-Nm-25 06-Feb-26 12-Feb-26 0% 80 ,IM Scan and'Anfiratidn NG MER) ANN Are A SOG Pre4N ur BIM Scan and uAeriketon NG MEP) 5 5 0 14-Nov-25 20-Nov-25 04-Sep-26 11Sep-26 0% 204 :a;MaA9QG P a Pour BIM Scan and;Ve Ykaton:(U<l MSP); A8Area B Steel BIM Scan 5 5 0 16-Mar-26 20-Mar-26 19-May-26 26-May-26 D% 48 °:�. SIM I p 580 3-Jun-26 29-lun A17570 Area CID Steel BIM Scan5 5 0 2144-26 27-Jul-262061701-26 12-Oct-26 0% y{-26 �-�: --QIM 5®n A9510 Area CID L.t Overhead MEP BIM Scan lu W6 28 5 0 22 Aim C/D:L.1:0v,*6hs6d 5 - , 426 20-001-26 28-001-26 0% 83 : : : : : : ' I A855U AreaA Steel BIM Sean '- a Assisi S1Ml&M gun MD I A8530 Area B L.2 Overhead MEP BIM Scan 5 5 0 23,W6 29Ju1-26 190d,26 23-W-26 0% 81 4 AI00 0 Lk CYMflaad MSP fsl lw A9500 Arae B L 1 Overhead MEP BIM Scan 5 5 0 30AY-26 05Aug-26 01-W-26 0704-26 0% M 0 4IOi�S 41 Owrgwad MEP AB540 Area C L.2 Overhead MEP BIM Scan Bl 5 5 0 03-Aur�28 07-/u9-26 22-0eo28 29-0eo-26 0% 88 Is MRC 42��M� ........_..........»...___... _ A9520 Area A Oveoteed MEP 61 M Sun 5 5 0 21Au9.26 27AW-26 14-060-26 1&Dec-26 0% 78 :_.�..' �._:_a AAhaA OvsrlWd MEP 81 sthrPONm4a fit.# moints G6r1BrHl Requienen� 10 0 11 12-Mar-25A 28-Mat-25A 16-0sa25 16-0ec25 :�GYhayl , A11140 Install Jobelle Fendng 5 0 4 12 Mar-25A 18-Mar-25A 16-Dc25 1&Dec-25 100% :is lim 1 r111 Lta A1080 Install SWPP Measures 5 0 1 27 Mar-25A 28-Mar-25A 160eo-25 16-Dec-25 100% : 1 NiAB ;0 IrMau1M 14 0 17 24-Mer-25A 15-Apr-25A 16-De0-25 16-Dec-25 � M l I '}^'"'t••�-•! ••r••!^ DB p 0 Remove Emitting Quarry Block 5 0 8 24-Mer-25A 02-Apr-25A 16-Deo25 16-Dec-25 100% { ANn1pr6 6dP1Yp OrMey:81¢k A1130 Rem" Trees 5 D 6 07-Apr-25A 15-Apr-25A 16-Deo-25 16-Deo-25 100% :e Ejde9{Ip TIM4 Eartrwork 120 61 59 07.AW-25A 24Sep-25 164)ec25 09001-26 285 E ttMo Stan Date: 13-Fab-25 — Actual Work • •Milestone Actual Level of Effort CoRR OSP-3C Rec Center Finish Dale 1&Mer-27 - Remaining Work Viii-4 Summary .WBS Layout-All Activities Data Date: 30-Jun-25 w Critical Remainng Work Level of Effort Page 3 of 22 Run Date. 30-Jun-25 A_V,i 10 Activity N Original Remakitti: Actual start Finish Late Start Late Finish Ac-ni .. AV . JASONDJF '.' A '.' - � A , � . , - Duration Duration Duration Coi- A9260 Moisture Condition and Prep Pavement Location Subgrade 8 0 6 14AW-25 A 211tpr-25 A 164)1aa25 16-Dec,25 100% ; : ;MO4h1e ConOlDoo arttl Prep Pawnl Locabon Subgracks A1250 Peace FII Materer at Pavement Locations 10 0 6 16Apr-25A 25-Apr-25A 24-Feb-26 24-Feb-26 100% diFtll Nlatanel a:Pavement loceuorts A9340 Cut Unsuaable Maters at Busdng Pads Where Not Impeded by F_xstng ONCOR Pan 15 0 10 30-Apr-25A 13-Mft-25A 16-0ec25 16-Dec-25 1DO% : r Cuq Unsuri lylatenals at Building Ped&Wlws;No(IEM8I'V Q111" A1270 E.—yee North Track and Feld Area Clays 20 0 17 24AW25 A 16-Mey-25 A 16-Dec25 1I Dec-25 100% ExIaM0e NoM Till and fi"NN Clad A1110 Clear and Grub 5 0 36 07,kpr-25A 27-May-25A 16DIsi 16-Dail100% ; t ;ate:ci�ww•rat Galls A1560 Excavate North Track and Feld Area Rock 25 0 23 28-Apr-25A 29#•1ay-25A 16-0-25 16-D-25 100% jewi: F�at� s:li liadt and RNd Arse Rork A9240 Cut Unsuitable Maters at Busting Pads Where impacted by F—fng CNJCOR Prmary, 5 0 4 29-May-25 A 03-Jun-25A 16-0ea25 16-Dea25 100% : ({ut Unavnable Mateneq at Botany Pada ljlmara Imvpai syFafiurh dflc'.OR 1 A1260 Race Select FN @ Building Pads 10 0 27 14-May-25A 20Jun-25A 26-Mai -Mar26 100% r� Placa Select Fit &iddirg Fws A1140 Cut Unsuitable Materials 0 Soccer Fields 10 0 17 04 Jun-25A 26Jun-25A 16-Oec-25 16-0ec-25 100% Malai, Sowr FeNs : 1 A9590 Bathroom Building Select Fill Placement 5 3 2 26Jun-25 A 02JU-25 07-0Gt-26 09-01 40% 323 a 139ihbora BUIda1Q Matt A PlaOarrlart A1190 Place Select FN at Soccer Feld. 15 9 14 10Jun-25A 11JuI-25 16-Mar-26 26-Mar-26 40% 178 Mill M plana Si FR at BoalrrP1alda _.....__•__.�.. ...t .....,..... I A2730 Ezcavale South Track am Feld lues Clays 20 14 22 294Aey-25 A 18JuF25 16-Feb-26 05-Mar-26 30% 158 :Egav*e South Troi Ond Hurd*-. 0 A9750 Soccer Feld Spurs Haul OR 15 15 0 30-Jun-25 21-Ak25 l i-0eo25 08-Jen-260% 117 somal Spew H4ul Qf1 A2920 Excavate South Track end Feld Area Rode 20 20 0 21 UL25 15Aug25 06 Mar-26 02Apr-26 0% 158 Cr :E>b.✓a South hick Yrld FaM AIN" ; A1740 Piece Structural Fill toTop ofSubgniF0valt,os Track&Fai 10 10 0 11-Sep-25 24-Sep-25 03-Apr-26 16-Apr-26 0% 141 :o:PI00aPh"lilttolbpof"MilliHIDYMOS hadcaAaallt Uwks 177 177 0 30Juri 12.Mw.26 17Sei 17-Feb-27 238 ; • . ; . . U1iUN; ilk A9670 Rork Saw MoDsaaton 6 Preliminary Cutting of Pathways to WW Utlses 6 SDS 10 10 0 01-Ak25 15-Jul-25 17SeP25 30SeP25 0% 54 ;ROCk BMIM NapQapu48 rra�aq�ll�p PM111MYa .1NW v+a�ae A9760 Rock Saw Cutting SD/DW Utlky Pathymys 10 10 0 22-Jul-25 04-Ai D9-Jan-26 22-Jan-26 0% 117 a} F�odi8rlljlrCyBkq 84,6W ilutir PMIrrlOYai A2420 Underground U"Pathways ComPbte 1 1 0 Ofi-Deo-25 08-Dei 16Jun-26 16-Jun-26 0% 132 l (1t1d}Iq�Olrl+d 1 11i,Pa�ral�Ys�d01iM j ��� �' I r • `�_ i i ilrrir lilwr ' ? i ? i i i ? ? i I A1220 Installation of STA,17+96.95 Manhole(Rods N'RneO 0 0 0 30Jun-25 011?d-25 0% 65 ; kMalallds d WWl SrA1 17wg8.96 itAaM10Y plaf!{N Rh ..............:.. ...:.... ... ...... :. - A14r)D hlttall WW Menhoes 15 15 0 1646-25 05-Aug-25 011]U-25 21-Oct-25 0% 54 a� INO WW MW*.Ci& 1- A15W IreWl WW lines 15 15 0 23,U-25 12Aug-25 128-0ct-25 0% ba aP kndal t*W Ukga A1870 natallDWLines 15 15 0 13-Aug-25 03-Sep-25 23-Jan-26 12-Feb-26 0% 111 ; : : IpdaMDIV L(naq ; A1750 retail Fm Hydrants 8 Assf ies 5 5 0 04-Sep-25 10Se"5 13feD-26 19feD26 0% 111 : : : : : : a.. 11Yt*'a}6�aaFnl�faR - M . r A1760 retall FOC's 6 Assamboes 5 5 0 WSep.25 10Se"5 13-Feb-26 19-Feb-26 0% 111 ; b kMM fDCs iMMNMK ; Al 7710 ostall Domestic Servxe to Bathmom Building 5 5 0 11Sap-25 17Sep-25 20Feb-26 28-FeA26 0% 111 :o:kWl Goraaat 8MN0a W BdN001nSs All rutall Water Urs to man 5 5 0 18Sep-25 24Sep-25 20-Apr-26 24Apr-26 0% 147 a:IndM11"r6riKto OsNq _K eiorni � i i i � i i I Al2M installation of STA:4.90 35 SD-E Manhole(Rock N'River) 0 0 0 14Ju425' 18May-26 0% 213 ♦rrxrlaarar a gTA:}a9�.31;W(rluYioip(fif odc:N'RNs() ! A1210 �n9lalletion of STA 4-99 72 SDA(Rods N'River) 0 0 0 14Ju425' 27Apr-26 0% 198 : �fla all of$M-4*".7Q SQA Pit*f•{'Ricer): A18M Install SD Manhulea 10 10 0 25-Sep-25 08-0d-25 27-Apr-26 08-May-26 0% 147 4 IhstiM SD Mari110W AIB/0 mstall HDPE St—L—A 10 10 0 024)d-25 15-0ct-25 04May-26 15-May-26 0% 147 P install NDPE BIovll LiaoA 10 10 0 16-0d-25 29-0d-25 18May-26 01-Jun-26 0% 147 o I �HgPE:$fo7m tilKB j j A1980 Install HDPE Stam Lina B A1230 installation of Printery XFMR(Hartel Parkvey Ph A.1) 0 0 0 30Jun-25 27-Feb-26 0% 167 ; 4 0 kpta+a64r of Prf(na7 7 Mq MOaai Pajilial A1780 IrWaleton of EeuVral Pathway to Playing Felds/Bath House7Tedk 10 10 0 18Sep-25 01-0d-25 27-Feb-26 124Aar-26 0% 111 : : s7 Irpta�abQri s>{B}CM,I Pativil to FW# FIa 81ab"Wd{k A1930 Parking Lot Light Poe Elect—,Rough In 15 15 0 18-SeP25 08-0d-25 10-Mar26 30-Mar-26 0% 118 : C ft iq Lot LSM Pola Elect,"RWO In A18M natallaton of E-edrical Pathway,to Rec Center Complex 15 15 0 02-0d-25 22-0d-25 13Apr-26 01-May-26 0% 132 P:IrMaYtlorl d£YdrfrJl PiOMey b Rrt:CMMMCoelpMt 10 10 0 18-0rt-25 29-0d-25 07Apr28 20 -26 0% 118 a; k�ay I.IdK�dM arsd FyQtaaa Pailip Lal A2080netal'Light Poles and Fixtures(�ParWrg Lot ' A2100 Set Rac Center Complex XFMR 8 Gear 10 10 0 23-0d-25 05-Nov-25 04-May-26 15-May-26 0% 132 * sal lima 11jl111111 00ya 64Nr : . A2930 EV Charger Electrical Rough In 5 5 0 06-Mar-26 12-Mar-26 29-Doo-26 05-Jan-27 0% 207 ; ; ;e FV Phy9a{FJ{OIyY P,,,#M � ������� T!ICaMiiaYdlllW.i i i i i i I A2180 1nslall Fiber from Rock N'Riser to Area D 5 5 0 06-Nov-25 12-Nov-25 18-May-26 22-May-26 0% 132 :a InNal Fbat flWn RbdsN'Rivah bAle�D A2290 I retail Fiber from Area C to Area B 5 5 0 13-Nov-25 19-Nov-25 26-May-26 01-Jun-26 0% 132 o;Irl�al Fb;rfaMn Nee C to Arse 9 ..;...:...:... ... ......:..:.. - I A2360 Install Facer from Rae.Center Area B to Bathroom Busdng 10 10 0 20-Nov-25 05-0ec,25 02-jun-26 15Jun-26 0% 132 : : : p IaMM F�M hen Rec.GnMrAaN71p Byla0ar11� Staff Date 13-Feb-25 Actual Work Actual Level of Enan CoRR OSP-3C Rec Center Finish Date 16-11 — Remaining Work Vessel Summary .WBS Layout-All Activities Data Date 30-Jun-25 — Ccs®I Remaining Work raa_ Level of Effort Page 4 of 22 Run Date 30-Jun-25 ....... _}................. ------------------ ----------------- ---------------I,. I p _-s-� __ LL ....................:........; a, ...................=� c g: g g _ $ ---- � 3 9 of s #g .. : aQ g - ' q (P���• a � .r..- - moi{ � -%----v•-'--°-•-•-i--• _ _ -.D..a..Q..P. .Q.�. . r;.e.. �. --- ............... .................' .................. ...........' ...""--.--"..-t.............. ..........----•••!------------------.l.....................................!_._....._.......... ................. {.....__.___.___...:...,-- ______________l.................. ................. _._.___.._._. ..................V------------------}.................. .................{........--_----...:. • V pppp p p pp pp pp pp p y._1n� m pp mm mm • . OI M Q O Oiffi - 0 0 0 0 0 0 0 S S tD fp f0 ID S A O) O) �•W �----------- � O n O O S S O ..................•N O X O m . . . 0 . o X . o . T' . o 0 o X `. X o 0 . . \ . d � � 0 0 0 O 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 � N • N N N N N O O N N N N N ID lD b .D tp ' N N N N N N N N b N N N N N N � N N N N N r � lV � ttVV GG IIVV O« fr•/ N Nr7 N f0 N iD t0 �O l0 (O �D N t0 .D .p ID (C • N N N D lD D O N N p N N N N N ^ N N b c c 6 n �apm} d lSt�p c c .Ni i d d d tCY}Vnp( �`/ ° `� 'Y 7y O O r r O a (Npp O N D gg € Li g � c tr LL a o , L 0 e N u K ` 6 6 bo V) LL O K s: ..... ..... _ --- .... . .... .. . S.. ._..- 5.... . .. t... 1 ....... 9.. .. y_. _ _ .. fin . _ .... .. .�. ... .._ .a.U. - ._ 1 S . 91-1-1 . .: .. : ........ .s................ . ----------- �. yp _�..�C- :�-�..�.�:�. 0 .0...Q.°;. .............. 1........... "g.� & -- ��- � a --� _-.0 R- -d8_ •"" A ,7ji -�•'n-P -"+� .... j.._...... qL a a : - �i ... : .... :: -.�-. .............. ................................................. o-..0..9..°. Q.. ........... ... ...............{....... __. o...... ........................j............... .............. _-•---........ ._......... ..,._ _ .. ... .............. ... _Q.O.:D_._._......_...{.--_------•---- ........---------------------------i----------•-•----.;--------..._.._. ........... .....................................I............._.. .....j............... .............. ..................{........._.__...{......_.._...._ ....... .......j........................_........__.;........... _. .............. .............. ....__........ ....._._._.... .................. ........ ......... 1. 1. u°Q o o - - - N - - $ - - `- - 0 - - - - - 0 - - - o `- - - 0 0 �i ry m o� '� '� w fl' N f a xxxxxxggxx i . . . . . . . axxxxxxxxxxxxxxx . . xxxox " 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (� O O IN ep t.`9 O r ipp ���pp N ���'pp1 Npp ttpp N O eepp ��pp O O N .��'ppI n lY N N N N N N r N N N N O N N N N N N N N N N M t ry N N ttriiiii N F1O N O O N O N N O N O - d M N O N N N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W O 9 m D c � o r ♦ I y � b ° � � g 3 oD H a w U e Q Z. ° li � a tS �, c W D ➢ cA � � �- ._u 9 U S � � w ♦ � 4 � � @ � �' � @ s � U @ � o � � c o o � m m c E U U N U U ✓> N N N LL 6 2 < a a d 2 a a z u9io° s' ................... ............................................................................ -------------------------------------4 ...................... --------------- .............. .................................... ----------- ........ .............................................................L..................L...... 3--.-_...' ....___-........................ ..................------------------ ------------------ ------ ................... ....... ----------- ..................r ,..... .................................... I................ ------- ---------- I............... ................... ........... ............. ........... ............ ---------- I--------------t . ........ .................... 71 ---------- 41 ja TA ............ ------J- U ................. T .. ............ .................. -------------- ...... ....... ....... 41............ ................................... ............. ....... ................ ........ ...... ...................................I.................. . ................................ ............... ------ •-+------------------4--- ........4-------- ----------------------- ................. ........... -------- ---------1-1—-------------------I------------------L......................................................... ................. .......*---------------------------- ------------------............................................................................................. .................4------------------..................------------------.................. ................. -------------..................------------------ ......................................................................... ---------- ..................------------------..................----------------- . . ............... . ...........................................................................I.................. ................. ..................................... ................. ............................. ...........------------------------------------ ................. ------------------.................. ..................L..................I.....................................------------------ --------- --------- ........ ..................................... ... . ......................... ....... .......................... .................................................. f I I It I, AN ,A F, AN �s 9"1 A a .. . .. s N 8 b b o b b L b b b S b o b o 0 0 0 'o 0 o i� b b b o 0 0 0 'b o o b o o b b b f/1 ti a IQ R R g R R 9 N, SI 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 'o 0 0 0 0 0 0 'o o m N � N u7 O m N � N t•I M N N N � m N N m m N a N O 'N N N N N t7 PI t,N N nn ��O ' ! 'N N ' ' ' Q m N � VI N �O O 'm m � '� � N M N 'l7 N N 'N � m m m 'N m m O N O 'N N N N N N t7 'N m I Le LL -el Js Js J 5 2 42 i ... .. ..................... .......:.. ...... ......:... _........ L: .. ........ _i._.. p....: .._ .......j...................:...... _ � ° -- n n.... . •....... m ............ . .. m L _ ---- . .. CD ..ro--a ............. -- .................to i...... . _ e 15 < < a _ ;o--o e o .� .......... --- •i ---------------i..........---- > LL i --- R_ -:: o----------- -------------- -------------- ---- *------ -------------- -------------- --- ........................ ----------------}--------------- -------------- :------------- -------------: ::::::::::::::- --:::::::::::::::::: :-- - U g ` - .......... .... --- - .............................. -. ........................... ............................ u b`t�0 . 'NN • -n..- ....m.�.�...♦�..m. � p N N N N NNff ff�•11 QFCj' 41 T . . . o o . . . . . . . 0 o . . . . o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 o O m h 1� tp N N .p tp �D O •O t0 H �O N t0 �D N t0 f� I� 1� � �O .O N N N O N N N N � N � N N O N N L N N N N C M C C N G A •Y N 1 N N N t C N N ; N N N N N N fY N M Nj N 6 Np N N9 N N �}N55 N N S N S N z N S N z 1-2 2 S N ry N N N N N N O j}N5( N N j NS{ SmSm S Np N N N N Nry Czd1 N N O N N o T N�Ty rt�pp t000pp ��pp CCC VI N Q� ON N O� H O N r � ry O �Npp ��pp tA3 tp 000 N appp W AOO ! �Opp O N N N N N R $ R6 0000000000000000000000000000000000000 - oo 'o w 0 m N W p o E ♦ f I 0 �n 3 E o d Z81 05 91 an N n N N N rt S � LLo � ------------ ------------------- .......... -----­---------------- .............................. 1 1. ----- ------------------ .................. ............... ........ .... ................*--------- --------------------- --------------- ..........y-----------------'{............ ...........-------------- f_...... .........------------------ --- ...ci .. .... ............. ..........................................f. ..................................... ............... .......... 4 .. ..................... ............. -------------------- CL ........... .. .................... : if: ]:.7' .................................... .................. C4: (A AD .................. ------------ - ----cr --------------- .. . ...� .A .r. 0 ......... ............ -- ----------- .............. jl ..... ---------- ........ Lu .............................. ............I..................I........... 41 ............: 17 4. T. .............. ................... ....................................................... -------------- ... ......... .., ............ ....................................................................... p.........L♦.................. ------- ----------- --- ........................................ .......... ............... ------------------------------------------------------------------ ........................ . ............................ ............................. .......... ......... ---------------- - ------- ................... ♦ 0 ...............I: -------------- ------------------------------------I------------ --------- ........... ........ • ..............................................-------------------------------------------------------------------------L......__.......................................... .......... ------------------------------------------------------i-------------------.................. ..................-----------------------­----------.............. ............................ ............................................................................................................................................ ..... ----------..................------------------------------------------------------------------------ ------------------..................------------------.............. ............................ .................I-------------------------------------------------------- -----------------—-----------------------*,----*....................... ............. ....... .................I..--••__....._.._..-.._....--.._....................... .................................... ................................. ag e e ag e ag at am ag ae ag at X at s 0 ae . . . . . . cn . . . . . . . . . . . . . . . . . . . . . . 0 w CY '10 a o N N N O O N N O � •- N '� N N N O N O N N 'Y . . . . . . . . . . . . . 'o 0 0 0 0 ,o 0 0 0 o a o o 'o 0 0 0 0 0 _ t O W N N 'N t•1 � � � th h � � N � N N N � Yf N N � '� � d O � 'N N N N N�N � 'R � � � R N � � � N Uf 'N O � � � O N O � � � N iO N N N N Vf � '•- � d t.f � 'N iO N Ut I t o 28 A A w z EE m 5; J A I ; ----..-- ..�•. N .; -- a Y :::. : s . .J.-J.. ... ..-......... .(-. - ... -- - a • _ !Yy a+- a-- -+- -�-� �+-- ......::::::::- : : :: ............................. . ....:::: :-----•.----•---•-. .............. ::a:..:::.. • 0 ..:...........'....'_�..................I... ..o.....---y------------------y..................y...............__.• ': ................... ............... .............. - ------ ..-----•------ ------------------y---•-------....._;.-•.--.---------..;............. ;5............_. : . ..i.....................................}..................}..................S------------------}... --------------- 4----------------- .i.................-I.................. i ................ .............. .................. ------------------•-_---•-'-y------------------------------------I................................. C d ............... .....:... .................. -- - - v • � x � vii v°'i v°'i vO1i � u�'i � � � n � � � � m m m m n � m �i � m � n is m � m � � � �......�+ � �c �o � � c M - � r �'a gg xoxxxx0xgxxx x000xxxoxxxxxx xxxx x xo a � a 0 0 0 0 0 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 o a o to 03 N N N R R b 'Y �Y b b N R b .N�ry H bj H N N b N N fb7 N N r r N N N N N N b ry N N N N b N N N N N N N N N N b N b H N N N N N R N N N N N N N N R N N M H N N N •D b �O b b b N R .D N lV N N N b b t0 N ry b N N N N N N (�j N N N (V N N 0 N N Q � r g o ♦ ( I 3 3 g • t ocr $ a If ol LL 3 • ` � oQm t � , � : r �.ity ID Activity Name Original :Iemarnin� Actual start Finish Late Start Late Finish Activity% Total Duration Duration Duration Complete Float ;LsyN A8200 L.21n Wel Pllmbhg RotUhln 20 20 0 04-Jun-26 01Ju1-26 I9A4F26 18Sep26 0% 84 :A L216VVj1P6n"Rakel' A8600 L.2 Overhead Pklmbi g Rough4n 10 10 0 02.kI-26 15-Jul-26 17-Sep-26 30-Sep-26 0% 54 0 ;L.2j0 j tYapEY1Y A7190 Tleln Rod Drairs 5 5 0 16.kL26 22Jul-26 01-W-26 0704-26 0% 84 0;Trill-I"Pod p71W11 ; A7350 Cas Rough-In to RNs 10 10 0 30 kt426 12-"-26 04Nov-26 17440v, 0% 68 o Gab RalgKln b R" A7790 Tie h RTU'. 5 5 0 13,14826 19Aug-26 18-hlov-26 24-Nov46 0% 66 . (✓. . A8610 Set L.2 Bathroom Fl duces 10 10 0 29-Sep-26 120d-26 294)ec 26 12-Jan-27 0% 62 P 7� aaFa AM30 Trim OLL L2 Bathroom Fbttres 5 5 0 130d-26 19-OC-26 13-Jan-27 19.1en-27 0% 62 ; :a "011 k12. . �Tt•��1a1 Buppr�l6n A5600 Hang L 1 Marna 10 10 0 20-Mey-26 03Jun-26 2849.26 10-/Wg,26 0% 48 b HenO L.1 kYM; A5910 Set Fire Suppression Riser to L.2 5 5 0 04Jun-26 10-kin-26 11-Aug-26 17-Aug-26 0% 48 a Set FYe:SullpaMldr RlMrb k'2 A6080 ntall L 1 Branch Lines 10 10 0 11-Jun-26 24Jun-26 18-Aug-26 31-Aug-26 0% 46 A6270 Harg L.2 Mans 10 10 0 25,1un-26 08,kf26 01-Sep-26 15-Sep-26 0% 48 b Hang Lk�M A6490 IntaA L.2 Branch Linea 10 10 0 09JW-26 22Ju1-26 16Sep-zs 29-Serr26 0% ab ..�--�--�-- --._+.. �..~ _'•�-Intol Lj.z gram 4n -- A6670 Set Spnlder Heade n Haid Ld Ceings 5 5 0 23,1uE26 29,ki1-26 3D-Sep-26 060d-26 0% 48 d S6t SpnnklerHeads In Hard A6830 Hardd Visual Inspection 1 1 0 30,krL26 3G kA-26 07-OU-26 07-W-26 0% 48 1 HSrdlid V"Inaped ion A8140 Set Spnnlder Heads n Gild Ce&V 5 5 0 18-Sep-26 24-Sep-26 28-Dec-26 0"n-27 0% 68 0 Set Sprinkler Heals h A8330 Drop Caing Visual Inspection 1 1 0 25,%ep-26hep-26 Jan-27 0% ._ ..-......-_ DT 9 W4a1 Imep. A8320 Trm OLL Spnrfda Heafs 10 10 0 25Sep-26 08-Od-26 09-F b-27 -Feb27 0% 9 --1--, �p Out Spfia{t A8420 Set Tampers 5 5 0 0904-26 1504-26 23-Feb-27 01-Mar-27 0% 93 s Sat:Tamp"" A8480 Hydroataoc Tea 1 1 0 160d-26 1604-26 184.4,27 16-Mar-27 0% 103 : : :r*Iyaosfaw. A6960 Set fBuld Out FACP 15 15 0 22Jt1F26 11a1tg-26 264an-27 15feb-27 0% 129 r A8130 Set Devices 10 10 0 1B-Sep28 010d,26 02-Feb-27 15-Feb-27 0% 93 8j1 gaNwa A8430 Tie n Davices 10 10 0 020d-26 1504-26 16-Feb-27 01-Mar-27 0% 93 km tips:,D'evdaa' A8530 Test and Troubleshoot De icor 10 10 0 1604-26 29-Oct-28 024.1er-27 15-+1er-27 0% 93 n TAst and Tmd biabho A8620 Area B Fee Alarm Inspecson 1 1 0 3004-26 300d-26 18Mar-27 16-Mar-27 0% 93 t AIM 6 Flt Alarm I 12® 0% 179 : _I..:......:.... A4290 Arae B Elevator Fee Alarm Rough-In26 : : : : bvaMa AWm Rorghlln MW Area B Elevator High Voltage Rough-In 5 5 0 26-Meyy 26 01-jun-26 08-Fab-27�7 12 27 0% 187 �M s13 E j Hgh VbKagp RpghJ A41150 Area B Elevator Sump Pump Electrical Rough-In 5 5 0 264Aay-28 01Jun-26 02-Mar-27 0&Mer-27 0% 195 it Aiee8 Elevator. P fLrrr.Efedrical: A4950 Install Area B Elevator PH Lighting 2 2 0 02-Jun-26 03-jun-26 18feb-27 19-Feb,27 0% 182 1 Idstal N6e B Eld W"Plt Li0ht9ig BU A6960 Install Area B Elevator Sump Pump 5 5 0 02-Jun-26 0BJun-26 09-Mar-27 15-Mar-27 0% 195f-•'•_;•-•;--'••--v.:•-• - - ----- - - - - -Lo- p A5310 Area B Elevator Low Vorcage Rough-Inn 5 5 0 05.1m-26 114un-26 15-Feb-27 19-Feb-27 0% 176 : : : : :•• - ? Ar"B k"toS Low\AD"*Rough A6720 install Aree B Pit Ladder 1 1 0 10,1ul-28 10-Jul-26 22-Feb-27 22-Feb-27 0% 166 �nlrpll Ates 8 P(Ladda7 A6770 Irutall Ansa B Elevator Car Rads 2 2 0 1344-26 14-Jul-26 23-Feb-27 24-Feb-27 0% 166 :1 4-N M Anse 8 Gavator Car!Rob A8930 install Area B Elevator Car 2 2 0 15Jul-26 16-Jul-26 25-Feb-27 26-Feb-27 0% 156 :1:IndW AMIB ElivAtor Cal A7010 Conned High Voltage to Ams B Elwator Car 2 2 0 17—kA-26 20,hM-26 08-Mar-27 09-Mar-27 0% 181 9:Cdhnsn High lbMagd to NM B A7020 Carom!Low Voltage to Area B Elevator Car 2 2 0 17-Jul-26 20,lul-26 01-Mar-27 02-Ma,27 0% 156 : : : : : : : : : s'Zg; Lpw 1b8ape to Area 8 A7240 Build Lobby S.C.CMU Mai 2 2 0 23-Jul-26 24Jul-26 05Mar-27 08-Mar-27 0% 168 1:BL*I;o*Side 011,40 VVI A7290 Install Area B Elevator Flooring 2 2 0 2444-26 27Jul-26 08-talar-27 09-Mar-27 0% /s6 0: In�talL"B;E*ywbl rSof A7420 Area B ElevarorAdjuatment 2 2 0 28J4-26 29.kk26 10-Mar-27 11-Mar-27 0% 156 ! Alan B E6vatorA�thM18YN; A7540 Teat Area B Elevator on EM Power 2 2 0 30Jtd26 31 Jt426 12-Mar-27 :5her-27 O% 166 : : : EM ft_ A7330 Complete Penetration Frastoppng at Area B Elevator 5 5 0 2744-26 31 Jul-26 09-Mar-27 15-Mar-27 0% 156 ; QwnDlela Penetta0al - o®- - -- . -._-U-- 30 Mar-26 17Jun-28 30,1un•26 "' M �'rr4 Roa'in0 Start Date-. 13-Feb-25 ass—ani Actual Work ♦ ♦Milestone Actual Level of Effort CoRR OSP-X Ree C@Mw Finish Date 16-Mar-27 — Remankg Work Summary WBS Layout-All ActWBMa Date Date 30-Jun-25 arae Cnhcal Rermanng Work ® Level of Effort Page i t of 22 Run Date. 30-Jun-25 G z ? ? s N N UNi r N D 2 2 C1 m m A ; A A A g A 2 n m fa Rm a a a @ 3 I � ♦ L 3 0 3 0 — O ? R ? ? ? ? ? ? ? ? ? m m m m m �, �' m �' m `a' rn rn �i a m m o rn m m m m ? ??�tt �NN 'fNN NN IFNN ?NN IN�1 ? I�N� I?N� ?NN N N N O� m p• OI �N NN NN �N N N Oi ONi q p� QNi T OI W � RAJ RN RNN RANJ ' R R N N 'N4 4N RNN N RANJ �.J '4 RNN IN� IRNS IRS v RN RN RNN N NN N V y ? o v R TVJ VJ Iv W W W W' V W W W W W W W W W U pf V O� W W W m O� Of W W G H 0 0 0 0 OO O gq O O O 0 0 0 0 O O O O O O 0 0 0 0 0 0 O � of eP a de �' Je a 2[ 2R .E at ee `e" T" e df -de' `•f e2 2C X 2C' d2 a d^ T 2 e e e aP X T e 0 : e 0 e 3" :e R � W {7 .............. ..................t------------------------....--...--•----------------------------- ........-.I-.. ------- ........... • • • ------------ -------------- -......- ------ --------------- - .- 7 .................. ................. ..................{.................. ;....--------------<------------------........................---••--•-••- ---....._.........y......---......--•i------------------F'-'--- ........................................................ _.................. .---•.................... c n ........, ...o -----.Q_. . er. . Ta .r. o _. J ,- O -41 o SX �..y ... N .Q eS `#' _.. .i• -•--.- .3• �' a .... _ Y..... -� -2f- ---_ ..... .. . ... j---------------- -F- ... ..... .- - an . ...... --> . w -- m = saw omoo '81 � ; T � m Q N N 8 8 o ° 3. 8 6 b s a am 6 d• F U u rda o kms' T T SZ ° a � s 11 • m IN A + W O A O p 0 0 0 0 0 N . N . N . . . V. . . N' N U. . . . N C.I N N . N - - - N N - N {J A + W A O N N O O O O O N U N N N - N N N - N N' N N N N N U - N N N' N N U N U. ill lJ. o 0 0 0 0 0 0 0 0 0 0 0 o p o o 0 o - o 0 - 0 0 0 - 0' o - - - 0 o - o 0 0 0 0 0 0 0 0 + m mm a � a'' a' � �' a•' � a' � �' a'i �' a m m �' m m �' a T D1 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � � xxxxxxxxxxxe . x �exxxxxxxxxx xxxxxxxxx xxxx �^ C • p p (� qq (p�� oe aa p♦ pp (�. (J. y p V p p p O D n A A P N N Rf W V ♦ ♦ A ♦ N A A fVp m m .O m m g � p O O H � O m m O O H H 01 O. b 10 m 0 0 N .. .................. ............... ............... .............. ------------------................. _......_...... ------------- ------------- -------------- ._..J..................T v------------------- l._...-..._"------- .. .............. ............... ........................I.......... .......... ..............................................................................y.._.------_"------..........._.....y._..__._._....____• • ....... ......{..................Jr..................J..........__..-----i......----.-..-..A............__.._i.................{..................{..................1................. - ---------•...... .................i...---------------- r••----............._....... ... ------------ i .... a ................}-- -----_------ •-•--.- . .................{...-----••---• - ....... y 3e' D yam.e`tl --- .----- ."..'...,..._ .. ................ ......_....... ------W* - t _.....__. ' .i I7 �. . .. n"_.y ......... ..... i .J..... -go- cD SL iji a - :: -------------- u ............... ..........• -- ---- - .............. ° ® m ; <.. m a a ° A O r N poq', W' N N A 9 m n ° ° n N n N n N n 2 g SSSV3 0 m � f 0 I � ♦ b ; a m � � s 0 in O N O N' tn ' N lU:� ' O N 0 0 0 U O b 0 0 O O b N V• N N � N N O O O O N U 3 v 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 o O . 0 0 0 0 0 0 0 0 _W W O O � _. �] - N N O O �`= N X 0 0 A A V -• N W N Ol O• 01 O+ O N N N tJi N N N N� �i � ONI Ol � rn �d' a'i �d'i m Oi Q1 W SNi A T T T T m m � a m a rn m O m Q N o 0 0 0 0 0 0 0 0 o p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v m � ae ae at ae ae ae a" at ;e ;e ae a" �e ae a` . a` • ae X ae ;e a a . ae a' ae ae ae az a ae X A � o . o D n + p q {� y ♦ p ....................