Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Contract - JKB Construction - 11/6/2014
City of Round Rock, Texas Contract Forms Standard Form of Agreement: Section 00500 City of Round Rock, Texas Standard Form of Agreement between Owner and Contractor AGREEMENT made as of the Q * 00.4‘ *day of ► - �r , in the year 20 M BETWEEN the Owner: City of Round Rock,Texas(hereafter"Owner"or"City") 221 East Main.Street Round Rock,Texas 78664 and the Contractor JKB Construction Co.,LLC 350 North Bagdad Road ("Contractor") Leander,Texas 78641 The Project is described as: Channel Erosion at Harvey Penick Drive I The Engineer is: K Friese and Associates For and in consideration of the mutual terms, conditions and covenants of this Agreement and all accompanying documents between Owner and Contractor, the receipt and sufficiency of which are hereby acknowledged,Owner and Contractor agree as follows: ARTICLE I THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement; these form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than Modifications,appears in Article 7. ARTICLE 2 THE WORK OF THIS CONTRACT Contractor shall fully execute the Work described in the Contract Documents, except to the extent specifically indicated in the Contract Documents to be the responsibility of others. 00500 8-2012 Page 1 of 5 00196575 Standard Form of Agreement I I ARTICLE 3 DATE OF COMMENCEMENT; DATE OF SUBSTANTIAL COMPLETION;DATE OF FINAL COMPLETION 1 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a Notice to Proceed issued by Owner. 3,2 The Contract Time shall be measured from the date delineated in the Notice to Proceed. 3.3 Contractor shall commence Work within Ten (10 ) calendar days from the date delineated in the Notice to Proceed. 3.4 Contractor shall achieve Substantial Completion of the items of Work listed on Attachment A to this 111 Agreement no later than Sixty (60 ) calendar days from issuance by Owner of Notice to Proceed, and Contractor shall achieve Substantial Completion of the entire Work no later than Seventy Five (75 )calendar days from issuance by Owner of Notice to Proceed,subject to adjustments of this Contract Time as provided in the Contract Documents. 3.5 If Contractor fails to achieve Substantial Completion of the Work(or any portion thereof) on or before the date(s) specified for Substantial Completion in the Agreement, Contractor shall pay to Owner, as liquidated damages,the sum of Five Hundred and No/100 Dollars $500.00 ( )for each calendar day that Substantial Completion is delayed after the date(s) specified for Substantial Completion. It is hereby agreed that the liquidated damages to which Owner is entitled hereunder are a reasonable forecast of just compensation for the harm that would be caused by Contractor's failure to achieve Substantial Completion of the Work(or any portion thereof)on or before the date(s)specified for Substantial Completion in the Agreement. It is agreed that the harm that would be caused by such failure, which includes loss of expected use of the Project areas, provision of alternative storage facilities and rescheduling of moving and occupancy dates, is one that is incapable or very difficult of accurate estimation.It is hereby agreed that if Substantial Completion of the Work(or any portion thereof)is not achieved on or before thirty(30)days after the date(s) specified for Substantial Completion in the Agreement, the Owner shall have the option to either collect liquidated damages as set forth herein or to thereafter rely on its remedies under the Contract Documents and at law and in equity, including without limitation, the recovery of actual damages. The date(s) specified for Substantial Completion of the Work(or any portion thereof) in the Agreement shall be subject to adjustment as provided in the Contract Documents. 3.6 Contractor shall achieve Final Completion of the entire Work no later than Seventy Five (75 )calendar days from issuance by Owner of Notice to Proceed. ARTICLE 4 CONTRACT SUM 4.1 Owner shall pay Contractor the Contract Sum in current funds for Contractor's performance of the Contract.The Contract Sum shall be one hundred and twelve thousand eight hundred and ninety dollars. ($112,890.00 ),subject to additions and deductions as provided in the Contract Documents. 4.2 The Contract Sum is based upon the following alternates which are described in the Contract Documents and are hereby accepted by Owner: Base Bid: $112,890.00 I Page 2 of 5 I I I ARTICLE 5 PAYMENTS ' 5.1 PROGRESS PAYMENTS 5.1.1 Based upon Applications for Payment submitted to Engineer and Owner by Contractor,and Certificates for Payment issued by Engineer and not disputed by Owner and/or Owner's lender, Owner shall make progress payments on account of the Contract Sum to Contractor as provided below,in Article 14 of the City of Round Rock General Conditions,and elsewhere in the Contract Documents. 