Contract - Hensel Phelps Construction Company - 8/28/2025
=' Document A1 31 - 2019 Exhibit A Guaranteed Maximum Price Amendment This Amendment dated the day of September in the year 2025,is incorporated into the accompanying AIA Document A133TM-2019,Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the 12th day of September ADDITIONS AND DELETIONS: The author of this document has in the year 2024 (the"Agreement") added information needed for its (In words, indicate day,month,and year.) completion.The author may also for the following PROJECT: have revised the text of the original AIA standard form.An Additions and (Name and address or location) Deletions Report that notes added information as well as revisions to the Bob Bennett Phases 11,I11,and IV standard form text is available from 3400 Sunrise Road the author and should be reviewed.A Round Rock,Texas 78665 vertical line in the left margin of this document indicates where the author THE OWNER: has added necessary information (Name, legal status,and address) and where the author has added to or deleted from the original AIA text. City of Round Rock 221 East Main St This document has important legal Round Rock,Texas 78664 consequences.Consultation with an attorney is encouraged with respect THE CONSTRUCTION MANAGER: to its completion or modification. (Name, legal status,and address) AIA Document A201 TM-2017, General Conditions of the Contract Hensel Phelps Construction Company for Construction,is adopted in this 8326 Cross Park Dr. document by reference.Do not use Austin,Texas 87854 with other general conditions unless this document is modified. TABLE OF ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED AA CONSTRUCTION MANAGER'S CONSULTANTS,CONTRACTORS, DESIGN PROFESSIONALS,AND SUPPLIERS ARTICLE A.1 GUARANTEED MAXIMUM PRICE § A.1.1 Guaranteed Maximum Price Pursuant to Section 3.2.6 of the Agreement,the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price.As agreed by the Owner and Construction Manager,the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed.The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work,as that term is defined in Article 6 of the Agreement. § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Forty Five Million Four Hundred and Forty-Six Thousand Eight Hundred and Twenty One Init. AIA Document A133—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects;"AIA,the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 13:48:48 1 NIT on 08/08/2025 under Order No.4104248843 which expires on 09/30/2025,is not for resale,is licensed for one-time use only,and may only be used in i accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (1782852464) R - 2Das - a�a1--/ Dollars and Zero Cents ($45,446,821.00 ),subject to additions and deductions by Change Order as provided in the Contract Documents. § A.1.1.2 Itemized Statement of the Guaranteed Maximum Price.Provided below is an itemized statement of the Guaranteed Maximum Price organized by trade categories,including allowances;the Construction Manager's contingency;alternates;the Construction Manager's Fee;and other items that comprise the Guaranteed Maximum Price as defined in Section 3.2.1 of the Agreement. (Provide itemized statement below or reference an attachment.) Reference attached document"Bob Bennett Complex,Phases 2&5,GMP Estimate Rev 1."dated August 6d,2025. § A.1.1.3 The Construction Manager's Fee is set forth in Section 6.1.2 of the Agreement. § A.1.1.4 The method of adjustment of the Construction Manager's Fee for changes in the Work is set forth in Section 6.1.3 of the Agreement. § A.1.1.5 Alternates § A.1.1.5.1 Alternates,if any,included in the Guaranteed Maximum Price: Item Price None § A.1.1.5.2 Subject to the conditions noted below,the following alternates may be accepted by the Owner following execution of this Exhibit A.Upon acceptance,the Owner shall issue a Modification to the Agreement. (Insert below each alternate and the conditions that must be met for the Owner to accept the alternate.) Item Price Conditions for Acceptance None §A.1.1.6 Unit prices,if any: (Identify the item and state the unit price and quantity limitations,if any, to which the unit price will be applicable.) Item Units and Limitations Price per Unit($0.00) Nonc ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § A.2.1 The date of commencement of the Work shall be: (Check one of the following boxes) [ ] The date of execution of this Amendment. [ X ] Established as follows: (Insert a date or a means to determine the date of commencement of the Work.) September 5s',2025 / If a date of commencement of the Work is not selected,then the date of commencement shall be the date of execution of this Amendment. § A.2.2 Unless otherwise provided,the Contract Time is the period of time,including authorized adjustments,allotted in the Contract Documents for Substantial Completion of the Work.The Contract Time shall be measured from the date of commencement of the Work. § A.2.3 Substantial Completion § A.2.3.1 Subject to adjustments of the Contract Time as provided in the Contract Documents,the Construction Manager shall achieve Substantial Completion of the entire Work: (Check one of the following boxes and complete the necessary information) Init. AIA Document A133—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects;"AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 13:48:48 2 MT on 08/08/2025 under Order No.4104248843 which expires on 09/30/2025,is not for resale,is licensed for one-time use only,and may only be used in t accordance with the AIA Contract Documents®Terns of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (1782852464) [ ] Not later than ( )calendar days from the date of commencement of the Work. [ X ] By the following date: November 30,2026 § A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents,if portions of the Work are to be completed prior to Substantial Completion of the entire Work,the Construction Manager shall achieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date None § A.2.3.3 If the Construction Manager fails to achieve Substantial Completion as provided in this Section A.2.3,liquidated damages,if any,shall be assessed as set forth in Section 6.1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED § A.3.1 The Guaranteed Maximum Price and Contract Time set forth in this Amendment are based on the Contract Documents and the following: § A.3.1.1 The following Supplementary and other Conditions of the Contract: Document Title Date Pages § A.3.1.2 The following Specifications: (Either list the Specifications here,or refer to an exhibit attached to this Amendment.) Reference attached document"Bob Bennett Complex,Phases 2&5,GMP Estimate Rev 1."dated August 61',2025. Section Title Date Pages § A.3.1.3 The following Drawings: (Either list the Drawings here, or refer to an exhibit attached to this Amendment.) Reference attached document"Bob Bennett Complex,Phases 2&5,GMP Estimate Rev 1."dated August 61h,2025. Number Title Date § A.3.1.4 The Sustainability Plan,if any: (If the Owner identified a Sustainable Objective in the Owner's Criteria, identify the document or documents that comprise the Sustainability Plan by title,date and number of pages,and include other identifying information. The Sustainability Plan identifies and describes the Sustainable Objective;the targeted Sustainable Measures; implementation strategies selected to achieve the Sustainable Measures;the Owner's and Construction Manager's roles and responsibilities associated with achieving the Sustainable Measures;the specific details about design reviews,testing or metrics to verify achievement of each Sustainable Measure;and the Sustainability Documentation required for the Project,as those terms are defined in Exhibit C to the Agreement.) Title Date Pages None Other identifying information: § A.3.1.5 Allowances,if any,included in the Guaranteed Maximum Price: (Idents each allowance.) Init. AIA Document A133—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 13:48:48 3 MT on 08/08/2025 under Order No.4104248843 which expires on 09/30/2025,is not for resale,Is licensed for one-time use only,and may only be used in I accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (1782852464) Item Price 1) 3-HR Rated Assembly Design Development $250,000.00 2) Inspector Code Interpretation $100,000.00 3) Third Party Review of Envelope Details $7,500.00 4) Furniture Coordination $25,000.00 5) Additional Phase 1 Gas Line Exploration $7,500.00 6) Phase 5 Scope of Work $5,251,884.00 7) Phase 1 Scope of Work $110,274.00 § A.3.1.6 Assumptions and clarifications,if any,upon which the Guaranteed Maximum Price is based: (Idents each assumption and clarification) Reference attached document"Bob Bennett Complex,Phases 2&5,GMP Estimate Rev 1."dated August 61h,2025. . § A.3.1.7 The Guaranteed Maximum Price is based upon the following other documents and information: (List any other documents or information here, or refer to an exhibit attached to this Amendment.) Reference attached document"Bob Bennett Complex,Phases 2&5,GMP Estimate Rev 1."dated August 61h,2025. ARTICLE A.4 CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS § A.4.1 The Construction Manager shall retain the consultants,contractors,design professionals,and suppliers,identified below: (List name, discipline, address,and other information) This I ent to the Agreement entered into as of the day and year first wri abov OWNER( gnature) ONSCT ON MANAGER(Signature) Craig Mor an Ma or radle inans Regional Vice President (Printed name and title) (Prname and title) Init. AIA Document At 33—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 13:48:48 4 MT on 08/08/2025 under Order No.4104248843 which expires on 09/30/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (1782852464) Additions and Deletions Report for AIA` Document A 1338— 2019 Exhibit A This Additions and Deletions Report,as defined on page 1 of the associated document,reproduces below all text the author has added to the standard form AIA document in order to complete it,as well as any text the author may have added to or deleted from the original AIA text.Added text is shown underlined.Deleted text is indicated with a horizontal line through the original AIA text. Note: This Additions and Deletions Report is provided for information purposes only and is not incorporated into or constitute any part of the associated AIA document.This Additions and Deletions Report and its associated document were generated simultaneously by AIA software at 13:48:48 MT on 08/08/2025. PAGE 1 This Amendment dated the day of September in the year 2025,is incorporated into the accompanying AIA Document A133TK-2019,Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Maximum Price dated the 12th day of September in the year 2024 the"Agreement") Bob Bennett Phases 11,III,and IV 3400 Sunrise Road Round Rock,Texas 78665 City of Round Rock 221 East Main St Round Rock,Texas 78664 Hensel Phelps Construction Company 8326 Cross Park Dr. Austin,Texas 87854 § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Forty Five Million Four Hundred and Forty-Six Thousand Eight Hundred and Twenty One Dollars and Zero Cents ($45,446,821.00 ), subject to additions and deductions by Change Order as provided in the Contract Documents. PAGE 2 Reference attached document"Bob Bennett Complex,Phases 2&5,GMP Estimate Rev 1."dated August 6t',2025. None None Additions and Deletions Report for AIA Document A133—2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects,""American Institute of Architects,""AIA,"the AIA Logo,and'AIA Contract Documents"are trademarks of The American Institute of Architects.This 1 document was produced at 13:48:48 MT on 08/08/2025 under Order No.4104248843 which expires on 09/30/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (1782852464) None [ X ] Established as follows: September 51h,2025 PAGE 3 [ X By the following date: November 30,2026 None Reference attached document"Bob Bennett Complex,Phases 2&5,GMP Estimate Rev 1."dated August 61',2025. Reference attached document"Bob Bennett Complex,Phases 2&5,GMP Estimate Rev 1."dated August&h.2025. None PAGE 4 1) 3-HR Rated Assembly Design Development $250,000.00 2) Inspector Code Interpretation $100,000.00 3) Third Party Review of Envelope Details $7,500.00 4) Furniture Coordination $25,000.00 5) Additional Phase 1 Gas Line Exploration $7,500.00 6) Phase 5 Scope of Work $5,251,884.00 7) Phase 1 Scope of Work $110,274.00 Reference attached document"Bob Bennett Complex,Phases 2&5,GMP Estimate Rev 1."dated August 6th,2025. . Reference attached document"Bob Bennett Complex,Phases 2&5,GMP Estimate Rev 1."dated August 6t',2025. Craig Morgan,Mayor Bradley D.Winans,Regional Vice President Additions and Deletions Report for AIA Document A133-2019 Exhibit A.Copyright©1991,2003,2009,and 2019.All rights reserved."The American Institute of Architects;"American Institute of Architects;"AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This 2 document was produced at 13:48:48 MT on 08/08/2025 under Order No.4104248843 which expires on 09/30/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (1782852464) Certification of Document's Authenticity AIA Document D401 TM — 2003 I, ,hereby certify,to the best of my knowledge,information and belief,that I created the attached final document simultaneously with its associated Additions and Deletions Report and this certification at 13:48:48 MT on 08/08/2025 under Order No.4104248843 from AIA Contract Documents software and that in preparing the attached final document I made no changes to the original text of AIA®Document A133Tm—2019 Exhibit A,Guaranteed Maximum Price Amendment,other than those additions and deletions shown in the associated Additions and Deletions Report. (Si ed) ,:,�� �\C.E P2ESI T1T (Title) 423- (Dated) AIA Document 0401—2003.Copyright©1992 and 2003.All rights reserved."The American Institute of Architects,""American Institute of Architects;"AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 13:48:48 MT on 08/08/2025 under Order No.4104248843 which expires on 09/30/2025,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (1782852464) ROUNDBS 1 j= HENSEL PHELPS ROCK Plan . BuildManage . EXAAS Bob Bennett GMP Estimate • -d2025 GMP Estimate Revision 1: Submitted 08/06/2025 Bob Bennett Complex-GMP Estimate August 4,2025 Table of Contents Tab 1 — Estimate Summary & Clarifications 1. Estimate Summary by Phase 2. Clarifications&Assumption 3. Sector Breakdown Map 4. Bidder Question&Answer Log Tab 2 — Phase 2 Estimate 1. Phase 2 Sector Summary a. 2B-Phase 2 Site b. 2C-Warehouse Expansion c. 2D-Utility Shop Expansion d. 2E-Phase 2 Main Building 2. Phase 2 Sector Detail Breakdown by Trade Tab 3 — Phase 5 Estimate 1. Phase 5 Sector Summary a. 5A-Fuel Canopy&Wash Bay including Site 2. Phase 5 Sector Detail Breakdown by Trade Tab 4 — Phase 1 Estimate 1. Phase 1 Renovations Sector Summary 2. Phase 1 Renovations Detail Breakdown by Trade Tab 5 — Schedule & Site Utilization 1. Schedule that aligns with Milestone Schedule by Owner 2. Site Utilization Tab 6 — Proposal Package Strategy I. HP Bid Package Schedule by Trade 2. HP Design Assist/Early Procurement Narrative Tab 7 - Coordination & Responsibility Matrix I. Responsibility Matrix 2. Concrete Demo Coordination Drawing 3. Demo Responsibility Matrix 4. Electrical Site Plan Markup ® HERMCL PHELPS 8/6/2025 ?Lfr.111ILa.441816. Bob Bennett Complex GMP Rev-1 Estimate Report Phase Breakdown by Bid Package Bid Package Phase 2 Phase 5 Phase 1 Renovations Total 0175 Final Clean 31,605 2,600 34,205 0330 Concrete 2,386,530 446,150 12,575 2,845,255 0335 Polished Concrete 76,812 7,920 84,732 0420 Masonry 615,496 273,000 888,496 0510 Structural Steel 2,693,650 403,575 3,097,225 0620 Millwork 319,335 26,000 345,335 0727 Waterproofing 306,901 3,000 667 310,568 0740 Roofing 887,945 202,654 1,090,599 0742 Metal Panels 597,760 597,760 0781 Fireproofing 108,000 108,000 0810 Doors,Frames&HW 571,100 22,150 1,500 594,750 0833 Overhead Doors 568,000 19,500 587,500 0841 Glass&Glazing 701,700 33,292 734,992 0929 Drywall&Framing 1,197,355 2,750 1,200,105 0930 Ceramic Tile 145,040 145,040 0951 Acoustical Ceilings 460,000 4,320 464,320 0965 Resilient Flooring 241,800 241,800 0991 Paint 451,467 460 2,756 454,683 1000 Building Specialties 361,218 1,540 10,925 373,683 1014 Building Signage 37,806 2,100 39,906 1065 Operable Partitions 35,000 35,000 1111 Storage Equipment 467,000 467,000 1111.A Fuel Island 626,800 626,800 1111.8 Vehicle Wash Bay Equipment 715,632 715,632 1130 Residential Appliances 19,900 19,900 1224 Window Coverings 28,400 28,400 1334 Pre-Engineered Metal Building 1,963,941 1,963,941 2100 Fire Protection 700,000 6,435 5,000 711,435 2200 Plumbing 1,328,000 20,046 3,260 1,351,306 2300 Mechanical 2,838,500 25,000 2,079 2,865,579 2600 Electrical 6,322,778 978,531 4,150 7,305,459 2831 Fire Alarm 235,194 22,800 257,994 3100 Earthwork 992,601 261,410 1,254,011 3213 Site Concrete 1,121,285 571,378 1,692,663 3217 Pavement Markings 12,100 3,900 16,000 3231 Fencing 116,400 207,840 1,000 325,240 3284 Landscaping&Irrigation 194,000 50,463 244,463 3300 Site Utilities 730,000 364,000 1,094,000 3311 5 W PPP 25,603 13,000 38,603 9900 Allowances 690,000 690,000 Subtotal $30,M,222 $S,2S1,9a4 $IW,274 $35 GENERAL CONDITIONS General Conditions 3,447,90S General Requirements 1,008,570 INDIRECTS&RESERVES Contractor's Bonds 281,770 Subcontractor&Supplier Bonds w/COW Builder's Risk Insurance 49,992 General Liability Insurance 340,851 CM Contingency 1,820,060 Owner Betterment 1,078,271 FEES Contractor's Fee 1,477,022 Total $45,446,821 Bob Bennett Complex–Phases 2 & 5 Q HENSEL PHELPS GMP Rev1 Cost Estimate �� Submitted: August 6, 2025 Plan. Build. Manage. Clarifications & Assumptions 01 —General Requirements 1. The following Clarifications and Assumptions are provided to convey the basis of the estimate and general approach taken by Hensel Phelps Construction Co. in the preparation of the estimate. The detailed estimate backup provided for each area of the project shall serve as a reference for all scope of work (work activity, assumed quantity and level of quality)which has been considered in this estimate. 2. This Guaranteed Maximum Price (GMP) Cost Estimate is based on a construction start date per the attached construction schedule. Should procurement of Phase 5 property and resulting design efforts extend past purchasing of Phase 2 Trade Partners, it is assumed associated costs will be incurred as change orders to contracted Phase 2 Trade Partners. 3. It has been assumed that Phase 5– Fuel &Wash Bay are being designed and purchased with Phase 2. Phase 5 cost of work has been included, but as an allowance due to the level of design development. 4. The GMP Estimate does not include any amounts for any changes in tariffs or taxes, which are enacted, passed or otherwise signed into law after the date of this GMP, Hensel Phelps shall be entitled to a corresponding increase for costs it incurs that directly or indirectly arise out of or in any way relate to changes in taxes or tariffs or similar charges due to such changes. Hensel Phelps shall also be entitled to submit a change order for additional contract time and the time related costs which arise out of or in any way relate to any changes in taxes or tariffs. 5. This project is understood to be tax exempt. No sales tax on permanently incorporated materials or Renovation taxes on Phase 1 have been included. 6. The schedule assumes normal work hours for the entire project duration. Occasional off-hour work is anticipated for special operations (i.e., concrete placements, utility shutdowns and flushing). 7. Construction working hours have been assumed to be unrestricted based on definition in City of Round Rock Municipal Code Sec 8-114 "Construction work hours"and zoning maps available on City of Round Rock CityView. 8. A stand-alone mockup is not included. 9. This Estimate is based on the following documents provided by Jacobs: a. 95% Construction Documents Specifications Volume 1 dated 7/10/25. b. 95% Construction Documents Specifications Volume 2 dated 7/10/25. c. Phase 2 Package 1 95% Construction Documents Drawings dated 7/10/25. d. Phase 2 Package 2 65% Construction Documents Drawings dated 6/23/25. e. Package 2 Design Progress Reference Sheets dated 7/10/25. f. Phase 2 Electrical Site Plan Markup dated 6/18/25 g. Package 1 80% Foundation Package Drawings dated 7/24/25 h. Package 2 80% Foundation Package Drawings dated 7/24/25 i. Fuel &Wash Plans issued 11/11/24. j. Geotechnical Reports dated 12/16/2024. k. Construction assemblies found in Phase I As-builts dated 11/13/17. I. Bidder questions/responses answered by Jacobs dated 7/03/25. m. Progressed Telecom Room Drawings dated 8/04/25 10. Currently contracted preconstruction value of$425,000 has not been included in the estimate. Page 1 of 7 Bob Bennett Complex— Phases 2 & 5 Q HENSEL PHELPS GMP Rev1 Cost Estimate Submitted: August 6, 2025 Plan. Build. Manage. Clarifications & Assumptions 11. No allowances have been included for Building, Right of Way, or Site Development Permits; this is assumed to be carried by Owner. Trade permits will be carried by the appropriate trades and will be part of the Cost of Work. 12. Costs to provide concrete paving and Vehicle Access Gate at the North Entrance of Phase 5 have been included. 13. The following contractor contingency has been included in this estimate. This contingency is intended to be able to absorb scope related to design development and is not intended to be used to fund additional scope items. a. Phase 5/Phase 1 Renovations/Allowances — 10% on Cost of Work b. Updated Package 2 Budgets—5% on Cost of Work c. PEMB/Electrical/Package 1 Scopes—3.5% on Cost of Work 14. The following Owner Betterment Allowance has been included in this estimate. a. 3%on all Cost of Work 15. The following items are understood to be Owner Furnished Owner Installed and are not included in the Estimate: a. Materials Testing b. Loose Furniture, Cubicles and Fitness Equipment c. Vending Machines d. Telecom cabling and devices e. Security cabling and devices f. Audio Visual cabling and devices g. DDC Controls h. 31d Party Commissioning i. Arborist services j. Permanent Meters 16. Work related to the Cell Phone Tower Scope is not included. 17. Any existing equipment and/or materials stored on-site are assumed to be removed by Owner prior to NTP. 18. Contractor parking will be within the Phase 2 and/or Phase 5 limits of construction per the Site Utilization Plan attached. 19. Based on previous discussions, it is assumed that temporary use utilities for construction and construction site officing will be covered as follows. a. Water: Metering and usage will be carried by the Owner. b. Power: Metering and usage will be carried by Hensel Phelps under General Requirements. 20. The following Attachments are included to supplement the basis of the estimate: a. Bidder Question &Answer Log b. Project Schedule c. Site Utilization Plan d. Bob Bennett Complex—Sector Breakdown e. HP Bid Package Schedule by Trade f. Design Assist/ Early Procurement Narrative g. Responsibility Matrix h. Concrete Demo Coordination Drawing Page 2 of 7 Bob Bennett Complex– Phases 2 & 5 GMP Rev1 Cost Estimate HENSEL PHELPS Submitted: August 6, 2025 Plan. Build. Manage Clarifications & Assumptions i. Demo Responsibility Drawing j. Phase 2 Electrical Site Plan Markup 21. Costs and Phase breakouts are for accounting purposes only. Pricing to remove or modify scope or phasing will be captured in Trend Log on a case-by-case basis. 22. We have not included budgets for Owners temporary offices, furnishings, copiers, utilities or related costs. 23. Site security personnel and site access monitoring systems are not included. 02— Existing Conditions 1. Hensel Phelps has not included any cost for environmental impact assessment or any hazardous material remediation or removal. 2. Reference Note 20 on sheets 1-G-004 and 2-G004; leveling of existing Phase 1 slabs on grade has not been included. 03—Concrete 1. Floor flatness requirements are assumed to only apply at the Warehouse expansion. 2. All new foundations for Parking Canopy P1 have been included. 3. Floor hardener has been included at all building foundations (Warehouse, Utility Shop, P3 Parking)with the exception of the Main Building due to the polished concrete floor finish. 04—Masonry 1. None. 05—Metals 1. No architecturally exposed structural steel has been included. 2. All exterior miscellaneous steel, with or without a painted finish, has been included as galvanized. 3. Provisions for a fall protection system have not been included in any Phase. 4. Monumental Stair is assumed to be concrete filled pan stair with polished concrete treads. 06—Wood, Plastics, and Composites 1. FRP has been included at the Utility Shop restroom only. 07—Thermal and Moisture Protection 1. We have not included costs for building system and building envelope commissioning and warranty period verification by an independent commissioning agent. 2. The estimate does not include destructive testing, including wind uplift testing,for the roofing system. 08—Openings 1. Door Security hardware is being supplied and installed by the Owner's Security vendor which includes the following hardware: a. Corbin Russwin i. Fail Secure Access Control CLX33605 X SN200 NZD BIPS CT6R Page 3 of 7 Bob Bennett Complex–Phases 2 & 5 Q HENSEL PHELPS GMP Rev1 Cost Estimate �P Submitted: August 6, 2025 Plan. B u i I d. Manage. Clarifications & Assumptions ii. Exit Device ED520ON-IN220 N 9134ET CT6SD iii. POE Cylindrical Lock CLX33134-IN220 NZD iv. Rim Exit Device ED520ON-SN200 N9603ET BIPS b. McKinney i. Hinges T4A3386 4 1/2 X 4 1/2 PoE-Option ii. Hinges TA2714 4 1/2 X 4 1/2 PoE-Option iii. Harness Assembly PoE-C1300PRJ iv. PoE Harness POE-C300PRJ 09—Finishes 1. All interior partitions are assumed to be non-load bearing and therefore, no delegated design cold-formed metal framed partitions are included for interior partitions. 