�-------------- ~ ... ................... .......... --------. . ...�................__.� ...... ............ -- ._. r m 7 ...... ............... ------------------t............... .{. __.....----.-. -------........ .....................................t. .-.-..-------.-t.__.. . .. ..t ..i.. , • . • , • , • ..........�.................. ................•-�--------..---.--..j-----.-...--.-.--..._._._.._........1_..................}..................±..................' .....................................y.......-----------s..................;-----------..._...�......................................{..................+---------. ...... .. ............ .............. .Q..__ ------------------..-----_ , -••-•-.___- : : :: _.............. .t.. ..---- ......... .............. .._......... _._._..._.... -------------- �..A: D �.. .. : - ..... .............. .............. ----------------.......................... : ------------ -------------:---------------------- --------- -- ------------- ----- o......... : ............ ............ : . ------------ -----------*2. .............. ..-._.-----------r------------------i------------------ f-... .........................:.... ........ ..-------. . s m .. ----------�a- ®[� ............t. ........... .................:.p.. ......... ..'.___'..... ei-Q.. . -D --------- ................ . .... ... ... .............. ............ :: :: : .� �..� -------------- Y -----------... ....._........ - _ _ '': : - -- ta a z QQa� w 4 C x p o oA C o o A yQ 4 O400 y a gO L 90 $vR# Y N a f � a a 8 ♦ Q a Sc 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12k k m a a'i •d'i �NN N a'i • ti N ry m m w a Nm rn rn m rn W m m a m w �' m m 0 N IV W IV N N N' I� N � � IV VJ ICl �+ pNj V ONi N 01 N �' � O• � Oi W � Of OI W O• � � QNi Of O T ONi T 0+ Q. O. O� O� Ol Ql O+ O• T 01 Oi Ot G m O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 x 0 0 0 0 0 0 0 0 0 0 0 0 � xe < xx xxxxxx �exxxx � x mo O D N V O m O V at 9 t r A 41 ♦ O. . at O al ♦ • • O m W A Q• t F l.Ai N V tAJ 0 Y N O G p ........._•--- -------------- -------------- --------------' ------------.. ------------------ ........_-_... ......._..._-__ _•------------ •• - ..................• : i A.................� i : .. ..........................................................M !..................:....... {.....................................t•--...-•-•-•-•----}---------•••-••-- ..............._..•...-...--.--..--..j.-.-.....--..--...j..................,-......_.....____.;..................•f.-___.............,.- .................------------------------------------------------------------•--------••- ------------------F------------------>--------------------------------...}...... ............................................................................................Y� ._._........_. ......----_.................._. ....................---------------.................t......._.._..... _ .o.�._!.. ----------' --t•"_..._._.....--•.t•------•-•......•.t• --------...... ..• • • ................... '............ ..................------------------ ..'....._..... --- .-�' ,.. ---------------------------------1........---..._.-.-. ...-.---........Z..._.. ------------------ .............. ....................................... ... .. _� ._......... ...__ .......... ....................... ..a...v _ _ _ o C i • . V _a. • �• _ _• • ' _ _a 1 1. rte._.._ _ .F .' _ yy . � � !F _...............1- - r-------------- j n _ -•--•••••• _ r _ VP -tea a _ . l .... ; .............. .... : ....... . - .--.dill-......... o;...__. a.. .........�............. .. ..............•............. ......_..... �' Original Remaininc Actual ---S6,t Finish Late Start Late Finish Actmty% Total F M A M J J A S 0 N 0 J F M A M J J A S 0 IN J F M A ---4w1ty 1 D Duration Duration Duration Complete Float A7230 Insulate L 2 Dudwd, 5 5 0 2,--o 6 31,Aug,26 1244ov'•26 18-Nov-26 0% 56 I I 4 Irlsubts L2 udw0lk A7530 Install L 2 Grilles and DAlu-I,s 5 5 0 01-Sep-26 08Sep-26 19RJor26 25440v-26 0% 56 6 brWg L;2 Gylbq ars Diff-, FA23o0 AIM CJD Bararlcal Ulldrpnaard Rotrgll In 15 15 0 _ 17-0d-25 08-Nm-25 24-De025 16-Jan-26 0% 46 g1 A.R CIV E,elb.Ml P.4.g�ourid F4.*lrj ___--__— -- -- --- '-- - 1 = � = A4410 Overhead Electrical Rough-In L.1 20 20 0 20-Apr-26 15-May-28 29.hm-26 24,11.6-26 0% 49 ; ; ; ; ; ; ; ; EI•d<I� 4^L1 ver A5720 Elear®I Room BuiW{1tn 5 5 0 09,lurr-26 15-Jun-2619-W-26 230d-26 0% 93 a A6020 Pug Wife from Area B Electoral Room to Area D Electrical Room 5 5 0 16-Jun-26 22-Jun-26 26d,26 30-0ct-26 0% 93 °',P4 V*•h01a111••BEYCidMI A6150 Pug Wire from Electrical Room to Receplides 10 10 0 23Jun-26 06.krF26 02-1fI 13-Nm-26 0% 93 A6570 Install L.1 Lighting Dawes 8 8 0 07-u1.26 16.hrF26 16-Nov-26 25-Nov-26 0% 93 o :Irlso 4.1"p.%64 A5920 In-Wall Electrical Rcugnin L 1 20 20 0 14.hi1-26 10,4ug-26 OSaJov-26 04-Dec26 0% 81 : : : : : Otil^ � In.M1 Brltrl i.1 A7610 Install L.1 Lighting Controls 5 5 0 11-Aug-26 17,W/g-26 14-0eo-26 18-De,26 0% 86 :o;Nghgl L'.1 LIpMYpxa1M^fY A7060 Set L 1 In Wel Deuces 10 10 0 11-k.9-26 24Aug-26 07-D-26 IS-Dec-26 0% 81 '�:9.1 L. Irr,W/D•vb• A7730 L.1 Devoe Trm Out 10 10 0 25,k*26 X,%efl 21-Dec 26 05Jan-27 0% 91 A4690 Owhised Electrical Rough-ln L.2 20 20 0 1&IAey,26 15-jun-26 27-Jul-26 21-Aug-26 0% 49 ~+X*h*d IPK"R*q*4riL.$- A5290 in-Wal l Elstcal Rou gtv l In L 2 20 20 0 16-Jin-26 13-Jul-26 24-Aug-26 21 Sep-26 0% 49 1 ma 3 IEidieY RlugAlri L2 A6580 Pug Wife from Eledncal Room to L 2 Reraptcies 5 5 0 07.M-26 13Juf-26 19-Nov-26 25Wm-26 0% 86 :e AiVA•fiy^EIRownto A7070 Instal L.2 Lighting Devens 10 10 0 17-Jul-26 30.1ui-26 30-No,26 11-Deo-26 0% 93 : . Ir. .L#Llagdl. 0. . A7740 Install L.2 Lighting Controls 5 5 0 16Aug-26 24-Aug-26 29-Deo26 05-Jan-270°0 91 ; ; ; ; : a:I^N•��•2 q_CMM _ A762o Set L 2 1n Wal Devices 10 10 0 25Aug-26 08-Sep-26 21-0eo26 05-Jan-27 0% 81 : •Z I^ Q° 4 A8030 2 Devi® 09-Sep- 22-Sap-2626 T"Out 10 10 0 09-Sep-26 22-Sap-26 06-Jan-2727 19-Jan-27 0% 81 o:�Lt1 D�Nd TiM1 Out • • • • •• • r i �_gi�f�gpg_l �r VIFrt�t t3F01 UW V~ A6000 Set Caleb Tmp 25 25 0 17,wg-26 21 Sep-26 07-Jan-27 10-Feb27 0% 98 : ';9th OdM°Tlaja nng A6410 Pug Low Voltage Wgig 10 10 0 22Se�26 OS-0d-26 11-Feb-27 24-Fetr27 0% 98 ; : ' ' ' ' . ' 4 LOw�m90 W A15860 natal Low Voltage Devices 10 10 0 06-0d-26 19-01 25-Feb-27 10-Mar-27 0% 98 o Ilr{aA how Vokage D A7390 AV Room BWdout 5 5 0 2040ct-26 26-0d-26 11-Mar-27 17-Mar-27 0% 98 °:NIP Rgom,BuYtloyt A2340 Ana CJD Pltaribfrlg Undelglwnd RfI In 15 15 0 17-Od-25 08-Nov-25 244DsI 16Jan-26 0% 48 d MMI GD Plail+Yg�Ugl loultd ROii�t Ili Littlest I A4430 L.1 Overhead Plumbing Rough-4n 20 20 0 17a1pr'-28 1"W28 M4626 31 Jul-26 0% 55 : : : : : �4K AS'10 L1InNalPumbngRogAin 20 20 0 OB•AMy-26 05-jun-26 27-.111 21-Aug-26 0% 55 : : : 411.1 IIW�IP.b^ihijROlgSMc A8350 Set L 1 Bathroom Fbdurss 10 10 0 OS-0d-26 16-W-26 14-Deo26 2&Dec-26 0% 48 . .so(L* I^Pr^f A8510 Trm OU L l Bathroom FN am 10 10 0 19-Od-26 30-0ct-26 29-0eo26 12Jan-27 0% 48 d TI^11-1�h A5740 L.21n Well Fumbling Roug I In 20 20 0 08-Jun-26 03,1l 24Aug-26 21-Sep-26 0% 55 -- � (:2MII�IP4gIbFgq Rdlg►i^� A6210 L 2 Overhead Plumbing Ragh-In 20 20 0 06-Jul-26 31Ju1-26 05-0d.26 30-01 0% 64 L2 i°°d gl�lq' A6640 Twin Rod Dara 5 5 0 03,4ug-26 07Aug-26 02a4ov-26 0&N0v-26 0% 64 ? 11►Mt Rad breils A6970 Gas Rough4n to RTU's 8 8 0 I&Aug26 19-Aug-26 09-Nov-26 1&Nw-26 0% 64 'ga:OM Rj u*fHr Ao 1jTtt'e A7410 To n RTU's 5 5 0 20A.9-26 26-Jug-26 19•Nov-26 25-Nov-26 % 6 -26 0 4 °:TI{n _ .._.._.......».........._ . - - - - - N'a A8520 Set L2 BaMmom Fodures B B 0 19Oc1-26 28-Oct-26 31-Dea26 12-Jan-27 "1 SK L:2 B••tl••tA an-27 0% 50 1 : : : : :-- IF A8760 Trim Out L2 Bathroom FdrrM 5 5 0 02-N-26 06-Nw-26 13-Jan-27-27 119-An-27 0% 48 P jiffniDtil-jillsim 271 271 I r • .Llti 8M•y 10 10 0 01 Oct-25 14Oq-25 D9-Feb-26 20-Feb-26 0% 88 I P lmlM OndjM16fu d SOpI List 6uni FW Riw A1590 Install Underground Supply Line From FDC to Riser .......... - - ,. A4710 Hang L 1 Mans 10 10 0 184May-26 01-Jun-26 31 Jul-26 13A4-26 0% 53 H•^g L-� II°: Stan Data 13-Feo-25 Act—,Woo ♦ ♦Milestone — Adual Lave)of Effort CoRR OSP-3C ReC Center Flmsh Data 16-Mar-27 — Remaining Won, P°--W Summary .WBS Layout-All Activities Date Date. 30-Jun-25 — Crttral Remanng Won, ssssgsas Level of Effort Page 16 of 22 Run Date 30-Jun-25 Jg.. d i:.:. ...._ •U; � .'{•_.____......... N.......... --------..... v ------..._ .................................. ................ ------------ ------------------ ------- _ _ - - �... - ........ . .............. ........ .Q.V. .11.. . - .,..r. 0-Y- .a - a .--j -•--•-.....-----+-------- + + + a;....... i ...........j------------------..................-------•---•-- + a... + ......_... �........._._...... -•'..... ...................................... .......---•--. --..........._ .............. ............... ..3 ........................... ............................... .............. .............. .............. .............. ........... a_ .. ................: ....... -•-•--.....j..................i................ ..._............------------------------------------ g _.a.- ..�; ._....-•--•-•_.;...._...... ......... .............. .............. .............. .............. : -------.---. : '.t + + + ... o ,..................;....... .... . .................... ....... ............ .............j------------------j------------------j-------------------•-----------------------•--------------•---•--- ................................ : ------------------ t ---------- ---------------------------------••-•-5---•--------••---- •---•-•-- •-•--•----.----------•-•------ ......__..... ....... m .. .-y ................y..-----..........j------------------j------------------..................i-----.-..--.----•-?-----•--..........�.................. « YO ..................................................... .. .. ..q .pp1. .. -- .._.....----� _g s.. ..�s'ffi. ..'.-N•• '-----�-'_'.�''-- .--- ♦..♦+.._♦_ ♦. .. .-.� �. - V Q O g xxxxxxxxx x000x xxxxxggggxooxxo xx0000x . xxxo a � 0 0 0 0 0 0 0 0 0 O O �O 0 0 0 0 0 0 0 O o 0 o0 0 0 O y m n N n IY � ry N n ry N N N N N N N N N N N (p pppp pp eQ �pN n m y n n h n n n N N N N N N N N N N N N N N ` n N � j .�qp} cb(p}�1goo} `bo} o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N n o 0 0 R O o 0 0 o m N 0 0 0 ,O � O � N N � 'X 0 0 ,O N N N N O N � N N N N N t•I N N �^ N O O O N Q O O O O N O I O O N • ` I 8 uu 3 U 5� � Q 32 A Pr Lr batt 10 M �a � e t O y LL O m ' s N > > ao C o 0 0 o m o 0 0 0 0 0 g a ;ng vi v� w N N w n w y N y c I � • • m � � IN N' N U U N N U •'�, 'O � N U"U 'O N' 'O U N + N' U � � m m � N' U N N" U p m m U U •� N U + ' ' m m � N � m U < U U' U ✓ v' N U U O O U N� U O N' O N' N O O N' N ' U O Q U 60 pmy. O O' 0 0 0 0 0 0 0 0 0 0 O"0 0 0 0 0 0 0 0 O' 0 0 0 0 0 0 0 0 S 1?1 a' o, mmaam aaa m a mm to m Q I ell ;N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 �� � xx' xxxxxxxxxxx" xxx' � � xxx' xxxx � � � xxx xxx � � x m - w .. ......... _ --................ ....... mn -------.-- -------------- _ _._.... .................. m _. ..................:..................{..................__....._.___.__...;.__.......__._....• ----_.__..__.---..._..;..........._....._. ..................j..................j.......-----------;------------------j------------------t................. _;..................;.................. ................__ .... ................ ........ ... .j. .............. .1....O.....v._ f. ._.....-.-.- .............. .-......_... . �.o. .............................................. ..o �._... ....._ G .➢; P .................... fl.._ So N - c p .. 7 u �e Ri s ..... ............. ....-. �. _ _ _. ..� �..c—.._..... _ ..5. - .. ._q. .t....:..Ll_....�.1........... M-----... t7 N 4 kk uuu ---------•••-- a- . � o0 ;�--- C. 0 ..................i...._.._.......... -----------------------•---.-....--.}.----------••----%-_...............: ... _.._.....II .. ........ -_.. .............. .. .............. .............. ............... .............. .............. III....._........ s i ... .................»-----------------»--.-------------- -----------------1-----------------�...............__. .__..... ............. :..................:...... ... ...... .. .._..............• ...........: -------- ....................................... ........ ................. ..................}................. ------------------................. ................. ..................i..................i.................. • ...................................._....._...._._....�....._............;......._........_..........._....._..�............................................................. ......................... .................»................. ................. ................. ..._......._..... .................»------------------:------------------:--------.-------..:.-.... ...............}..................i------------------}------------------i------------------>------------------}------------------}------------------y------------------i....... ..............•... --------------- ...................L--•-------•------ .................................. .. ..... pp yy�� yy�� yy�� ��pp ��pp ap �vn� uu--�� y�O� pp t� ��pp ��pp ��pp ♦ e p ♦ Oa m � � N V Q O {h O. xoxx oox gxxxxoox xggxxxxxox xxx000xxxxoxxxxx a � O O O O o '0 0 0 0 0 0 0 0 0 0 0 0 O y I N N N 'Y O N N N N N N N N O N N N N N N N N O r N N N N H H O N N `Ri iB 0 aVQe� �Qe/ RRRYs4 V4jb @d }�}IVy{{{{ i2 iyy2[l � yv{{ RYA s4 a H �yj lyTyy� �r VQjb yT�yy � a Jyp{5 �r N 111•••"'ff '� (V N N N N N 101 N t0�1 t0 N N N N N N O � N ry N � O Ip •D N N N N N ry N N N N N � �P. f0 G t Op N � N O O O N O O ttttttpppppp ttpp ��pp Npp �Opp ttpp �p tOpp O eepp N �Opp ��pp 0 0 0 0 0 0 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m — IV O O O 8 o 12 a ma a a LL t L q 4 B B o A ui yyy� 33{ a 4 4 h y_D 3 $ 9 JS y} ` - 3C{ 9 v 9 ��j S m om $ 3 g 2 N x 2 m qq gq iq N N ¢ 2 ¢ N VN 2 ag0p pq i E � Zpp yam, y�q _ a �ym yyc tpj pCq 2 G m C C • m s o -. -- _ .... g ; RFsli. • • 8 -----------•....y..................y.. . ......... = : .. .................................. IjIl" ---Q-...... a- .. ........ .............. ........ _t..................:....................................:... �.. a a a -- ---•-+..................y..................