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month. 5.1.3 Provided that an Application for Payment is received by Engineer and Owner, and Engineer issues a Certificate of Payment not later than the tenth (10th)day of a month, Owner shall make payment to Contractor not later than the tenth(10th)day of the next month. If an Application for Payment is received by Engineer and Owner after the application date fixed above,payment shall be made by Owner not later than one month after the Engineer issues a Certificate for Payment. 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work.The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as Engineer and Owner may require. This schedule, unless objected to by Engineer or Owner,shall be used as a basis for reviewing Contractor's Applications for Payment. 5.1.5 Applications for Payment shall warrant the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as provided in Article 14 of the City of Round Rock General Conditions. 5.1.7 Except with Owner's prior written approval, Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. 5.2 FINAL PAYMENT 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by Owner to Contractor when: .1 Contractor has fully performed the Contract except for Contractor's responsibility to correct Work,and to satisfy other requirements,if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by Engineer. 5.2.2 Owner's final payment to Contractor shall be made no later than thirty (30) days after the issuance of Engineer's final Certificate for Payment. In no event shall final payment be required to be made prior to thirty(30) days after all Work on the Contract has been fully performed.Defects in the Work discovered prior to final payment shall be treated as non-conforming Work and shall be corrected by Contractor prior to final payment, and shall not be treated as warranty items. ARTICLE 6 TERMINATION OR SUSPENSION 6.1 The Contract may be terminated by Owner or Contractor as provided in Article 15 of the City Rock General Conditions. of Round I Page 3 of 5 I I I 6.2 The Work may be suspended by Owner as provided in Article 15 of the City of Round Rock General Conditions. ARTICLE 7 ENUMERATION OF CONTRACT DOCUMENTS 7.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows: 7.1.1 The Agreement is this executed version of the City of Round Rock, Texas Standard Form of Agreement 111 between Owner and Contractor,as modified. 7.1.2 The General Conditions are the "City of Round Rock Contract Forms 00700," General Conditions, as modified. 7.1.3 The Supplementary, Special, and other Conditions of the Contract are those contained in the Project Manual dated Oc.doc - Ap1 y .j ' 7.1.4 The Specifications are those contained in the Project Manual dated OcitA06(' a01' lie 7.1.5 The Drawings, if any,are those contained in the Project Manual dated OcWoor o l 449 7.1.6 The Insurance&Construction Bond Forms of the Contract are those contained in the Project Manual dated 7.1.7 The Notice to Bidders,Instructions to Bidders,Bid For and Addenda,if any,are those contained in the Project Manual dated S .Vnbe,- 2 c4M 7.1.8 If this Agreement covers construction involving federal funds, thereby requiring inclusion of mandated contract clauses, such federally required clauses are those contained in the "City of Round Rock Contract Forms 03000,"Federally Required Contract Clauses,as modified. 7.1.9 Other documents, if any,forming part of the Contract Documents are as follows: ARTICLE 8 MISCELLANEOUS PROVISIONS 8.1 Where reference is made in this Agreement to a provision of any document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. 8.2 Owner's representative is: Lance Shellenberger Project Manager for the City of Round Rock Office: 512-218-6609 Cell: 512-801-0668 lshellenberger(aroundrocktexas.gov 8.3 Contractor's representative is: Justin K.Byrn ® President of JKB Construction Company,LLC 350 North Bagdad Road Leander,Texas 78641 8.4Neither Owner's nor Contractor's representative shall be changed without ten (10) days' written notice to the other party. 8.5 Waiver of any breach of this Agreement shall not constitute waiver of any subsequent breach. Page 4 of 5 I I 8.6 Owner agrees to pay Contractor from available funds for satisfactory performance of this Agreement in accordance with the bid or proposal submitted therefor,subject to proper additions and deductions,all as provided in the General Conditions, Supplemental Conditions, and Special Conditions of this Agreement, and Owner agrees to make payments on account thereof as provided therein. Lack of funds shall render this Agreement null and void to the extent funds are not available. This Agreement is a commitment of City of Round Rock's current revenues only. 8.7 Although this Agreement is drawn by Owner, both parties hereto expressly agree and assert that, in the event of any dispute over its meaning or application, this Agreement shall be interpreted reasonably and fairly, and H neither more strongly for nor against either party. 