2. STC partitions will be constructed in accordance with the drawing details. Field testing of STC ratings has not been included. 3. It has been assumed that wall finish depths for ADA and code required clearances as well as loading will be coordinated with the partition tags provided by the Designer of Record. 4. Glass railings have been included at the Monumental Stair in the Main Building Expansion. 10—Specialties 1. Reference Specification Section 10 11 00–Visual Display Units and Sheet 2-A701 - Material Index– Interior lists the following items under Div 10 Specialties but are not called out and therefore are not included except as noted below and in the estimate. a. MWB– Magnetic Erase Board –qty included as noted in the estimate b. DMB–Dry Erase Marker Board c. TB–Tackable Wall Board d. GMB- Glass Marker Boards 2. Wire Mesh Partitions WWM1 are found in the Material Index– Interior on sheet 2-A701, however none are found called out on the plans or elevations,therefore none have been included. 3. 11 — Equipment 1. No cost for relocation of existing material and/or equipment has been included at this time. 2. Any residential appliances not specifically included in the estimate detail backup has not been included. 3. Vending machines are assumed to be OFOI and are currently not included in the cost estimate. 4. This Estimate includes costs for the following Owner approved alternates: a. Bulk Storage Containers (Castors)–WH-9 b. Bulk Storage Containers (Castors–WH-10 Page 4 of 7 Bob Bennett Complex Phases 2 & 5 Q HENSEL PHELPS GMP Rev1 Cost Estimate �••� Submitted: August 6, 2025 Plan. Build. Manage. Clarifications & Assumptions 12—Furnishings 1. Loose furnishings and fixtures are Owner Furnished Owner Installed and are therefore, not included in this estimate. 2. No cubicles have been included in this estimate and are assumed to be FFE at this time. 13—Special Construction 1. The following structures have been priced as PEMB: a. Phase 2 Warehouse Expansion b. Phase 2 Utility Shops Expansion c. Phase 2 Parking Canopy P1 d. Phase 2 Parking Canopy P2 i. Extents of canopy and foundations included are per sheet 1-A001 Building Location Plan, not the extents shown on Civil or Structural Drawings e. Phase 2 Parking Canopy P3 2. No provisions for roof hung elements beyond the typical MEP systems needed to support the building are included in the PEMB scope as we understand there to be none required. 3. Currently, the drawings indicate the loading for Parking P3 to be more stringent than what was originally answered in the PP00 bidder questions. This estimate currently includes pricing for original loading per the Bidder Questions RFI #0062 and we are carrying a budget of$180,000 to cover the increase until further analysis can be completed by Red Dot. Updated pricing is anticipated to be received August 7th and an update can be provided at that time. 14—Conveying Equipment 1. None. 21 —Fire Suppression 1. Retesting of the existing fire protection building systems is included, however rework as a result of that testing is not included. Should rework be required, those costs will be treated as a change once that scope has been identified. 22—Plumbing 1. Due to the plumbing system being independent from the existing, no retesting of the existing building systems after tie in has been assumed or included. 23—Heating, Ventilating, and Air Conditioning (HVAC) 1. This estimate has included two(2)wall-mounted mini-split air conditioning units at the Phase 5 Wash-Bay structure. 25—Integrated Automation 1. Conduit pathway for DDC Controls is included, however DDC Control scope of work is understood to be by Owner's Vendor. Page 5 of 7 Bob Bennett Complex Phases 2 & 5 Q HENSEL PHELPS GMP Rev1 Cost Estimate �� Submitted: August 6, 2025 Plan. Build. Manage. Clarifications & Assumptions 26— Electrical 1. Costs for Oncor new transformer and design is assumed to be by Owner. 2. Conduit pathways only have been included for low voltages systems (Telecom, AV, Security, DDC controls, and Fire Alarm). 3. All lighting and lighting controls have been provided per Legacy Lighting's design and quote provided to Schmidt Electric. 4. Underground ductbanks for power have been included per the Site Electrical Markup Coordination drawing attached. 5. Cost for Alternate WH-A to add fans to the existing Warehouse as well as Alternate P2-A to add lighting to Parking Canopy P2 Soffit has been included per Owner direction. 27—Communications 1. Underground ductbanks for communications cabling and fiber have been included per the Site Electrical Markup Coordination drawing attached. 2. Scope for pathways has been provided per the Responsibility Matrix. Need to attach. 28— Electronic Safety and Security 1. It is assumed that the existing Silent Knight Fire alarm system will be expanded as part of the Phase 2 Main Building Expansion and that the existing Control Panel is capable of this expansion and the devices to match are readily available and supported by the manufacturer. 2. Testing of the existing fire alarm system is included, however, any remediation necessary to the existing as a result of a failed test, is not included. 3. No emergency responders' system or cellular DAS is included. 31 — Earthwork 1. We have assumed the existing site is generally at final elevation, therefore we have not included costs for large site cuts or fills. 2. We have included Geogrid and at HMAC paving per Option 2 of the Geotechnical Report. 3. We have included over-excavation of 64'at the Office, 2'-0" at the Warehouse and 0'-0"at the Utility Shop and importing of select fill to bottom of slab per the Geotech Addendum Letter#1 dated 6/25/2024. Pad at Parking Canopy P3 has been included as 2'-0"of over-excavation and select fil to bottom of slab elevation. 32—Exterior Improvements 1. No costs have been included for landscape furnishings (benches, bike racks, etc.). 2. No costs have been included for relocating existing trees or for an arborist to maintain existing trees. 3. Costs associated with water usage for landscape maintenance have not been included. 4. Currently, the Geotech calls for reinforcing of#4's at 12"on center both ways, but the Civil drawing sheet 1-0002 Note 8 under Street and Drainage Notes heading says#4's at 14" on center both ways. This estimate has included the spacing listed in the Civil drawing not the Geotech Report. Page 6 of 7 Bob Bennett Complex— Phases 2 & 5 GMP Rev1 Cost Estimate HENSEL PHELPS Submitted: August 6, 2025 Plan. Build. Manage. Clarifications & Assumptions 5. Costs associated with five(5)Automated Vehicle Access Gates have been included on the Phase 5 Site. 33— Utilities 1. We have not included temporary rerouting of existing site utilities due to demolition or excavation activities. 99—Allowances 1. 3 Hr Rated Assembly Design Development $250,000 2. Inspector Wish List $100,000 3. Zero/Six Drawing Review of Waterproofing/Envelope $7,500 4. Furniture Coordination $25,000 5. Additional Gas Line Exploration $7,500 6. Storm Trooper Interceptors $300,000 7. Phase 5 Work $5,251,884 8. Phase 1 Work $110,274 Page 7 of 7 • • Sector • • •�• Utility o . • e� _ ' � — — 1AI PHASE 2 I PHASE 2 '` IN + 'HOP BLDG: T. WAREHOUS PHASE 4/ 1 m:,Pu , w,... WASH & FucL 111111 illlllllllllllilllllllllll i MAI • . BUILDIN arm Sector 2B: Site & Civil + Covered PEMB Parking 1 • • rr II 1 RFI Template 1.Civil 5. Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFI No Phase SpeclDwy No Discipline Question D. .Submitted Response Date of Response Finish plans indicate the Utility Shop&Warehouse are to have Polished Jacobs Response:Correct,finish plans are incorrectly tagged.All floor 001 Phase 2 1-A14011-A141/1-A142 Architectural Concrete flooring finish throughout.Please confirm this is correct as existing is 6/25/2025 surfaces for both Warehouse and Utility shop should be'CFS'in lieu of 6/25/2025 Sealed and not Polished. the indicated'CFP' 002 Phase 2 Fire Protection Please confine no new fire pump is needed at the Warehouse 6/25/2025 Jacobs Response:Confimmed,no new fire pump is needed at the 6/25/2025 warehouse Jacobs Response:Per confirmation from Owner received on 6125,no Please provide Basis of Design for Static Dissipative Tile floor called out in SDT will be in scope.Telecom room will match phase 1 condition with 003 Phase 2 2-A131 Architectural "TELECOM 127" 612512025 'CFS'sealed concrete flooring.This change will occur as partof CD 612512025 devleopment between 65%and 95% 004 Phase 2 2-A700 Architectural Please confirm Tile Types for the following Rooms.Currently no designation 6130/2025 Jacobs Response:All restroom flooring will be TLV 6130/2025 on floor or partition file type.Rooms 131 B,1338,211,212 Please proivde existing fire alarm system asbuilts to determine if system is HPCC Response: Phase 1 Submittals can be found in the Drawings 005 Phase 2 284621.11 Fire Alarm capbable of meeting expansion requiremetns or networking requirements for 6/30/2025 folder on Building Connected. 7/1/2025 phase II. HPCC Response: Earthwork subcontractor to bring building pad up to Earthwork/TK Please clarify what elevation the building pad should be brought up to by the bottom of slab.All foundation elements should be neat dug by TK 006 Phase 2 Concrete Earthwork subcontractor. 6/30/2025 Concrete subcontractor with exterior face formed as noted in the contract 7/912025 Bid Package Subsystem documents. Backfill after foundation elements are placed and any fine 1.01 grading necessary prior to vapor barrier placement is by TK Conrete sub. HPCC Response: Yes,per the bid form and TK Concrete bid breakdown, 007 Phase 2 65%Construction Structural Please confirm all bidders are to include the concrete scope for the Main 6/25/2025 the Main Building Foundation should be included in the base bid even 711/2025 Documents Building Ex ansion in their bids? though it is 65%CD's. It was mentioned at the prebid that their was demolition to be included in the HPCC Response:Refer to Appendix T-Concrete Demo Responsibility 008 Phase 2 Structural Turnkey Concrete scopes.Please clarify the areas of demolition required to be 6/25/2025 Markup Drawing and Appendix U-Demolition Coordination Drawing 7/112025 included? HPCC Response: No mockup structure or tower crane foundations are 009 Phase 2 Bid Package Subsystem Structural Inclusion#1 mentions piers fora"mockup structure".Where is this mockup 71112025 71112025 1.01 defined in the documents? required,see revised language for this inclusion issued via Addendum. 010 Phase 2 Bid Package Subsystem Structural Inclusion#1 mentions piers required for a'tower crane foundation'.Where is 7/112025 HPCC Response: No mockup structure or tower crane foundations are 7/1/2025 1.01 the foundation defined in the documents? required,see revised language for this inclusion issued via Addendum. HPCC Response: Disregard requirement,any concrete pumping required 011 Phase 2 Bid Package Subsystem Structural Inclusion#32 says that,"All concrete is assumed to be pumped by the 7/1/2025 due to limitations of access and specification requirements are by 1.01 TK 711/2025 1.01 Subcontractor".Does this include small placements as well? Concrete. HPCC Response: Foundations and Slab on Metal Decks are intended to 012 Phase 2 Bid Package Subsystem Structural Inclusion#33 mention placements during"night-time hours".For bidding 7/112025 follow a typical off hours placement schedule. Exact placement times to 7/10/2025 1.01 purposes,please clarify the amount of night time placements anticipated? be coordinated and approved by HPCC Supt. Inclusion#43 mentions a"full-time,on-site superintendent".The bid package 013 Phase 2 Bid Package Subsystem Structural alludes to it,but please confirm that this person cannot be shared with another 7/112025 HPCC Response:Confirmed. 7/112025 1.01 project? HPCC Response:Confirmed,all concrete related engineering layout As tar as'engineering layout',exclusion#3 and inclusion#50 appears to 014 Phase 2 Structural As should be included in 1.01 TK Concrete pricing. Primary Control and 7/912025 Bid Package Subsystem conflict.Please clarify if engineering layout dollars should be included in secondary control(benchmarks and offsets)for the project is by CMAR. 1.01 everyone's bid? RFI Template 1.Civil 5. Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFI No. Phase SpecJDwg No. Discipline Question Date Submitted Response Date of Response 015 Phase 2 Bid Package Subsystem Structural Please clarify the expectation of inclusion#51 for"post-placement as-built 7/112025 HPCC Response: See revised language stating to'provide"as-built 7/912025 1.01 information"assist? information to the Company post placement. 016 Phase 2 Bid Package Subsystem Structural Inclusion#11 mentions"capillary fill"beneath the slab on grade.We couldn't 7/112025 HPCC Response:Per Geotech Report,no capillary is required. 7/912025 1.01 find the thickness for this on the drawings.Please clarify? Language has been updated. Bid Package Subsystem Civil Inclusion#8 mention placements during"night-time hours".For bidding HPCC Response: Pour placement plans and quantities are the 7/912025 017 Phase 2 1.08 u ses, lease clan the amount of night time placements anfici ated? 7/112025 resonsbility of the proposer,please price accordingly. HPCC Response: Yes,Rooms Mechanical 136&Electrical 137 will 018 Phase 2 Bid Package Subsystem Architectural Inclusion#1 of subsystem 1.08 mentions"exterior equipment pads".Are any 7/1/2025 require concrete equipment pads for equipment scheduled there. 7/10/2025 1.01&1.08 interior equipment pads to be included in subsystem 1.01? Proposal language has been updated to include this scope. 019 Phase 2 Subsystem 1.08 Civil This subsystem mentions specification 32 13 13-Concrete Paving.We don't 7/112025 HPCC Response: Per Table of Contents,321313 CONCRETE PAVING- 7/712025 see that spec in the Project Manual.If not included,please provide? Refer to City of Round Rock Standard Specification Series 200&300 This subsystem mentions specification 32 13 16-Decorative Concrete Paving. HPCC Response: Per Table of Contents,321316 DECORATIVE 020 Phase 2 Subsystem 1.08 Civil We don't see that sepc in the Project Manual.If not included,please provide? 7/112025 CONCRETE PAVING-Refer to City of Round Rock Standard 7/712025 Specification Series 400 Please reference detail 3 of drawing C013.This details mentions,"compacted HPCC Response:The Goetech Report was provided on Building 021 Phase 2 C013 Civil subgrade per geotech report dated April 20,2017".We don't see this report in 7/1/2025 7@712025 the contract documents.Please rovide? Connected in the Bid Documents folder with the original issuance. This drawing shows"decorative pavers".Please provide a cut section of this, Jacobs Response:No decorative pavers.This should simply be scored 022 Phase 2 C012 Civil or assumed thicknesses of all required layers? 71112025 concrete only.Will revise as art of Addendum 71312025 Inclusion#1 mentions'retaining walls and footings".By this do you mean the HPCC Response:retaining walls and footings are found at the exterior 023 Phase 2 Subsystem 1.08&C013 Civil "mortared rock wall"on drawing C013? 7/1/2025 stairs on grade located on the North and South of the Buildings. 7/1012025 Reference structural drawings 2-5-111 for these elements. Jacobs Response:Mortared rock wall is not accurate.Wall will be broom 024 Phase 2 C013 Civil Is their any engineering required for the"mortared rock wall"on drawing 7/112025 finished concrete,similar to existing phase 1 site walls.Civil will revise as 7/312025 C013?Also,please provide a specification for this scope of work. part of addendum 001.Civil will identify extent and top/bot of wall, structural will detail the retaining walls as part of package 2 development 025 Phase 2 Subsystem 1.08 Civil Inclusion#1 mentions"exterior stairs and landings".Please provide an 7/112025 HPCC Response: Exterior steps on grade found on sheet 2-5-111. 7/10/2025 example of where these are located on the drawings? 026 Phase 2 Subsystem 1.08 Civil Inclusion#1 mentions"dumpster pads".Please provide an example of where 7/112025 HPCC Response: No dumpster pads are required,disregard. Scope 711012025 these are located on the drawings? language will be updated in Addendum to reflect this. HPCC Response: Yes. In general,concrete elements shown on the 027 Phase 2 65%CD;2-1-205 Landscape Detail D3 shows a concrete"mow strip".Should this be included in the 7/112025 structurals should be priced with the 1.01 TK Concrete subsystem and 7/2/2025 Subsystem 1.08? concrete elements shown on the civils or landscape should be priced with the 1.08 Site Concrete Paving sub stem. Jacobs Response:Structural drawings are in development.Please refer to Sheet 1-0016 for elevation information regarding the plan south Please provide assumed heights for the retaining walls running east/west on retaining wall.Please also note that Civil has resolved grading at the West 028 Phase 2 65%CD;2-S101 Structural the north and south sides of the building? The drawings are not super clear. 7/112025 side of the building such that retaining wall is no longer required there. 712/2025 Structural drawings will continue development into 95%to match the Civil conditions illustrated there.Civil sheet also indicates the plan north grade condition. RFI Template 1.Civil 5. Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFI No. Phase Spec/Dwg No. Discipline Question Date Submitted Response D. •of Response Jacobs Response:Jacobs will identify on plan where the existing controller was identified to be located,but cannot confirm that it was installed at that location.Contractor will need to field verify controller location.The cistern system is separate and is next to the pump,as Please provide location of existing Irrigation Controller and electrical located by the survey.Landscape plans will be updated to reflect this 029 Phase 2 Landscape requirements(if neccessary)for new system tie-in 7/2/2025 information as well.Regarding fie-in,it's a 2-wire system and the irrigation 7/2/2025 remote control valve detail shows the wire splice with decoder.There is no need to run wires back to the controller.The cistern system is conventional wiring and can manifold the new valve next to the original. The cistern system will require connection to the controller,but is a short distance. 1-EQ100 1-EQ101 1 Jacobs Response:Refer to Spec 105600'Storage Equipment".If 030 Phase 2 EQ102 Equipment Please provide BOD and/or model#'s for required new equipment 712/2025 information requested is not represented there,please resubmit RFI 7/2/2025 question HPCC Response: Structural plinths will be required at P1 parking canopy foundations. For bidding purposes,assume footings are in place and top of footing is located 2'below top of paving. Plinths should extend from top of footing to elevation 760'to allow for a consistent steel column baseplate elevation for Parking canoy. Plinths as well as sawcutting and removal of 7/2/2025 031 Phase 2 2-S501 Structural Please clarity where"structural plinths'are required? 7/212025 paving for this work is by TKCconcrete. 711012025 Jacobs Response:Plinths will be required at all perimeter columns and will be used at interior columns as needed based on pier sizes.Plinths will be tagged in the 80%foundation set later in July. Jacobs Response:Generally,plinth heights will match the gradebeams since they are monolithically poured.This will be further clarified in the 032 Phase 2 2-S501 Structural What height should be assumed for the"structural plinths"? 7/212025 80%foundation set later in July. 7/10/2025 HPCC Response:For bidding purposes,assume only the footings are in place and new plinths will extend up to elevation 760'. The submittals provided reference Silent Knight 5700 panels with horn strobes; however,the plans include comments indicating a requirement for voice evacuation.The 5700 panel is not inherently equipped to support voice 033 Phase 2 284621.11 Fire Alarm evacuation.If a voice evacuation system is currently installed,it must be 7/2/2025 HPCC Response:Assume system was installed per the submittals. 7118/2025 utilizing a separate voice evacuation panel,as the 5700 does not have this capability.Please clarify what type of voice panel is currently installed to meet the voice evacuation requirements noted on the plans. 034 Phase 2 284621.11 Fire Alarm The fire alarm submittals for reference depict Hochiki protocol devices.Can we 712/2025 HPCC Response:Assume system was installed per the submittals. 7/1812025 confirm Hochild protocol devices are installed? If Hochiki protocol devices are installed which are no longer supported by Honeywell.Is the customer open to replacmenl of all eixitng fire alarm 035 Phase 2 284621.11 Fire Alarm detectors,modules,and other intelligent devices being repaloed with a 7/2/2025 HPCC Response:Currently Phase 1 is not part of project scope. 7/18/2025 suppored protocol such as Silent Knight.If this is the case we will need a full list of devices currently installed. RFI Template 1.Civil 5. Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10,Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT IRFI No. Phase SpeciDwg No. Discipline Question Date Submitted Response Date of Response Pricing Breakdown- The unit price breakdown for Turnkey Concrete calls for a"Dry-Shake HPCC Response:95%Spec Book section 0330000-3.8.G calls for Dry- 036 Phase 2 Turnkey Concrete General Hardener".Where is this defined in the project documents? 7/3/2025 Shake Hardener to be applied in accordance with manufacturer's 7172025 instructions Pricing Breakdown- The unild price breakdown for Turnkey Concrete calls for"FF Premium Add". HPCC Response:95%Spec Book section 0330000-3.8.0 7.a states all 037 Phase 2 Turnkey Concrete General Please define what this means? 713/2025 Slabs on Ground are to meet FF45&FL35. 7712025 Reference sheets 2-A111&2-A113 for Partial RCP Plans at the Main Building. Jacobs Response:Window treatments are identified on finish plans 038 Phase 2 2-A111.2-A113 Architectural It is unclear where the WTI&WT2 roller shades are to be located,please 7/3/2025 (Sheet 2-A13 Series drawings) 7/7/2025 clanty. Women's Locker 131A is tagged for RBI rubber base and TBI tile base,but I Jacobs Response:Tile base is required where tile flooring is indicated. 039 Phase 2 2-A131 Architectural do not find any notations or elevations showing the extent of either.Please 7/3/2025 RB is required at all other locations.Transition between base types occurs 718/2025 clarify. as location where floor types transition Jacobs Response:All egress stairs shall be concrete filled steel treads Spec Section 09 65 13-2.3 calls for rubber stair treads,risers,and stringers, and risers to match phase 1.The open stairwell is anticipated to be Section 2.4 calls for vinyl stair treads,risers,and stringers.Neither is called out polished concrete precast stair with open riser,as previously discussed. 040 Phase 2 096512-2.3/2A70012A701 Architectural on the 2-A700 Room Finish Schedule,the 2-A701 Materials Index Interiors, 7/3/2025 Paragraph identifying vinyl stair treads/riserslstnngers will be removed 7/812025 nor any of the Finish Plans.Are these to be included,and,if so,rubber or from the specification.Please note that sheet 2-A700 will be removed vinyl?At all egress stairs? from the set such that the finish plans govern without conflict.All changes will be reflected in forthcoming Addendum Jacobs Response Please note that sheet 2-A700 will be removed from the set in forthcoming addendume such that finish plans govern without conflict. Following rooms are tagged for RB1,but the Room Finish Schedule calls for Breakroom 1221123:R132 041 Phase 2 2-A131,2-A132,2-A700 Architectural R82.Please clarify.(Breakroom 122,Breakroom 123,Vestibule 131,Corridor 71312025 Vestibule 131:RBI 78,2025 C12,Corridor C13,Vestibule C14,Lobby C15,Corridor C16,Stair S3.1, C12,C13 R82 Corridor C20,Corridor C21,Corridor C22.Corridor C23,Stair 3.2) C14:RB1 C15,C16:R82 Stair 3.1:RB1 C20,C21,C22,C23:RB2 Stair 3.2:R81 Pipe size and routing of Gas Lines do not line up between"Gas Line"drawing Jacobs Response:Drawings will be clarified and revised in forthcoming 042 Phase 2 1-0036,1-CO37 Civil and"Underground Utilities'drawing.Please confirm which is correct sizing and 713/2025 Addendum 7/812025 routing. Utility Shop Restroom 320:1-A140 Finish Plan has RB3 tagged as the wall Jacobs Response: 043 Phase 2 1-A140,2-A700 Architectural base,but 2-A700 Room Finish Schedule calls for the wall base to be TB2. 7(712025 All base T132.Please note that sheet 2-A700 will be removed from the set 7/812025 Please clarify. in forthcoming addendume such that finish plans govern without conflict. Jacobs Response: 044 Phase 2 1-A141,2-A700 Architectural 1-A141 Finish Plan calls for both L02 Mezzanine rooms 327&328 to receive 717/2025 7/8/2025 RB3 wall base,but 2-A700 Room Finish Schedule calls for R131.Please clarify Al base R133.Please note that sheet 2-A700 will be removed from the set in forthcoming addendume such that finish plans govern without conflict. RFI Template 1.Civil 5. Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFINo. Phase Spec/Dwg No. Discipline Question Date Date of Response Please confirm that the demo exact limits shown are supposedJacobs Response:Great question,thank you for asking!demo/new work to be replaced limits should be taken to the nearest control/sawcut joint.This information 045 Phase 2 1-0007 Civil with concrete paving,and not the nearest(control or sawcuut)q joint?We've seen 717/2025 7114/2025 it that way on other jobs. has not been surveyed and will not be added to the drawing.We will include a general note clarifying the intent as part of the IFC set. 046 Phase 2 1-0007 Civil Please provide joint spacings(i.e.control,expansion,sawcut)for the new rigid 7/712025 HP Response:Reference Sheet 1-0002,Street&Drainage Notes#8 for paving?I don't see these details on the drawings. expansion and control joint requirements. Jacobs Response:No decorative pavers in scope.Civil drawings will be 047 Phase 2 1-0007 Civil Are the Decorative Pavers in the Site Concrete scope,or Landscaping? 