------------------+------------------+------------------+._......... ......}..-----.� :� a �.ol....<..... .. i..................:..................:..................i ................................. -.._.__._.i ..................j..................{------------------i------------------i------------------i........... .....--------- A E m 3 (a _1: r3 •- ---- .............. .............. ._a..o x j................i. ..........- ...............i.------ a ......�.:E o ---- --• --+.. . .. • • --. --.. --:- • • • . -- .. Q. I --------------- -+ --•--••-•-••. •+ ------------- ------------- -+.------------- -+ ------. .- .a En... ;............. O • .._.___-•_1-'................}.................. ..------------ ....t------------------ .y._.....----------- �..................;------------------ }.._...._....------ }............... ........ ................................................................................................ ............... d n t'1 r O1 x A A O b < .OD O tD N N e�f f'! tW0 b O t7 N N d V m m m m N Sao o � X . o . xo o . a X . . ae X X X T' a' '. . . a . . . . X . X X . X o X 'X 2' a" � 3E d" a� (n � a - o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o fn y O � ep rp � Nj A N N O N N N N 101 N N N N N N N N � N N N N O N N N N N N N N M N N N N 0 ob � � N � N N N N N � N � N � N � � � N N � N N N � N � N N � � i � � � � � N d e • J�Q, N N N O10'Q(I O N 17Nyy( N¢¢ 'fNyy(� jjN�( �nNj �gNj JyN{. N JYN[{ l'RT� N RyN J�yNS( JyNn[ `J,N1{/. lyQNyj1 QQNQ QQNf �{4N2p' N N N 'n ','y�1y(( N !N1 N1 N N N N T � � � � '( � � _/ V� •! T T i() N � W ." � tO t0 N 17 1.1 !.l 1.1 O � � � � N � T T 12 N N N N N N N N N N N N N N N N N N � N N N N N N t�l lV ry N N N N N N f0�1 N N N N � N a4 . 00000000a0000000 '000000000 - - - - - 00 00000 '00 El . • 17 N N N N m O O N d 0 0 0 0 0 ' O 'O O N N O N O � O O O N O N ��-� � O 'O O m m N N n I c r w � E ♦ fI a 3 m o 33 Q o m U a1 .$ e a E a a E v ^ U g U 3 o W a U U� U � � c B U a_ ¢ _g U d .9 o d m a 8a a a a a a a a a a < a a a o y9p a -------------- <. 1IF f C • • . •• ..... i 6•............. n 111 — • ■ •; • : • 6 Qd......°--0-- ••...•...._...... ....._._..t--•�---..._ .{ ............ ................{ _j .......... .j..._..........-. ---------------- .................................... ........ ........-.- _------...._ ..._.......__ ._...._:._• ................ ._._._......._. ................:................. < ------•---f- ---------•. .{< •----------•-. .i ............................------. .. . . { .............. ........... ..Q..........--{-......•••.. •�&•............. ....-----•---..i•••----•------...y_..................{.---_......_... .. ................................ ----------------- ' ---•-...C-•------------•••_: 0 m V m � � m oc 3 Q7 4YO .D .O N N NRQ N RNQ N Q4N N N �9} ,•C8o}f fbyy9 fj7ty til N N N N N N N fV N IY 1� 'Y M 'Y IY 'Y IY N • N N O N r N N � N o4 • • $ - _ aD m � N h � N � �r ^'� �r e•f 't7 t� 'h m ' m � N N � N � i•1 �O O t•I .7 a7 t m � 'N m � .- fj � N � N N N N �� N � N � I m � w p O • ( I O 3 qa 3 1O p1 p I 181 g mq � t � �bod e . rz ............ is .:o- - -----••--•-... ;.......... ............... ............. i-----------------.i.................. ;... ... -----.__..U -•-•-••- : : - _; --•--=�: .......... ..... ------------------ ................•�• .......... ---------- .......+......................................------------------........................................................... ......................................................... �.... ......l--............-••.t..................;... --•........:...................:.... :.__...............:.... :.......... t m ..................s..._..... ;..........._.._.._.;_....................................F------------------}-•----•.----------+ c ......................_............ .. .... t----- - -....... -- u a . • ' � � � m r � � � R � � N N . . . a . . . . : o 0 0 \ . \ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O y � 3 n N N ry N � ep N •- O N . . .D .O . .O . . . . .O .O ttpp ��pp ��pp ttpp � ttpp tp 888 ? z ? 43 - •' N N N O O O N N O N N O O N 0 0 0 N O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W Om p N Q IIVV IIVV O W p � o y 9 • ` I 3 c o f b E E E < f. N A ILL. -6 m E w N a' G m U U U E E E w '� 0 0 0 C7 C7 L7 a lgy Q LL U U U U UU U U N rn to N m N U O 21 32 LILI N N N W LL o�o N C � m � ^ � � � p n � � n O� rO.� O m O N � T Q N O_ C O • 1.'1 N 00 � � N S O a < a A LL o � lumplow—W t dw AW - SpawGICISS Providing the Absolute Best Construction Experience Bid Proposal Package Strategy City of Round Rock - Old Settler's Park Build Out Package 3C - Rec Center 95% CD Drawings 3300 E Palm Valley Blvd Round Rock, TX 78665 Long Lead Time Equipment and Material There are no schedule concerns with long lead material at this time. There are no current tariffs that could impact schedule that are known at this time, but SpawGlass will continue to monitor changes and strive to minimize any impact. Construction Document Packages GMP #1 was previously approved for fencing, SWPPP, earthwork, and site utilities. This work has started and is currently underway. GMP #2 is the rest of the scopes required to complete the Admin, Pec Center, and fields. Proposal Package Strategy The project will be advertised for proposals from suppliers, subcontractors, and vendors for all major features of work. Proposals shall be received via mail, email, courier, or hand delivered from subcontractors and suppliers. Any addendums that may be required will be issued one week prior to receiving proposals. The respondents will be evaluated on the subcontractors' ability to perform the work. Subcontractors will be recommended based on their company's personnel and corporate qualifications. SpawGlass will recommend the best value supplier and/or subcontractor to the Owner for concurrence prior to negotiating their contract. ` a 91-JP 7 x V i SpawGlass Contractors, Inc. 1111 Smith Road Austin, TX 78721 512-719-5251 y M SpawGlass.com ACORO9 77/10/2025 E(MM DD'YYYV) `� CERTIFICATE OF LIABILITY INSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Mlrta Tamez Adams Risk Management Services, LLC PHONE FAX Adams Insurance Service, Inc. (A/C,No,Ext): (713)869-8346 (A/C,No):(713)869-9144 1111 North Loop W, Suite 600 ADDRESS: mtamez@adamsins.com Houston TX 77008 INSURER(S)AFFORDING COVERAGE NAIC N INSURER A:American Contractors Insurance Co. RRG 12300 INSURED SGADMIN-01 INSURERS:ACIG Insurance Company 19984 SpawGlassContractors, Inc. 1111 Smith RoadLloyds INSURER C:Travelers Llo ds Insuran-c-e Company 41262 Austin,TX 78721 INSURER D:Valley Forge Insurance Company 20508 INSURER E: The Continental Insurance Company 35289 INSURER F: COVERAGES CERTIFICATE NUMBER:527066035 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. - -- INSR TYPE OF INSURANCE ADDL SUER POLICY EFF POLICY EXP LIMITS LTR POLICY NUMBER MMiDD/YYVY MMIDD/YYVV A X COMMERCIAL GENERAL LIABILITY Y Y GL25ABC00046 6/1/2025 6/1/2026 EACH OCCURRENCE $10,000,_0_00__ CLAIMS-MADE OCCUR DAMAGE TO RENTED X - - —_ - PREMISES-LEa-occurrence) $100,000 MED EXP(Any one person) $5,000 PERSONAL 8 ADV INJURY $10,000,000 _ GEN'L AGGREGATE LIMIT APPLIES PER. GENERAL AGGREGATE $10,000,000 X PRO POLICY JECT _._ LOC PRODUCTS COMP/OP AGG $10,000,000 OTHER: --$-- -------- -- D AUTOMOBILE LIABILITY Y Y BUA7033775896 6/1/2025 6/1/2026 COMBINED SINGLE LIMIT $5,000.000 Ea accident) X ANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ .. . . AUTOS ONLY , AUTOS _ X HIRED X NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY -1Per_accident) _ - - E UMBRELLA LIAB X OCCUR Y Y CUE7034067095 6/1/2025 6/1/2026 EACH OCCURRENCE $10,000,000 X EXCESS LIAR CLAIMS MADE AGGREGATE $10,000,000 DED RETENTION$ $ B WORKERS COMPENSATION Y WCA000008325 6/1/2025 6/1/2026 X PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE UT_E__ _ -_ER ANYPROPRIETOR.PARTNER,EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER,MEMBER EXCLUDED? N.A ------- - -- - ----- - - - -- - ---- - - (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 It yes,describe under - -- - - - DESCRIPTION OF OPERATIONS below E.L.DISEASE POLICY LIMIT $1,000,000 C LEASED/RENTED EQUIPMENT QT-630-7625B35-0-TLC-25 6/1/2025 6/1/2026 ANY ONE ITEM 1,500,000 DESCRIPTION OF OPERATIONS I LOCATIONS'VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) The General Liability policy includes the following endorsements: 1)1170-Additional Insured-Automatic Status as required by Contract-Blanket-Who is an insured is amended to include as Additional Insured any person or organization when you have agreed in a written contract that such person or organization be added as an additional insured on your policy.The endorsement also provides for the coverage to apply on a primary and non-contributory basis for ongoing and completed operations when required by written contract.2)205-Blanket Waiver of Subrogation when required in a written contract or agreement.3)336- Notice of Cancellation, Nonrenewal or Material Change-30 days blanket as required by written contract.4)9-Aggregate Limits of insurance Per Project. The Automobile policy includes the following endorsements. 1)CNA63359-Blanket Additional Insured as required by written contract executed prior to the bodily injury or property damage.2)CNA63359-Blanket Waiver of Subrogation as required by written contract executed prior to the bodily injury or property See Attached... CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Round Rock 221 East Main Street Round Rock TX 78644 ARIZEDREPRESEN7ATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016;03) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: SGADMIN-01 _ LOC#: A`"Ro® ADDITIONAL REMARKS SCHEDULE Page 1 of 1 AGENCY NAMEDINSURED Adams Risk Management Services, LLC SpawGlass Contractors, Inc. 1111 Smith Road POLICY NUMBER Austin,TX 78721 CARRIER NAIC CODE EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE damage.3)CNA63359&CNA71527-Primary Non-Contributory basis only when required by a written contract prior to Accident or Loss.4)CNA68021 -Notice of Cancellation-30 days blanket as required by written contract. The Workers'Compensation policy includes the following endorsements: 1)WC990304-Waiver of Subrogation-Blanket waiver for any person or organization for whom the named insured has agreed in a written contract to furnish the waiver.2)WC420601 -Notice of Cancellation-60 days blanket as required by written contract. The Umbrella/Excess Liability policy applies in excess and follows form of the underlying General Liability,Automobile Liability and Employers Liability policies above including the terms of any additional insured,waiver of subrogation and 30 day notice of cancellation endorsements.The policy follows the terms and conditions of such underlying policies unless they are inconsistent with the terms of the policy. The Equipment Floater policy includes a Blanket Automatic Loss Payee Endorsement CMU618 that provides Loss Payee status to the Certificate Holder only when there is a written contract between the Named Insured and the Certificate Holder that requires such status. Re.Project:Old Settlers Park Buildout,Package 3C-Old Settlers Park,3300 E. Palm Valley Blvd., Round Rock,TX 78665, Rec Center and Admin Buildings GMP#2R1 ACORD 101 (2008/01) ©2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD 1170 ADDITIONAL INSURED - AUTOMATIC STATUS AS REQUIRED BY CONTRACT - BLANKET This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM SCHEDULE Any person or organization that you are required by written contract to include as an additional insured on this policy if the contract is executed prior to the loss. A. Section II,Who Is An Insured is amended to include as an additional insured any person or organization shown in the above SCHEDULE (called additional insured),but only with respect to liability for"bodily injury","property damage"or"personal and advertising injury"arising out of your premises or your operations for the additional insured, and only to the extent and for the minimum limits required in the written contract. B. The insurance provided to the additional insured is subject to the following limitations: 1. Unless a written contract specifically requires additional insured coverage for your completed operations,this insurance does not apply to"bodily injury"or"property damage"occurring after"your work"for the additional insured has been completed or after that portion of "your work"out of which the"bodily injury"or"property damage"arises has been put to its intended use by any person or organization, whichever occurs first. 2. Unless broader coverage is specifically required by written contract,this insurance provides additional insured coverage only for liability for"bodily injury","property damage"or"personal and advertising injury"to the extent caused by the named insured's acts or omissions or the acts or omissions of those acting on the named insured's behalf. If broader coverage is specifically required by written contract, this insurance does not apply to "bodily injury" or "property damage" or "personal and advertising injury' arising out of the sole negligence, act,or omission of the Additional Insured unless additional insured coverage for an Additional Insured's sole negligence, act,or omission is specifically required by written contract. 3. This insurance does not apply to"bodily injury","property damage"or"personal and advertising injury"for which the additional insured is obligated to pay damages by reason of the assumption of liability in a contract or agreement except to the extent that the additional insured would have been obligated to pay such damages in the absence of the contract or agreement. 4. This insurance does not apply to"bodily injury", "property damage"or"personal and advertising injury"arising out of the rendering or failure to render any professional services by any insured or on any insured's behalf,including: a) The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders,change orders,drawings or specifications;or b) Supervisory,inspection,architectural,or engineering services. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring, employment,training or monitoring of others by that insured,if the"occurrence"which caused the"bodily injury" or"property damage",or the offense which caused the"personal and advertising injury", involved the rendering of, or the failure to render,any professional architectural,engineering or surveying services. 5. This endorsement shall not apply to a person or organization if any other additional insured endorsement attached to this policy specifically applies to that person or organization. 6. The insurance afforded herein only applies to the extent permitted by applicable state law, including statutes governing additional insured coverage in the construction industry. 7. The insurance afforded to the additional insured shall not exceed the minimum limits required in the written contract. C. In no event shall the insurance provided to the additional insured exceed the minimum coverage required by the written contract, including but not limited to minimum limits,minimum scope of coverage,or minimum duration of coverage.If a written contract or agreement requires that additional insured status be provided by the use of specified edition dates of the ISO CG2010 and/or CG2037,then the terms of that endorsement are incorporated into this endorsement as respects such additional insured and shall supersede the coverage grant and limitations in Sections A. and B. of this endorsement. In the event that CG2010 and/or CG2037 are required but no edition dates are specified,the 04/13 editions shall apply. D. This insurance is excess to any other insurance, whether primary, excess, contingent or on any other basis, available to the additional insured unless a written contract requires that this insurance be primary or primary and non-contributing. However,this insurance is always excess to other insurance,whether primary, excess, contingent or on any other basis,when the additional insured has been added to the other insurance as an additional insured. Nothing herein contained shall be held to vary,alter,waive or extend any of the terms,conditions, provisions,agreements or limitations of the mentioned Policy,other than as above stated. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective: Same as policy effective date unless otherwise indicated above. Policy Effective:06/01/2025 Policy No.: GL25A00046 Endorsement No.: Insured: SpawGlass Employee Holding Company Premium $ Insurance Company: American Contractors Insurance Co. RRG 1139 ADDITIONAL INSURED - LESSOR OF LEASED EQUIPMENT - AUTOMATIC STATUS WHEN REQUIRED IN LEASE AGREEMENT WITH YOU This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART A. Section II -Who Is An Insured is amended to include as an additional insured any person or organization from whom you lease equipment when you and such person or organization have agreed in writing in a contract that such person or organization be added as an additional insured on your policy. Such person or organization is an insured only with respect to their liability caused, in whole or in part, by the maintenance, operation or use by you of equipment leased to you by such person or organization. A person's or organization's status as an insured under this endorsement ends when their contract with you for such leased equipment ends. B. With respect to the insurance afforded these additional insureds, the following additional exclusions apply: This insurance does not apply: 1. To any"occurrence"which takes place after the equipment lease expires; 2. Unless specifically required by written contract, to"bodily injury" or"property damage" caused by the negligence of such person or organization. C. This insurance shall not exceed the scope of coverage, including limits, of this policy and in no event shall the insurance provided to the additional insured exceed the scope of coverage, including minimum limits, minimum duration, and minimum scope of coverage required by the contract. D. It is agreed and understood no other additional insured endorsement attached to this policy will apply unless such a person or organization is specifically designated in that endorsement. This insurance is excess to any other insurance, whether primary, excess, contingent or on any other basis, available to the additional insured unless a written contract requires that this insurance be primary or primary and non- contributing. However, this insurance is always excess to other insurance, whether primary, excess, contingent or on any other basis, when the additional insured has been added to the other insurance as an additional insured. Nothing herein contained shall be held to vary, alter, waive or extend any of the terms, conditions, provisions, agreements or limitations of the mentioned Policy, other than as above stated. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated.. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective:06/01/2025 Policy No.: GL25A00046 Endorsement No.: Policy Effective: 06/01/2025 Premium $ Insured: SpawGlass Employee Holding Company Insurance Company: American Contractors Insurance Company Risk Retention Group 1140 ADDITIONAL INSURED - MANAGERS OR LESSORS OF PREMISES This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Designation of Premises Part Leased to You): Any premises leased to you where you are required by a lease agreement to add a person or organization as an additional insured. Name of Person or Organization Additional Insured): As required by the lease agreement. Section II -Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule but only with respect to liability for"bodily injury', "property damage" or"personal and advertising injury" caused, in whole or in part, by you or those acting on your behalf in connection with the ownership, maintenance or use of that part of the premises leased to you and shown in the Schedule and subject to the following additional exclusions: This insurance does not apply to: (1) Any"occurrence"which takes place after you cease to be a tenant in that premises. (2) Structural alternations, new construction or demolition operations performed by or on behalf of the person(s) or organization(s) shown in the Schedule. This endorsement shall not apply to a person or organization if any other additional insured endorsement attached to this policy specifically applies to that person or organization. The insurance afforded herein only applies to the extent permitted by applicable state law. This insurance shall not exceed the scope of coverage, including limits, of this policy and in no event shall the insurance provided to the additional insured exceed the scope of coverage, including minimum limits, minimum scope of coverage, and minimum duration of coverage, required by the contract. This insurance is excess to any other insurance, whether primary, excess, contingent or on any other basis, available to the additional insured unless a written contract or agreement requires that this insurance be primary or primary and non- contributing. However, this insurance is always excess to other insurance, whether primary, excess, contingent or on any other basis, when the additional insured has been added to the other insurance as an additional insured. Nothing herein contained shall be held to vary, alter, waive or extend any of the terms, conditions, provisions, agreements or limitations of the mentioned Policy, other than as above stated. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective: 06/01/2025 Policy No.: GL25A00046 Endorsement No.: Policy Effective. 06/01/2025 Insured: SpawGlass Employee Holding Company Premium $ Insurance Company: American Contractors Insurance Company Risk Retention Group ADDITIONAL INSURED - STATE OR GOVERNMENTAL AGENCY OR SUBDIVISION OR POLITICAL SUBDIVISION - PERMITS OR AUTHORIZATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM SCHEDULE State or Governmental Agency or Subdivision or Political Subdivision: Any state or political subdivision that you are required to include as an additional insured as a condition for issuance of a permit or authorization. Section II-Who Is An Insured is amended to include as an additional insured any state or governmental agency or subdivision or political subdivision shown in the Schedule,subject to the following provisions: (1) This insurance applies only with respect to operations performed by you or on your behalf for which the state or governmental agency or subdivision or political subdivision has issued a permit or authorization. However: a. The insurance afforded to such additional insured only applies to the extent permitted by law;and b. If coverage provided to the additional insured is required by a contract or agreement,the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. (2) This insurance does not apply to: a. "Bodily injury","property damage"or"personal and advertising injury"arising out of operations performed for the federal government, state or municipality;or b. 'Bodily injury"or"property damage"included within the"products-completed operations hazard". With respect to the insurance afforded to these additional insureds,the following is added to Section III—Limits of Insurance: If coverage provided to the additional insured is required by a contract or agreement,the most we will pay on behalf of the additional insured is the amount of insurance: (1) Required by the contract or agreement;or (2) Available under the applicable limits of insurance; whichever is less. This endorsement shall not increase the applicable limits of insurance. With respect to these additional insureds,this insurance does not apply to"bodily injury","property damage"or"personal and advertising injury'arising out of the rendering of or failure to render any professional services by any insured,including: (1) The preparing,approving or failure to prepare or approve maps,drawings,opinions,reports,surveys,change orders,designs or specifications;or (2) Supervisory,inspection or engineering services. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision,hiring,employment,training or monitoring of others by that insured. This endorsement shall not apply to a person or organization if any other additional insured endorsement attached to this policy specifically applies to that person or organization. The insurance afforded herein only applies to the extent permitted by applicable state law,including statutes governing additional insured coverage in the construction industry. This insurance is excess to any other insurance, whether primary, excess, contingent or on any other basis, available to the additional insured unless a condition for the issuance of the permit or authorization requires that this insurance be primary or primary and non-contributing. However, this insurance is always excess to other insurance, whether primary, excess, contingent or on any other basis, when the additional insured has been added to the other insurance as an additional insured. Nothing herein contained shall be held to vary, alter,waive or extend any of the terms, conditions, provisions, agreements or limitations of the mentioned Policy,other than as above stated. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective:Same as policy effective date unless otherwise indicated above. Policy Effective:06/01/2025 Policy No.:GL25A00046 Endorsement No.: Insured: SpawGlass Employee Holding Company Premium$ Insurance Company: American Contractors Insurance Co.RRG 205 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM SCHEDULE Name of Persons or Organization(s): Any person or organization for whom you have agreed by written contract to furnish this waiver. Section IV—Commercial General Liability Conditions, 14. Transfer of Rights of Recovery Against Others to Us Condition is amended by the addition of the following: We waive any right of recovery we may have against any person or organization shown in the Schedule above because of payments we make for injury or damage arising out of your ongoing operations or"your work" done under a contract with that person or organization and included in the"products-completed operations hazard". This waiver applies only to the person or organization shown in the Schedule above. Nothing herein contained shall be held to vary, alter, waive or extend any of the terms, conditions, provisions, agreements or limitations of the mentioned Policy, other than as above stated. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective: Same as policy effective date unless otherwise indicated above. Policy Effective: 6/1/2025 Policy No.GL25A00046 Endorsement No.: Insured: SpawGlass Employee Holding Company Premium$ Insurance Company: American Contractors Insurance Co. RRG „6 NOTICE OF CANCELLATION, NONRENEWAL OR MATERIAL CHANGE - CERTIFICATE HOLDERS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART The certificate of insurance holders shown in the schedule below have requested that they receive written notice of cancellation, nonrenewal or material change with respect to this policy. If we decide to cancel, nonrenew or make a material change to this policy, we agree to mail or deliver sixty(60)days advance written notice to the certificate of insurance holders shown in the schedule below. However, if we are cancelling or nonrenewing due to nonpayment of premium, we will only provide the certificate of insurance holders shown in the schedule below with ten (10) days advance written notice. The notice of cancellation, nonrenewal or material change will be mailed to the addresses provided to us by the certificate of insurance issuer. Proof of mailing will be considered sufficient proof of our good faith attempt to provide notice of cancellation, nonrenewal or material change to the certificate of insurance holders shown in the schedule below. SCHEDULE All certificate of insurance holders where written notice of cancellation, nonrenewal or material change to this policy is required by written contract, permit or agreement with the Named Insured. Nothing herein contained shall be held to vary, alter, waive or extend any of the terms, conditions, provisions, agreements or limitations of the mentioned Policy, other than as above stated. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective: Same as policy effective date unless otherwise indicated above. Policy Effective:6/1/2025 Policy No.:GL25A00046 Endorsement No.: Insured: SpawGlass Employee Holding Company Premium $ Insurance Company: American Contractors Insurance Co RRG 9 AGGREGATE LIMITS OF INSURANCE (PER PROJECT) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART It is hereby understood and agreed the General Aggregate Limit under Limits of Insurance, Section III, of the Coverage Form applies separately to each of your projects away from premises owned by or rented to you. Nothing herein contained shall be held to vary, alter, waive or extend any of the terms, conditions, provisions, agreements or limitations of the mentioned Policy, other than as above stated. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective: same as policy eff.date unless otherwise indicated above. Policy Effective: 6/1/2025 Policy No.: GL25A00046 Endorsement No.: Insured: SpawGlass Employee Holding Company Premium $ Insurance Company: American Contractors Insurance Co RRG CNASpawGlassBusiness Auto Policy Contractors,Inc.,SpawGlass Construction Corp., SpawGlass Civil Construction, Inc.,Westland Equipment and Supplies,LLC CONTRACTORS EXTENDED COVERAGE • • • • PLUS THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM I. LIABILITY COVERAGE A. Who Is An Insured The following is added to Section II, Paragraph A.1., Who Is An Insured: 1. a. Any incorporated entity of which the Named Insured owns a majority of the voting stock on the date of inception of this Coverage Form; provided that, b. The insurance afforded by this provision A.1. does not apply to any such entity that is an insured under any other liability "policy" providing auto coverage. 2. Any organization you newly acquire or form, other than a limited liability company, partnership or joint venture, and over which you maintain majority ownership interest. The insurance afforded by this provision A.2.: a. Is effective on the acquisition or formation date, and is afforded only until the end of the policy period of this Coverage Form, or the next anniversary of its inception date, whichever is earlier. b. Does not apply to: (1) Bodily injury or property damage caused by an accident that occurred before you acquired or formed the organization; or (2) Any such organization that is an insured under any other liability "policy" providing auto coverage. 33.. 4ny person or organization that you are required by a written contract to name as an additional insured is an insured but only with respect to their legal liability for acts or omissions of a person, who qualifies as an insured under SECTION II — WHO IS AN INSURED and for whom Liability Coverage is afforded under this policy. If required by written contract, this insurance will be primary and non-contributory to insurance on which the additional insured is a Named Insured. 4. An employee of yours is an insured while operating an auto hired or rented under a contract or agreement in that employee's name, with your permission, while performing duties related to the conduct of your business. "Policy", as used in this provision A. Who Is An Insured, includes those policies that were in force on the inception date of this Coverage Form but: 1. Which are no longer in force; or 2. Whose limits have been exhausted. B. Bail Bonds and Loss of Earnings Section II, Paragraphs A.2. (2) and A.2. (4) are revised as follows: 1. In a.(2), the limit for the cost of bail bonds is changed from $2,000 to $5,000; and 2. In a.(4), the limit for the loss of earnings is changed from $250 to $500 a day. Form No: CNA63359XX (04-2012) Policy No:BUA 7033775896 Underwriting Company: Valley Forge Insurance Company Policy Effective Date: 06/01/2025 o Coovriaht CNA All Riahts Reserved. Includes coovriahted material of the CNA Business Auto Policy Policy Endorsement C. Fellow Employee Section II, Paragraph B.5 does not apply. Such coverage as is afforded by this provision C. is excess over any other collectible insurance. ll. PHYSICAL DAMAGE COVERAGE A. Glass Breakage - Hitting A Bird Or Animal - Falling Objects Or Missiles The following is added to Section III, Paragraph A.3.: With respect to any covered auto, any deductible shown in the Declarations will not apply to glass breakage if such glass is repaired, in a manner acceptable to us, rather than replaced. B. Transportation Expenses Section III, Paragraph A.4.a. is revised, with respect to transportation expense incurred by you, to provide: a. $60 per day, in lieu of $20; subject to b. $1,800 maximum, in lieu of $600. C. Loss of Use Expenses Section III, Paragraph A.4.b. is revised, with respect to loss of use expenses incurred by you, to provide: a. $1 ,000 maximum, in lieu of $600. D. Hired "Autos" The following is added to Section III. Paragraph A.: 5. Hired "Autos" If Physical Damage coverage is provided under this policy, and such coverage does not extend to Hired Autos, then Physical Damage coverage is extended to: a. Any covered auto you lease, hire, rent or borrow without a driver; and b. Any covered auto hired or rented by your employee without a driver, under a contract in that individual employee's name, with your permission, while performing duties related to the conduct of your business. c. The most we will pay for any one accident or loss is the actual cash value, cost of repair, cost of replacement or $75,000, whichever is less, minus a $500 deductible for each covered auto. No deductible applies to loss caused by fire or lightning. d. The physical damage coverage as is provided by this provision is equal to the physical damage coverage(s) provided on your owned autos. e. Such physical damage coverage for hired autos will: (1) Include loss of use, provided it is the consequence of an accident for which the Named Insured is legally liable, and as a result of which a monetary loss is sustained by the leasing or rental concern. (2) Such coverage as is provided by this provision will be subject to a limit of $750 per accident. E. Airbag Coverage The following is added to Section Ill, Paragraph B.3.: The accidental discharge of an airbag shall not be considered mechanical breakdown. Form No: CNA63359XX (04-2012) Policy No:BUA 7033775896 Underwriting Company: Valley Forge Insurance Company Policy Effective Date: 06/01/2025 Copyright CNA All Rights Reserved. Includes copyrighted material of the CNA Business Auto Policy Policy Endorsement F. Electronic Equipment Section 111, Paragraphs B.4.c and B.4.d. are deleted and replaced by the following: c. Physical Damage Coverage on a covered auto also applies to loss to any permanently installed electronic equipment including its antennas and other accessories d. A $100 per occurrence deductible applies to the coverage provided by this provision. G. Diminution In Value The following is added to Section 111, Paragraph B.6.: Subject to the following, the diminution in value exclusion does not apply to: a. Any covered auto of the private passenger type you lease, hire, rent or borrow, without a driver for a period of 30 days or less, while performing duties related to the conduct of your business; and b. Any covered auto of the private passenger type hired or rented by your employee without a driver for a period of 30 days or less, under a contract in that individual employee's name, with your permission, while performing duties related to the conduct of your business. c. Such coverage as is provided by this provision is limited to a diminution in value loss arising directly out of accidental damage and not as a result of the failure to make repairs; faulty or incomplete maintenance or repairs; or the installation of substandard parts. d. The most we will pay for loss to a covered auto in any one accident is the lesser of: (1) $5,000; or (2) 20% of the auto's actual cash value (ACV). III. Drive Other Car Coverage — Executive Officers The following is added to Sections II and III: 1. Any auto you don't own, hire or borrow is a covered auto for Liability Coverage while being used by, and for Physical Damage Coverage while in the care, custody or control of, any of your "executive officers", except: a. An auto owned by that "executive officer" or a member of that person's household; or b. An auto used by that "executive officer" while working in a business of selling, servicing, repairing or parking autos. Such Liability and/or Physical Damage Coverage as is afforded by this provision. (1) Equal to the greatest of those coverages afforded any covered auto; and (2) Excess over any other collectible insurance. 2. For purposes of this provision, "executive officer" means a person holding any of the officer positions created by your charter, constitution, by-laws or any other similar governing document, and, while a resident of the same household, includes that person's spouse. Such "executive officers" are insureds while using a covered auto described in this provision. IV. BUSINESS AUTO CONDITIONS A. Duties In The Event Of Accident, Claim, Suit Or Loss The following is added to Section IV, Paragraph A.2.a.: Form No: CNA63359XX (04-2012) Policy No:BUA 7033775896 Underwriting Company: Valley Forge Insurance Company Policy Effective Date: 06/01/2025 ®Copyright CNA All Riqhts Reserved. Includes coovriahted material of the CNA Business Auto Policy Policy Endorsement (4) Your employees may know of an accident or loss. This will not mean that you have such knowledge, unless such accident or loss is known to you or if you are not an individual, to any of your executive officers or partners or your insurance manager. The following is added to Section IV, Paragraph A.2.b.: (6) Your employees may know of documents received concerning a claim or suit. This will not mean that you have such knowledge, unless receipt of such documents is known to you or if you are Ad*V*dtf8l' to 819Y cutive officers or partners or your insurance manager. B. Transfer Of Rights Of Recovery Against Others To Us e rap A.S. Transfer Of Rights Of Recovery Against Others To Us: We waive any right of recovery we may have, because of payments we make for injury or damage, against any person or organization for whom or which you are required by written contract or agreement to obtain this waiver from us. This injury or damage must arise out of your activities under a contract with that person or organization. You must agree to that requirement prior to an accident or loss. C. Concealment, Misrepresentation or Fraud The following is added to Section IV, Paragraph B.2.: Your failure to disclose all hazards existing on the date of inception of this Coverage Form shall not sect to the coverage afforded provided such failure or omission is not intentional. D. Other Insurance a ed to to IV, Paragraph B.S.: Regardless of the provisions of Paragraphs 5.a. and 5.d. above, the coverage provided by this policy shall be on a primary non-contributory basis. This provision is applicable only when required by a written contract. That written contract must have been entered into prior to Accident or Loss. E. Policy Period, Coverage Territory Section IV, Paragraph B. 7.(5).(a). is revised to provide: a. 45 days of coverage in lieu of 30 days. V. DEFINITIONS Section V. paragraph C. is deleted and replaced by the following: Bodily injury means bodily injury, sickness or disease sustained by a person, including mental anguish, mental injury or death resulting from any of these. Form No: CNA63359XX (04-2012) Policy No:BUA 7033775896 Underwriting Company: Valley Forge Insurance Company Policy Effective Date: 06/01/2025 � Copyright CNA All Rights Reserved. Includes copyrighted material of the CNA Business Auto Policy Policy Endorsement ADDITIONAL INSURED - PRIMARY AND NON-CONTRIBUTORY It is understood and agreed that this endorsement amends the BUSINESS AUTO COVERAGE FORM as follows: SCHEDULE Name of Additional Insured Person Or Organization ANY PERSON OR ORGANIZATION THAT YOU ARE REQUIRED BY WRITTEN CONTRACT OR WRITTEN AGREEMENT TO NAME AS AN ADDITIONAL INSURED 1. In conformance with paragraph A.1.c. of Who Is An Insured of Section II - LIABILITY COVERAGE, the person or organization scheduled above is an insured under this policy. 2. The insurance afforded to the additional insured under this policy will apply on a primary and non-contributory basis if you have committed it to be so in a written contract or written agreement executed prior to the date of the "accident" for which the additional insured seeks coverage under this policy. All other terms and conditions of the policy remain unchanged This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy. Form No: CNA71527XX (10-2012) Policy No:BUA 7033775896 Underwriting Company: Valley Forge Insurance Company Policy Effective Date: 06/01/2025 Insured:SpawGlass Contractors,Inc.,SpawGlass Construction Corp., SpawGlass Civil Construction,Inc.,Westland Equipment and Supplies,LLC m Copyright CNA All Rights Reserved. CNA Business Auto Policy Policy Endorsement NOTICE OF CANCELLATION TO CERTIFICATEHOLDERS It is understood and agreed that: If you have agreed under written contract to provide notice of cancellation to a party to whom the Agent of Record has issued a Certificate of Insurance, and if we cancel a policy term described on that Certificate of Insurance for any reason other than nonpayment of premium, then notice of cancellation will be provided to such Certificateholders at least 30 days in advance of the date cancellation is effective. If notice is mailed, then proof of mailing to the last known mailing address of the Certificateholder on file with the Agent of Record will be sufficient to prove notice. Any failure by us to notify such persons or organizations will not extend or invalidate such cancellation, or impose any liability or obligation upon us or the Agent of Record. All other terms and conditions of the policy remain unchanged This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy. SpawGlass Contractors,Inc.,SpawGlass Construction Corp., SpawGlass Civil Construction,Inc.,Westland Equipment and Supplies,LLC Form No: CNA68021 XX (02-2013) Policy No:BUA 7033775896 Underwriting Company: Valley Forge Insurance Company Policy Effective Date: 06/01/2025 ®Coovriaht CNA All Riahts Reserved. TEXAS WORKERS COMPENSATION AND EMPLOYERS LIABILITY POLICY WC 99 03 04 (Ed. 04-07) WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver. This waiver does not extend to the statutory right of reimbursement from a claimant who recovers any amount under Section 417.002 of the Texas Labor Code. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person organization ( X ) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. This waiver does not extend to the statutory right of reimbursement under Section 417.002 of the Texas Labor Code. 2. Operations: CONSTRUCTION AND RELATED CONSTRUCTION RELATED WORK ALL TEXAS OPERATIONS 3. Premium: The premium charge of this endorsement shall be 2 percent of the premium developed on payroll in connection with work performed for the above person(s)or organization(s)arising out of the operations described. 4. Minimum Premium: $0 5. Advance Premium: $0 This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective: Same as Policy Effective Date unless otherwise indicated above. Policy Effective Date: 6/1/2025 Policy No. WCA000008325 Endorsement No. Premium $ Insured SpawGlass Employee Holding Company Carrier Name/Code: ACIG Insurance Company WC 99 03 04 (Ed. 04-07) WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 42 06 01 (Ed. 0 1-94) TEXAS NOTICE OF MATERIAL CHANGE ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. In the event of cancelation or other material change of the policy, we will mail advance notice to the person or organization named in the Schedule. The number of days advance notice is shown in the Schedule. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule 1. Number of days advance notice: 60 days. However, in the case of cancellation or nonrenewal due to nonpayment of premium,only 10 days advance notice will be provided. 2. Notice will be mailed to: All certificate holders where written notice of cancellation, nonrenewal or material change to this policy is required by written contract, permit or agreement with the Named Insured. The notice will be mailed to the addresses provided to us by the certificate of insurance issuer. Proof of mailing will be considered sufficient proof of our good faith attempt to provide written notice. This endorsement is only applicable in the state of Texas. This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective: Same as Policy Effective Date unless otherwise indicated above. Policy Effective Date: 6/1/2025 Policy No. WCA000008325 Endorsement No. Premium $ Insured SpawGlass Employee Holding Company Carrier Name/Code: ACIG Insurance Company WC 42 06 01 (Ed. 0 1-94) COMMERCIAL INLAND MARINE THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET LOSS PAYEES This endorsement modifies insurance provided under the COMMERCIAL INLAND MARINE COVERAGE PART The following is added to Section E — ADDITIONAL b. Pay any claim for loss or damage jointly to you COVERAGE CONDITIONS: and the Loss Payee as your interests may Loss Payable Provision appear. In the event of a Covered Cause of Loss to Covered This endorsement applies to all Covered Property for Property in which both you and a Loss Payee share which a Loss Payee is on file with us or your an insurable interest, we will: insurance agent or insurance broker. a. Adjust the loss or damage with you; and SpawGlass Contractors, Inc., SpawGlass Construction Corp., SpawGlass Civil Construction, Inc., Westland Equipment and Supplies, LLC Travelers Property& Casualty Co. Policy No. QT-630-7625B35-0-TLC-25 CM U618 05 21 ©2021 The Travelers Indemnity Company Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc.with its permission. C H U B B Surety O + 908.903.3485 202B Halls Mill Road,PO Box 1650 F +908.903.3656 Whitehouse Station,NJ 08889-1650 Federal Insurance Company Liberty Mutual Insurance Company AIA Document A312TM- 2010 Payment Bond K42017395(Federal) 022242526(Liberty Mutual) Any singular reference to Contractor,Surety,Owner or other party shall be considered plural where applicable. CONTRACTOR SURETY (Name, legal status and address): (Name, legal status and principal place of business): SpawGlass Contractors,Inc. Federal Insurance Company(IN) 1111 Smith Road Austin,Texas 78721 Liberty Mutual Insurance Company(MA) OWNER (Name, legal status and address): City of Round Rock,TX 221 East Main Street Round Rock,TX 78664 CONSTRUCTION CONTRACT Date: July 1,2025 Amount: $71,496,519.00 Seventy One Million Four Hundred Ninety Six Thousand Five Hundred Nineteen& 00/100 Dollars Description(Name and Location): City of Round Rock–Old Settler's Park Build Out-Rec Center GMP#2R1 BOND Date(Not earlier than Construction Contract Date): July 8,2025 Amount: $71,496,519.00 Seventy One Million Four Hundred Ninety Six Thousand Five Hundred Nineteen& 00/100 Dollars Modifications to this Bond: %.oto"'�Ii� El None ❑ See Page 4 G.... .. R,q ,, CONTRACTORS AS PRINCIPAL ��Vp�POOA' SURETY Company: SpawGlass Contracto nc.� rateEA L ;0-Company: (Corporate Seal) Federal Insurance mp y erty 1953 •�Mutual Insur a Com Signature: _ T P5• -, Name and Titl avi en �,ds � Signature: esident -Austin Region ///I t t r*1 t tAttorney-in-F ct Name: John A.Prince Signed and Sealed this 8th day of July, 2025 (Any additional signatures appear on the last page of this Performance Bond.) (FOR INFORMATION ONLY—Name,Address and Telephone) AGENT or BROKER: OWNER'S REPRESENTATIVE(Architect.Engineer orotherpeuV) Adams Risk Management Services,LLC 11-11 N Loop West Ste.600 Houston,TX 77oo8 713-869-8346 Printed in cooperation ivith the American institute ofAr-chitects(AIA)by Chubb.The language in this document conforms to the language used in AIA Document A312 n1-2010. Form 15-02-0574-FED(Rev.11/16) I L The Contractor and the Surety,jointly and severally,bind themselves,their heirs,executors,administrators, successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the performance of the Construction Contract,which is incorporated herein by reference,subject to the following terms. 2 If the Contractor promptly makes payment of all sums due to Claimants,and defends,indemnifies and holds harmless the Owner from claims,demands,liens or suits by any person or entity seeking payment for labor, materials or equipment furnished for use in the performance of the Construction Contract, then the Surety and the Contractor shall have no obligation under this Bond. 3. If there is no Owner Default under the Construction Contract,the Surety's obligation to the Owner under this Bond shall arise after the Owner has promptly notified the Contractor and the Surety(at the address described in Section 13)of claims,demands,liens or suits against the Owner or the Owner's property by any person or entity seeking payment for labor,materials or equipment furnished for use in the performance of the Construction Contract and tendered defense of such claims,demands,liens or suits to the Contractor and the Surety. 4 When the Owner has satisfied the conditions in Section 3,the Surety shall promptly and at the Surety's expense defend,indemnify and hold harmless the Owner against a duly tendered claim,demand,lien or suit. 5. The Surety's obligations to a Claimant under this Bond shall arise after the following: 51 Claimants,who do not have a direct contract with the Contractor, .1 have furnished a written notice of non-payment to the Contractor, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were,or equipment was, furnished or supplied or for whom the labor was done or performed,within ninety(90)days after having last performed labor or last furnished materials or equipment included in the Claim;and .2 have sent a Claim to the Surety(at the address described in Section 13). 5.2 Claimants,who are employed by or have a direct contract with the Contractor,have sent a Claim to the Surety (at the address described in Section 13). 6. If a notice of non-payment required by Section 5.1.1 is given by the Owner to the Contractor,that is sufficient to satisfy a Claimant's obligation to furnish a written notice of non-payment under Section 5.1.1. 7. When a Claimant has satisfied the conditions of Sections 5.1 or 5.2,whichever is applicable,the Surety shall promptly and at the Surety's expense take the following actions: 71 Send an answer to the Claimant,with a copy to the Owner,within sixty(60)days after receipt of the Claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed;and 7.2 Pay or arrange for payment of any undisputed amounts. 73 The Surety's failure to discharge its obligations under Section 7.1 or Section 7.2 shall not be deemed to constitute a waiver of defenses the Surety or Contractor may have or acquire as to a Claim, except as to undisputed amounts for which the Surety and Claimant have reached agreement.If,however,the Surety fails to discharge its obligations under Section 7.1 or Section 7.2, the Surety shall indemnify the Claimant for the reasonable attorney's fees the Claimant incurs thereafter to recover any sums found to be due and owing theClaimant. 8 The Surety's total obligation shall not exceed the amount of this Bond,plus the amount of reasonable attorney's fees provided under Section 7.3,and the amount of this Bond shall be credited for any payments made in good faith by the Surety. 9. Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance of the Construction Contract and to satisfy claims,if any,under any construction performance bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and the Surety under this Bond,subject to the Owner's priority to use the funds for the completion of the work. Printed in cooperation with the American Institute of Architects(AIA)by Chubb. The language in this document conforms to the language used in AIA Document A312 TO-2010. Form 15-02-0574-FED(Rev.11/16) 2 X1 The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated to the Construction Contract.The Owner shall not be liable for the payment of any costs or expenses of any Claimant under this Bond,and shall have under this Bond no obligations to make payments to,or give notice on behalf of,Claimants or otherwise have any obligations to Claimants under this Bond. IL The Surety hereby waives notice of any change,including changes of time,to the Construction Contract or to related subcontracts,purchase orders and other obligations. 12 No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the state in which the project that is subject of the Construction Contract is located or after the expiration of one year from the date (1) on which the Claimant sent a Claim to the Surety pursuant to Section 5.1.2 or 5.2,or(2)on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract,whichever of(1)or(2)first occurs.If the provisions of this Paragraph are void or prohibited by law,the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 13. Notice and Claims to the Surety,the Owner or the Contractor shall be mailed or delivered to the address shown on the page which their signature appears.Actual receipt of notice or Claims, however accomplished, shall be sufficient compliance as of the date received. 14 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein.When so furnished,the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 15. Upon request by any person or entity appearing to be a potential beneficiary of this Bond,the Contractor and Owner shall promptly furnish a copy of this Bond or shall permit a copy to be made. 16. DEFINITIONS 161 Claim.A written statement by the Claimant including at a minimum: .1 the name of the Claimant; .2 the name of the person for whom the labor was done,or materials or equipment furnished; .3 a copy of the agreement or purchase order pursuant to which labor,materials or equipment was furnished for use in the performance of the Construction Contract; .4a brief description of the labor,materials or equipment furnished; .5 the date on which the Claimant last performed labor or last furnished materials or equipment for use in the performance of the Construction Contract; .tithe total amount earned by the Claimant for labor,materials or equipment furnished as of the date of the Claim; .7 the total amount of previous payments received by the Claimant;and, .8 the total amount due and unpaid to the Claimant for labor,materials-or equipment furnished as of the date of the Claim. 162 Claimant:An individual or entity having a direct contract with the Contractor or with a subcontractor of the Contractor to furnish labor,materials,or equipment for use in the performance of the Construction Contract. The term Claimant also includes any individual or entity that has rightfully asserted a claim under an applicable mechanic's lien or similar statute against the real property upon which the Project is located.The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water,gas power, light, heat, oil gasoline, telephone service or rental equipment used in the Construction Contract, architectural and engineering services required for performance of the work of the Contractor Printed in cooperation with the American Institute of Architects(AIA)by Chubb. The language in this document conforms to the language used in AIA Document A312 TM-2010. Form 15-02-0574-FED(Rev.11/16) 3 and the Contractor's subcontractors,and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor,materials or equipment were furnished. 163 Construction Contract: The agreement between the Owner and the Contractor identified on the cover page,including all Contract Documents and all changes made to the agreement and the Contract Documents. 16A Owner Default:Failure of the Owner,which has neither been remedied nor waived,to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract. 165 Contract Documents.All the documents that comprise the agreement between the Owner and Contractor. 17. If this Bond is issued for an agreement between a Contractor and subcontractor,the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. 18. MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: 181 "Claim notices for FEDERAL INSURANCE COMPANY must be sent to the following address: Chubb,PO Box 2191, Chesapeake,Virginia 23327,Attention:Surety Support Team." (Space is provided below for additional signatures of added parties,other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL SURETY Company: (Corporate Seal) Company: (Corporate Seal) Federal Insurance Company Signature: Signature: Name and Title: Name and Title: Address: Address: Printed in cooperation with the American Institute of Architects(AIA)by Chubb. The language in this document conforms to the language used in AIA Document A312 rm-2010. Form 15-02-0574-FED(Rev.11/16) 4 CHUEBB* Power of Attorney Federal Insurance Company I Vigilant Insurance Company I Pacific Indemnity Company Westchester Fire Insurance Company I ACE American Insurance Company Know All by These Presents,that FEDERAL INSURANCE COMPANY,an Indiana corporation,VIGILANT INSURANCE COMPANY,a New York corporation,PACIFIC INDEMNITY COMPANY,a Wisconsin corporation,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY corporations of the Commonwealth of Pennsylvania, do each hereby constitute and appoint Andrew A.Adams,Norman E.Adams,Michael Macomber,John A.Prince and Larry D.Snider of Houston,Texas---- each as their true and lawful Attorney-in-Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise,bonds and undertakings and other writings obligatory in the nature thereof(other than bail bonds)given or executed in the course of business,and any instruments amending or altering the same,and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof,said FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY have each executed and attested these presents and affixed their corporate seals on this 10th day of April 2024. 7 Rupert HD Swindells,Assistant secretary Warren Eich horn.Vice President 6 o 000wo STATE OF NEW JERSEY County of Hunterdon ss. On this 10th day of April,2024 before me,a Notary Public of New Jersey,personally came Rupert HD Swindells and Warren Eichhorn,tome known to be Assistant Secretary and Vice President,respectively,of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY,the companies which executed the foregoing Power of Attorney,and the said Rupert HD Swindells and Warren Eichhorn,being by me duly sworn, severally and each for himself did depose and say that they are Assistant Secretary and Vice President,respectively,of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY and know the corporate seals thereof,that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies;and that their signatures as such officers were duly affixed and subscribed by like authority. Notarial Seal Alban Coneum NOTARY PUK C OF FEIN JERSEY ►T�� Flo 50202369 •uauo Commrssion Ergires Aupm 22.2027 Mowry Public CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,and PACIFIC INDEMNITY COMPANY on August 30,2016; WESTCHESTER FIRE INSURANCE COMPANY on December 11,2006;and ACE AMERICAN INSURANCE COMPANY on March 20,2009: 'RESOLVED,that the following authorizations relate to the execution,for and on behalf of the Company,of bonds,undertakings,recognizances,contracts and other written commitments of the Company entered into In the ordinary course of business(each a'Written Commitment"): (1) Each of the Chairman,the President and the Vice Presidents of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company,under the seal of the Company or otherwise. (2) Each duly appointed attorney-in-fact of the Company is hereby authorized to execute any Written Commitment for and on behalf of the Company,under the seal of the Company or otherwise, to the extent that such action is authorized by the grant of powers provided for in such person's written appointment as such attorney-In-fact (3) Each of the Chairman,the President and the Vice Presidents of the Company Is hereby authorized,for and on behalf of the Company,to appoint in writing any person the attorney-in- fact of the Company with full power and authority to execute,for and on behalf of the Company,under the seal of the Company or otherwise,such Written Commitments of the Company as may be specified in such written appointment which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (4) Each of the Chairman,the President and the Vice Presidents of the Company is hereby authorized,for and on behalf of the Company,to delegate in writing to any other officer of the Company the authority to execute,for and on behalf of the Company,under the Company's seal or otherwise,such Written Commitments of the Company as are specified in such written delegation,which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution,and the seal of the Company,may be affixed by facsimile on such Written Commitment or written appointment or delegation. FURTHER RESOLVED,that the foregoing Resolution shall not be deemed to be an exclusive statement of the powers and authority of officers,employees and other persons to act for and on behalf of the Company,and such Resolution shall not limit or otherwise affect the exercise of any such power or authority otherwise validly granted or vested.' 1,Rupert HD Swindells,Assistant Secretary of FEDERAL INSURANCE COMPANY,VIGILANT INSURANCE COMPANY,PACIFIC INDEMNITY COMPANY,WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY(the"Companies')do hereby certify that (i) the foregoing Resolutions adopted by the Board of Directors of the Companies are true,correct and in full force and effect, (ii) the foregoing Power of Attorney is true,correct and in full force and effect. Given under my hand and seals of said Companies at Whitehouse Station,NJ,this 8th day of July, 2025 • Rupert HD Swindells.Assistant secretary IN THE EVENT YOU WISH TO VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER MATTER PLEASE CONTACT US AT: Telephone 908 903-3493 Fax 908 903.3656 e-mail:surety@chubb.com Combined:FED-VIG-PI-WFIC-AAIC(rev.11-19) This Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to the extent herein stated. Liberty Liberty Mutual Insurance Company Mutual.. The Ohio Casualty Insurance Company Certificate No:8205857-974105 West American Insurance Company SURETY POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire,that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts,and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana(herein collectively called the"Companies"),pursuant to and by authority herein set forth,does hereby name,constitute and appoint, Andrew A. Adams;John A.Prince;Larry D.Snider;Michael Macomber;Norman E.Adams all of the city of Houston state of TX each individually if there be more than one named,its true and lawful attorney-in-fact to make, execute,seal,acknowledge and deliver,for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surety obligations,in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 28th day of June 2021 Liberty Mutual Insurance Company P�1NSURq Poo INSU \NSIJ The Ohio Casualty Insurance Company �J o°aroR,,f yC, yJ Goa°o,4, y C�P°oa°°Rol 'tom West American Insurance Company J 3 Fo F Q 3 Fo n Lu r Fo F 1912 0 1919 0 f 1991 C Z _ k,3 Q 0 �CaAMP' IAP ,pa ` By. U � �O Fo co David M.Carey,Assistant Secretary v t`p State of PENNSYLVANIA ss c (I) County of MONTGOMERY o 0 S On this 28th da of June 2021 before me personally appeared David M.Care who acknowledged himself to be the Assistant Secreta of Liberty Mutual Insurance CLO) m � Y P Y PP Y. 9 Secretary rtY w Company,The Ohio Casualty Company,and West American Insurance Company,and that he,as such,being authorized so to do,execute the foregoing instrument for the purposes 0)> therein Contained by signing on behalf of the corporations by himself as a duly authorized officer. IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia,Pennsylvania,on the day and year first above written. N NPAS 0-0 O gP T 2 ` q, �M°N WF F� Commonwealth of Pennsylvania-Notary Seal >` <' Teresa Pastella,Notary Public tU'F0 wO A' o s ➢ Montgomery County O a) OF My commission expires March 28,2025 By 0 N C ( �P Commission number 1126044 �• yLJP \G Member,Pennsylvania Association of Notanes Teresa Pastella,Notary Public Q O �� ARY p L O (0 V W This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual 3°No 0-S� Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows: I0 E 00 ARTICLE IV-OFFICERS:Section 12.Power of Attorney. `0 I o M Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the-0— r- President may prescribe,shall appoint such attomeys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal,acknowledge and deliver as surety m— j C any and all undertakings,bonds,recognizances and other surety obligations.Such attomeys-in-fact,subject to the limitations set forth in their respective powers of attorney,shall-a cui o ` have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed,such o N Z instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attomey-in-fact under the 2m provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority. t0 0- ARTICLE ARTICLE XIII-Execution of Contracts:Section 5.Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president,and subject to such limitations as the chairman or the president may prescribe, shall appoint such attomeys-in-fact,as may be necessary to act in behalf of the Company to make, execute,seal,acknowledge and deliver as surety any and all undertakings, bonds,recognizances and other surety obligations.Such attomeys-in-fact subject to the limitations set forth in their respective powers of attorney,shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company.When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation-The President of the Company,acting pursuant to the Bylaws of the Company,authorizes David M.Carey,Assistant Secretary to appoint such attomeys-in- fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety obligations. Authorization-By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C.Llewellyn,the undersigned,Assistant Secretary,The Ohio Casualty Insurance Company,Liberty Mutual Insurance Company,and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full,true and correct copy of the Power of Attorney executed by said Companies,is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this Sill day of July 2025 V INSU/, VIN( INSU a \NSU/, °av°�r•9yC yJp'coavorzgrRgy UP coav0ROTgyn J/ J 3 Fo cr` Q ? Fo n 3 Fo rn 54uc_� 190 1919 f 1991 � i O Q B . d,9sS4,Nu5��dD� Z°�'1, Mvs'�aa� Ys SIV 1AN" aa3 Y Renee C Llewellyn,Assistant eh * 1•� dyl * Y Secretary LMS-12873 LMIC OCIC WAIC Multi Co 02/21 Have a complaint or need help? Tiene una queja o necesita ayuda? IMPORTANT NOTICE AVISO IMPORTANTE If you have a problem with a claim or your premiums, call Si tiene un problema con un reclamo o las primas,flame your insurance company first. If you can't work out the primero a la empress de seguros.Si no puede resolver el issue, the Texas Department of Insurance may be able to problema,el Departamento de Seguros del estado de Tejas help. puede ayudar. Even if you file a complaint with the Texas Department of Si registra una queja con el Departamento de Seguros del Insurance, you should also file a complaint or appeal estado de tejas,tambien debe presentar una queja o through your insurance company. If you don't, you may apelacion a traves de su compania de seguros.Si no to hace lose your right to appeal. puede perder su derecho de apelar. To get information or file a complaint with CHUBB: Para obtener informacion o registro de una queja con CHUBB: Call Toll-free:1-800-36-CHUBB Llame al:1-800 36-CHUBB Mail: Eastern Claim Service Center Correo: Eastern Claim Service Center 600 Independence Parkway 600 Independence Parkway Chesapeake,VA 23320 Chesapeake,VA 23320 Attn: Surety Support Attn: Surety Support Phone: 800-252-467o Fax: 800-664-5358 Telefono: 800-252-4670 Fax: 800-664-5358 Email: ecsc.claims@chubb.com Correo electronico: ecsc.claims@chubb.com To get help with an insurance question or file a complaint Para ayuda con una pregunta de seguros o registrar una with the state: queja con el estado: The Texas Department of Insurance EI Departamento de Seguros del Estado de Tejas Call with a question: 1-800-252-3439 Preguntas: 1-800-252-3439 File a complaint: www.tdi.texas.gov Quejas: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov Correo electronico: ConsumerProtection@tdi.texas.gov Mail: MC-11i-1A,P.O.Box 149091 Correo: MC-iii-iA,P.O.Box 149091 Austin,TX 78714-9091 Austin,TX 78714-9091 Form 15-10-0347(Rev.2/23) Liberty mutual. SURETY TEXAS TEXAS IMPORTANT NOTICE AVISO IMPORTANTE To obtain information or make a complaint: Para obtener informacion o para someter una queja: You may call toll-free for information or to Usted puede ]lamar a] numero de telefono gratis make a complaint at para informacion o para someter una queja al 1-877-751-2640 1-877-751-2640 You may also write to: Usted tambien puede escribir a: 2200 Renaissance Blvd., Ste. 400 2200 Renaissance Blvd., Ste. 400 King of Prussia, PA 19406-2755 King of Prussia, PA 19406-2755 You may contact the Texas Department of Puede comunicarse con el Departamento de Insurance to obtain information on companies, Seguros de Texas para obtener informacion coverages, rights or complaints at acerca de companias, coberturas, derechos o 1-800-252-3439 quejas al 1-800-252-3439 You may write the Texas Department of Insurance Puede escribir al Departamento de Seguros Consumer Protection(l l 1-1 A) de Texas Consumer Protection(1 l I A A) P. 0. Box 149091 P. 0. Box 149091 Austin,TX 78714-9091 Austin,TX 78714-9091 FAX: (512)490-1007 FAX#(512)490-1007 Web: hM://www.tdi.texas.2ov Web: htW://www.tdi.texas.gov E-mail: ConsumerProtection&tdi.texas.gov E-mail: ConsumerProtectionng.tdi.texas.gov PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS: Should you have a dispute concerning your Si tiena una disputa concerniente a su prima o a premium or about a claim you should first un reclamo, debe comunicarse con el agente o contact the agent or call 1-800-843-6446. primero. Si no se resuelve la disputa, puede If the dispute is not resolved, you may contact the entonces comunicarse con el departamento(TDI) Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR UNA ESTE AVISO A SU POLIZA: POLICY: This notice is for information only and does not Este aviso es solo para proposito de informacion become a part or condition of the attached y no se convierte en parte o condicion del document. documento adjunto. NP 70 68 09 01 LUS•15292 10/15