7/712025 revised to identify this pattern as scored concrete.Refer to forthcoming 7/8/2025 addendum 048 Phase 2 1-0012 Civil Please confirm the scale is incorrect for drawing 1-0012? 7/7/2025 Jacobs Response Scale has been addressed 711412025 Around the south of the Utility shop building,the demolition boundaries,and 049 Phase 2 1-0007&1-0012 Civil new pavement boundaries don't match.Please clarify,or revise the paving 7/712025 Jacobs Response:Boundaries have been syncronized 7114/2025 plan? Please confirm Curb and gutter is requred at the west and southwest edges of 050 Phase 2 1-Colo Civil the warehouse rigid paving areas?It's inferred,but not specifically called out 7/7/2025 Jacobs Response:Curb and gutter have been clarified 7/14/2025 on the drawings? 051 Phase 2 1-A101 Architectural Reference sheet 1-A101,detail Al. Door P180B.1 into room P180B is an OH 71712025 Jacobs Response:No.OH door is desired by stakeholders 7/812025 door. For use of wall space and cost,could a HMDF be used in this location? Reference sheet 1-G004 Note#19. Please confirm that requirement for X-ray Jacobs Response:Confirmed,this requirement is for structural slabs only. 052 Phase2 1-G004 General 7/712025 71812025 is for structural concrete only and not concrete paving. Civil slab does not require this. 053 Phase 2 1-0016 Civil The scale for this drawing appears to be incorrect.Please clarify? 71712025 Jacobs Response.Scale has been addressed 711412025 Jacobs Response:This note cannot be removed and would apply if and Reference sheet 1-G004 Note#20. Please confirm the inclusion of rework to where specific scope shown in the construction documents would require 054 Phase 2 1-G004 General exisiting concrete floors"can be removed. It is understood that work in Phase 77/2025 it. 7116/2025 1(other than included in these drawings)is not included in scope. HPCC:Confirmed that this note would only apply to specific cases if/when encountered and directed to address by CoRR. Reference sheet 1-G004 Nate#20. Note#20 states to flatten any concrete Jacobs Response:Notes are not contradictory as specification 033000 is floors that are outside of 1/8":10' This is inconsistent with Specification intended for new concrete,whereas note 20 addresses floors that are"out 055 Phase 2 1-G004 General 033000.3.3A and ACI 117. Please confirm that tolerances in Spec 033000 71712025 of specified tolerances".Le.when and where noncompliances apse either 7116/2025 and ACI 117 will govern. in new or existing concrete,remedy shall be provided per note 20. HPCC:Reference response for RFI 054. Reference sheet 1-0002 Street&Drainage Notes#10. Power and Jacobs Response:Acknowledged.This will have to be worked out with 056 Phase 2 1-0002 Civil Communications ductbank will need a variance to traverse above storm sewer 7/712025 CoRR during the permit process 7/14/2025 utilities at SO LN G and F. Please confirm variance. Reference sheet 1-0002 Water&Wastewater Notes#8. This note should be Jacobs Response:These are standard CoRR notes and cannot be 057 Phase 2 1-0002 Civil deleted or modified. Contractually water permits,meters and usage is 7(712025 changed without express written direction by the Owner 7/14/2025 provided by the CoRR. Please confirm. Reference sheet 1-0002 Round Rock Fire Department Notes#11. It is Jacobs Response:No Knox box on the main again.Main building will 058 Phase 2 1-0002 Civil understood that existing gates or Building have knox box and no additional are 7/712025 have an added knox box at the plan West entrance.Drawings to be 7/1412025 anticipated for Phase 2 scope. Please confirm. updated as part of the 65%design effort RFI Template 1.Civil 5. Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFI No. Phase Spec/Dwg No. Discipline Question Date Submitted Response Date of Response Reference sheet 1-0002 Round Rock Fire Department Notes#8. Please 059 Phase 2 1-0002 Civil confirm who will be responsible for scheduling the pre-enhancement radio 7/7/2025 Per CoRR,City is responsible for pre-enhancement radio survey 7!16/2025 survey. Hensel Phelps or City of Round Rock. Reference sheet 1-0007. Please confirm bollards at the NW and SW comers Jacobs response:Refer to architectural sheets for demo of existing O6G Phase 2 1-0007 Civil of the existing Shop should be removed to facilitate structure be in. 7/712025 bollards at building 7 812025 Reference sheet 1-0007. The limits of demo for the water and wastewater 061 Phase 2 1-0007 Civil lines to the Shop are not coordinated with the new paving plan on Sheet 1- 7/712025 Jacobs Response:plans have been coordinated 7/14/2025 C012. Please confirm which one should govem or coordinate the limits. Reference sheet 1-0007. Concrete sidewalk demo at the north face of the 062 Phase 2 1-0007 Civil Warehouse to install the new fiber ductbank is not shown. Please confirm this 7/712025 Jacobs Response:pavement has been coordinated 7/1412025 demo. Reference sheet 1-0007. South of the Office Expansion there are two extents 063 Phase 2 1-0007 Civil of demo for water and wastewater tie ins. These are not shown as new paving 7/712025 Jacobs Response:pavement has been coordinated 711412025 on Sheet 1-0012. Please add to sheet 1-0012. Reference sheet 1.0007. West of the Office Expansion,there is an existing 064 Phase 2 1-0007 Civil light pole that will be in paving in Phase 2. Please confirm this is to be 71712025 Jacobs Response:Light pole has been shown to be removed 7/14/2025 removed. If to be relocated,please include new location. Jacobs Response:Field verify new location of sign with CoRR prior to Reference sheet 1-0007. At the south drive gate from Luther Peterson,the install.Civil drawing will be updated for proposed location in forthcoming 065 Phase 2 1-0007 Civil existing Round Rock logo sign is to be relocated. Please confirm if there is a 7/7/2025 addendum. 7116/2025 desired location. HPCC Response:CoRR to provide direction onsite for new sign location, if needed 066 Phase 2 1-0012 Civil Reference sheet 1-0012. New paving for utility tie-ins at the south of the Shop 7/712025 Jacobs Response:pavement has been coordinated 711412025 are not coordinated with the demo of Sheet 1-0007. Please coordinate. 067 Phase 2 1-0012 Civil Reference sheet 1-0012. New paving at the south of the Office Expansion for 7/7/2025 Jacobs Response:pavement has been coordinated 7/1412025 utility be-ins is not shown. Please coordinate sheet with 1-0007. Reference sheet 1-0012. The hashed areas are called in the legend to be Jacobs Response:Correct,no decorative pavers in scope.These areas 068 Phase 2 1-0012 Civil concrete pavers. Please confirm this to be Decorative Concrete and not 7/7/2025 are scored concrete.Drawings will be revised in forthcoming addendum 7/812025 avers. Reference sheet 1-0012. If decorafive pavement is confirmed,please include Jacobs Response:No decorative pavers in scope.Civil drawings will be 069 Phase 2 1-0012 Civil spec 321316 for decorative concrete. This is listed in the Volume 2 Table of 71712025 revised to identify this pattern as scored concrete.Refer to forthcoming 718/2025 Contents,but not included. addendum Reference sheet 1-0012. The stair and sidewalk at the north entrance to the Jacobs Response:Civil governs the extent of this entry that is curb,while 070 Phase 2 1-0012 Civil Office fitness room is detailed in the Package 2 stuctural drawings. Please 7/712025 structural will govern the extent of this wall at the stair where grade 71812025 change is most drastic. confirm structural details govern this stype and not civil details. HPCC:Items in question will be detailed in Structural Reference Sheet 1-5100. Reference Phase 1 documents. Phase 1 Jacobs Response: Contractor will need to demo the existing paving at foundation details for P1 indicate that the plinths terminate at grade. The each plinth location and provide the top of concrete elevation to the PEMB 071 Phase 2 1-S100 Structural plinths are not visible onsite at grade. Do the pfinths stop at underside of 717/2025 manufacturer and the design team for final coordination,design and 7/10/2025 paving?Are there plinths installed out of the mat fooling?Please provide new detailing.Contractor to provide as-built condition of each plinth that detail for adding or extending the plinth. includes installed anchor rod sizes and layout,etc.A detail with anticipated work has been provided in the 07/10 addendum. RFI Template 1.Civil 5. Mechanical 9.Fire Alarn Project Name: Bob Bennett Complex-Phases 2 8 5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFI No. Phase Spec/Dwg No. Disc,pline Questioll Date Submitted Response Date of Response Reference Sheet 1-5004 Detail 12. The loads for the darker shaded area of Jacobs Response:Darker area was a visibility item for the raised slab at 072 Phase 2 1-S004 Structural the Shop are not provided in the loading diagram legend. Please provide. 7/712025 the Utility Shop.Design loads for the entire plan are the same.The 7/10/2025 visibility item has been corrected for the 07/10 addendum. Reference Sheet 1-S102. Please confirm P2 is one section at 450LF as Jacobs Response:P2 Delegated design is ongoing and being revised to 073 Phase 2 1.5102 Structuralindicated in detail 12 this sheet. 71712025 align to design intent.Structural will update based on the final condition 7110/2025 for the 80%foundation set if decision is made in time. Reference Sheet 5-501 Continuous Footing Schedule. Reinforcing Jacobs Response:Continuous footing reinforcement schedule has been 074 Phase 2 1-5501 structural Reference 711012025 information is missing. Please provide. filled out for the 07110 addendum. Reference Sheet S-502 Detail 01. Please provide reinforcing for the mat Jacobs Response:For the 07110 addendum,a note has been added to 075 Phase 2 1-5502 Structural Reference 7110/2025 portion of the footing. Information for CF48-18 from sheet 1-5501 is missing. the detail to refer to the continuous footing schedule. Reference Sheet S-502 Detail 02. Reinforcing information is not included for Jacobs Response:Referring note in the detail has been updated to point 076 Phase 2 1-5502 Structural the vertical beam portion of the footing. Please confirm this is the same as 7/8/2025 to 01/1-5502 for additional information,which would include the 7/10/1025 01/1-S502 or provide. reinforcement. Reference Sheet S-502 Detail 02. This detail references 0111-5503 for Jacobs Response:Referring note in the detail has been updated to point 077 Phase 2 1-S502 Structuraladditional information. Sheet 1-5503 isnot included. Please provide. 7/812025 to 01/1-5502 for additional information,which would include the 7110/2025 reinforcement. Jacobs Response:Confirmed.At the contractor's option,hooks can either 078 Phase 2 1-S502 Structural Reference Sheet 5-502 Details 03,04,12. Please confirm the hook dowel is 7/812025 be included at the end of the main slab mat reinforcement bars,or Class B 7/1012025 the same sizing as the SOG mat(#4). lapped hooked dowels can be placed adjacent to the main slab mat reinforcement bars. Reference Sheet 1-S105. Continuous footing at perimeter of P3 is called to be Jacobs Response:Continuous footing reinforcement schedule has been 079 Phase 2 1-5105 Structural Reference Please provide missing bar information from CF table on 1-5501. 7/812025 filled out for the 07110 addendum. 7/10/2025 080 Phase 2 1-S105 Structural Reference Sheet 1.5105. Please provide reinforcing information for plinth P2 7/8/2025 Jacobs Response:Plinth schedule has been added to sheet 1-5501 for 7/10/2025 28. the 07/10 addendum. Reference Sheet 1-S105 Detail 11. This detail is for the north perimeter beam Jacobs Response:Detail 11 is correct as there is no Continuous Footing 081 Phase 2 1-5105 Structural at the ecnlcosed portion of P3. Please provide a CF designation so reinforcing 7/8/2025 since there is not a CMU wall.Section cuts for detail 03 have been 7/10/2025 is known. updated to 04 for the 07/10 addendum. Reference Sheet 1-S105. Detail 10 is called out as a out section for interior Jacobs Response:Section cut for detail 10 has been shifted for the 07/10 082 Phase 2 1-S105 Structural beam at the enclosed portion of P3. Please confirm this should be a 511-5502 7/812025 7/10/2025 or provide call out for looting type if 1011S502 is correct. addendum. Reference Sheet 1-S110 Detail 17. The enlargement call out at the bottom Jacobs Response:The visual issue with the Calloul reference to 06/1- 083 Phase 2 1-5110 Structuralright comer is unclear. Please clarify. 7/812025 5110 has been cleared for the 07/10 addendum. 7110/2025 084 Phase 2 1-S120 Structural Reference Sheet 1-5210.The enlargement call out on detail 17 is unclear. 7/812025 Jacobs Response:The visual issue with the Callout reference to 0611- 7110/2025 Please clarify. 5120 has been cleared for the 07/10 addendum. 085 Phase 2 1.5120 Structural Reference Sheet 1-5210 Enlargement 06. Please provide reinforcing 7/8/2025 Jacobs Response:Continuous footing reinforcement schedule has been 7110/2025 information for continuous footing CF48-18. filled out for the 07/10 addendum. Jacobs Response:Frame type"A"applies to all exterior single and double Reference Sheet 1-A600,Door Schedule Utility Shop.All frame types are doors.OH door frame conditions are dictated by the PEMB designer and 086 Phase 2 1-A600 Architectural celled out as Type A. Please provide corrected doorframe types. 7/8/2025 the selected OH door supplier.Door schedule will be updated to reflect a 71812025 "at OH doors as a result Changes will be reflected in the forthcoming addendum. Reference Sheet 1-P121. Will confirm in shop drawimg submittals,but in Jacobs Response:Yes,as long as they are installed per 2015 IPC section 087 Phase 2 1-P121 Plumbing general can vents be routed to perimeter side walls as neccessary to limif roof 7/812025 7/8/2025 emetrations? 1 093.1.4 and 093.5 RFI Template 1.Civil 5. Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT Disciplini Question Date Submitted Response Date of Response Jacobs Response:Rebar is required for all duct banks under drivable spaces.Structural will need to provide the sizing of the rebar.Structural Feedback:Entire electrical duct bank shall be encased in 3000PSI(3KSI) pea gravel concrete.Prior to concrete being poured and trench being back-filled,Oncor energy requires inspection and approval of work for 088 Phase 2 1-E500 Electrical Reference Sheet k. If re Detail qui Please confirm rebar n not required at 7/812025 extent of trenching that is included within the area of easement.Rebar 712212025 electrical ductbank. If rebar is required,please provide reinforcing information. shall be sized(5)#5 bars top and bottom with#4 stirrups at 4'-0"o/c max. Reinforcement provided is based on ACI minimums for temperature and shrinkage and assumes duct bank does NOT span or receive any direct structural loading.Alert Jacobs to any deviating conditions for further direction,prior to implementing the work. 089 Phase 2 1-E500 Electrical Reference Sheet 1-E500 Detail A5. Please confirm rebar is not required in 7/812025 Duplicate RFI,see response to item 088 above 7/8/2025 electrical ductbank. If rebar is required,please provide reinforcing information. Reference Sheet 1-E700 Lighting Fixture Schedule. Fixtures B1,B1 E,JE and Jacobs Response:Mounting heights will be identified in addendum 090 Phase 2 1-E700 Electrical JE2 reference the architectural plans for mounting heights. Heights are not 7/812025 7/812025 indicated. Please provide. issuance 091 Phase 2 1-TS101 Telecom Reference Sheet 1-TS101 Key Note#4. This ductbank to remain with 7/812025 Jacobs Response:Confirmed 7110/2025 exception of portion removed under Shop expansion. Please confirm. 092 Phase 2 1-TS101 Telecom Reference Sheet 1-TS101 Key Note#12. This handhole is not to be installed 7/812025 Jacobs Response:Confirmed.HH will not be installed. 7/1012025 per CoRR direction. Please confirm. Jacobs Response:Confirmed.vacant conduit is to be abandoned in place Reference Sheet 1-TS101 Key Note#14.These conduits will not be used in and demo'd as needed for construction of phase 2.Connection between 093 Phase 2 1-TS101 Telecom Phase 2 construction and will demoed for structural subgrade preparation. 718/2025 phase 2 OF and phase 1 MDF will run internally to the building.The 7110/2025 Please confirm. Telecom site plan will be revised in forthcoming addendum.The main building telecom design will continue as part of package 2 with next issuance being 95%in late October. Jacobs Response:The new HH structure specified to be used is the Reference Sheet 1-TS101 Key Notes#16 and#17. It is planned to install a Hubbell 36'x 60"x 30"box PG3660Z439FC4. This is a solid bottom HH straight conduit run from the new hand hole(Key Note#3)to the Warehouse. that only allows straight conduit exits from end walls or side walls.The 094 Phase 2 1-TS101 Telecom As such,items in key note#16 and#17 would not be needed based on degree 7/8/2025 only option for a single,straight conduit run is to angle the Hubbell HH to 7110/2025 of bend. Please confirm. point directly at the open bottom HH adjacent to the warehouse as the locations are offset horizontally.This would eliminate the need to the sweeps as shown. Otherwise at least one sweep will be required. Reference Sheet 1-TS101 Key Note#18. Per CoRR direction,this to be a Jacobs Response:LBs have been eliminated in the forthcoming 095 Phase 2 1-TS101 Telecom 18^X18"pull box,not an LB. Please confirm. 7/8/2025 addendum. The specified wall mounted NEMA enclosure in the final 7/10/2025 design is 18'x 18'X 8"wall box. 096 Phase 2 1-TS101 Telecom Reference Sheet 1-TS101 Key Note#1. Compromised MH to be replaced,not 7/8/2025 Jacobs Response:Confinned. Damaged MH will be removed,not 7/10/2025 relocated. Please confirm. relocated. Note has been updated in the forthcoming addendum. Reference Sheet 1-TS101 Key Note#2. No ductbank connectivity is needed Jacobs Response:Confirmed. Connection to compromised MH is 097 Phase 2 1-TS101 Telecom to the old telecomm ductbank as this will be abandoned in place. Please 7/812025 removed and keynote 2 is updated in the forthcoming addendum. 7110/2025 confirm. RFI Template 1.Civil 5. Mechanical 9.Fire Alar Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFl No. Phase Spec/Dwg No Discipline Question Date Submitted Response Date of RC-5ponse Reference Sheet 1-T104 Key Note 1. Per CoRR direction,this connection to Jacobs Response:Confirmed. On 1-T104,keynote 1 has been revised to 098 Phase 2 1-T104 Telecom be made in 18"x18"pull box,not an LB. Please confirm. 7/812025 remove LBs and to specify an 18'x 18"x 8'pull box in the forthcoming 7/10/2025 addendum. Jacobs Response:Per consultation and agreement with Austin Structured 099 Phase 2 1-T104 Telecom Reference Sheet 1-T104 Key Notes#3 and#4. Per CoRR direction,cable is 7/812025 Cabling,conduit will be used. Keynotes have been adjusted to reflect the 7/10/2025 to be ran in J-hooks not conduit. Please confirm. discussion with Austin Structured Cabling representative on 71812025 in the forthcoming addendum. Reference Sheet 1-T105 Enlargement 2.Are the BET and TEO in the NC&S Jacobs Response:Both the BET and the TEO are lockable cabinet 100 Phase 2 1-T105 Telecom to be installed as shown on the unsecure side of the room? 71812025 enclosures. Lockable cabinets for the BET and TEO are to remain in 7/10/2025 place on the plan east wall current location) 101 Phase 2 1-T105 Telecom Reference Sheet 1-T105 Detail 1 and 2. Please confirm this is Parking 7/8/2025 Jacobs Response:Confirmed. Details 1 and 2 have been corrected to 7/10/2025 Structure P3. P2 is listed. reflect parking structure 3 in the forthcoming addendum. Reference Sheet 1-0010. Ductbank routing to P3 is shown in different Jacobs Response:Electrical site plan is correct.Civil plan will be adjusted 102 Phase 2 1-0010 Civil alignemnt then the Electrical Site Plan. Please confirm Electrical She Plan to 7/812025 to match.Drawings will be revised in forthcoming Addendum 7/812025 oven. 103 Phase 2 1-S091 Structural Reference Sheet 1-S091. New cast in place stair at Warehouse(Phase 1) 7/8/2025 Jacobs Response:Stair is indicated within the 17/1-S120 plan.Specific 7/10/2025 south elevation is not shown. Please provide and confirm. reference to the stair detail has been added for the 07110 addendum. Jacobs Response:There is a 1.9'(per Civil 1-0010)between existing utility shop and immediate adjacent phase 2 utility shop.PEMB Shop Reference Sheet 1-A200 Elevations Al and B1. Confirm that at GL BE there drawings will need to be coordinated with exact grade conditions along 104 Phase 2 1-A200 Architectural should be a 1'step in metal panels due to rise in SOG FF Elevation from 7/812025 face of building(grade condition is different between south and north 7/8/2025 Phase 1 to Phase 2. sides of building.Intent would be that exposed slab face is minimized: single jog may not accommodate this.Jacobs will review shop drawings upon submission. 105 Phase 2 1-F003 Fire Alarm Reference Sheet 1-F003 Note 101. Dashed line for mezzanine above should 7/812025 HPCC Response:Correct and addressed in 07/10 Addendum 7117/2025 be around Room 312 and not around Room 311. Please confirm. 106 Phase 2 1-F011 Fire Protection Reference Sheet 1-F011 Note 710. The 6"line indicated as new is existing. 71812025 HPCC Response:Noted 6"Dry-line to be removed and replaced with new 7117/2025 Please confirm. 6"Wet-line 107 Phase 2 1-EQ100 Equipment Reference Sheet 1-EQ100 Equipment List. Please add specification 7/812025 Jacobs Response:Refer to Equipment Notes#1.Note calls out spec 7/8/2025 referemces for each item tag called out. 105600—Storage Equipment that contains all item tags. Reference Sheet 1-EQ100. How are cantelivered storage arms supported? Jacobs Response:Mounting of equipment in question will be addressed 108 Phase 2 1-EQ100 Equipment Hensel Phelps reccomends a concrete pad.Attaching to PEMB structure may 7/8/2025 7/812025 delay PEMB design. If concrete pad is acoeptable,please provide details. in forthcoming addendum. Reference Sheet 1-ED100. Is demo required of existing EV Chargers for Jacobs Response:Addendum issuance will address the relocation of 2 109 Phase 2 1-ED100 Electrical installation of new ONCOR transformer and associated pad? If so,please 7/8/2025 7/8/2025 rovide limits of demo. existing EV charging stations as well as addition of 6 more Jacobs Response:While we understand the concern,the Client is focused on native,drought tolerant options.Buffalo grass,once Will alternate to Buffalo Grass be considered?Buffalo is difficult to establish established,is hardy,low water,and low maintenance.We also 110 Phase 2 2-1-201 Landscape 7/812025 acknowledge current supply challenges.If Subcontractor would like to 7/10/2025 and suseptible to weed invasion. propose an alternative for the Client's consideration,this could be considered as a substitution request.For base bid,please price Buffalo as scheduled. RFI Template I.Civil 5. Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2 8 5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFI No. Phase Spec/Dwg No. Discipline Question •. .Submitted Response Date of Response 111 Phase 2 2-5111 Structural Please confine exterior stair located between gridlines W.5 and X are to be 7/812025 Jacobs Response:Confirmed for pricing only.A specific detail will be 7110/2025 detailed similar to that shown on 25501 provided in the 80%foundation set later in July. 2-5113,2-5114,2Sl l5,2- Jacobs Response:No roof top equipment will be placed on the roots 112 Phase 2 5116 Structural Reference Notes 4&5.Confirm no rooftop equipment is anticipated 7/812025 (requirement by the CoRR).Drawings will be updated as part of package 7110/2025 2 design development. HPCC Response:Confirmed. 113 Phase 2 Multiple Structural Outdoor Canopy to be Steel Structure ILO PEMB.Please confirm. 718/2025 Jacobs Response:Will be developed as part of pacakge 2 design 7/1012025 development 114 Phase 2 2-A520 Structural Reference Detail B1.Please provide detail for Structural Support called out. 71812025 Jacobs Response:Will be developed as part of package 2 design 711012025 development Jacobs Response:There are a number of acoustically rated partitions in 115 Phase 2 2-A602 Architectural Please confirm no Acoustical Partitions are anticipated. 7/8/2025 the project(refer to partition types on A600-series sheets).Partitions with 71812025 test number rating indicated are classified as"acoustical'assemblies. Jacobs Response:Overhead doors at package 2 are"frameless'fire 116 Phase 2 2-A610 Architectural Please provide correct Frame Type for OH Doors 112C,112D,C20C,C20D 718/2025 rated shutters.Conceptual details are shown on 2-G020.Refer to spec 7/812025 083323 for additional basis of design information Jacobs Response:Door 115.2 is an existing door/frame to remain that is scheduled to receive hardware changestadjustments,door type is irrelant Reference the following Doors:115.2,133D.2,S2.2.Please provide correct to the scope of work.Doors 131 D.2133D.2 are exterior HM door that 117 Phase 2 2-A610 Architectural Door Types as type Q,G.R are not detailed. 7/812025 should be door type TV.Door S2.2 will be removed from the project as 71812025 HP performed remediation of this existing door as part of precon services. Door types will be adjusted as part of the 95%CD development of package 2 RFI Template 1.Civil 5. Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10.Intenors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFI No. Phase Spec/Dwg No. Discipline Question Date Submitted Response Date of Respon— se Jacobs Response: 121.2-SIM to A4/B4 on 2-A630.You may also refer to A3/A-314 of the phase 1 set 123.2-SIM to A4/134 on 2-A630 126.2-SIM to A4/B4 on 2-A630 131D.2-SIM to A41134 on 2-A630.You may also refer to A1/A-314 of the phase 1 set. 133D.2-SIM to A4/B4 on 2-A630.You may also refer to A1/A-314 of the phase 1 set. 135.3-This is part of a CW system.Door jamb/head condition would be relative to the specified product.Jamb condition of full CW system would be SIM to A4 on 2-A630.Head condition will be detailed as part of 118 Phase 2 2-A610 Architectural Please provide Head/Jamb details for the fallowing Doors:121.2,1232,126.2, 7/812025 95°/CD development 7/8/2025 131D.2,133D.2,135.3,136,137,C12,C14,S3.1. 136-SIM to A41B4 on 2-A630 137-SIM to A4/B4 on 2-A630 C12-This is part of a CW system.Door jamb/head condition would be relative to the specified product.Jamb condition of full CW system would be SIM to A4 on 2-A630.Head condition will be detailed as part of 95%CD development C14-SIM to A4/134 on 2-A630.You may also refer to A11A-314 of the phase 1 set. 53.1-This is part of a CW system.Doorjamb/head condition would be relative to the specified product.Jamb condition of full CW system would be SIM to A4 on 2-A630.Head condition will be detailed as part of 95°/CD development.You may also refer to A11A-314 of the phase 1 set. Jacobs Response:Confirmed that currently installed water heater is Reference Detail 4 Confirm existing water heater that is to be replaced is electric.Pre-existing water heater was gas and replaced with an electric 119 Phase 2 2-P401 Plumbing 7/812025 71812025 electric water heater. unit by the Client when the site's gas line failed.New unit will be a gas unit.This will be reflected in the development of package 2 120 Phase 2 2-A102.2-A620 Architectural Please provide deatils for Glazing Type"N"as shown on drawing 2-A102 7/812025 Jacthe cdbs Response:ocument develtoo p is the same as type"C"Will revise as part of 7!8/2025 pmeentnt process 121 Phase 2 1-0012 Civil Please clarify the dowel requirements for the Site Paving(i.e.control joints, 7/8/2025 Jacobs Response:Refer to note 8 under"STREET AND DRAINAGE 7/10/2025 sawcut oints,etc.)?We can't seem to find these on the drawings. NOTES"on sheet 1-0002 Please verify if each run is intended to be provided in 4'segments,per the Jacobs Response,It is intended to provide 4'segments of the length 122 Phase 2 2-E202/2-A111 Electrical Luminaire Schedule(2-E700)or if the intention is to have custom lengths of 8 7/8/2025 desired.Next design submission will call out each type"M"light to 71912025 and 12'each. eliminate any confusion. A hatched fixture symbol is shown for the(2)runs of Type M.However,these are not tied into emergency circuitry and the Luminaire Schedule does not Jacobs Response:It is intended to provide BOTH a 90 minute battery 123 Phase 2 2-E20212-A111 Electrical dentify Type M as being equipped with emergency battery packs. Are these 7/8/2025 pack and be supplied by an emergency circuit.Next design submission 7/9/2025 fixtures intended to be furnished with battery packs and/or tied into will provide this information. emergency?If so,please provide an updated catalogue number and drawings with the emergency circuit designations. RFI Template 1.Civil 5 Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7,Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFI No. Phase Spec/Dwg No. Discipline Question Date Submitted Response Date of Response 1)Please verify if each run is intended to be provided in 4'segments,per the Luminaire Schedule(2-700)or if the intention is to have custom lengths scaled off Architectural RCPs. Jacobs Response.All type M fixtures will be of 4'length.Next design 1 124 Phase 2 2-E204!2-A113 Electrical 7/812025 .9'2025 a.Nole:There are multiple lengths which are not divisible by 4.If 4'segments submission will update the lighting layout in this region. are required,please provide direction and updated drawings with required lengths. 2)The Type M fixture run,second from the left,in the area between Stair (52.2)and Break Room(207)appears to go through the ceiling baffle. Jacobs Response:The light through the baffle will be removed.Next 125 Phase 2 2-E20412-A113 Electrical 71812025 7/912025 a.ls this run intended to go through the baffled?If not,please provide direction design submission will update this light, and updated drawings with required lengths. 126 Phase 2 1-ES1011 1-A00111-A100 Electrical Ref Parking Structure P1: What are the power requirements? 719/2025 Jacobs Response.Power requirements will be illustrated on forthcoming 71912025 addendum 127 Phase 2 1-ES101/1-A00111-A100 Electrical Ref:Parking Structure P1: Will lightning protection be required? 7/9/2025 Jacobs Response.Lightning protection is not required on the parking 719/2025 covers Ref:Parking Structure P1: There are no Telecom Sheets for P1.Will telecom] Jacobs Response:We believe existing telecom covers this area.It is not 128 Phase 2 1-ES101/1-A0011 1-A100 Electrical security be required? 7/912025 anticipated at this time.Will confirm with Jayson(structured cabling)to be 7/9/2025 sure Ref:Parking Structure P2: There are no Electrical Sheets for P2.What are the Jacobs Response:Refer to forthcoming addendum for P2 elec]telecom 129 Phase 2 1-A001 Electrical power and lightingrequirements? 7/912025 requirements.Also refer to associated Alternates spec 711012025 130 Phase 2 1-A001 Electrical Ref:Parking Structure P2: Will lighting protection be required? 7/912025 Jacobs Response:Lightning protection is not required on the parking 7/10/2025 covers Ref:Parking Structure P2: There are no Telecom Sheets for P2.Will telecom Jacobs Response:Refer to forthcoming addendum for P2 elec/telecom 131 Phase2 A001 Electrical 7/9/2025 7110/2025 security be required? requirements.Also refer to associated Alternates spec Jacobs Response:Refer to sheet 1-A001 detail B3 for concept diagram of Ref:Parking Structure P2: There are no Architectural Elevations,Floor Plans, PEMB delegated design structure.Reactions by PEMB supplier were 132 hose 2 A001 PEMB 7/912025 012025 RCP,or Details for P2. provided to Structural EOR with anticipation of foundation designs to be furnished by July timeframe agreed to with HP. 1-ES10111-ES102/1- Ref:Parking Structure P3: Note:Electrical refers to P3 as"Structure 2". Jacobs Response:Nomenclature of stucture 2 to the correct"P3"name 133 Phase 2 A001/1-A101/1-T105 Electrical What are the power requirements? 719/2025 will be made in addendum issuance.Refer to addendum for 7110/2025 Will lightning rotection be required powerli ght ng protection requirements 134 Phase 2 1-ES101/1-ES102/1- Electrical Ref:Parking Structure P: Note:Telecom refers to P3 as"Structure 2 Will 71912025 Jacobs Response:Refer to forthcoming addendum for corrected 7/10/2025 A00111-A101/1-T105 telecom/securitybe required beyond the Rooms P1 80A&P181 B nomenclature and scope beyond PI 80A&P181 B Foundation and Slab on ground note#24,mentions"board forming"the top 135 Phase 2 1-S001 Structural 12"of all earth formed grade beams.Please confirm this is accurate,and all 7/9/2025 Jacobs Response:Note is confirmed by the Structural EOR 7/10i2025 bidders should price accordingly? After the concrete subs demolish the paving items,please confirm the HPCC Response: Where TK Concrete is sawcutting and removing paving 136 Phase 2 1-0007 Civil Earthwork contractor is responsilble to remove what is beneath the paving? 7/10/2025 for foundation elements,they are also responsible for any excavation 7/10/2025 necessary in order to perform the work. There is"gravel"to be removed west of the warehouse building.Is this to be HPCC Response: Removal of gravel prior to site grading is considered 137 Phase 2 1-0007 Civil removed b the Earthwork contractor,or concrete contractor? 7110/2025 mass excavation and is b Earthwork. 7110/2025 138 Phase 2 1-0007 Civil Who is responsible for the fence removal on this drawing? 7/10/2025 HPCC Response:Removal of existing fence to be carried with Hensel 7/17/2025 Phelps 139 Phase 2 1-0007 Civil Who is responsible for the curb removal on this drawing? 7/1012025 HPCC Response: Curb removal and by Site Concrete 7/10/2025 140 Phase 2 1-S120&1-A112 1 Structural ISlight dimensional discrepancy between S120 and At 12. 7/14/2025 HPCC Response:20'spacing from CJ to CK grid line RFI Template 1.Civil 5. Mechanical 9.Fire Hann Project Name: Bob Bennett Complex-Phases 2 8 5 2.Landscape 6.Plumbing 10.Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFI No. Phase SpeciDwg No Discipline Question D. .Submitted Response Date of Response Mezzanine height shows 13'.Our records indicate that the existing mezzanine HPCC Response:Finish elevation for the mezzanine as shown on 1-S111 141 Phase 2 1-5111 Structural was lowered 1't in the field for an unknown reason.Do you want to field verify 7114/2025 at 113,-0" 7118/2025 and lower new mezzanine to match existing. Columns at enclosed area along grid line P3 are shown to be offset 11"from 142 Phase 2 1-5105 Structural outside of slab on 5105.Section C3/A101 shows girts as flush with columns. 7114/2025 HPCC Response:Columns will be as shown on 1S105 with 11"offset. 7/182025 Are girts at FSW to be flush as well?0-0 of column is unclear. 143 Phase 2 1-5105 Structural Interior columns at end walls are no longer shown,but required for girt span. 7/14/2025 HPCC Response:Include interior columns at end walls as required by 71182025 P2/PA and P2/PF need a column to carry end wall girts. Red Dot Inducted at P2/PA and P2/PF grids. Pre-bid RFI no.062 confirmed that'standard MBMA deflections should be acceptable"for the parking canopies.95%CDs sheet 1-5002 notes deflections used for warehouse and utility buildings,but does not list separate criteria for the parking canopies.Please confine if below assumptions are acceptable or what changes are needed: HPCC Response:Loading to be less stringent at parking canopies as 144 Phase 2 1-5002 Structural P1-H/60 drift,U180(LL)vertical frame deflection,U180(LL)puriin deflection, 7114/2025 71182025 L/90(LL)girt deflection defined in the pre-bid RFI. P2-H/60 drift,U180(LL)vertical frame deflection,U180(LL)puriin deflection, L/90(LL)girt deflection. P3-H160 drift,U180(LL)vertical frame deflection,U180(LL)puriin deflection, L/90 LL in deflection. Similar to above,RFI no.062 response clarifies that 5 PSF collateral load is acceptable for parking canopies.95%CDs sheet 1-SO02 notes only 7 PSF HPCC Response:Loading to be less stringent at parking canopies as 145 Phase 2 1-5002 Structural collateral load.Please confine if 5 PSF is acceptable for canopies. 7/14/2025 defined in the pre-bid RFI. 7/18/2025 (Warehouse and utility buildings are assumed to match existing collateral load of 10 PSF in lieu of 7 PSF). Architectural layout looks farther along than the structural layout.Structural layout is in line with the original design intent.Discussed potentially utilizing a HPCC Response:Include columns at both ends as detaled by Red Dot. 146 Phase 2 1.5102 Structural plinth at both high and low columns to maintain a consistent grade,while also 7/14/2025 711812025 eliminating the need for a bollard.Columns will be needed on both ends of the Column bearing on a plinth a(760'constant elevaton. canopy. Reference sheet 2-E600 for Electrical Single Line Diagram.The existing Phase 1 Switchboard named"DIST-OFFICE"is noted as 14 kAIC on this Jacobs Response:Switchboard kAIC ratings cannot be locked in until 135 Phase 2 2-E600 Electrical sheet,however Phase 1 submittals note the existing swithcboard to be 71162025 further into the package 2 design process.Only when loads are finished 7/172025 18kAIC.Please confine the rating of the existing switchboard is 18kAIC and being added to the design may a SKM be solidified.Until then,best whether or not this would cause for a change to the new"MSB'switchboard estimations have been made,resulting in the documents provided to date. being provided as part of Phase 2. While reviewing the documents,we noticed electrical sheet 1-E450 is listed on HPCC Response:This sheet does not exist,will be removed from Index 136 Phase 2 1-E450 Electrical the Sheet Index but was not included in the drawings. Would you please 71162025 sheet in Addendum. 7116/2025 provide us this sheet? Earthwork/TK Currently,per the Proposal Package Language,the Earthwork trade owns the HPCC Response: Language has been revised for Earthwork to provide+l 137 Phase 2 1.07 Earthwork grade to+/-0.1',who owns the delta?(earthwork,TK Concrete or Site 7116/2025 0.02'(114")for site concrete and asphalt paving areas. Building Pads Concrete Concrete?) should be left to+/-0.1'as described. Reference 030000 Paragraph 2.5 which lists 3 different types of dry shake 138 Phase 2 033000 Cast-in-Place Structural hardener. Please clarify which buildings the each dry shake floor hardener 7/17/2025 Jacobs Response:All indicated dry shake hardeners are structurally Concrete applies. Also,please confirm that all dry shake hardener can be hand cast. acceptable for all the buildings. RFI Template 1.Civil 5 Mechanical 9.Fire Alarm Project Name: Bob Bennett Complex-Phases 2&5 2.Landscape 6.Plumbing 10,Interiors Design Phase: GMP Estimate 3.Architectural 7.Fire Protection Company Name: Hensel Phelps Construction Co. 4.Structural 8.Electrical Responses due from Subs: Thursday,July 3,2025 @ 5:00 PM CT RFI No. Phase Spec/Dwg No. Discipline Question D. .Submitted Response Date of Response Refer to floor flatness requirement in specification section 033000 paragraph 033000 Cast-in-Place 3.8.7.a Slabs on Grade. Please confirm this requirement is only for the Jacobs Response:Clarify intent of RFI.It is the DT's recommendation that 139 Phase 2 Structural 7/17/2025 7/22/2025 Concrete Warehouse Building and is not applicable to the Utility Shop,P3 Parking all buildings meet this requriemenl. Canopy or the Main Building slabs on grade. HPCC Response: Yes,modifications to the bid breakdown are allowed. Excel Bid Breakdown The Excel bid breakdown form is being used for accounting and leveling 14, Phase 2 Forms General Are modifications to the Excel bid breakdown allowable? 7/1712025 only.Please modify as needed to clarify or align scope with drawings and 711812025 assumptions. Please ensure the total of the Excel bid breakdown,which should include bond costs,matches the total on the bid form. Reference Spec Section 012300 for Altemate for Parking P2 which adds lighting to Parking Canopy P2. Is the intention of sheet 1-E404 to remove(4) The intention of sheet 1-E404 to remove(4)Type S413C pole lights Type S4BC pole lights around P2 and only utilize(1)Type 34BC+(31)Type around P2 and only utilize(1)Type S4BC+(31)Type SC1A fixtures. 141 Phase 2 12300 Electrical SC1A fixtures? 7117/2025 (remove and replace option,not the additive option) 711812025 Or is the intention of sheet 1-E404 to add(31)Type SC1A in addition to the(5) Type S4BC shown around P2 on sheet 1-ES100? 0080 Sub systems1.01 TK Concrete Foundations note 3&12 conflict.Can we HPCC Response: Inclusion 12 is correct.Stockpile and remove any 142 Phase 2 1.01 TK Concrete Structural stockpile spoils and remove them after excavation operations are complete? 7/18/2025 excess excavated spoils as a result of this Subcontractor's excavation 7/17/2025 Or do we have to daily remove all spoils at the end of the day? operations from the jobsile daily or as directed by the Company.Inclusion 3 will be striken from the language p, ^ HERSOL Pl T hn, UIH.Nroa�s. 8/6/x015 Bob Bennett Complex GMP Rev-1 Estimate Report Phase 2 Breakdown by Bid Package 2B-Phase 2 Site& 2C-Warehouse- 2D-Utility Shop- Bid Package Civil+Covered Foundations,PEMB, Foundations,PEMB, 2E-Main Building Total Parkin P1,P2,P3 Interior Buildout Interior Buildout Expansion 261,341 GSF 19,300 GSF 14,550 GSF 43,595 GSF 0175 Final Clean 4,500 6,755 5,092 15,258 31,605 0330 Concrete 765,045 405,115 401,133 815,238 2,386,530 0335 Polished Concrete - 6,686 15,862 54,264 76,812 0420 Masonry 370,728 - 244,768 615,496 0510 Structural Steel 216,800 83,400 182,550 2,210,900 2,693,650 0620 Millwork - 319,335 319,335 0727 Waterproofing 31,901 - 275,000 306,901 0740 Roofing - - 887,945 887,945 0742 Metal Panels - - 597,760 597,760 0781 Fireproofing 108,000 108,000 0810 Doors,Frames&HW 28.025 24,525 110,725 407,825 571,100 0833 Overhead Doors 125,000 96,000 275,000 72,000 568,000 0841 Glass&Glazing - 1,000 700,700 701,700 0929 '�, Drywall&Framing 2,275 1,700 123,380 1,070,000 1,197,355 0930 Ceramic Tile - 1,040 144,000 145,040 0951 Acoustical Ceilings - - 460,000 460,000 0965 Resilient Flooring - 1,000 3,800 237,000 241,800 0991 Paint 9,000 74,300 109,572 258,595 451,467 1000 Building Specialties 1,350 20,800 11,253 327,815 361,218 1014 Building Signage 6,820 4,395 3,683 22,909 37,806 1065 Operable Partitions - 35,000 35,000 1111 Storage Equipment 36,500 318,300 112,200 - 467,000 1111.A Fuel Island - - 1111.B Vehicle Wash Bay Equipment - - 1130 Residential Appliances 5,000 - - 14,900 19,900 1224 Window Coverings - - 28,400 28,400 1334 Pre-Engineered Metal Building 797,759 516,877 649,305 - 1,963,941 2100 Fire Protection - 155,000 165,000 380,000 700,000 2200 Plumbing 87,000 130,000 275,000 836,000 1,328,000 2300 Mechanical 65,500 103,500 595,500 2,074,000 2,838,500 2600 Electrical 2,262,150 556,563 656,275 2,847,790 6,322,778 2831 Fire Alarm 15,000 55,005 41,530 123,659 235,194 3100 Earthwork 696,401 31,300 11,500 253,400 992,601 3213 Site Concrete 1,121,285 - - 1,121,285 3217 Pavement Markings 12,100 - 12,100 3231 Fencing 77,800 34,600 4,000 116,400 3284 Landscaping&Irrigation 194,000 - - - 194,000 3300 Site Utilities 730,000 - - 730,000 3311 SWPPP 25,603 - - 25,603 9900 Allowances 307,500 382,500 690,000 Subtotal $7,995 $2,625,821 $3,750,400 $16,206 $30,580,222 GENERAL CONDITIONS General Conditions 3,447,905 General Requirements 1,008,570 INDIRECTS&RESERVES Contractor's Bonds 281,770 Subcontractor&Supplier Bonds w/COW Builder's Risk Insurance 49,992 General Liability Insurance 340,851 CM Contingency 1,820,060 Owner Betterment 1,078,271 FEES Contractor's Fee 1,477,022 Total $40,084,663 ® HENSEL PHELPS 8/6/2025 Vt,n B'i'id Maer 1• Bob Bennett Complex GMP Rev-1 Estimate Report Phase 2 Sector Detail Bid Package Name Quantity UOM Unit Cost Total 2B-Phase 2 Site&Civil+Covered Parking(P3,P2,P3) 7,995,042 0175-Final Clean 4,500 Final Clean 261,341 GSF 0.02 4,500 0330-Concrete 765,045 P1 Covered Parking,Spread Footings(6'x6'x2'-5") 20 EA 2,500.00 50,000 PS Covered Parking,Foundations extensions/pilasters,top of pilaster at 760' 20 SOFT 1,330.00 26,600 P1 Covered Parking,Demo&Patch-back of Concrete Paving at existing column connections 2,000 SOFT 11.00 22,000 P2 Covered Parking,Spread Footings(6'x6'x2'-0") 62 EA 2,500.00 155,000 P2 Covered Parking,Concrete Pilaster at Footings(20"x20"x2'-0") 62 EA 400.00 24,800 P2 Covered Parking,Demo&Patch-back of Concrete Paving at existing column connections 2,800 SOFT 15.00 42,000 P3 Covered Parking,Grade Beam @ Screenwall(16"D x 78"W) 186 LNFT 135.00 25,110 P3 Covered Parking,Grade Beam @ Enclosed Perimeter(16"D x 78"W) 203 LNFT 135.00 27,405 P3 Covered Parking,Stem Wall at Grade Beam below CMU wall(2'-0"D x 1'-4"W) 186 LNFT 125.00 23,250 P3 Covered Parking,Interior Grade Beams 898 EA 75.00 67,350 P3 Covered Parking,Spread Footings(10'x10'x2'-0") 5 EA 6,500.00 32,500 P3 Covered Parking,Concrete Pilaster at Footings(20"x20"xT-O") 5 SOFT 400.00 2,000 P3 Covered Parking,Slab on Grade(6")@ Enclosed Area 5,156 SQFT 8.00 41,248 P3 Covered Parking Spread Footings(6'x6'x2'-0") 4 EA 2,750.00 11,000 P3 Covered Parking Concrete Pilaster at Footings P28-28 15 EA 1,000.00 15,000 Sawcutting,removal,haul-off for foundations in existing paving 1 LSUM 25,000.00 25,000 TE 2.012.28-Add Telecom Rm to Parking P3 Canopy-Grade Beam @ Enclosed Perimeter(16"D x 78"W) 24 LNFT 135.00 3,240 TE 2.012.28-Add Telecom Rm to Parking P3 Canopy-Slab on Grade(6")@ Enclosed Area 64 SOFT 8.00 512 Building Entry Concrete-Scored 6,042 SOFT 10.00 60,420 Building Entry Steps and Ramp 330 SQFT 25.00 8,250 Building Entry Ramp Walls 2,198 SOFT 42.00 92,316 Misc Concrete Coordination 5,022 SOFT 2.00 10,044 0420-Masonry 370,728 10"CMU Wall @ Covered Parking-P3(Double Wythe) 4,878 SOFT 44.00 214,632 4"CMU Wall @ Covered Parking-P3(Double Wythe) 4,878 SOFT 32.00 156,096 Coping Cap on top of Wall 355 LNFT w/Above 0510-Structural Steel 216,800 Stand-alone Steel Trellis for Outdoor BBQ area,galvanized 9 TONS 10,000.00 94,000 Miscellaneous Steel,embedded items 5 TONS 5,750.00 28,750 Overhead Door Support Steel Frame 5 EA 7,000.00 35,000 Bollards 46 EA 650.00 29,900 Rails at exterior concrete steps 106 LN FT 275.00 29,150 0727-Waterproofing 31,901 1"Polyisocayanurate Board Insulation 432 SQFT 4.40 1,901 Joint Sealants @ concrete Els and saw-cut Cls 9,500 LNFT 3.16 30,000 0810-Doors,Frames&HW 28,025 HM Doors,Exterior 6 EA 825.00 4,950 HM Frames,Single 5 OPNGS 650.00 3,250 Door Hardware Allowance 5 SETS 2,500.00 12,500 Installation of Doors&HW 6 OPNGS 500.00 3,000 TE2.012.28-Add Telecom Rm to Parking Canopy P3-HM Doors,Exterior 1 EA 825.00 825 TE2.012.213-Add Telecom Rm to Parking Canopy P3-HM Frames,Single 1 OPNGS 500.00 500 TE2.012.28-Add Telecom Rm to Parking Canopy P3-Door Hardware Allowance 1 SETS 2,500.00 2,500 TE2.012.213-Add Telecom Rm to Parking Canopy P3-Installation of Doors&HW 1 OPNGS 500.00 500 0833-Overhead Doors 125,000 Overhead Coiling Doors,20x10(power operated) 5 EA 25,000.00 125,000 0929-Drywall&Framing 2,275 Standard Interior Wall-Framing and Drywall @ P3 IDF 35 LNFT 65.00 2,275 0991-Paint 9,000 Paint Scope 1 LSUM 9,000.00 9,000 Paint Hollow Metal Frames 5 EA - w/Above Paint Steel Bollards 46 EA - w/Above 1000-Building Specialties 1,350 FEB-Fire Extinguisher bracket+108 Fire Extinguisher 3 EA 450.00 1,350 1014-Building Signage 6,820 Code Required Signage,Parking Canopy P3 4,800 GSF 0.15 720 Sign Type P3-Large 1 EA 4,500.00 4,500 Sign Type P3-Small 1 EA 1,600.00 1,600 1111-Storage Equipment 36,500 Equipment Locker-TS-2 @ P3 3 EA 4,000.00 12,000 Wall Storage-TS-3 @ P3 2 EA 500.00 1,000 Safety Cabinets-TS-4 @ P3 2 EA 7,250.00 14,500 Work Desk-TS-5 @ P3 1 EA 1,000.00 1,000 Absorbent Mat-TS-6 @ P3 3 EA 2,666.67 8,000 1130-Residential Appliances 5,000 Outdoor BBQ Grill 1 EA 5,000.00 5,000 1334-Pre-Engineered Metal Building 797,759 PEMB Canopy,PI w/HSS tube steel columns 1 LSUM 182,951.00 182,951 PEMB Canopy,P2 East w/HSS tube steel columns 1 LSUM 206,509.00 206,509 PEMB Canopy,P2 West w/HSS tube steel columns 1 LSUM 280,198.00 280,198 PEMB Canopy P3,heated storage with open parking bays and HSS tube steel columns 1 LSUM 280,601.00 280,601 TE 2.005-Early Release to Precon-Red Dot-Early Release 500 SOFT 55.00 27,500 TE 2.012.28-Add Telecom Rm to Parking Canopy P3-Metal Panels to match PEMB 1 LSUM (180,000.00) (180,000) 2200-Plumbing 87,000 Domestic Water Distribution @ P3 Enclosed 1 LSUM 12,000.00 12,000 Natural Gas 1 LSUM 25,000.00 25,000 Plumbing Fixtures&Equipment @ P3 Enclosed 1 LSUM 15,000.00 15,000 Sanitary Waste @ P3 Enclosed 1 LSUM 35,000.00 35,000 2300-Mechanical 65,500 Exhaust Fan 2 EA 9,000.00 18,000 Louvers 3 EA 5,000.00 15,000 Natural Gas Unit Heater 5 EA 4,000.00 20,000 Air Conditioning Unit @ P3 IDF 1 EA 12,500.00 12,500 2600-Electrical 2,262,150 Site-MV Ductbanks(empty for Oncor) 130 LNFT 200.00 26,000 Site-Secondary Service Feeders&Pathway 261,341 GSF 2.25 588,017 Site-Parking lot Lighting Circuits 261,341 GSF 0.33 86,243 Site-Parking Lot Light Fixture Allowance incl controls 1 LSUM 251,847.00 251,847 Site-Ltg&Convenience Pwr at Covered Parking 261,341 GSF 1.75 457,347 Site-Power,Lighting,BA Fans-Outdoor Barbecue Area 1 LSUM 54,478.00 54,478 Site-Comm Underground Pathways&Power 261,341 GSF 0.30 78,402 Site-EV Charging Stations 6 EA 16,500.00 99,000 Site-Lighting Protection&Grounding at Canopies 1 LSUM 168,000.00 168,000 Site-Temporary Construction Power Infrastructure 261,341 GSF 0.38 99,310 Site-Haul-off own spoils 1 LSUM 22,464.00 22,464 Site-Trenching 810 LSUM 200.00 162,000 Site-Remove and relocate existing lightpoles(3 each) 1 LSUM 31,179.00 31,179 TE 2.005-Move Early Work to Precon-Site-Comm Ductbanks for Fiber Reroute - - w/Precon Parking Canopy P3-Fans 1-2(Aireye 20") 2 EA 8,500.00 17,000 TE2.012.28-Add power for Telecom Rm&Mini Split 1 LSUM 10,000.00 10,000 TE 2.003-ALT P2-A-Site-Add lighting at Parking Canopy P2 1 LSUM 110,864.00 110,864 2831-Fire Alarm 15,000 Fire Alarm System at Parking Canopy P3 1 LSUM 15,000.00 15,000 3100-Earthwork 696,401 Clear&Grub 236,175 SOFT 1.15 271,601 Excavate&Recompact 12"General Fill/Moisture Condition @ Concrete Paving 4,950 CY 30.00 148,500 Pad Prep at Parking Canopy P3 1 LSUM 65,000.00 65,000 HMAC Paving including Crushed Limestone(8") 860 CY 45.00 38,700 Geogrid @ HMAC Paving/Compact Subgrade 34,520 SOFT 5.00 172,600 3213-Site Concrete 1,121,285 Concrete Paving(7") 149,300 SOFT 6.65 992,845 Sidewalks(4") 3,535 SQFT 10.05 35,527 Curb&Gutter 1,714 LNFT 27.00 46,278 Misc Site Concrete(Curbs,Bases,bollards,etc.) 261,341 GSF 0.15 39,201 Flume 413 SOFT 18.00 7,434 3217-Pavement Markings 12,100 Fire Lane Striping 2,365 LNFT 1.06 2,500 Pavement Marking/Striping-Parking Stalls 251 STALL 35.86 9,000 ADA Sign 1 EA 500.00 500 Concrete wheel stop 1 EA 100.00 100 3231-Fencing 77,800 Fencing-8'Chain Link 900 LNFT 77.78 70,000 Fencing-10'Chain Link w/Barbed Wire 70 LNFT 85.71 6,000 Chain Link Swing Gate 1 EA 1,800.00 1,800 3284-Landscaping&Irrigation 194,000 Irrigation System 1 LSUM 62,000.00 62,000 --Cedar Elm 15 EA - w/Above ---Eve's Necklace 1 EA - w/Above ---Seedless Desert Willow 7 EA - w/Above ---TexasRedbud 3 EA w/Above Landscaping 1 LSUM 132,000.00 132,000 Trees - - w/Above --Indian Hawthorn 38 EA - w/Above ---Juniper 30 EA - w/Above ---Phoenix Bird of Paradise 9 EA w/Above ---Pink Muhly 51 EA - w/Above - --PurpleTrailingLantana 7 EA - w/Above ---Red Yucca 37 EA - w/Above ---Texas Sage 50 EA - w/Above ---Yellow Bells 8 EA w/Above Shrubs - - w/Above ---Bermuda Grass 2,032 SOFT - w/Above ---Buffalo Grass 25,231 SQFT w/Above ---Decomposed Granite 1,154 SQFT - w/Above ---Mountain Pea 863 EA w/Above ---Mulch 1,116 SQFT - w/Above ---River Rock 367 SQFT - w/Above ---Texas Sedge 1,938 EA - w/Above ---TrailingRosemary 931 EA - w/Above Ground Covers - - w/Above 3300-Site Utilities 730,000 Demo of Existing Utilities 1 LSUM 50,000.00 50,000 Domestic Water Improvements 1 LSUM 130,000.00 130,000 Sanitary Sewer Improvements 1 LSUM 55,000.00 55,000 Natural Gas Improvements 1 LSUM 150,000.00 150,000 Storm Drain Improvements 1 LSUM 345,000.00 345,000 3311-SWPPP 25,603 SWPPP Startup&NOI Permitting 1 LSUM 1,750.00 1,750 CISE Inspection Services(Monthly) 15 MNTH 450.00 6,750 Silt Fence 1,190 LNFT 3.00 3,570 OSHA Safety Caps 196 EA 2.00 392 Area Inlet Protection 13 EA 100.00 1,300 Stabilized Construction Entrance 1 EA 1,950.00 1,950 Revegetation Area for soil stabilization 5,000 SOFT 0.65 3,250 Tri Dikes at Spoils Area 200 LNFT 9.50 1,900 Tri Dikes at West&North Building Excavation-Warehouse 238 LNFT 9.50 2,261 Tri Dikes at West&North Building Excavation-Utility Shop 261 LNFT 9.50 2,480 9900-Allowances 307,500 Additional Gas Line Exploration 1 LSUM 7,500.00 7,500 Storm Trooper Interceptors 1 LSUM 300,000.00 300,000 X-Wareham FoundatI M,PEMB,Ntterior OVUM 2,625,121 0175-Final Clean 6,755 Final Clean 19,300 GSF 0.35 6,755 0330-Concrete 405,115 Grade Beams(30"D x 16"W) 2,329 LNFT 75.00 174,675 Perimeter Footings(4'x4'x2'-6") 4 EA 1,500.00 6,000 Perimeter Footings(6'x4"x2'-6") 17 EA 1,900.00 32,300 Spread Footings(6'x6'x2'-6") 6 EA 2,750.00 16,500 Continuous Footings,CF48-18 111 LNFT 150.00 16,650 Slab on Grade(8") 13,560 SOFT 8.25 111,870 --Dry-Shake Hardener(w/above) - - w/above --Underslab Vapor Barrier(w/above) w/above Sawcutting,removal,haul-off for foundations in existing paving 1 LSUM 20,000.00 20,000 Misc Concrete Coordination 13,560 GSF 2.00 27,120 0335-Polished Concrete 6,686 Sealed Concrete 6,078 SOFT 1.10 6,686 0510-Structural Steel 83,400 Miscellaneous Steel,embedded items 2 TONS 6,000.00 12,000 Overhead Door Support Steel Frame 6 EA 7,000.00 42,000 Bollards 36 EA 650.00 23,400 HRE-1,guardrails at CIP concrete steps,galvanized 24 LNFT 250.00 6,000 0810-Doors,Frames&HW 24,525 HM Doors,Exterior 5 EA 825.00 4,125 HM Frames,Single 4 OPNGS 650.00 2,600 Door Hardware Allowance 4 SETS 2,500.00 10,000 Installation of Doors&HW 5 OPNGS 500.00 2,500 TE2.012.2C-Add Telecom Rm to Warehouse-HM Doors,Exterior 2 EA 825.00 1,650 TE2.012.2C-Add Telecom Rm to Warehouse-HM Frames,Dbl 1 OPNGS 650.00 650 TE2.012.2C-Add Telecom Rm to Warehouse-Door Hardware Allowance 1 SETS 2,500.00 2,500 TE2.012.2C-Add Telecom Rm to Warehouse-Installation of Doors&HW 1 OPNGS 500.00 500 0833-Overhead Doors 96,000 Overhead Coiling Doors,10x9(power operated) 6 EA 16,000.00 96,000 0929-Drywall&Framing 1,700 Rated Partition-Framing and Drywall @ WH IDF 26 LNFT 65.38 1,700 0965-Resilient Flooring 1,000 Rubber Base 240 LNFT 4.17 1,000 0991-Paint 74,300 Paint Scope 1 LSUM 55,000.00 55,000 Paint Hollow Metal Frames 4 EA - w/Above Paint Steel Bollards 36 EA w/Above PT-S--Exposed Ceilings 10,070 SOFT - w/Above Misc.Paint 19,300 GSF 1.00 19,300 1000-Building Specialties 20,800 FEB-Fire Extinguisher bracket+10#Fire Extinguisher 4 EA 200.00 800 Bird Netting at open covered storage 4,000 SOFT 5.00 20,000 1014-Building Signage 4,395 Code Required Signage 19,300 GSF 0.15 2,895 Exterior Building Signage 2 EA 750.00 1,500 1111-Storage Equipment 318,300 Pallett Rack-WH-1 58 EA 1,206.90 70,000 Pallett Rack,w/Dividers-WH-2 7 EA 2,071.43 14,500 Cantilever Pipe Rack-WH-3 67 EA 626.87 42,000 Safety Cabinet-WH-4 6 EA 2,133.33 12,800 Floor Beam Rack-WH-5 1 EA 2,500.00 2,500 Bulk Storage Containers-WH-6 150 EA 1,000.00 150,000 Variable Width Reel Dispenser-WH-7 1 EA 1,000.00 1,000 General Storage Rack-WH-8 5 EA 1,400.00 7,000 Bulk Storage Containers(Castors)-WH-10 30 EA 516.67 15,500 Bulk Storage Containers(Castors)-WH-9 4 EA 750.00 3,000 1334-Pre-Engineered Metal Building 516,877 Pre-Engineered Metal Building 1 LSUM 516,877.00 516,877 2100-Fire Protection 155,000 Wet Pipe System 10,070 GSF 15.39 155,000 Dry Pipe System @ Covered Storage 9,230 GSF - w/Above Demo Existing Dry Pipe System 1 LSUM - w/Above 2200-Plumbing 130,000 Domestic Water Distribution 19,300 GSF 2.33 45,000 Natural Gas 19,300 GSF 1.55 30,000 Plumbing Fixtures&Equipment 19,300 GSF 0.78 15,000 Sanitary Waste 19,300 GSF 2.07 40,000 2300-Mechanical 103,500 Exhaust Fan 2 EA 15,000.00 30,000 Louvers 2 EA 5,500.00 11,000 Natural Gas Unit Heater 6 EA 8,333.33 50,000 Air Conditioning Unit @ Warehouse IDF 1 EA 12,500.00 12,500 2600-Electrical 556,563 Electrical Service&Distribution-Normal Power 19,300 GSF 1.20 23,160 Lighting and General Power 19,300 GSF 4.80 92,640 Lighting Fixture Package incl Controls 1 LSUM 26,847.00 26,847 Building Temporary Lighting and Power 19,300 GSF 0.55 10,615 Low Voltage Pathways and backboxes 19,300 GSF 5.75 110,975 LighTONSing Protection System&Grounding loop 1 LSUM 47,148.00 47,148 MEP&Misc Equipment Connections 19,300 GSF 3.75 72,375 Covered Storage Area-Lighting only 9,734 GSF 4.50 43,803 Fans 3-8,15,16(Aireye 20") 8 EA 8,500.00 68,000 TE 2.001-ALT EWH-A-Fans 9-14(Aireye 20") 6 EA 8,500.00 51,000 TE2.012.2C-Add power for Telecom Rm&Mini Split 1 LSUM 10,000.00 10,000 2831-Fire Alarm 55,005 Fire Alarm System 19,300 GSF 2.85 55,005 3100-Earthwork 31,300 Excavate 5'-0"@ Building Pad 460 CY 30.00 13,800 Import 4'-6"of Select Fill @ Building Pad 350 CY 50.00 17,500 3231-Fencing 34,600 Chain Link Sliding Gate 8 EA 2,000.00 16,000 Chain Link Swing Gate 2 EA 1,800.00 3,600 Fencing-10'Chain Link w/Barbed Wire 160 LNFT 93.75 15,000 2D-Utility Shop-Foundations,PEMB,Interior Buildout 3,750,399 0175-Final Clean 5,092 Final Clean 14,550 GSF 0.35 5,092 0330-Concrete 401,133 Grade Beams(30"D x 16"W) 1,394 LNFT 75.00 104,550 Perimeter Footings(4'x4'x2'-6") 5 EA 1,250.00 6,250 Perimeter Footings(6'x4"x2'-6") 18 EA 1,500.00 27,000 Spread Footings(6'x6'x2'-6") 7 EA 2,750.00 19,250 Slab on Grade(6") 12,078 SOFT 8.25 99,644 ---Dry-Shake Hardener(w/above) w/above --Underslab Vapor Barrier(w/above) w/above Slab on Metal Deck(3.5"NW) 2,422 SOFT 11.00 26,642 Misc Concrete Coordination 14,550 GSF 2.00 29,100 Sawcutting,removal,haul-off for foundations In existing paving 25,342 GSF 3.50 88,697 0335-Polished Concrete 15,862 Sealed Concrete 14,420 SOFT 1.10 15,862 0510-Structural Steel 182,550 Miscellaneous Steel,embedded items 2 TONS 6,000.00 12,000 Overhead Door Support Steel Frame 11 EA 7,000.00 77,000 Bollards 37 EA 650.00 24,OS0 Metal Stair and railings,21 rsrs each 2 EA 20,000.00 40,000 HRW-1,steel wall mounted handrail at CIP stair 12 LNFT 150.00 1,800 HRM-1,steel pipe wall rail 11 LNFT 75.00 825 GRM-1,steel 3 line guardrail at Mezz 60 LN FT 150.00 9,000 GRW-1,3 line steel guardrail 65 LN FT 275.00 17,875 0810-Doors,Frames&HW 110,725 HM Doors 28 EA 825.00 23,100 HM Frames,Total 22 OPNGS 650.00 14,300 Door Hardware Allowance 22 SETS 2,500.00 55,000 Installation of Doors&HW 28 OPNGS 500.00 14,000 TE2.012.2D-Add Telecom Rm to Utilities Shop-HM Doors,Exterior 1 EA 825.00 825 TE2.012.2D-Add Telecom Rm to Utilities Shop-HM Frames,Single 1 OPNGS 500.00 500 TE2.012.2D-Add Telecom Rm to Utilities Shop-Door Hardware Allowance 1 SETS 2,500.00 2,500 TE2.012.2D-Add Telecom Rm to Utilities Shop-Installation of Doors&HW 1 OPNGS 500.00 500 0833-Overhead Doors 275,000 Overhead Coiling Doors,12x16(power operated) 11 EA 25,000.00 275,000 0841-Glass&Glazing 1,000 Interior Storefront 50 SOFT 20.00 1,000 0929-Drywall&Framing 123,380 Standard Interior Wall-Framing and Drywall 23,609 SOFT 5.14 121,380 Rated Interior Wall-Framing and Drywall 1,410 SOFT - w/Above Painted Gypsum Ceiling 400 SOFT - w/Above In-Wall Blocking 1 LSUM 2,000.00 2,000 0930-Ceramic Tile 1,040 riileFlooring-TL4 60 SOFT 16.67 1,000 Schluter Metal Edge 3 LN FT 6.67 20 Floor Protection 60 SOFT 0.33 20 0965-Resilient Flooring 3,800 Rubber Base 1,460 LNFT 2.60 3,800 0991-Paint 109,572 Paint Scope 1 LSUM 95,000.00 95,000 PT-1--Gypsum Ceilings 400 SOFT - w/Above PT-2--Interior Walls 24,651 SOFT w/Above PT-5--Exposed Ceilings 11,700 SOFT - w/Above Paint Steel Bollards 37 EA - w/Above Paint Hollow Metal Frames 22 EA - w/Above Misc.Paint 14,572 GSF 1.00 14,572 1000-Building Specialties 11,253 FEB-Fire Extinguisher bracket+10#Fire Extinguisher 6 EA 200.00 1,200 FEC-Semi-Recessed FE Cabinet+10#Fire Extinguisher 6 EA 1,000.00 6,000 FRPI-FRP Wall Panels at Restroom Walls 247 SOFT 12.50 3,088 CG2-Corner Guards 9 EA 45.00 405 TA-1 TOILET TISSUE(ROLL)DISPENSER, OFCI 1 EA 35.00 35 TA-2 PAPER TOWEL(ROLL)DISPENSER, OFCI 1 EA 35.00 35 TA-3 WASTE RECEPTACLE, OFCI 1 EA 35.00 35 TA-4 SOAP DISPENSER,OFCI 1 EA 35.00 35 TA-SA 18"GRAB BAR 1 EA 65.00 65 TA-5B 36"GRAB BAR 1 EA 85.00 85 TA-5C 42"GRAB BAR 1 EA 95.00 9S TA-8 MIRROR,24"x 48" 1 EA 175.00 175 1014-Building Signage 3,683 Code Required Signage 14,550 GSF 0.15 2,183 Room ID Signs 5 each 150.00 750 Exterior Building Signage 1 EA 750.00 750 1111-Storage Equipment 112,200 Bulk Storage Rack-WS-1 14 EA 842.86 11,800 Safety Cabinet-WS-9 2 EA 2,500.00 5,000 Safety Cabinet-WS-9.1 2 EA 750.00 1,500 Pallet Rack-WS-10 1 EA 1,500.00 1,500 Wire Rack-WS-11 1 EA 1,500.00 1,500 Spill Containment-WS-12 1 EA 1,500.00 1,500 Welding Fume Exhaust Capture-WS-18 1 EA 7,500.00 7,500 Bench Grinder-WS-25 1 EA 1,000.00 1,000 Bulk Storage Rack-WS-1.1 13 EA 830.77 10,800 Parts Storage Cabinet-WS-2 9 EA 2,166.67 19,500 Work Station-WS-3 2 EA 2,000.00 4,000 Work Bench-WS-4 10 EA 1,720.00 17,200 Tool Storage Cabinet-WS-5 3 EA 2,466.67 7,400 Lockable Desk-WS-6 1 EA 3,000.00 3,000 Slatwall Mounted Storage-WS-7 2 EA 9,250.00 18,500 Media Reel Rack-WS-8 1 EA 500.00 500 1334-Pre-Engineered Metal Building 649,305 Pre-Engineered Metal Building 1 LSUM 639,305.00 639,305 Sealing additional MEP Penetrations 1 LSUM 10,000.00 10,000 2100-Fire Protection 165,000 Wet Pipe System 14,572 GSF 11.32 165,000 2200-Plumbing 275,000 Compressed Air 14,550 GSF 4.12 60,000 Domestic Water Distribution 14,550 GSF 4.47 65,000 Natural Gas 14,550 GSF 3.09 45,000 Plumbing Fixtures&Equipment 14,550 GSF 2.7S 40,000 Sanitary Waste 14,550 GSF 4.47 65,000 2300-Mechanical 595,500 Air Conditioning Unit 2 EA 12,500.00 25,000 Air Handling Unit 1 EA 255,000.00 255,000 Condensing Unit 3 EA 4,000.00 12,000 HVAC Ductwork&Piping 14,572 GSF 10.29 150,000 Natural Gas Unit Heater 8 EA 3,500.00 28,000 Air Conditioning Unit @ Utility Shop IDF 1 EA 12,500.00 12,500 Air Curtain 4 EA 6,250.00 25,000 Diffusers,Registers&Grilles 18 EA 166.67 3,000 Exhaust Fan 7 EA 9,285.71 65,000 Louvers 8 EA 2,500.00 20,000 2600-Electrical 656,275 Electrical Service&Distribution-Normal Power 14,550 GSF 5.95 86,573 Electrical Service&Distribution-Emergency Power 14,550 GSF 1.55 22,553 Lighting and General Power 14,550 GSF 9.00 130,950 Lighting Fixture Package incl Controls 1 LSUM 39,349.00 39,349 Building Temporary Lighting and Power 14,550 GSF 1.00 14,550 Low Voltage Pathways 14,550 GSF 8.00 116,400 LighTONSing Protection Grounding Riser 1 LSUM 11,640.00 11,640 LighTONSing Protection System&Grounding loop 1 LSUM 49,661.00 49,661 MEP&Misc Equipment Connections 14,550 GSF 12.00 174,600 TE2.012.2D-Add power for Telecom Rm&Mini Split 1 LSUM 10,000.00 10,000 2831-Fire Alarm 41,530 Fire Alarm System 14,572 GSF 2.85 41,530 3100-Earthwork 11,500 Import 4'-6"of Select Fill @ Building Pad 230 CY 50.00 11,500 2E-Main Building Expansion 16,208,959 0175-Final Clean 15,258 Final Clean 43,595 GSF 0.35 15,258 0330-Concrete 815,238 Grade Beams(30"D x 18"W) 1,126 LNFT 150.00 168,900 Pier Caps 73 EA 1,100.00 80,300 Slab on Grade(5")(copy) 25,417 SOFT 6.00 152,502 ---Underslab Vapor Barrier(w/above) -SOFT - w/above Slab on Metal Deck(3.5"NW) 20,198 SOFT 4.50 90,891 Concrete fill for pan stairs 1 LSUM 15,000.00 15,000 Misc Concrete Coordination 43,595 GSF 2.00 87,190 Sawcutting,removal,haul-off for foundations in existing paving 22,838 SQFT 2.75 62,805 Piers @ Main Building 314 vLNFT 425.00 133,450 Piers @ Outdoor BBQ Steel Trellis 11 EA 2,200.00 24,200 0335-Polished Concrete 54,264 Joint Filler 1,350 LNFT 2.55 3,442 Sealed Concrete 2,870 SQFT 1.10 3,157 Polished Concrete-Level 2,low sheen,400 grit 11,837 SOFT 2.60 30,776 Floor Protection(RAM Board) 11,837 SOFT 0.75 8,878 Mock-Up,10'x 10' 1 EA 1,500.00 1,500 Epoxy Grout Coat 11,837 SOFT 0.55 6,510 0420-Masonry 244,768 Exterior 3 5/8"CMU Block 7,084 SOFT 32.00 226,688 4"CMU Wall @ Exterior Stair 565 SOFT 32.00 18,080 Coping Cap on top of Wall 650 LNFT - w/Above 0510-Structural Steel 2,210,900 Structural Steel Framing 203 TONS 6,000.00 1,218,000 Metal Decking,L2 SOMD 23,400 SOFT 10.00 234,000 Roof Decking 31,200 SOFT 10.00 312,000 Miscellaneous Steel,embedded items 8 TONS 6,000.00 48,000 Overhead Door Support Steel Frame 4 EA 7,500.00 30,000 Overhead Steel for Operable Partitions 32 EA 500.00 16,000 Overhead Toilet Partition Supports 80 LNFT 500.00 40,000 Lavatory Countertop Support Steel 56 LNFT 350.00 19,600 CMU wall head supports 67 EA 400.00 26,800 Demo existing steel trellis at West Tie-in 1 LSUM 8,000.00 8,000 Balcony Railing at monumental stair overlook,3 Form infill w/Millwork 56 LNFT 250.00 14,000 Steel Trellis at West Entry,galvanized 5 TONS 12,500.00 62,500 TE 2.006-Revised Monumental Stair Railings-Monumental Steel Stair and railings 28 RSRS 3,000.00 84,000 TE 2.007-Revised Egress Stair Railings-Egress Stair,Concrete Pan Filled w/Landings&Handrail 28 RSRS 3,500.00 98,000 0620-Millwork 319,335 Restroom Base Cabinets-P1.2 65 SOFT 575.00 37,375 Breakroom Base Cabinets-PL2 168 SOFT 325.00 54,600 Breakroom Upper Cabinets-PL2 252 SOFT 240.00 60,480 3Form Panel Infill @ Stair Overlook-SRPI 712 SOFT 175.00 124,600 Restroom Countertops-SSM2 509 SOFT 29.98 15,260 Breakroom Countertops-SSM2 593 SQFT 45.56 27,020 0727-Waterproofing 275,000 Exterior EJ @ Building Tie-In 70 LNFT 142.86 10,000 Fluid Applied Air Barrier 22,685 SOFT 5.07 115,000 Interior EJ Cover Assembly @ Building Tie-In 196 LNFT 127.55 25,000 Polyurethane Sealants 1,700 LNFT 5.88 10,000 SeLNFT-Adhered Flexible Flashing 7,579 LNFT 2.64 20,000 1"Polyisocayanurate Board Insulation 18,310 SOFT 4.37 80,000 Firestop Sealants 515 LNFT 29.13 15,000 0740-Roofing 887,945 Standing Seam Metal Roof,24ga 29,115 SOFT 30.50 887,945 Downspouts 525 LNFT - w/Above Rooftop Gutters 590 LNFT - w/Above 0742-Metal Panels 597,760 Exterior Metal Wail Panels,24ga 9,300 SOFT 38.00 353,400 Soffit Panels,22ga 5,960 SOFT 41.00 244,360 0781-Fireproofing 108,000 1-Hr Intumescent Fireproofing @ Exposed Members 1 LSUM 52,000.00 52,000 1-Hr Sprayed Applied Fireproofing 8,480 SOFT 6.60 56,000 0810-Doors,Frames&HW 407,825 HM Doors 9 EA 825.00 7,425 HM Frames,Total Three Sided 40 EA 650.00 26,000 HM Frames,w/Sidelites 50 EA 2,100.00 105,000 Wood Doors-Single,PL-2 Finish 86 EA 650.00 55,900 Interior Hollow Metal Window Frames 12 EA 750.00 9,000 Door Hardware Allowance 90 SETS 1,500.00 135,000 Installation of Doors&HW 95 OPNGS 500.00 47,500 Auto Operators 2 EA 3,500.00 7,000 Budget-Temp Exterior Doors 12 EA 1,250.00 15,000 0833-Overhead Doors 72,000 Fire Shutters 10x10 4 EA 18,000.00 72,000 0841-Glass&Glazing 700,700 Aluminum-Framed Door w/Hardware 10 LEAF 6,300.00 63,000 1-Hr Fire Rated Storefront System 596 SOFT 528.52 315,000 Exterior Storefront 638 SOFT 62.70 40,000 Punched Openings 1,802 SOFT 59.38 107,000 Horizontal Sunshades 216 LNFT 277.78 60,000 I nterior Storefront 354 SOFT 42.37 15,000 Full Height Mirror @ FiTONSess Room 105 SOFT 23.81 2,500 Frameless Wall Mounted Mirror 117 SOFT 21.37 2,500 Door Vision Lites 2,531 SOFT 17.78 45,000 Glass Railings at Monumental Stair 78 LNFT 650.00 50,700 0929-Drywall&Framing 1,070,000 Standard Interior Wall-Framing and Drywall 64,759 SOFT 16.21 1,050,000 Cold-Formed Metal Framing 49,700 SOFT - w/Above Rated Interior Wall-Framing and Drywall 5,090 SOFT - w/Above Painted Gypsum Ceiling 4,000 SOFT - w/Above In-Wall Blocking 1 LSUM 20,000.00 20,000 0930-Ceramic Tile 144,000 TileFlooring-TU 1,437 SOFT 17.40 25,000 Tile Flooring-TL4 304 SOFT 16.45 5,000 Tile Backsplash-TL3 628 SOFT 29.46 18,500 Tile Wall-TU 3,857 SOFT 17.24 66,500 Tile Wall-TL2 385 SOFT 50.65 19,500 Schluter Dilex inside and outside corners 93 EA 26.88 2,500 Schluter Dilex Metal Cove 524 SOFT 7.63 4,000 Schluter Metal Edge 369 LNFT 6.78 2,500 Floor Protection 1,741 SOFT 0.29 500 09S1-Acoustical Ceilings 460,000 Acoustical Ceiling,2'x 2'-APC-1 25,150 SOFT 10.74 270,000 Acoustical Wall Panels-AWPS/AWP2/AWP3 425 SOFT 47.06 20,000 Wood Veneer Panels-AMC-1 2,600 SOFT 65.38 170,000 0965-Resilient Flooring 237,000 Carpet Tile,24"x24"-CPTS 25,893 SOFT 6.18 160,000 Entrance Mat-EM 595 SOFT - w/Above Transition Strips 467 LNFT - w/Above Rubber Base,2-1/2"H-RBI 4,560 LNFT 2.41 11,000 Rubber Base,6"H-R82 1,200 LNFT 3.33 4,000 Resilient Athletic Flooring-RAF1 1,700 SOFT 36.47 62,000 Rubber Base-RBR 135 LNFT - w/Above 0991-Paint 258,595 Paint Scope 1 LSUM 215,000.00 215,000 PT-1--Gypsum Ceilings 4,000 SOFT - w/Above PT-2--Interior Walls 119,459 SOFT - w/Above PT-S--Exposed Ceilings 8,750 SOFT - w/Above PT-2--Interior Walls 90 EA - w/Above Misc.Paint 43,595 GSF 1.00 43,595 1000-Building Specialties 327,815 DMB-Dry Erase Markerboards,up to 8'high AFF 1,537 SOFT 75.00 115,275 Toilet Compartments-ADA 6 EA 2,000.00 12,000 Toilet Compartments-Standard 11 EA 2,000.00 22,000 Toilet Compartments-Urinal Screen 4 EA 650.00 2,600 CG1-Corner Guards 216 EA 45.00 9,720 End Wall Guards(Stainless) 8 EA 450.00 3,600 TA-1 TOILET TISSUE(ROLL)DISPENSER, OFCI 17 EA 35.00 S95 TA-2 PAPER TOWEL(ROLL)DISPENSER, OFCI 6 EA 35.00 210 TA-3 WASTE RECEPTACLE,OFCI 6 EA 35.00 210 TA-4 SOAP DISPENSER, OFCI 6 SETS 35.00 210 TA-SA 18"GRAB BAR 6 EA 65.00 390 TA-58 36"GRAB BAR 7 EA 85.00 S95 TA-5C 42"GRAB BAR 7 EA 95.00 665 TA-SD TWO-WALL SHOWER STALL GRAB BAR 4 EA 365.00 1,460 TA-5E 18"VERTICAL GRAB BAR 6 EA 35.00 210 TA-6 SANITARY NAPKIN DISPOSAL UNIT 10 EA 200.00 2,000 TA-7 SANITARY NAPKIN DISPOSAL VENDOR 3 EA 250.00 750 TA-8 MIRROR,24"x 48" 18 EA 400.00 7,200 TA-9 TOILET STALL HOOK 21 EA 25.00 S25 TA-10 SHOWER CURTAIN ROD 8 EA 65.00 520 TA-11 SHOWER CURTAIN 8 EA 50.00 400 TA-12 Folding Shower Seat 2 EA 355.00 710 TA-13 Soap Dish-w/Tile -EA - TA-14 Robe Hook 8 EA 15.00 120 TA-15 Diaper Changing Station 2 EA 1,000.00 2,000 TA-16 Custodial Utility SheLNFT 1 EA 350.00 350 TA-17 Custodial Mop and Broom Holder 1 EA 500.00 500 Fire Extinguisher and Cabinet 5 EA 1,000.00 5,000 Fire Extinguisher w/bracket only 10 EA 200.00 2,000 Metal Lockers w/built in boot storage and bench,Mens Restroom 102 EA 1,000.00 102,000 Metal Lockers w/built in boot storage and bench,Womens Restroom 34 EA 1,000.00 34,000 1014-Building Signage 22,909 Code Required Signage 43,595 GSF 0.25 10,899 Sign Type 4-Room ID Signs 65 EA 1S0.00 9,750 Sign Type 12-Restroom Room ID 8 EA 65.00 520 Sign Type 13-Stair ID 4 EA 60.00 240 Exterior Building Signage 1 EA 1,500.00 1,500 1065-Operable Partitions 35,000 Operable Panel Partition at Multi-Purpose/Break Rm(STC 52) 1 LSUM 35,000.00 35,000 1130-Residential Appliances 14,900 Microwave 3 EA 800.00 2,400 Dishwasher 1 EA 1,000.00 1,000 Garbage Disposal 2 EA 500.00 1,000 Icemaker 1 EA 1,000.00 1,000 Refrigerator 3 EA 2,500.00 7,500 Coffee Maker 2 EA 1,000.00 2,000 1724-Window Coverings 28,400 WT-1,Single Roller Shades 46 EA 500.00 23,000 WT-2,Dual Roller Shades 6 EA 900.00 5,400 2100-Fire Protection 380,000 Dry Pipe System @ Exterior BBQ Canopy 1,856 GSF - w/Above Wet Pipe System 43,389 GSF 8.76 380,000 2200-Plumbing 836,000 Domestic Water Distribution 43,595 GSF 6.19 270,000 Natural Gas 43,595 GSF 0.34 15,000 Plumbing Fixtures&Equipment 43,595 GSF 5.53 241,000 Sanitary Waste 43,595 GSF 7.11 310,000 2300-Mechanical 2,074,000 Air Conditioning Unit 5 EA 28,000.00 140,000 Air Handling Unit 2 EA 312,500.00 625,000 Condensing Unit 8 FA - w/Above Fan Powered Box 50 EA 2,540.00 127,000 HVAC Ductwork&Piping 43,595 GSF 20.64 900,000 Electric Unit Heater 2 EA 3,500.00 7,000 Exhaust Fan 6 EA 7,500.00 45,000 Louvers 9 EA 2,777.78 25,000 VAV Box 18 EA 1,388.89 25,000 Diffusers,Registers&Grilles 632 EA 284.81 180,000 2600-Electrical 2,847,790 Electrical Service&Distribution-Normal Power 43,595 GSF 8.95 390,175 Electrical Service&Distribution-Emergency Power 43,595 GSF 1.50 65,393 Lighting and General Power 43,595 GSF 29.90 1,303,491 Lighting Fixture Package incl Controls 1 LSUM 443,771.00 443,771 Building Temporary Lighting and Power 43,595 GSF 1.00 43,595 Low Voltage Pathways 43,595 GSF 4.00 174,380 LighTONSing Protection Grounding Riser 1 LSUM 24,298.00 24,298 LighTONSing Protection System&Grounding loop 1 LSUM 76,291.00 76,291 MEP&Misc Equipment Connections 43,595 GSF 4.75 207,076 Refed Ex Dist Board in Office from New MSB 1 LSUM 119,320.00 119,320 TE 2.005-Move Early Work to Precon-Data logger on existing gear to validate Phase 1 loads - - w/Precon 2831-Fire Alarm 123,659 Fire Alarm System 43,389 GSF 2.85 123,659 3100-Earthwork 253,400 Excavate 5'-0"@ Building Pad 3,380 CY 30.00 101,400 Import 4'-6"of Select Fill @ Building Pad 3,040 CY 50.00 152,000 3231-Fencing 4,000 Fencing-8'Chain Link @ Mechanical Yard 50 LNFT 80.00 4,000 9900-Allowances 382,500 3-Hr Rated Assembly Design Development 1 LSUM 250,000.00 250,000 Furniture Coordination 1 LSUM 25,000.00 25,000 Inspector Code Interpretation 1 LSUM 100,000.00 100,000 Zero/Six Drawing Review of Waterproofing/Envelope 1 LSUM 7,500.00 7,500 SWPPP-Initial Installation 130,000 SOFT 0.10 13,000 Subtotal $30,580,221 pMRsI PHELPS P4411. ISMeuat�. 8/6/2025 Bob Bennett Complex GMP Rev-1 Estimate Report Phase 5 Breakdown by Bid Package Bid Package 5A-Fuel(F)&Wash(W)Bays Total 130,000 GSF 0175 Final Clean 2,600 2,600 0330 Concrete 446,150 446,150 0335 Polished Concrete 7,920 7,920 0420 Masonry 273,000 273,000 0510 Structural Steel 403,575 403,575 0620 Millwork 0727 Waterproofing 3,000 3,000 0740 Roofing 202,654 202,654 0742 Metal Panels 0781 Fireproofing 0810 Doors,Frames&HW 22,150 22,150 0833 Overhead Doors 19,500 19,500 0841 Glass&Glazing 0929 Drywall&Framing 0930 Ceramic Tile 0951 Acoustical Ceilings 0965 j Resilient Flooring 0991 Paint 460 460 1000 Building Specialties 1,540 1,540 1014 j Building Signage 2,100 2,100 1065 Operable Partitions 1111 Storage Equipment 1111.A Fuel Island 626,800 626,800 1111.8 Vehicle Wash Bay Equipment 715,632 715,632 1130 Residential Appliances 1224 Window Coverings 1334 Pre-Engineered Metal Building 2100 Fire Protection 6,435 6,435 2200 Plumbing 20,046 20,046 2300 Mechanical 25,000 25,000 2600 Electrical 978,531 978,531 2831 Fire Alarm 22,800 22,800 3100 Earthwork 261,410 261,410 3213 Site Concrete 571,378 571,378 3217 Pavement Markings 3,900 3,900 3231 Fencing 207,840 207,840 3284 Landscaping&Irrigation 50,463 50,463 3300 Site Utilities 364,000 364,000 3311 SWPPP 13,000 13,000 9900 Allowances - Subtotal $5,251,884 $$,2$3,884 GENERAL CONDITIONS General Conditions w/Phase 2 General Requirements w/Phase 2 INDIRECTS&RESERVES Contractor's Bonds w/Phase 2 Subcontractor&Supplier Bonds w/COW Builder's Risk Insurance w/Phase 2 General Liability Insurance w/Phase 2 CM Contingency w/Phase 2 Owner Betterment w/Phase 2 FEES Contractor's Fee w/Phase 2 Total $5,251,884 ® HENSEL PHELPS 8/6/2025 rlaa.Itll/.MI.a Ir. Bob Bennett Complex GMP Rev-1 Estimate Report Phase 5 Detail Bid Package Name Quantity UOM Unit Cost Total SA-r.el(n&Wal sm SA51.es4 0175-Final Clean 2,600 Final Clean 130,000 GSF 0.02 2,600 0330-Concrete 446,150 Fuel Island Canopy,Grade Beams(30"D x 16"W) 330 LNFT 145.00 47,850 Fuel Island Canopy,Mix Concrete(Curbs,Pads,Grout,Bolts) 3,000 GSF 5.00 15,000 Fuel Island Canopy,Perimeter Footings(4'x4'x2'-6") 2 EA 2,250.00 4,500 Fuel Island Canopy,Perimeter Footings(6'x4"x2'-6") 7 EA 2,500.00 17,500 Fuel Island Canopy,Slab on Grade(6")Incl dry shake hardener and underslab vapor barrier 3,000 SQFT 7.75 23,250 Fuel Island Canopy,Spread Footings(6'x6'x2'-6") 3 EA 2,750.00 8,250 Wash Bays,Grade Beams(30"D x 16"W) 920 LNFT 145.00 133,400 Wash Bays,Misc Concrete(Curbs,Pads,Grout,Bolts) 7,400 GSF 5.00 37,000 Wash Bays,Perimeter Footings(4'x4'x2'-6") 4 EA 2,250.00 9,000 Wash Bays,Slab on Grade(6")incl dry shake hardener and underslab vapor barrier 7,400 SQFT 7.75 57,350 Wash Bays,Spread Footings(6'x6'x2'-6") 1 EA 1,850.00 1,850 Wash Bays,Vehicle Wash Pit Walls(5'x10") 2,400 SQFT 38.00 91,200 0335-Polished Concrete 7,920 Sealed Concrete 7,200 SOFT 1.10 7,920 0420-Masonry 273,000 Exterior 3 5/8"CMU Block 7,800 SOFT 35.00 273,000 0510-Structural Steel 403,575 Roof Framing at wash bay 37 TONS 8,250.00 301,125 Roof Decking at wash bays 8,150 SOFT 9.00 73,350 Miscellaneous Steel,embedded items 1 TONS 6,000.00 6,000 Overhead Door Support Steel Frame 1 EA 7,500.00 7,500 Bollards 24 EA 650.00 15,600 0727-Waterproofing 3,000 Waterproofing&Sealants 7,800 SOFT 0.38 3,000 0740-Roofing 202,654 Standing Seam Metal Roof,24ga 7,600 SOFT 26.67 202,654 Gutter/Downspouts 160 LNFT - w/Above 0810-Doors,Frames&HW 22,150 HM Doors,Exterior 5 EA 1,750.00 8,750 HM Frames,Single Exterior 3 OPNGS 500.00 1,500 HM Frames,Double Exterior 1 OPNGS 650.00 650 Door Hardware Allowance 5 SETS 1,750.00 8,750 Installation of Doors&HW 5 OPNGS 500.00 2,500 0833-Overhead Doors 19,500 Overhead Coiling Door,Equip Room,10x10(power operated) 1 EA 19,500.00 19,500 0991-Paint 460 Paint Hollow Metal Frames 4 EA 115.00 460 1000-Building Specialties 1,540 TA-1 TOILET TISSUE(ROLL)DISPENSER,OFCI 1 EA 35.00 35 TA-2 PAPER TOWEL(ROLL)DISPENSER,OFCI 1 EA 35.00 35 TA-3 WASTE RECEPTACLE,OFCI 3 EA 200.00 600 TA-4 SOAP DISPENSER,OFCI 1 EA 35.00 35 TA-5B 36"GRAB BAR 1 EA 65.00 65 TA-5C 42"GRAB BAR 1 EA 85.00 85 TA-8 MIRROR,24"x 48" 1 EA 400.00 400 TA-17 Custodial Mop and Broom Holder 1 EA 250.00 250 Fire Extinguisher w/bracket only(copy) 1 EA 35.00 35 1014-Building Signage 2,100 Room ID Signs 4 EA 150.00 600 Exterior Building Signage,Wash Bay 1 EA 750.00 750 Exterior Building Signage,Fuel Canopy 1 EA 750.00 750 1111.A-Fuel Island 626,800 Backfill Material 1 LSUM 7,600.00 7,600 Barricades/Fencing/Erosion Control 1 LSUM 1,500.00 1,500 Canopy&Canopy Installation 1 LSUM 95,000.00 95,000 Crane Service 1 LSUM 6,500.00 6,500 Demo&Removal 1 LSUM 1,000.00 1,000 Equipment Start-Up Travel,Mileage and Labor 1 LSUM 6,000.00 6,000 Fuel Electrical labor&Materials 1 LSUM 83,000.00 83,000 Fuelmaster Cloud Based Fuel Management System 1 LSUM 25,000.00 25,000 Gasboy Dispensers 1 LSUM 55,500.00 55,500 Heavy Equipment Required for Installation 1 LSUM 17,000.00 17,000 Hose/Nozzle/Swivel Assemblies 1 LSUM 6,000.00 6,000 Installation Travel,Mileage and Labor 1 LSUM 125,000.00 125,000 OPW Island Forms 1 LSUM 6,500.00 6,500 Permitting 1 LSUM 1,900.00 1,900 Pipe Fittings 1 LSUM 1,500.00 1,500 Sails Haul Off 1 LSUM 3,000.00 3,000 Sumps&Hardware 1 LSUM 3,100.00 3,100 Tank&Tank Freight I LSUM 120,000.00 120,000 Tank Pipe Fittings 1 LSUM 1,200.00 1,200 Tank Valves/Fittings/Hardware 1 LSUM 35,000.00 35,000 Tank/Line/Leak Detector Testing 1 LSUM 1,000.00 1,000 Vedeer Root TLS450PLUS ATG 1 LSUM 24,500.00 24,500 1111.6-Vehicle Wash Bay Equipment 715,632 Wash Bay Equipment Allowance 3 EA 238,544.00 715,632 2100-Fire Protection 6,435 Wet Pipe System 1,170 GSF 5.50 6,435 2200-Plumbing 20,046 Domestic Water Distribution 7,800 GSF 0.85 6,630 Sanitary Waste 7,800 GSF 0.77 6,006 Plumbing Fixtures 7,800 GSF 0.95 7,410 2300-Mechanical 25,000 Air Conditioning Unit 2 EA 12,500.00 25,000 2600-Electrical 978,531 Electrical Service&Distribution-Normal Power 8,000 GSF 3.00 24,000 Lighting and General Power 8,000 GSF 12.00 96,000 Lighting Fixture Package incl Controls 1 LSUM 44,245.00 44,245 MEP Equipment Power&hookups 1 LSUM 15,000.00 15,000 Building Temporary Lighting and Power 8,000 GSF 1.00 8,000 Low Voltage Pathways 8,000 GSF 5.00 40,000 Lightning Protection System&Grounding loop 8,000 GSF 1.25 10,000 Site-MV Ductbanks(empty for Oncor) 250 LNFT 490.00 122,500 Site-Comm Ductbanks(empty for Provider) 250 LNFT 490.00 122,500 Site-Secondary Service Feeders&Pathway 130,000 GSF 1.05 136,500 Site-Parking lot Lighting Circuits 130,000 GSF 0.26 33,800 Site-Parking Lot Light Fixture Allowance incl controls 1 LSUM 36,300.00 36,300 Site-Comm Underground Pathways&Power 130,000 GSF 0.2S 32,500 Site-Landscape&Other Decorative Lighting 130,000 GSF 0.40 52,000 Site-Temporary Construction Power Infrastructure 130,000 GSF 0.20 26,000 Site-Trenching 1 LSUM 106,152.00 106,152 Haul-off own spoils 1 LSUM 23,034.00 23,034 TE 2.010-Phase 5 Gate Modifications-Site-Power&Security for gates 5 EA 10,000.00 50,000 2831-Fire Alarm 22,800 Fire Alarm System 8,000 GSF 2.85 22,800 3100-Earthwork 261,410 Clear&Grub 130,000 SOFT 0.50 65,000 Excavate&Recompact 12"General Fill/Moisture Condition @ Concrete Paving 2,240 CY 30.00 67,200 TE 2.010-Phase S Site Modifications-North Rd Transition - - w/below TE 2.010-Phase 5 Site Modifications-Remove and haul-off existing 4,500 SOFT 15.00 67,500 TE 2.010-Phase S Site Modifications-Excavate&Recompact 12"General Fill/Moisture Condition @ Concrete Paving 167 CY 30.00 5,010 TE 2.010-Phase 5 Site Modifications-Crushed base 112 CY 45.00 5,040 TE 2.010-Phase 5 Site Modifications-South Entrance - - w/below TE 2.010-Phase 5 Site Modifications-Remove and haul-off existing(copy) 3,000 SOFT 15.00 45,000 TE 2.010-Phase 5 Site Modifications-Excavate&Recompact 12"General Fill/Moisture Condition @ Concrete Paving(copy) 111 CY 30.00 3,330 TE 2.010-Phase 5 Site Modifications-Crushed base(copy) 74 CY 45.00 3,330 3213-Site Concrete 571,378 Concrete Paving(8") 60,220 SQFT 7.90 475,738 Curb&Gutter 930 LNFT 8.00 7,440 Misc Site Concrete(Curbs,Bases,etc.) 130,000 GSF 0.15 19,500 TE 2.010-Phase 5 Site Modifications-North Rd Transition - - w/below TE 2.010-Phase S Site Modifications-Concrete paving 7"at North Rd 4,500 SQFT 7.90 35,550 TE 2.010-Phase 5 Site Modifications-Curb&Gutter 250 LNFT 27.00 6,750 TE 2.010-Phase 5 Site Modifications-South Entrance - - ./below TE 2.010-Phase 5 Site Modifications-Concrete paving 7" 3,000 SQFT 7.90 23,700 TE 2.010-Phase 5 Site Modifications-Curb&Gutter 100 LNFT 27.00 2,700 3217-Pavement Markings 3,900 Pavement Markings 130,000 GSF 0.03 3,900 3231-Fencing 207,840 Fencing-46'Vehicle Sliding Gates 5 EA 28,000.00 140,000 Fencing-8'Chain Link 1,060 LNFT 64.00 67,840 3284-Landscaping&Irrigation 50,463 Landscape&Irrigation 130,000 GSF 0.39 50,463 3300-Site Utilities 364,000 Utilities-Water 130,000 GSF 0.40 52,000 Utilities-Waste Water 130,000 GSF 0.25 32,500 Utilities-Storm Sewer 130,000 GSF 2.15 279,500 3311-SWPPP 13,000 SWPPP-Initial Installation 130,000 SQFT 0.10 13,000 Subtotal $5,251,884 HENSEL PHELPS 8/6/2025 ri.rr.211e.M.logo. Bob Bennett Complex GMP Rev-1 Estimate Report Phase 1 Renovations Breakdown by Bid Package Bid Package Phase 1 Renovations Total 0175 Final Clean 0330 Concrete 12,575 12,575 0335 Polished Concrete 0420 Masonry 0510 Structural Steel 0620 Millwork 26,000 26,000 0727 Waterproofing 667 667 0740 Roofing 0742 Metal Panels 0781 Fireproofing 0810 Doors,Frames&HW 1,500 1,500 0833 Overhead Doors 0841 Glass&Glazing 33,292 33,292 0929 Drywall&Framing 2,750 2,750 0930 Ceramic Tile 0951 Acoustical Ceilings 4,320 4,320 0965 Resilient Flooring 0991 Paint 2,756 2,756 1000 Building Specialties 10,925 10,925 1014 Building Signage 1065 Operable Partitions 1111 Storage Equipment 1111.A Fuel Island 1111.13 I Vehicle Wash Bay Equipment 1130 Residential Appliances 1224 Window Coverings 1334 Pre-Engineered Metal Building 2100 Fire Protection 5,000 5,000 2200 Plumbing 3,260 3,260 2300 Mechanical 2,079 2,079 2600 Electrical 4,150 4,150 2831 1 Fire Alarm 3100 Earthwork 3213 Site Concrete 3217 Pavement Markings 3231 i' Fencing 1,000 1,000 3284 Landscaping&Irrigation - 3300 Site Utilities 3311 SWPPP 9900 Allowances Subtotal $110,274 $110,274 GENERAL CONDITIONS General Conditions w/Phase 2 General Requirements w/Phase 2 INDIRECTS&RESERVES Contractor's Bonds w/Phase 2 Subcontractor&Supplier Bonds w/COW Builder's Risk Insurance w/Phase 2 General Liability Insurance w/Phase 2 CM Contingency w/Phase 2 Owner Betterment w/Phase 2 FEES Contractor's Fee w/Pha ? Total $110,274 ® HENSEL PHELPS 8/6/2025 rl.n.g.iu. M-1,. Bob Bennett Complex GMP Rev-1 Estimate Report Phase 1 Renovation Detail Bid Package Name Quantity UOM Unit Cost Total 1A-Phase 1 Renovations 110,274 0330-Concrete 12,575 TE 1.008.01-Modify existing vehicle gate-Pourback Paving at Old Loop 50 LNFT 35.00 1,750 TE 1.008.01-Modify existing vehicle gate-Removal of Existing Loop&Wire 50 LNFT 20.00 1,000 TE 1.008.01-Modify existing vehicle gate-Sawcut Concrete Paving at New Loop 100 LNFT 25.00 2,500 TE 2.011-Level 2 Leak Mitigation-Sawcut concrete landing for trench drain and remove 20 SOFT 35.00 700 TE 2.011-Level 2 Leak Mitigation-Pourback concrete with trench drain 15 SQFT 200.00 3,000 TE 1.008.06-Women's Mud Room-Pourback SOG 50 SOFT 35.00 1,750 TE 1.008.06-Women's Mud Room-Sawcut SOG 75 LNFT 25.00 1,875 0620-Millwork 26,000 TE 1.008.14-Provide wardrobes at corridor-7'high Wardrobe,2'deep 50 LNFT 520.00 26,000 0727-Waterproofing 667 Self-Adhered Flexible Flashing 5 LNFT 10.00 50 TE 1.008.08-Address surface cracks-Patch crack exposed in corridor and at control joint 100 LNFT 2.67 267 TE 1.008.08-Address surface cracks-Retool and replace sealant 100 LNFT 3.50 350 0810-Doors,Frames&HW 1,500 TE 1.008.03-Modify existing personnel gate-Panic Hardware 1 EA 500.00 500 TE 1.008.03-Modify existing personnel gate-Plates to prevent exterior access to hardware 1 EA 1,000.00 1,000 0841-Glass&Glazing 33,292 Aluminum-Framed Door w/Hardware 1 LEAF 6,300.00 6,300 TE 1.008.07-Add Security Door at N.Corridor-Aluminum-Framed Door w/Hardware 2 LEAF 6,250.00 12,500 TE 1.008.11-Add Security Door at Lobby-Aluminum-Framed Door w/Hardware 2 LEAF 6,250.00 12,500 Horizontal Sunshades 6 LNFT 278.00 1,668 Door Vision Lites 18 SOFT 18.00 324 0929-Drywall&Framing 2,750 TE 1.008.06-Women's Mud Room-Interior Partition 100 SQFT 8.00 800 TE 1.008.06-Women's Mud Room-Partial demo&patch existing drywall ceiling/wall for new fixture and wall tie-it 1 LSUM 1,000.00 1,000 TE 1.008.17-Water Meter Rm-Remove and replace drywall 100 SOFT 9.50 950 0951-Acoustical Ceilings 4,320 TE 1.008.04-Add acoustical clouds at Crew Area-Hanging Acoustical Cloud 6 PNLS 720.00 4,320 0991-Paint 2,756 TE 1.008.06-Women's Mud Room-Tape,float,paint new walls 100 SOFT 2.81 281 TE 1.008.06-Women's Mud Room-Tape,float,paint patched walls/ceilings 1 LSUM 150.00 150 TE 1.008.17-Water Meter Rm-Tape,float&Finish drywall patch 100 SOFT 1.50 150 TE 1.008.09-Correct beam color at 3 exterior beams-Paint existing red beam 300 SOFT 3.50 1,050 TE 1.008.09-Correct beam color at 3 exterior beams-Prep beam and blast to remove existing paint 300 SOFT 3.75 1,125 1000-Building Specialties 10,925 TE1.008.15-Bird Netting at existing dock 2,185 SOFT 5.00 10,925 2100-Fire Protection 5,000 TE 1.008.04-Add acoustical clouds at Crew Area-Rework fire protection 1 LSUM 5,000.00 5,000 2200-Plumbing 3,260 TE 1.008.06-Women's Mud Room-Tie-Into existing drain line to add new drain extension 1 LSUM 800.00 800 TE 1.008.06-Women's Mud Room-New drain body and grating 1 LSUM 1,100.00 1,100 TE 1.008.06-Women's Mud Room-F-1 plumbing fixture 1 EA 410.00 410 New Drain Piping @ Existing Exterior Stair 25 LNFT 20.00 500 Trench Drain @ Level 2 Landing 5 LNFT 90.00 450 2300-Mechanical 2,079 TE 1.008.06-Women's Mud Room-Add supply air 110 SOFT 18.90 2,079 2600-Electrical 4,150 TE 1.008.06-Women's Mud Room-Remove can light 1 LSUM 150.00 150 TE 1.008.17-Water Meter Rm-Rerun wiring to existing switches 1 EA 500.00 500 TE 1.008.01-Modify existing vehicle gate-Extend underground conduit,direct buried 50 LNFT 25.00 1,250 TE 1.008.06-Women's Mud Room-Add exit sign 1 EA 250.00 250 TE 1.008.06-Women's Mud Room-Linear Fixture 1 EA 1,000.00 1,000 TE 1.008.17-Water Meter Rm-Add swith to current water meter room including conduit and wiring 1 EA 1,000.00 1,000 3231-Fencing 1,000 TE 1.008.01-Modify existing vehicle gate-Install new Vehicle Detection Loop Wiring 1 LSUM 1,000.00 1,000 Subtotal $110,274 MZ4 2025 2026 207'JJ on No. 12n F.e w - An Ae al p.t Jan ree Jd on I>.t a) Neaa W Slab F114h k7' Rux 2Camelgbn Start Da p& 25 ♦PneulCmslrvtrarr 51ar1 P rile,2•CW 6 Unde09uk T7d l 12& 25 23-Da-2s —Rrau 2-Cwi 6 Underground R1ax2-SPutlwn 68Nkby E-10pa 1364 02-Det-25 09-Jun-26 Rau 2.511.11-6a ,ig Envelope Pneae 5•CIN,6 undergraM 76d 13•Hrr26 2 •26 —Rax 5•Cwi 6 UrlMgrwrne Piax SC9rotnAtlon Surt Oil 1}pn•26 •Pnax SCanslructan Sutt Plape 2-&Wdae 6 FilWas 103d lO.Mer•26 19•Nov-ze PMu2-BuidMi Intoes ptlase 5•$IrwturM i B11gtlFr Hoch. 6" •26 26-3426 —Rau 5•SlrwwrY 6 Birkgg Emebpe Pnsu 5•BwIdP1Y 6 F'biYws e-!d 20.Ju626 zi!—.26 PMxS• dpul6 imbaa IOmra Tarrant _ _ Ods lN,—Turroar 2e-Nw.ze2 Ttanspwunm 407d 1]•May24 W-0et•25 +o RFP.CMAR(PlKveurAaon) 15d 1744W-24 0'2-Jun-2<gp RFP-CMM Rlvlelr/Stan/MfYNws lb IOJ-24 2&Jun•24 RFP-CMAR Review/Score/Imerv-30 "1CMMU*WCwiratConn140 01•Ju1.24 19-JW24 aa�RFP-CMM Legal Contract CORfl eO AFP-CMM Ci—Q Appr6val 150 22•)1424 12•Aua•24 I�RFP•CMAR Council Approval m Daslan liparl.nn Room Dau S6eas 650 254a 24 M0 -24 Dev n g Report nnn Room Dau Sntns a0 (Diq•Revrew min 51—e der Gray 174 04F9b•25 19• 25 a�I lAil.Revr<..N1n 5lakefroMe GmuV 180 30%orawmgs end BOplw Review 30d IW.a 25 31•Ma•25 Ibaa�50%Dr, ,,— DIP,It— oo E%v Rewew of IMDil lrrq 100 01 .2S 144P-25Ma�Crly aev—,io Draoingz A1110 63%DeYgn CevekprrlaK Owlet Pia%/spn:i,zii— SOd 15•Ap•25 2}Jua•25 6'%—ei,Developnait.DevBn Ram/SP<tlntngns A1120 FdY lkbne PUMage-9s%E1NE Wara1—i Shoe K PaAbga Sod I5•Ap•25 2}Aaw25 Ea0,RPa 12!•95%EINI,Wnelwse 6 Shoe IFC ii—kge At1A0 Cayaewew of 65%Drawrras 15d 24Jaw25 14Ju625 c7-7-1-1— A 1170 Caarl Apprw 0065%EaMp 695%Eery 12Yaae P.Aye 2b 25 0}Sg25 —1 ApP—of 65%GMP 695%Earh RNeax Paduge A1190 9S%Dear D1lWAppnere,Darien Pons/SpadaraOae OFP LQ Sea Is 17.Oct-25 X95%Design 01.,61 em DevgnpWs/spetiKdlwm(PP Sn) A1180 "ra ae awwe,a Paiage lArlWVctlen Dd OS• 25 .nTP1p EaM w,<,ae PUEa9e ComVwtgn Al2M Cav11av1aee1V5%Dra.mgs IN 2 -25 0.2-Nw•25 aa�CNY Revie.of 95x Du.,nRv AIM t00%I—by Connrcu1—SealM Rans/SPeur-,— 1Sd 10•Nov25 2&Now25 X100lik to<msncutrPn 5i,e.Bens/SlsecMt— AIM Nom Can Estimate Std zs-D<n24 O,s F 2s �uoM cmt Espmale A1IM CMM Cosi Evil—NB don SO%Dra.rngs 25d 01-AR-25 . OS-61av-25 CMM Cosr stmt.Based on 30%DurnnNs All. Set GMP/GMP Revie.6 M<epurce ]f10. 24J 25 Oi—•25 Sn GMP/GMP Revw.6 At«ounte A1130 &dpng Rweas for Earh Releax Pacbage lOd� 24Ja1•IS i 04• •z5 &ddgg Process fpr Earh Releau Pubege All. CMMCO51Esimal<Ei,i-65%Ouvnngs 1S4, 24Jw-25 14•Ju425 CMM<ml Eslmwl<BaaM Pn pS%Du.Ings A1250 0owng Prwess of 95%Dra.rngs Sed 20.Oc1.25 U8•Da•25 aaa�&dmng Raess 0195%Duw , PMse 2 Transpwtnuin 51M o&Sg2s Ma 2e A15e0 1.4M 58%MEP INq to Demon Sh., SI 0& 2S 12• 2s %MabeSetoMEP PriortoDemoalY— A15T0 Dwq 5d 1} 25 - 25 aPawng Dema AIM Vlalvl6nla td 2z• 2S 22• 25 1 lllrbW Lane AIM $M EAtavnlm 106 2} 23 064kt•25 a�Sne Eua , A1640 sea prep 20d 07.00425 O3•New25 aaaaa1511e Prep A16W Udwwo Clvll lhilmes 1511 OA-25 24•Non25 uMek'—Gvd-h— A1660 a ddi q pad 54 25•Nov25 Ot•Oat•25 ■liukrne Pad AI470 F61a1da11w% 2511 09•Det•25 12•An•26 aaaaa�Ewrgaigns A169D E—SOuclural StM(PEMB) 20d 1}Jen•26 09•Fab.26 aaaa�Fret 151rwlure151M(VEMd) A— —.11 Rohl MIMS) 10d tOdrb•26 2NF 26 a�Yrstall RwN(PEMBI -'900 M-Sbin(PFMS) 10d 24•Feb.26 00.Mar•26 a�—I Sirn(PEMBI 110 kI MEP ERuipwwm 50 1-26 '6-Mn-26 ■Sn MEP Ei,U—m r20 Begin MEP RPugnF 15d 17•Mar-26 Oe•A,,,-M anent BeRq MEP RVugn In r30 Mull Rdl Up Down 10d O1-AR•2e 2&A1•Se a�NslYl Rdl Up Wor. A1760 Mab Pmsnea We 21.AW.26 04Mei aaE MWror Einlsnez A1750 MEP Trim Out S0 26 11- 26 ■MEP Ti,0,,lA17W MEPU—T4stkg Sd 12• 26 I 1& 26 ■MEP C%and Tesnne AtTq P1Aghgst we 19-M-26 01.3-26 ear—hilt Ai7a0 OYna Tusawr of Ot•AYwze .Owner iulrover A3300 ft.0 Gnda +06 1} 2S Ib 25 a�RYuen crane Au7o Mea taall.a tSd 29• 2S 17-0n.25 �Miall Ut&Is A32eo BrleGrede +00 pAct•25 31.00.25 a�Fine erex ASz90 CataM PeNe1a —_. __...__ 30d 03•N R 12•Da.25 �Catcnv PMrlg City of Round Rock Bob Bennett Complex- =Current ♦ Milestones get'15ed 27-Jun-2508:47 a.m. I Data DaW24-1un-25 HV Prolan ID Ne Name: I Region Coda:Template HENSEL PHELPS Phase 2,3&4 =Progress r�Summary View Name:17x171 Presentation Template ✓Idn Build Manage Phases 2St5 -CfILICaI Printed By.Philip Goertz Page 1 of 3 Pages X24 2025 1010 102. ' Jut JW On Nor Ow Jm F,b tun Jul 0[+ Nor Ow Jn ib An Ai On Nor Ow i.0 ID N,m, Dw surf Flnlan r 25 2,i-a 2s L21 Ro Rn Graee 100 29.5ep-25 10.0.1.25 9�..,JI Gude 150 13.Or1-25 Jl-Oct-25 aa�hs411-1-1 Ine Grade 10d 0&Nov25 ov.25 Mine W,ee 0 Conan.P,w'nR 3011 17•N-25 26.06,-25 aaEaEaEal Concreu p'—ft 0 Relish Grade Sd 13-Oct-25 17.Oct-25 a iI-v0 Yeti Uoloin' 150 03•Ncr-25 2144-25 aa�Intall(Ar-o Foe Gr4de sd z4•Np.-:s za44-ss ■Floe,M0 Cur6aM Gntw 150 01•Dec-25 1943-25 aa1001—rd_ •AWMR P,vmo AapMl1 v-nR Se 2I•Dec.25 20•DR•25 eeh WMe 50 20.,1125 240ct•2S0 MIY1/R.move Nnnr 201 2444,-25 1940-250 Fme Graee 54 22-Dic.25 20•Mc•25 ■floe WaOe0 tw.o ane wow 1Sit 29-DK-25 16.1-•26 aa�Curb■A,i—t Para0 45pMI1 PainR 50 14Mn20 23-lel•20 8 roo M,b S.M MEP Pop.to D—atWfehouse 50 0& •IS 12.5w.25 ■Mase yak MEP Rwrb OMq al warenous< Sit 16 2s f9. 25 ■Site Demo 1e 22• 25 22.5ali I UtI thio- IN Sn4,• .EM toil 23•$ 25 06625 0 w shau- e E1n A18M S4Pn,va_-.-_-- 200 0743ci•25 Os-N-41 she Rep A 1840 Urgwpwq Gw,l Uuln:es 150 I:14 -25 2444-25 IlM'—p 0.UIunus A+BSO a1A"Pb 50 2544-25 014W-25 all WWI.,Pae A'— F*InddWre 2511 02.011,•25 OF,4 26 I Fourgn�ons A1870 iaecl s—" (,EMB) 200 063-26 02411626 Erect Sir It.(%-8) AIM Yetall Roef(PEMB) 100 03•Fb.26 16Fe626 MMui-1(PEMB) AISW Yetall SYln(PEMB) 100 174eb-26 024411-26 1111110 hvA'S ff.B) A19M Sw MEP E9upmr4 50 03.4-26 O96144a-26 ■Sw MEP F-r— A1910 B.RIn MEP R.4nW 150 1044"6 3044,•26 a.RIn MEP—wl AIM MWI Rdl Up Dods 100 31.14-26 13•.,.•26 it,uu—up Doors A1930 htwwr Fnshes 106 14-A-26 2•J •7e Menor Fhnher A1440 MEPTtitr— s4 2&A>-26 26 MEP Trim wt AIM MEPCX"Tesin, 5d 05-M 26 /1•Mry ■MEP Cx,M T—I, A1960 Pwth65t 100 12-M 26 2 26 1— A1970 O—Turnlner 00 26 •OQr.a+T.— A5240 Eiciatille 1>FwnO.lbrs 10d 20.D11c•25 ci*. 126 �E.urale ld Founeauons A3420 m"um" 5d 12.4..26 1&J-2e ■MMIIUMmea A3410 F01a10140e 200 19.44-•26 134-26 aaEaE CanopYFwMallms A5a30 —P"cwv 200 0$•141.26 3 lar-26 —,EMB Campy A35(10 mee"y5eeenYM 200 3144..26 27•Apr-26 aalillate M,wnrY scm.n oral; A3510 MEP Roush 11 150 28-Apr•26 1&Wa 26 MEP Rpughh A3520 lot rRrOaMa 200 10.M 20 16Jun•2eaaaa�+ntwMr Fin,snes . w MEPTnm Out 100 16Ju-26 _'u... alle Tnm Out 6 A3250 cer1044o— Fouldwlas 100 21-W 26 103-2e a�Cwcrete p.mPrd Founeairons A3440 CuaPF FaPtlElae 250 0 1 20 t0.Mw-2e aaEaEaE GroutFouMatom .3450 Erni PEAl9Carapy 200 1144..26 07-Ad-26 Erwl pEAlB canopy 43460 200 O&Ad26 o5-1,1ry-2e 4Eaa�MEP RuuRn:n ane t•:m 2e 43260 C9newe D9mobr PouMFt1oM 106 oaii 17•Fee•2e a�CoMrwe Demold Founengns AL70 cwcpy Fdatl.tbe me 1&1626 a�(w1wYFourWal:m .3480 Erect PEW CAnopy miii 18446.26 '4-Apr•2e affitallilill-1PEM8 Canopy A3.90 MEP'-*It,aM I— 204 1 .20 12•Mry-20 MEP—ith herW'nm A219D M4Ye S111a AEP Prod M D— Off- w 07.,(•25 13.0[625 ■MaM Sara MEP R.uDemo n Oreo A2200 SIN Demo W /44d,2S 20.40,-25 ■SI.01— A2210 UMyLPuu 10 21-01 214x1*25 I Uu14Y Eauu A22M si*EJe4r — 10d 2240c625 0444,-25 111111 Slle EAuvncn A2230 SIE Pry 100 os.NP-2s 184104.25 aini SOa Prep A m v d4g19Mt0 out ll lti- 150 19.01-zs 09.06,-25 IJrgivp,uW CMI Ulih— i od -1od 10.D11c•zs 25•Dec-25 BuNbE P40 .2260 BUI1011+a Fou Wilde Sod. 24.0,.25 01 F 26 aaEaEaE4FauMnvn City of Round Rock Bob Bennett Complex- =Current ♦ Milestones Revised 27•3un-2508:47 a.m. I Data Date:24-Jun-25 HP Protect IDN,:70ame:1 I Region Code:Template HENSEL PHELPS Phase 2,3 bi 4 =Progress �summary View Name:i1x17l Presentation Template Printed By.Philip Goertz Dtan 90110 Ma: Phases 2625 -ClItlCal Page 2 of 3 Pages 2024 eon 2024 20P 10 Nam• Dur Start FMbh a Jury O<t !be Oat Jan Fro Mar Jul On Nor J•n Fw Jun Jul On rwr Oat Jan 144 A2220 Erect su—w s" 25d 04Fw.26 10-AN1•26 U.,stru<1wN Si-i A22M /-Mall sA Aso 11• .26 12•M 26 MWlSi Yl A2290 stat Pool 20d 13,M,,26 09•Jun36 EIIIIEEI MP•II R I A2300 Set MEP EqA— 1Sd 10.1,n•26 30-J-26 BSN MEP Eq.,, ,t A2310 B"M MEP A.yIM 20d 01.1,1.26 28-1,426 see.,MEP Rory6N A23M a Hr 35d 29.1.1.20 1}5ep.26 Mlerbr Faashes A2340 MEPTdm Out 1Sd 16.5e 26 06.Oct36 MEP Tran Out A23W MEP CIt arMTes 1 12d 07A.26 22-Oct-26 MEP U and T—S VA2}60 Wnchlnt 20d ,139•Nw 23.06 1 •2. P tYlst A2}20 Omwr Turmver Od ! 19• -26 •Owner Turroaer M. Wash. F. SI.— 2280 13.3-26 26f 26 A— _i Mahe Sale MEP—m Orono I 5d 1}lan•26 19•lan•26 III—Ste MEP Noor to D— A2— B.iWing D•mo at-5 15d 20•J•n•26 094e&26 0111111111(W..n lJemO n PHS A2810 U011ty Lar td IO.Fe&26 10-Fe&26 I111i1dy Latae A2820 S.Eauy- 15d 11-Fa&26 034M•r.16 Vale SteEu—i— A28}O sde P_ 1Ol 0a• -26 17. ,-20 M5.1.Pref 42840 U-vn" ,i Ctrl tlleRies 20d 18414•r•26 14-AM-26 —Underground Cwil tniiities A2850 Buildale Pad 100 15,4M-26 2&Ap-26 11111111 Bufti ii Pad -0 FaAdp&C.mOele Patine 50d 29.W-26 09•Jun•26 FouMrtiom 6 CorcMe PawnB ro ElectSwnunl5teN6Roo1 150 10.).-36 P2644-26 n•26 �Erect S.uttural 51. Root q btW Masonry MI 01.1--26l•26 �Install Masonry _ q Sat MEP E9,pnw8 15d 291.1.26 •26 �Sn MEP ErWi9mer9 A2910 Bey,MEP F-4hM 25d 19 26 g26 �Beyn MEP pough In --A21M MEP Tnm Out I5d 2} 26 -16 B�MEP Tdm OM A2940 MEP C%aM T•dtay 12d I4 L-26 1.26 MEPU..T-In, A21W PMrch851 20d 30-0,1•26 ZONES%u hEst A2960 Ower T.— Od 264 -26 _ ♦Owner Tvrweer__..... City of Round Rock Bob Bennett Complex- =Current ♦ Milestones Revised 27-Jun-25 08:47 a.m. I Data Dah•.24-Jun-25 � HP Project ID No: 8 I Region Cods HP-700 HENSEL PHELPS Phase 2,3&4 =Progress Summary VlewName:Nama:11x171PnesentatlonTemplate Plan Build. Manage Phases 2S25 -CfItlCdl Printed BY.Philip Co rtz Page 3 of 3 Pages BOB BENNETT-SITE PHASING PLAN 06.24.25 -- -- -- - --— -- -- -------- - --- ---- ------- ---- ..*r'� � �I-4rl�lo.uUNoolMl1l11laGflon c �j 2 ASY# t �- b a.. 171 `TC for u vMNING GOUM TABLE /' i .BOvnFO 7 AREA 1-SEPT15-DEC 12 \.... a AREA 2-SEPT 29-DEC 26 AREA3-OCT AREA 4-OCT 20-JAN 23 M /Nib Z 'I w,ow where below. sS 4 Call before yw Mg. LU CONTRACTOR NOTES: v7 � uo�.ra unoreonwro�o�r�.o�n.e ''11� `"n..w.acnre SDP24X)OCXX mill oc m 7024208 - CoRR Bob Bennett Site Utilization Plan 7.31.2025 UL ax _ — �� I X --------- Ov i - 1 rte. tt. ;,gym u • * ��� Fence panel/protection screen up to roof level to protect hying �� debns into o.blic space - 1 I 1 I li 1 IL 1111.11 I ly``— fJor Smng fence for contractor parking entrance. tri : .. PHASE 2&5 STRUCTURES INTIAL PARKING TOILET&HAND WASH PHASE 2 ENTRANCE SITE FENCING SITE BARRICADES SECONDARY PARKING DUMPSTERS O PHASE 5 ENTRANCE ---- _ HP FIELD OFFICE ® LUNCH/BREAK FODS ® SECOND FLOOR LOADING • DEWATERING INLET = SCE ® COVERED WALK ® GATE ® Bob Bennett Complex Proposal Package Strategy Schedule Proposal Proposal Documents to Receive Proposals Prelim.Tab Start Work Start Work based on Forward Pass- Sector Bid Package Description Package Sub Documents Title HPCC Review/Scope Mtg Forward Pass NTP of 61112022 Start Work Date No. (ell at 2:00PM uno) Sector Priority PEMB Delegated Design&Design Assist MEP 00 Proposal Package 0 Mon,Mar 31,25 Tue,Apr 29,25 14 Tue,Dec 02,2025 246 Sector 2B A 1334-PEMB-Parking Canopies-Delegated Desig 0.01 30%SD's Mon,Mar 31,25 Tue,Apr 29,25 7 Tue,Nov 25,2025 Wed,Mar 25,2026 120 Sector 2C A 1334-PEMB-Warehouse-Delegated Design 0.01 30%SD's Mon,Mar 31,25 Tue,Apr 29,25 7 Tue,Nov 25.2025 Tue,Jan 13,2026 49 Sector 2D A 1334-PEMB-Utility Shops-Delegated Design 0.01 30%SD's Mon,Mar 31,25 Tue,Apr 29,25 7 Tue,Nov 25,2025 Tue,Jan 20,2026 56 Sector 5A A 1334-PEMB-Fuel Island-Delegated Design 0.01 30%SD's Mon,Mar 31,25 Tue,Apr 29.25 7 Tue,Nov 25,2025 Wed,Jun 10,2026 197 Sector 2C A 2600-Electrical 0.02 30%SD's Mon,Mar 31,25 Tue,Apr 29,25 7 Tue,Aug 12.2025 Mon.Sep 15.2025 34 Sector 2E A 2600-Electrical(Equipment Procurement 0.02 30%SID'S Mon,Mar 31,25 Tue,Apr 29,25 7 Tue.Jun 16,2026 Wed.Jun 17.2026 1 Sector 2E A 12600-Electrical 0.02 30%SD's Mon,Mar 31,25 Tue,Apr 29,25 7 Tue,Aug 05.2025 Tue,Oct 14,2025 70 Sector 2B A 12600-Site-Electrical 0.02 30%SD's Mon,Mar 31,25 Tue,Apr 29,25 7 Tue,Aug 05,2025 Mon,Sep 15.2025 41 Sector 5A A 2600-Electrical(Equipment Procurement 0.02 30%SD's Mon,Mar 31,25 Tue,Apr 29,25 7 Wed,Jun 24,2026 Wed,Jul 29,2026 35 Sector 5A A 2600-Electrical 0.02 30%SD's Mon,Mar 31,25 Tue,Apr 29,25 7 Tue,Aug 19,2025 Tue,Jan 13,2026 147 Sector Priority Phase 2-Early Site Civil&Foundations 01 Proposal Package 01 Mon,Jun 23,25 Thu,Jul 24,25 21 Start work Thu,Oct 23,2025 122 Sector 2B C 0330-TK Concrete 1.01 95%CD Early Package Mon,Jun 23,25 Thu,Jul 24,25 21 Thu,Oct 23,2025 Wed.Feb 11,2026 111 Sector 2C C 0330-TK Concrete 1.01 95%CD Early Package Mon,Jun 23,25 Thu,Jul 24,25 21 Thu.Oct 23,2025 Tue,Dec 09,2025 47 Sector 2E C 10330-TK Concrete 1.01 95%CD Early Package Mon,Jun 23,25 Thu,Jul 24,25 21 Thu,Nov 06,2025 Wed.Dec 31,2025 55 Sector 2B C 0510-Structural Steel-Design Assist 1.02 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 21 Thu,Dec 04,2025 Wed,Feb 11.2026 69 Sector 2C C 0510-Structural Steel-Design Assist 1.02 65%DD Set Mon,Jun 23,25 Thu.Jul 24,25 21 Thu,Dec 18.2025 Tue.Jan 13.2026 26 Sector 2E C 0510-Structural Steel-Design Assist 1.02 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 21 Thu,Dec 04,2025 Wed,Dec 17.2025 13 Sector 2B B 2100-Fire Sprinkler-Delegated Design 1.03 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 14 Thu,Nov 06,2025 Wed,Jun 17.2026 223 Sector 2C B 2100-Fire Sprinkler-Delegated Design 1.03 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 14 Thu.Dec 25,2025 Tue,Mar 17,2026 82 Sector 2E B 2100-Fire Sprinkler-Delegated Design 1.03 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 14 Thu,Nov 06.2025 Wed,Jun 17,2026 223 Sector 2D B 2200-Plumbing-Design Assist 1.04 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 14 Thu,Nov 27,2025 Tue,Mar 10,2026 103 Sector 2E B 12200-Plumbing-Design Assist 1.04 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 14 Thu,Nov 06,2025 Wed,Nov 26,2025 20 Sector 2C B 12300-Mechanical-Design Assist 1.05 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 14 Thu,Jan 22,2026 Tue,Mar 10,2026 47 Sector 2D B 12300-Mechanical-Design Assist 1.05 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 14 Thu,Jan 22,2026 Tue.Mar 17,2026 54 Sector 2E B 12300-Mechanical-Design Assist 1.05 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 14 Thu,Jan 22,2026 Wed,Jun 17,2026 146 Sector 2B C 12800-Fire Alarm 1.06 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 21 Thu.Oct 16.2025 Wed.Jun 17.2026 244 Sector 2C C 2800-Fire Alarm 1.06 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 21 Thu.Oct 16.2025 Tue.Mar 17,2026 152 Sector 2E C 2800-Fire Alarm 1.06 65%DD Set Mon,Jun 23,25 Thu,Jul 24,25 21 Thu,Oct 16,2025 Wed,Jun 17,2026 244 Sector 2B A 3100-Earthwork incl SW PPP 1.07 95%CD Early Package Mon,Jun 23,25 Thu,Jul 24,25 7 Thu,Oct 09,2025 Wed,Oct 29,2025 20 Sector 2C A 3100-Earthwork incl SW PPP 1.07 95%CD Early Package Mon,Jun 23,25 Thu,Jul 24,25 7 Thu,Sep 18.2025 Mon,Sep 22.2025 4 Sector 2E A 3100-Earthwork incl SW PPP 1.07 95%CD Early Package Mon,Jun 23,25 Thu,Jul 24.25 7 Thu,Oct 09,2025 wed.Oct 29,2025 20 Sector 2B C 3213-Site Concrete Paving 1.08 95%CD Early Package Mon.Jun 23,25 Thu,Jul 24,25 21 Thu.Oct 02,2025 Tue.Oct 20,2026 383 Sector 2B A 3300-Site Utilities 1.09 95%CD Early Package Mon,Jun 23,25 Thu,Jul 24,25 7 Thu,Sep 18,2025 Tue,Oct 28.2025 40 0 Sector Priority Phase 2-Skin&Buildout 02 Proposal Package 02 Mon,Oct 27,25 Thu,Nov 27,25 26 start work Thu,Apr 09,2026 164 Sector 2B D 0175-Final Clean 2.01 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Apr 09,2026 Fri,Oct 30,2026 204 Sector 2C D 0175-Final Clean 2.01 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu.Apr 09,2026 Fri.May 29,2026 50 Sector 2E D 0175-Final Clean 2.01 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Apr 09,2026 Fn,Oct 30.2026 204 Sector 5A D 0175-Final Clean 2.01 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Apr 09,2026 Fn,Oct 30,2026 204 Sector 2E D 0335-Polished&Sealed Concrete 2.02 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Feb 26,2026 Wed,Aug 05,2026 160 Sector 2B B 0420-Masonry 2.03 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 14 Thu,Feb 19,2026 Wed.Mar 18.2026 27 Sector 2E B 10420-Masonry 2.03 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 14 Thu.Feb 19,2026 Wed.Mar 18.2026 27 Sector 5A B 0420-Masonry 2.03 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 14 Thu.Mar 26,2026 Wed.Jul 01,2026 97 Sector 2E C 0620-Millwork 2.03 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 21 Thu,Apr 02.2026 Wed.Aug 05.2026 125 Sector 2E A 0727-Waterproofing 2.04 95%CD Buildout Mon,Oct 27,25 Thu.Nov 27,25 7 Thu,Feb 12.2026 Wed.Mar 18.2026 34 Sector 5A A 0727-Waterproofing 2.04 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 7 Thu.Feb 12,2026 Wed.Jun 10,2026 118 Sector 2B A 0740-Roofing 2.05 95%CD Buildout Mon,Oct 27,25 Thu.Nov 27,25 7 Thu,Mar 05,2026 Wed.Mar 25,2026 20 Sector 2E A 0740-Roofing 2.05 95%CD Buildout Mon,Oct 27,25 Thu.Nov 27,25 7 Thu,Mar 05.2026 Wed,May 20,2026 76 Sector 5A A 0740-Roofing 2.05 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 7 Thu,Mar 05,2026 Wed.Jun 10,2026 97 Sector 2E I A 10742-Metal Panels 2.06 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 7 Thu,Mar 05,2026 Wed.Mar 18,2026 13 Page 1 Date Printed:8/3/2025 ® Bob Bennett Complex Proposal Package Strategy Schedule Proposal Proposal Documents to Receive Proposals Prelim.Tab Start Work Start Work based on Forward Pass- Sector Bid Package Description Package Sub Documents Title HPCc Review/Scope Mtg Forward Pass NTP of 6/112022 Start Work Date No. (ell 0 2:00PM eno) Sector 2E B 0810-Door,Frames&Hardware 2.07 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27.25 14 Thu,Mar 26,2026 Wed,May 20,2026 55 Sector 2B B 0810-Door,Frames&Hardware P3 Canopy vv/PE 2.07 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 14 Thu,Mar 26,2026 Mon.May 25,2026 60 Sector 2C B 0810-Door,Frames&Hardware W/PEMB? 2.07 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 14 Thu.Mar 26,2026 Tue,Feb 24,2026 -30 Sector 5A B 0810-Door,Frames&Hardware 2.07 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 14 Thu,Mar 26,2026 Wed,Jul 01,2026 97 Sector 2B B 0833-Overhead Doors 2.08 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27.25 14 Thu,Mar 26,2026 Mon,May 25,2026 60 Sector 2C B 0833-Overhead Doors 2.08 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 14 Thu,Mar 26,2026 Mon,Apr 27,2026 32 Sector 2E B 0833-Overhead Doors 2.08 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 14 Thu,Mar 26,2026 Tue,May 19.2026 54 Sector 5A B 10833-Overhead Doors 2.08 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 14 Thu,Mar 26,2026 Tue.Jul 28,2026 124 Sector 2E A 10841-Glass&Glazing 2.09 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 7 Thu,Feb 12,2026 Sat,Mar 28,2026 44 Sector 2E A 10929-Drywall 2.10 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 7 Thu,Feb 05,2026 Wed,Aug 05.2026 181 Sector 2E A 0951-Acoustical Ceilings 2.10 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 7 Thu,Feb 05,2026 Wed,Aug 05,2026 181 Sector 2E C 0930-Ceramic Tile 2.11 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 21 Thu,Apr 02,2026 Wed,Aug 05,2026 125 Sector 2E C 0965-Resilient Flooring 2.12 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 21 Thu,Apr 02,2026 Wed,Aug 05,2026 125 Sector 2B C 0991-Painting 2.13 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 21 Thu,Feb 26,2026 Wed,Aug 05,2026 160 Sector 2C C 0991 -Painting 2.13 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 21 Thu,Feb 26,2026 Tue,Apr 21,2026 54 Sector 2E C 0991 -Painting 2.13 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 21 Thu,Feb 26,2026 Wed,Aug 05,2026 160 Sector 5A C 0991-Painting 2.13 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 21 Thu,Feb 26,2026 Wed.Sep 23,2026 209 Sector 2B D 1000-Building Specialties 2.14 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu.Apr 09,2026 Mon,May 25.2026 46 Sector 2C D 1000-Building Specialties 2.14 95%CD Buildout Mon,Oct 27,25 Thu.Nov 27,25 28 Thu.Apr 09,2026 Tue,Apr 21,2026 12 Sector 2E D 1000-Building Specialties 2.14 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Apr 09,2026 Wed,Aug 05,2026 118 Sector 5A D 1000-Building Specialties 2.14 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27.25 28 Thu.Apr 09,2026 Wed,Sep 23,2026 167 Sector 2B D 1014-Signage 2.15 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27.25 28 Thu.Apr 09,2026 Tue,Apr 21.2026 12 Sector 2C D 1014-Signage 2.15 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Apr 09,2026 Tue,Apr 21,2026 12 Sector 2E D 1014-Signage 2.15 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Apr 09.2026 Wed,Aug 05,2026 118 Sector 5A D 1014-Signage 2.15 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Apr 09,2026 Wed,Sep 23,2026 167 Sector 2E C 11065-Operable Partitions 2.16 95%CD Buildout Mon,Oct 27,25 Thu.Nov 27,25 21 Thu,Apr 02,2026 Wed,Aug 05,2026 125 Sector 2E D 11130-Residential Appliances 2.17 95%CD Buildout Mon,Oct 27,25 Thu.Nov 27,25 28 Thu,Apr 09,2026 Wed.Aug 05.2026 118 Sector 2E D 1224-Window Coverings 2.18 95%CD Buildout Mon,Oct 27,25 Thu.Nov 27.25 28 Thu,Apr 09.2026 Wed,Aug 05,2026 118 Sector 2B D 3217-Pavement Markings 2.21 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Mar 05,2026 Wed,May 20,2026 76 Sector 5A D 3217-Pavement Markings 2.21 95%CD Buildout Mon,Oct 27,25 Thu.Nov 27,25 28 Thu,Apr 09,2026 Wed,Apr 29,2026 20 Sector 2B D 3231-Fences&Gates 2.22 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27.25 28 Thu,Mar 05,2026 Wed,May 20,2026 76 Sector 5A D 3231-Fences&Gates 2.22 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Mar 05,2026 Tue,May 05,2026 61 Sector 2B D 3284-Landscape&Irrigation 1 2.23 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Mar 05,2026 Wed,May 20,2026 76 Sector 5A D 3284-Landscape&Irrigation 2.23 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 28 Thu,Apr 09,2026 Wed,Apr 29,2026 20 Sector 2C C 1111 -Equipment 2.24 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 21 Thu,Mar 05,2026 Tue,Mar 10,2026 5 Sector 5A A 1111 -Equipment Fuel Station 2.24 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 7 Sun,Jul 26,2026 Wed,Jul 29,2026 3 Sector 5A A 1111 -E ui mint W ash Ba 2.24 95%CD Buildout Mon,Oct 27,25 Thu.Nov 27,25 7 Thu,May 14,2026 Wed,Jul 29.2026 76 .. .. 1.01 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 21 Thu,Apr 02,2026 Wed,Apr 29,2026 27 Cter 5A C C5 0-Structural Steei-Design Assist 1.02 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 21 Thu.Apr 02,2026 Wed,Jun 10,2026 69 ctor 5A B 12100,-Fire Sprinkler-Delegated Design 1.03 95%CD Buildout Mon,Oct 27,25 Thu.Nov 27,25 14 Thu.Mar 12,2026 Wed,Jul 29,2026 139 oto r 5A B 2200-Plumbing-Design Assist 1.04 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 14 Thu,Mar 12,2026 Wed.Mar 18,2026 6 ctor 5A A 3100-Earthwork(incl SW PPP) 1.07 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 7 Thu,Jan 22,2026 Wed,Feb 11,2026 20 1.08 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27.25 21 Thu,Feb 05,2026 Wed.Apr 29,2026 83 1.09 95%CD Buildout Mon,Oct 27,25 Thu,Nov 27,25 7 Thu,Jan 22,2026 Tue,Feb 10,2026 19 0 Page 2 Date Printed:8/3/2025 Bob Bennett Complex Q HENSEL PHELPS Design Assist/Early Procurement Flan eulI] Manage Overview Upon schedule analysis and due to current critical path major equipment procurement lead times,it is necessaryto procure the Electrical and Pre-engineered Metal building trade partners at 30%Design. Additionally,to support the BIM coordination effort,Structural Steel, Mechanical, Plumbing and Life Safety trades will need to be procured at the 65%Design Phase. The design assist subcontracting approach does not alleviate the Design Team from any Design responsibilities but allows these trade partners to provide valuable input during the design phase. Design Assist Subcontracting Approach This Design Assist Subcontracting approach is based on maintaining a Bid Breakdown during design for a not to exceed amount. During the design phase, the Subcontractor will provide design assistance by reviewing drawings and specifications, providing product and/or system selection input,constructability reviews,value engineering and participating in weekly Design Meetings as required to coordinate this Subcontractor's work. The Subcontractor will be responsible for all work which would be customarily provided by this trade or as required for complete systems.As design progresses it is assumed that reasonably foreseeable modifications to the scope have been anticipated and are included. If design elements are proposed which the Subcontractor believes are outside the requirements of the scope and will compromise their Bid Breakdown,the Subcontractor shall promptly give written notice to Contractor and appropriate adjustments will be tracked by the Subcontractor for the reconciliation process. In the absence of such notice,the Subcontractor will be held responsible for all scopes of work identified in the 100%CD's,otherwise,the CMAR reserves the right to re-bid the subcontracted work. The subcontract amount will be split into two parts: 1.An early spend value for early procurement of equipment,submittals,engineering and BIM Coordination and 2.the remaining Construction value,the sum of which will make up the total subcontract amount. Should the Subcontractor fail to maintain the not to exceed Bid Breakdown value during the design phase,the Contractor reserves the right to terminate the Subcontract and re-bid this scope of work. Design Assist Trade Partner Roles&Responsibilities during Design are as follows: 1. Site investigations as necessary to assist design development decision making and construction pre-planning. 2. Attend Design meetings as needed to assist in coordination of the scope of work. 3. Updated Bid Breakdowns will be required at the following drawing issuances: a. 65%Design Documents b. 95%Construction Documents c. 100%Construction Document 4. Continuous Value Engineering,Trending and Estimating Input as required between estimates described above. S. Schedule input and analysis including long lead items,time saving opportunities, man-power projections. 6. Constructability reviews to support system selection and routing of major pathways and underground elements. 7. BIM related efforts during the design phase to ensure a coordinated design. 1 1 P a g e March 11,2025 Bob Bennett Complex Q HENSEL PHELPS Design Assist/Early Procurement Plan. Build. Manage. Design Parameters Needed for Bidding by Trade Trades to Bid at 30%Design 1. PEMB-Delegated Design a. Structural Loading Criteria b. Building size and height requirements c. As-builts of existing d. Submittals and Shop Drawings of existing 2. Electrical-Early Procurement/Design Assist a. Major Equipment Sizing(Generator, Main Switchboard) i. Generator Size and type ii. Metering Requirements iii. Need a preliminarily approved submittal to get in queue iv. Can modify up to 3 months after entering queue v. Generator lead time is 52 weeks vi. Gear lead time is 40-46 wks,this item is critical for commissioning of other trades as well b. Site Electrical Oncor Design for pathways c. Lighting Controls Room Matrix that identifies which rooms will require lighting controls and what type. Trades to Bid at 65%Design 1. Steel-Early Procurement/Design Assist a. Structural Loading Criteria b. Major member sizing to place a Mill Order c. Building size and height requirements d. As-bunts of existing e. Submittals and Shop Drawings of existing 2. Mechanical-Early Procurement/Design Assist a. System Selection b. Major Equipment(AHU)Sizing c. Preliminary Equipment List with preliminary assumed qty's i. VAV's(12-14 wks) ii. ERV's(12-14 wks) iii. Exhaust Fans(10-12 wks) iv. GUH's(6-8 wks) 3. Plumbing-Early Procurement/Design Assist a. Plumbing Fixture submittals b. Site/Civil Utility Tie-ins 2Page March 11,2025 Bob Bennett Complex Q HENSEL PHELPS Design Assist/Early Procurement Plan. Build Manage. 4. Fire Alarm-Delegated Design a. Existing system b. Submittals and as-builts of Phase 1 c. Life Safety Code Requirements 5. Fire Sprinkler-Delegated Design a. Existing system b. Submittals and as-builts of Phase 1 c. Life Safety Code Requirements Major Advantages of Design Assist/ Early Procurement Bringing the PEMB, MEP and Life Safety Trade Partners on at these early design phases has 4 major advantages: 1. Early procurement of major equipment to meet the project completion of Nov 2026 2. Temporary power planning and execution 3. BIM Coordination started earlier when most impactful 4. Continuous VE Efforts during design 5. Allows pricing to be locked in during an uncertain time Critical Path Items for Electrical: Equipment Design Docs TP Selected Submittals Enter Lead Arrival by Needed by issued by Queue Time Date Generator March 31, May 15,2025 4 wks lune 15, 52 wks June 14,2026 June 17,2026 2025 2025 Switchgear March 31, May 15,2025 6 wks June 26, 46 wks May 14,2026 lune 17,2026 2025 2025 XFMR by 6-8 Oncor mnths MV Cabling 30 wks by Oncor Conclusion: To meet the project completion goal of November 2026 and to provide an early coordination effort and lock-in pricing,the trades discussed above should be procured in a design assist/early procurement approach. Unfortunately,the schedule analysis shows that if these trade partners are not procured with the design assist approach,the Project Schedule cannot support the anticipated completion date of November 2026 the currently anticipated costs could be at risk. 31 Page March 11,2025 7024208-Bob Bennett Complex City of Round Rock Responsibility Matrix Item Division Item CMAR Owner 001 Div 01 General Requirements Building&Trade Permits X 002 Div 01 General Requirements Permanent Meters X 003 Div 01 General Requirements Temporary Water Metering(Construction Use) X 004 Div 01 General Requirements Temporary Water Usage(Construction Use) X 005 Div 01 General Requirements Temporary Power Metering(Construction Use) X 006 Div 01 General Requirements Temporary Power Usage(Construction Use) X 007 Div 01 General Requirements Arborist During Construction(As Needed) X 008 Div 03 Concrete Materials Testing X 009 Div 04 Masonry Materials Testing X 010 Div 05 Metals Materials Testing X 011 Div 06 Woods and Plastics Rough Carpentry-Blocking for CMAR and Owner Items X 012 Div 07 Thermal&Moisture Protection Penetration Firestopping-All X 013 Div 08 Doors and Windows All Doors&Frames X 014 Div 08 Doors and Windows Construction Cores&Keys X 015 Div 08 Doors and Windows Permanent Cores&Keys X 016 Div 08 Doors and Windows Security Doors-Non-Electrified Hardware X 017 Div 08 Doors and Windows Security Doors-Electrified Hardware X 018 Div 08 Doors and Windows Security Doors-Pathways X 019 Div 08 Doors and Windows Security Doors-Penetration Firestopping X 020 Div 08 Doors and Windows Security Doors-Cable Tray,J Hooks X 021 Div 08 Doors and Windows Security Doors-Cabling X 022 Div 08 Doors and Windows Security Doors-Power(POE) X 023 Div 08 Doors and Windows Security Doors-Terminations X 024 Div 08 Doors and Windows Security Doors-Wire Hinge Transfers X 025 Div 08 Doors and Windows Security Doors-Equipment X 026 Div 11 Equipment Coffee Appliances X 027 Div 11 Equipment All Other Appliances(Less Coffee) X 028 Div 11 Equipment Relocation of Existing Equipment X 029 Div 11 Equipment Fitness Equipment X 030 Div 12 Furnishings Window Shades-Complete System X 031 Div 12 Furnishings Loose Furnishings X 032 Div 12 Furnishings Cubicles-Equipment X 033 Div 12 Furnishings Cubicles-Power X 034 Div 12 Furnishings Cubicles-AV X 035 Div 23 Heating Vent&AC DDC-Power X 036 Div 23 Heating Vent&AC DDC-Pathways&Backboxes X 037 Div 23 Heating Vent&AC DDC-Penetration Firestopping X 038 Div 23 Heating Vent&AC DDC-Hardware X 039 Div 23 Heating Vent&AC DDC-Cabling X 040 Div 23 Heating Vent&AC DDC-Programming X 041 Div 26 Electrical Lighting Controls X 042 Div 26 Electrical Lighting Fixture Package X 043 Div 27 Communications AV-Pathways&Backboxes X 044 Div 27 Communications AV-Penetration Firestopping X 0451 Div 27 Communications AV-Power for Racks X 046 Div 27 Communications AV-Cabling X 047 Div 27 Communications AV-Network Connections X 048 Div 27 Communications AV-Equipment X 049 Div 27 Communications AV-Projector Screens X 050 Div 27 Communications AV-Blocking for Equipment X 051 Div 27 Communications AV-Cable Tray,1 Hooks X 052 Div 27 Communications AV-Misc.Cables(Aux,HDMI,etc.) X 053 Div 27 Communications IT-Pathways&Backboxes X 054 Div 27 Communications IT-Penetration Firestopping X 055 Div 27 Communications IT-Power for Racks and UPS X 056 Div 27 Communications IT-Cable Tray,J Hooks X 057 Div 27 Communications IT-Cabling X 058 Div 27 Communications IT-Computers&Phones X 059 Div 27 Communications IT-UPS X 060 Div 27 Communications IT-Racks&Switches X 061 Div 27 Communications IT-Patch Panels&Patch Cords X 062 Div 28 Safety&Security Fire Alarm-Complete System X 063 Div 28 Safety&Security Security Gates-Pathway&Backboxes X 064 Div 28 Safety&Security Security Gates-Equipment X 065 Div 28 Safety&Security Security Gates-Cabling X 066 Div 28 Safety&Security Cameras-Pathways&Backboxes X 067 Div 28 Safety&Security Cameras-Penetration Firestopping X 068 Div 28 Safety&Security Cameras-Cabling X 069 Div 28 Safety&Security Cameras-Terminations X 070 Div 28 Safety&Security Cameras-Equipment X 071 Div 28 Safety&Security Cameras-Cable Trays,J Hooks X 072 Div 31 Earthwork Materials Testing I X 073 Div 33 Utilities Water for Testing I X yacobs Ms- RON A.. ..r t �L O W U w� Legend \ _ -— ----- - - - N z u z %�_- O 1i O NF 1 Description Quantity Unit a zYp \ -- ------ z 0 m a 0 --------- ww.wn.r.allow. z F z Call bek. r ere. y 8 Z t ~ X U5 _ __ CONTRACTOR nN ,• p }jflg sDI;.MXXX a 7-C007 EXISTING ANO DEMOLRION PLAN 1 - C007 GENERAL DEMOLITION NOTES Demo w/ - f Drywall Demo w/ Plumbing "= _ _ ° bYIE l00 � aw.en merrne.n.nr�u.�nn.wn.°.ec.v� REV OERP°nlgR DEMOLITION LEGEND E===3 a.e ---------- --- --- — — - -- -------------- SHEET KEYNOTES .,yam memo Demo w/ "' ' w/ zo e� Drywall 0R _ m W KU 2 N Z yK U m a � -W7Y6350 DEMOLITION PLAN LEVEL DD DEMOLITION PLAN LEVEL, �} 2-AO50 A7 E ro GENERAL DEMOLITION NOTES DEMOLITION LEGEND [Z==3 ---- ------- SHEET KEYNOTES Demo wl Demo wl Masonry & .—Drywall & ,�9 Drywall (E6 Plumbing LL 0 z 1 0 d 0x NZ8 Z r MW . 00 z 8z 0 z 'y :3 F__T7oo W7Y6350 DEMOLITION PLAN LEVEL At 2-AO51 .�FLITION P�UINL V 2 GENERAL DEMOLITION NOTES BN BM 8L BK BJ BH BG BF 9E.2 .ry mrow.vaa�o,n.wiawo. _ �m I � I Ll--- - --- --- - - - J VERALL DEMOLITION PLAN-UTILITY SHOP LEVEL 1 seu[�w a .. oEaauvran w.e BF BE.2 Demo w/TK / Concrete DEMOLITION LEGEND _ �emo w/ �_ Demo w/ rywall \� µ` DrywallSHEET KEYNOTES U< Z $ u0� � 03 O > UK1 tt C yy HZG Ho W h ZO _ Y a m Demo w/ TK y _ Concretem r yW7Y6350 DEMOLITION PLAN LEVEL I.WORKSHOP -AoOL �_fARTIAL DEMOLITION PLAN-UTILITY SHOP LEVEL 1 u GENERAL DEMOLITjaws ION NOTES ..- Demo w/ �PEMB `Demo w/ OH Doors DEMOLITION LEGEND SHEET KEYNOTES Y LL s Demo w/ O K K NY OH Doors z W W I A0 Demo w/ I=. O m ::\�—Drywall � yW7Y6350 Demo W/ �DEMOLMONPLAN - P E M B WAREHOUSE OVERALL DEMOLITION FLOOR PLAN-WAREHOUSE ® 1-A003 z T s dwillm"to!°�°°rz EXHIBIT G - PHASE 2 SITE ELECTRICAL GENERAL NOTES JhooksM Telecom mw,waa,nwt maarrn .orre r,orzcrto, NMC,mm xbdt •..•••••••••••••••••••••••• Vendor to Comm ov.ararurn.w,Pto.veru`Ow" v APLAN REVISED 06.18.2025 New Power uobank ••••...... •...•••...••.. ,.•, Conduct l• t .rzeme.m.as.anrawu ueowr , to . w.•,e...w..,omwmroN.w.mov.oaem.w,ar.o+onv Exbtirlp Ptlwx ..u.5,n�r m»�w»c.wv.amv,,,.o,aw awww.axr dItCIDlnYc blbBnldon N.w uNxy 6.nalamar mna aoxmrw,rnv.,e,avrAwawwro ProrYls lDS IF YANV __._. •oun...uwz ,vrz t.IGtlf.nit brIF L Eatmmq Comm rcw.nrmww„x.oar. I.9..r tr••x•eran,t ulwry . nva.rtun.xr.roNiraravno,.v,u,u,°svnr •/ an.SPDBYa1 ro rema,r,, wm,..mr,wxax,n.m...a ��° 190 Lw.loanra4.. . .Ctlmm ducbnXR..-r lea'o."br,¢line WaienouN 161MA1 arW b fOltB lnlP171” .aAb%yao .errrm jI j l l i '" rw.No°<rtaxrt q,.gr.t.nrotp. (20) MS11ED FOR BID KEYNOTES a LEE%IBT .� _ _ ossa arsorrws - ECTINORICAL MAIN •� SHOP EXPANSION TO OF ABANDONED LrN n6w r«», ��Y»�� AFTER NEW FEED (�, r,nn.amr v.srEan•awavvruuw P7 Pn,n m1 I 1 TIE•W (88) Ca�x c i...........M.a.�•. ............ 1. (27), �• �_ — I s ww,.ww.roe,voaa..c - 18)'1 DnuNwz..r (15) - comun, �—� _PIP (23)NO Cut r Uj W U x. R,AI n.w aN comm •., av1O6b1..0 :.�..,:.� r ,. nbr.M..r _..•. �. Y � �O - -ww.. w c w. oau6t.e rn,:,• 2 W p� w t•h..s. I � �1— �y F'H2 NEJJ +.......i: r"°'4•'f1°0' -- w• r�ew MSR W W Y Z Y MAIN ELEC >S _ a h U O U \� rr.o..•bw�.. r' i�"•1 �+ W 0: CO O n.m.rra 1 ' 0=myC oyo wBRwlBIF H �..o.wm } �2 iP ,nga.O Grp M1gA' � gY KEYPLAN 5°r" • I s ow.oivinArF '.4.'.�Ivw• ! I I ' I I� nMlolwlgNn9--- fYnRl°r!� j U Sr E PLAN s PUN NOM 05mc,201, Dr O DF r G'wr.q Nn: D.,DIES-100 Bond No: 108292810 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Hensel Phelps Construction Co. of the City of Austin County of Travis , and State of Texas , as Principal, and Travelers Casualty and Surety Company authorized under the law of the State of Texas to act as surety on bonds for principals, are held and firmly bound unto THE CITY OF ROUND ROCK, TEXAS, (Owner), in the penal sum of Forty-Five Million Four Hundred Forty-Six Thousand Eight Hundred Twenty-One and 00/100Dollars ($ 45,446,821.00 ) for the payment whereof, well and truly to be made the said Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written Agreement with the Owner dated the day of , 20 25 to which the Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein consisting of- Bob Bennett Phases II, III, and IV, Round Rock, TX (Name of the Project) NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Agreement and shall, in all respects, duly and faithfully observe and perform all and singular the covenants, conditions and agreements in and by said Agreement, agreed and covenanted by the Principal to be observed and performed, including but not limited to, the repair of any and all defects in said work occasioned by and resulting from defects in materials furnished by or workmanship of, the Principal in performing the Work covered by said Agreement and occurring within a period of twelve (12) months from the date of Final Completion and all other covenants and conditions, according to the true intent and meaning of said Agreement and the Plans and Specifications hereto annexed, then this obligation shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. Page l 00610 7-2009 Performance Bond 00090656 PERFORMANCE BOND(continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the term of the Agreement, or to the Work performed thereunder, or the Plans, Specifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this instrument this day of 12025 . Hensel Phelps Construction Co. Travelers Casualty and Surety Company Principal Surety Bradley D. Wina Vice President Kelly T. Urwiller, Attorney-in-Fact Printed Na Printed Name By: By: A4--- I Title: Vi reident Title: Attme n-Fac Ad ss: 6 Cross Park Drive Address: One ower Square Austin, TX 78754 ?"ELPSCo Hartford, CT 06183 CO •.2J� ,^,,.,,,,�,��,,,,, �A-9� •:n +� � p.... SVR%,,�� Resident Agent of Surety: J'�, �,.-� ��,••' •: "X',, QQ �F• � _ � FpFz� • o GNN Signat re RE i a) G Bridgette S. Jackson L��''•, `�.' Printed Name bal 1301 E. Collins Blvd. Ste.I I I C Street Address Richardson,TX 75081 City, State& Zip Code Page 2 00610 7-2009 Performance Bond 00090656 Travelers Casualty and Surety Company of America T p� k Travelers Casualty and Surety Company 1 RAVELERS J St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the"Companies"), and that the Companies do hereby make,constitute and appoint Kelly T Urwiller of GREELEY , Colorado , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed,this 21st day of April. 2021. 3y ` e i.�(o w} NPATFOfO, < ' �yglt�•l �O\CNtI. _.�+gyp ! s f \\ii, r •r Is }� State of Connecticut By City of Hartford ss Robert L Rane enior Vice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. ", HO y IN WITNESS WHEREOF, I hereunto set my hand and official seal ! ;or I.OIARY i My Commission expires the 30th day of June, 2026 `j plc'.I� r q Anna P. Nowik, Notary Public C�MVF� This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies,which resolutions are now in full force and effect,reading as follows. RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President.. any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her, and it is FURTHER RESOLVED, that the Chairman. the President, any Vice Chairman, any Executive Vice President. any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary,and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President any Senior Vice President or any Vice President, any Second Vice President, the Treasurer. any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary. or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority,and it is FURTHER RESOLVED, that the signature of each of the following officers. President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary. any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in- Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned. Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,w icjjggjns in full force and effect Dated this day of �•'JPL�Y•AN�'+p' cuow+ny '.� `+o� JOE �'V�• SG��'' (4 HARTFORD.c o w : CONN n z -7•� r•��° Kevin E Hughes,Assi tant Secretary S �'•., To verify the authenticity of this Power of,4ttgrne*pfeb�.t'a//us at 1 800-421 3880. Please refer to the above-named Attorney(s)-in-Fact and the detaRk"f fft"Sond to which this Power of Attorney is attached. Bond No: 108292810 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF WILLIAMSON § That Hensel Phelps Construction Co., of the City of Austin County of Travis , and State of Texas as Principal, and Travelers Casualty and Surety Company authorized under the laws of the State of Texas to act as Surety on Bonds for Principals, are held and firmly bound unto THE CITY OF ROUND ROCK, (OWNER), and all subcontractors, workers, laborers, mechanics and suppliers as their interest may appear, all of whom shall have the right to sue upon this bond, in the penal sum of Forty-Five Million Four Hundred Forty-Six Thousand Eight Hundred Twenty-One and 00/100 Dollars (S 45,446,821.00 ) for the payment whereof, well and truly be made the said Principal and Surety bind themselves and their heirs, administrators, executors, successors, and assigns,jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written Agreement with the Owner, dated the day of , 2025 ' to which Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein consisting of- Bob Bennett Phases II, III, and IV, Round Rock, TX (Name of the Project) NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall well and truly pay all subcontractors, workers, laborers, mechanics, and suppliers, all monies to them owing by said Principals for subcontracts, work, labor, equipment, supplies and materials done and furnished for the construction of the improvements of said Agreement, then this obligation shall be and become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. Page 1 00620 7-2009 Payment Bond 00090656 PAYMENT BOND (continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the plans, specifications or drawings accompanying the same shall in anywise affect it's obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this Instrument this day of , 2025 . Hensel Phelps Construction Co. Travelers Casualty and Surety Company Principal Surety Bradley D. Wina Vice President Kelly T. Urwiller, Attorney-in-Fact Printed Name WNNa By: By: Title: Vic re dent E�RHE(p Title: A orn -in-Fact W4 Addr s: 8 Cross Park Drive S ..•••.., T ddress: 04 Tower Square Austin,TX 78754 �: CO '••may Hartford, CT 06183 tp `y Resident Agent of Surety: <9 '9� ■ �OcP.• •.'Q,�a, �/ �q9F• ... .0;� =rte.' ,•• '�`�� ,�f�c��✓�u v R Signature d NPGONN. is Bridgette S. Jackson Printed Name %,�y �,.•� 1301 E. Collins Blvd, Ste 111C "W s Street Address Richardson, TX 75081 Page 2 00620 7-2009 Payment Bond 00090656 Travelers Casualty and Surety Company of America T AMW Travelers Casualty and Surety Company 1 RQVELERS J St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS That Travelers Casualty and Surety Company of America. Travelers Casualty and Surety Company, and St Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the"Companies"), and that the Companies do hereby make,constitute and appoint Kelly T Urwiller of GREELEY , Colorado , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF. the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021. `pro�ry� /f 3 a K s�,� O ���rovcaa o stx State of Connecticut ����%�` By City of Hartford ss Robert L Raney-Senior Vice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. �.' iy^.ti /�y1 IN WITNESS WHEREOF, I hereunto set my hand and official seal. fes' HOk •; l.O1ANv i My Commission expires the 30th day of June.2026 `j f�G Anna P. Nowik, Notary Public t This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies,which resolutions are now in full force and effect,reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her,and it is FURTHER RESOLVED, that the Chairman. the President. any Vice Chairman. any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President. any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary, or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority,and it is FURTHER RESOLVED, that the signature of each of the following officers President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary.. any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in- Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned. Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,whkopre1119"Flog full force and effect .`.�Jo-1 Y Dated this day of .S a car+. sa- wvcrorcaxo.Ao. S {z ) HARTFORD � -<A r ,n wCONN �a ,� _ Kevin E Hughes,Assi tant Secretary - To verify the authenticity of this Power of Att6Y•ngtpie �)af/us at 1-800-421-3880. Please refer to the above-named Attorney(s)-in-Fact and the details of Me"bond to which this Power of Attorney is attached. A��� DATE(MM/DWYVVY) C EVIDENCE OF PROPERTY INSURANCE B/o7O2025 THIS EVIDENCE OF PROPERTY INSURANCE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE ADDITIONAL INTEREST NAMED BELOW.THIS EVIDENCE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS EVIDENCE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE ADDITIONAL INTEREST. AGENCY PH NEO (970)356-0123 COMPANY Flood and Peterson Zurich American Insurance Company PO Box 578 8734 Paysphere Circle Greeley CO 80632 Chicago IL 60674-8745 FAX A/C N0:19'/01330-186'/ AooaeSs. kurwiller@floodpeterson.co CODE: SUB CODE: AGENCY00001310 U T M RID R: INSURED LOAN NUMBER POLICY NUMBER Hensel Phelps Construction Co. TBD Southcentral Region EFFECTIVE DATE EXPIRATION DATE CONTINUED UNTIL 8326 Cross Park Dr Per NTP X TERMINATED IF CHECKED Austin TX 78754 THIS REPLACES PRIOR EVIDENCE DATED: PROPERTY INFORMATION LOCATIONIDESCRIPTION Bob Bennett Phases II, III, and IV 900, 901, and 910 Luther Peterson Pl, Round Rock, TX 78665 THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS EVIDENCE OF PROPERTY INSURANCE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS COVERAGE INFORMATION COVERAGE I PERILS I FORMS AMOUNT OF INSURANCE DEDUCTIBLE Builder's Risk (coverage per Hensel Phelps' Master Program) $45,446,821 $50,000 REMARKS(Including Special Conditions) CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. ADDITIONAL INTEREST %AME AND ADDRESS MORTGAGEE ADDITIONAL INSURED LOSS PAYEE Hx Loss Payee 6 Addl Insured City of Round Rock LOAN a 221 E. Main Street Round Rock, TX 78664 AUTHORIZED REPRESENTATIVE Kelly Urwiller/KURWILT '" ACORD 27(2009112) ©1993-2009 ACORD CORPORATION. All rights reserved. INS027 (200912)02 The ACORD name and logo are registered marks of ACORD A�� DATE(MM/DD/YYYY) CCERTIFICATE OF LIABILITY INSURANCE 08/07/2025 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Denise Hill-Holligan NAME. Flood and Peterson PHONE (970)356-0123 FAX (970)330-1867 A/C No Ext). A/C,No): PO Box 578 E-MAIL Dhillholligan@floodpeterson com ADDRESS: INSURER(S)AFFORDING COVERAGE NAIC• Greeley CO 80632 INSURER A: Zurich American Insurance Company 16535 INSURED INSURER B: American Zurich Insurance Company 40142 Hensel Phelps Construction Co INSURER C American Guarantee and Liability Ins Co 26247 Southcentral Region INSURER 0: XL Insurance America.Inc 24554 8326 Cross Park Dr INSURER E: National Fire&Marine Ins Co 20079 Austin TX 78754 INSURER F: Steadfast Insurance Co 26387 COVERAGES CERTIFICATE NUMBER: X26 55M LIMB/CPPI REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INSR AUULIbUtSK POLICY EFF POLICY EXP LIMITS LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER MMIDD/YYYV M' MMIDDYY X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE S 6,000,000 DAMAGE TO RENTE13_7 CLAIMS MADE 7 OCCUR PREMISES Ea occurrence g 500,000 MED EXP(Any one person) $ A GL0369726420 01/01/2025 01/01/2026 PERSONAL&ADV INJURY S 6,000,000 M'OTHER L AGGREGATE LIMIT APPLIES PER GENERAL AGGREGATE s 10000,000 POLICY aPRO ❑ 10,000,000 LOC PRODUCTS-COMP/OPAGG SJECT I S AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT g 5.000,000 Ea accident X ANYAUTO BODILY INJURY(Per person) S A OWNED SCHEDULED BAP369726120 01/01/2025 01/01/2026 BODILY INJURY(Per accident) S AUTOS ONLY AUTOS X HIRED NON-OWNED PROPEccRTY DAMAGE S AUTOS ONLY X AUTOS ONLY Per.aident S X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 10,000,000 C EXCESS LIAB CLAIMS-MADE AUC928038423 01/01/2025 01/01/2026 AGGREGATE $ 10,000,000 DED RETENTION S (Addt'I Limits Attached) S RIWORKERS COMPENSATION X1 STATUTE I EOR_ AND EMPLOYERS'LIABILITY Y I N ANY PROPRIETOR/PARTNER/EXECUTIVE E L EACH ACCIDENT $ 2,000,000 B OFFICERWEMBER EXCLUDED) ❑N NIA WC369726521 01/01/2025 01/01/2026 (Mandatory in NH) E L.DISEASE-EA EMPLOYEE g 2.000,000 If yes,describe under 2.000,000 DESCRIPTION OF OPERATIONS below E L DISEASE-POLICY LIMIT S Each Occurrence $25,000,000 Professional and Pollution F Liability EOC937461721 01/01/2025 01/01/2026 Aggregate $25,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) (Job# HP 7024208 Job Type] RE Bob Bennett Phases Il,III and IV Round Rock,TX City of Round Rock is included as Additional Insured as required by written contract for liability caused by the named Insured,subject to policy terms, exclusions,and conditions The coverage Is primary and non-contributory to any other valid and/or collectible insurance where required by written contract. subject to policy terms,exclusions, and conditions Waiver of subrogation applies where required by written contract and legally permissible This Certificate is issued as a matter of information only,confers no rights upon the certificate holder,and does not alter the insurance coverage afforded by the policies described herein. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN City of Round Rock ACCORDANCE WITH THE POLICY PROVISIONS 221 East Main St AUTHORIZED REPRESENTATIVE Round Rock TX 78664 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: LOC#: x ADDITIONAL REMARKS SCHEDULE Page of AGENCY NAMED INSURED Flood and Peterson Hensel Phelps Construction Co POLICY NUMBER CARRIER NAIC CODE EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance Notes 2-D)XL Insurance America,Inc. Umbrella US00095537LI25A$15,000,000 Each Occurrence/Aggregate 3-C)American Guarantee and Liability Ins.Co.AEC422694505$15,000.000 Each Occurrence/Aggregate 4-E)National Fire&Marine Ins.Co 42-XSF-31308605 $15.000,000 Each Occurrence/Aggregate TOTAL UMBRELLA POLICY LIMITS:$55,000,000 EACH OCCURRENCE/$55,000.000 AGGREGATE ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD a Additional Insured - Automatic - Owners, Lessees Or ZURICH Contractors THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. Policy No. GL0369726420 ] Effective Date: 1/01/2025 This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part A Section U - Who Is An Insured is amended to include as an additional insured any person or organization whom you are required to add as can additional insured under a written contract or written agreement executed by you, but only with respect liD liability for "bodily injury", "property damage" or "personal and advertising injury" and subject b the following: 1. If such written contract or written agreement specifically requires that you provide that the person or organization be named as an additional insured under one or both of the following endorsements: a The Insurance Services Office (ISO) ISO CG 20 10(10/01 edition); or b. The ISO OG 20 37 (10/01 edition), such person or organization is then an additional insured with respect to such endorsement(s), but only to the extent that "bodily injury", "property damage" or "personal and advertising injury" arises out of. (1) Your ongoing operations, with respect to Paragraph 1.a. above; or (2) 'Your work", with respect to Paragraph 1.b. above, which is the subject of the written contract or written agreement. However, solely with respect to this Paragraph 1., insurance afforded to such additional insured: (a) Only applies if the "bodily injury", "property damage" or"personal and advertising injury" offense occurs during the policy period and subsequent to your execution of the written contract or written agreement; and (b) Does not apply to "bodily injury" or "property damage" caused by "your work" and included within the "products-completed operations hazard" unless the written contract or written agreement specifically requires that you provide such coverage to such additional insured. Z If such written contract or written agreement specifically requires that you provide that the person or organization be named as an additional insured under one or both of the following endorsements: a. The Insurance Services Office (ISO) ISO OG 20 10 (07/04 edition); or b. The ISO OG 20 37 {07/04 edition), such person or organization is then an additional insured with respect to such endorsement(s), but only to the extent that "bodily injury", "property damage" or "personal and advertising injury" is caused, h whole or in part, by: (1) Your acts or omissions; or (2) The acts or omissions of those acting on your behalf, U-GL-2162-A ON(02119) Page 1 d 4 Indudes copyrighted material d Insurance Services Office, he-vAh its permission in the performance of: (a) Your ongoing operations,with respect to Paragraph 2.a.above: or (b) "Your work" and included in the "products-completed operations hazard", with respect to Paragraph 2.b.above. which is the subject of the written contract or written agreement. However, solely with respect to this Paragraph 2.. insurance afforded to such additional insured: (i) Only applies if the "bodily injury". "property damage" or "personal and advertising injury" offense occurs during the policy period and subsequent to your execution of the written contract or written agreement:and (ii) Does not apply to "bodily injury"or"property damage"caused by "your work" and included within the "products-completed operations hazard" unless the written contract or written agreement specifically requires that you provide such coverage to such additional insured. 3. If neither Paragraph 1. nor Paragraph 2. above apply and such written contract or written agreement requires that you provide that the person or organization be named as an additional insured: a. Under the ISO CG 20 10(04/13 edition, any subsequent edition or if no edition date is specified);or b. With respect to ongoing operations (if no form is specified), such person or organization is then an additional insured only to the extent that"bodily injury". "property damage" or"personal and advertising injury"is caused, in whole or in part by: (1) Your acts or omissions;or (2) The acts or omissions of those acting on your behalf. in the performance of your ongoing operations,which is the subject of the written contract or written agreement. However, solely with respect to this Paragraph 3., insurance afforded to such additional insured: (a) Only applies to the extent permitted by law: (b) Will not be broader than that which you are required by the written contract or written agreement to provide for such additional insured:and (c) Only applies if the"bodily injury"."property damage"or"personal and advertising injury"offense occurs during the policy period and subsequent to your execution of the written contract or written agreement. 4. If neither Paragraph 1. nor Paragraph 2. above apply and such written contract or written agreement requires that you provide that the person or organization be named as an additional insured: a. Under the ISO CG 20 37(04/13 edition, any subsequent edition or if no edition date is specified);or b. With respect to the"products-completed operations hazard"(if no form is specified), such person or organization is then an additional insured only to the extent that"bodily injury"or"property damage" is caused, in whole or in part by"your work"and included in the"products-completed operations hazard", which is the subject of the written contract or written agreement. However.solely with respect to this Paragraph 4., insurance afforded to such additional insured: (1) Only applies to the extent permitted by law; (2) Will not be broader than that which you are required by the written contract or written agreement to provide for such additional insured: (3) Only applies if the "bodily injury"or"property damage"occurs during the policy period and subsequent to your execution of the written contract or written agreement; and (4) Does not apply to "bodily injury" or "property damage" caused by "your work" and included within the "products-completed operations hazard" unless the written contract or written agreement specifically requires that you provide such coverage to such additional insured. U-GL-2162-A CW(0219`. Page 2 of 4 Includes copyrighted material of Insurance Services Office.Inc..with its permission. B. Solely with respect to the insurance afforded to any additional insured referenced in Section A. of this endorsement. the following additional exclusion applies: This insurance does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of,or failure to render. any professional architectural,engineering or surveying services including: 1. The preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports. surveys, field orders.change orders or drawings and specifications;or 2. Supervisory. inspection, architectural or engineering activities. This exclusion applies even if the claims against any insured allege negligence or other wrongdoing in the supervision, hiring,employment.training or monitoring of others by that insured.if the'occurrence"which caused the"bodily injury" or"property damage". or the offense which caused the "personal and advertising injury", involved the rendering of or the failure to render any professional architectural,engineering or surveying services. C. Solely with respect to the coverage provided by this endorsement,the following is added to Paragraph 2.Duties In The Event Of Occurrence,Offense, Claim Or Suit of Section IV—Commercial General Liability Conditions: The additional insured must see to it that: (1) We are notified as soon as practicable of an 'occurrence"or offense that may result in a claim; (2) We receive written notice of a claim or"suit"as soon as practicable; and (3) A request for defense and indemnity of the claim or"suit"will promptly be brought against any policy issued by another insurer under which the additional insured may be an insured in any capacity. This provision does not apply to insurance on which the additional insured is a Named Insured if the written contract or written agreement requires that this coverage be primary and non-contributory. D. Solely with respect to the coverage provided by this endorsement: 1. The following is added to the Other Insurance Condition of Section IV — Commercial General Liability Conditions: Primary and Noncontributory insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured provided that: a. The additional insured is a Named Insured under such other insurance;and b. You are required by written contract or written agreement that this insurance be primary and not seek contribution from any other insurance available to the additional insured. 2. The following paragraph is added to Paragraph 4.b. of the Other Insurance Condition under Section IV — Commercial General Liability Conditions: This insurance is excess over: Any of the other insurance.whether primary.excess,contingent or on any other basis,available to an additional insured, in which the additional insured on our policy is also covered as an additional insured on another policy providing coverage for the same 'occurrence", offense, claim or "suit". This provision does not apply to any policy in which the additional insured is a Named Insured on such other policy and where our policy is required by a written contract or written agreement to provide coverage to the additional insured on a primary and non- contributory basis. E. This endorsement does not apply to an additional insured which has been added to this Coverage Part by an endorsement showing the additional insured in a Schedule of additional insureds. and which endorsement applies specifically to that identified additional insured. F. Solely with respect to the insurance afforded to an additional insured under Paragraph A.3. or Paragraph A.4. of this endorsement, the following is added to Section III—Limits Of Insurance: Additional Insured—Automatic—Owners, Lessees Or Contractors Limit The most we will pay on behalf of the additional insured is the amount of insurance: U-GL-2162-A CW M 191 Page 3 of 4 Includes copyrighted material of Insurance Services Office.Inc..with its permission. 1. Required by the written contract or written agreement referenced in Section A.of this endorsement;or 2. Available under the applicable Limits of Insurance shown in the Declarations. whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. All other terms,conditions, provisions and exclusions of this policy remain the same. U-GL-2162-A CW(02 19) Page 4 of 4 Includes copyrighted material of Insurance Services Office.Inc..with its permission. POLICY NUMBER: GLO 3697264-20 COMMERCIAL GENERAL LIABILITY CG 24 041219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s) Or Organization(s): ANY PERSON OR ORGANIZATION THAT REQUIRES YOU TO WAIVE YOUR RIGHTS CF RECOVERY, N A WRITTEN CONTRACT OR AGREEMENT WITH THE NAMED INSURED THAT 6 EXECUTED PRIOR TO THE ACCIDENT OR LOSS. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV- Conditions: Wa waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s) shown in the Schedule above. CG 24 041219 © Insurance Services Office, Inc., 2018 Page 1 of 11 Other Insurance Amendment - Primary And Non 9 1 - Contributory ZURICH Policy No. Eff Dale ut Pol ( Exp Date of Poi I F.ff Date of Fnd. Producer No. Add'I Prem Return Prem GLO 369726420 I 01/01/2025 01/011/202_6 ___ 33123000 INCL THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. Named Insured: Hensel Phelps Construction Co. Address (including ZIP Code): This endorsement modifies insurance provided under the: Commercial General Liability Coverage Part 1. The following paragraph is added to the Other Insurance Condition of Section IV - Commercial General Liability Conditions: This insurance is primary insurance to and will not seek contribution from any other insurance available to an additional insured under this policy provided that: a. The additional insured is a Named Insured under such other insurance; and b. You are required by a written contract or written agreement that this insurance would be primary and would not seek contribution from any any other insurance available to the additional insured. 2 The following paragraph is added to Paragraph 4.b. of the Other Insurance Condition of Section IV - Commercial General Liability Conditions: This insurance is excess over: Any of the other insurance, whether primary, excess, contingent or on any other basis, available to an additional insured, n which the additional insured on our policy is also covered as an additional insured an another policy providing coverage for the same "occurrence", offense, claim or "suit". This provision does not apply to any policy in which the additional insured is a Named Insured on such other policy and where our policy is required by written contract or written agreement to provide coverage to the additional insured on a primary and non-contributory basis. All other terms and conditions of this policy remain unchanged. U-GL-1327-B ON(04/13) Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission POLICY NUMBER: BAP369726120 COMMERCIAL AUTO CA 20 48 10 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED INSURED FOR COVERED AUTOS LIABILITY COVERAGE This endorsement modifies insurance provided under the following.- AUTO ollowing:AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement. This endorsement identifies person(s) or organization(s) who are"insureds"for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter coverage provided in the Coverage Form. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: Hensel Phelps Construction Co i Endorsement Effective Date: 1/1/2025 SCHEDULE Name Of Person(s) Or Organization(s): ANY PERSON OR ORGANIZATION TO WHOM OR WHICH YOU ARE REQUIRED TO PROVIDE ADDITIONAL INSURED STATUS OR ADDITIONAL INSURED STATUS ON A PRIMARY, NON- CONTRIBUTORY BASIS, IN A WRITTEN CONTRACT OR WRITTEN AGREEMENT EXECUTED PRIOR TO LOSS, EXCEPT WHERE SUCH CONTRACT OR AGREEMENT IS PROHIBITED BY LAW. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. Each person or organization shown in the Schedule is an "insured" for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in Paragraph A.I. of Section II — Covered Autos Liability Coverage in the Business Auto and Motor Carrier Coverage Forms and Paragraph D.2. of Section I — Covered Autos Coverages of the Auto Dealers Coverage Form. CA 20 48 10 13 ©Insurance Services Office, Inc., 2011 Page 1 of 1 Wolters Kluwer Financial Services l Unitorm Forms' POLICY NUMBER: BAP369726120 COMMERCIAL AUTO CA 04 44 10 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Named Insured: Hensel Phelps Construction Co. Endorsement Effective Date: 1/12025 SCHEDULE Names)Of Person(s)Or Organization(s): ALL PERSONS AND/OR ORGANIZATIONS THAT ARE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT WITH THE INSURED, EXECUTED PRIOR TO THE ACCIDENT OR LOSS, THAT WAIVER OF SUBROGATION BE PROVIDED UNDER THIS POLICY. Information required to complete this Schedule,if not shown above,will be shown in the Declarations. The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the "accident' or the "loss" under a contract with that person or organization. CA 04 44 10 13 ©Insurance Services Office, Inc., 2011 Page 1 of 1 Wolters Kluwer Financ al Services I Uniform Forms"' WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 00 03 13 (Ed 4-84) WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule ALL PERSONS AND/OR ORGANIZATIONS THAT ARE REQUIRED BY WRITTEN CONTRACT OR AGREEMENT WITH THE INSURED, EXECUTED PRIOR TO THE ACCIDENT OR LOSS, THAT WAIVER OF SUBROGATION BE PROVIDED UNDER THIS POLICY FOR WORK PERFORMED BY YOU FOR THAT PERSON AND/OR ORGANIZATION WC 00 03 13 (Ed 4-84) Z 1963 National Council on Compensation Insurance