8.8 This Agreement shall be enforceable in Round Rock,Texas, and if legal action is necessary by either party with respect to the enforcement of any or all of the terms or conditions herein,exclusive venue for same shall lie in 111 Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the laws and court decisions of the State of Texas. 8.9 Both parties hereby expressly agree that no claims or disputes between the parties arising out of or relating to this Agreement or a breach thereof shall be decided by an arbitration proceeding, including without limitation, any proceeding under the Federal Arbitration Act(9 USC Section 1-14)or any applicable state arbitration statute. 8.10 The parties, by execution of this Agreement, bind themselves, their heirs, successors, assigns, and legal representatives for the full and faithful performance of the terms and provisions hereof. ® This Agreement is entered into as of the day and year first written above and is executed in at least three(3) original copies, of which one is to be delivered to Contractor, one to Engineer for use in the administration of the Contract,and the remainder to Owner. OWNER CONTRACTOR CITY O • a' ND R K,TEXAS _3716 /LdI" Q " �' Printed Name: NA 1/1 M WPrinte Gl i 1me:me: Title Title: csl/ed7 Date Signed: I( • t7 "f� Date Signed: (C21,0Z"' 0//20/I ATTEST: Sit444,( , City Clerk FO ' ''!/ ED AS TO FORM: !JP-Attorney I 1 Page 5 of 5 I I I I II PERFORMANCE BOND BOND NO.: HSIFSU0 666038 THE STATE OF TEXAS § IJ § KNOW ALL BY THESE PRESENTS: COUNTY OF WILLIAMSON § 11 That JKB Construction Co.,LLC of the Cityof Leander County of Williamson , and State of Texas , as Principal, and International Fidelity Insurance Company authorized under the law of the State of Texas to act as surety on bonds for principals, are held ® and firmly bound unto THE CITY OF ROUND ROCK, TEXAS,(Owner), in the penal sum of One Hundred and Twelve Thousand Eight Hundred and Ninety Dollars and No Cents Dollars ($ 112,890.00 ) for the payment whereof, well and truly to be made the said 11 Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally, by these presents: ® WHEREAS, the Principal has entered into a certain written Agreement with the Owner dated the C) day of //1/e ate-y---- , 2m which the Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length 11 herein consisting of: Channel Erosion at Harvey Penick Drive (Name of the Project) 111 NOW, THEREFORE, THE CONDITIONS OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform said Agreement and shall, in all respects, duly and faithfully observe and perform all and singular the covenants, conditions and agreements in and by said Q Agreement, agreed and covenanted by the Principal to be observed and performed, including but not limited to, the repair of any and all defects in said work occasioned by and resulting from defects in materials furnished by or workmanship of, the Principal in performing the Work Ifil covered by said Agreement and occurring within a period of twelve (12) months from the date of Final Completion and all other covenants and conditions, according to the true intent and meaning of said Agreement and the Plans and Specifications hereto annexed, then this obligation II shall be void; otherwise to remain in full force and effect; PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253, 011 Texas Government code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. 1II ;I Page l 00610 7-2009 Performance Bond 00090656 I I PERFORMANCE BOND (continued) 111. Surety, for value received, stipulates and agrees that no chane extension, of time, alteration or addition to the term of the Agreement, or to the Work performed thereunder, or the Plans, ISpecifications, or drawings accompanying the same, shall in anywise affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement, or to the work to be performed thereunder. IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this this '21st day of October instrument 2414 . TKR Construction Co., LLC International Fidelity Insurance Company PrincrP l Surety Printed Name y") Kenneth Nitsche i Printed Name By: _� Title: S1 •••\ By: �' Title: ttnrney-Tn-Fact Address: 350 North Bagdad Road Address: 10077 Grogans Mill Road,Suite 250 Leander,Texas 78641 The Woodlands,TX 77380 Resident Agent of Surety: • • Signature Robert James Nitsche Printed Name 143 E. Austin Street Address Giddings, TX 78942 City, State &Zip Code 1 • 00610 7-2009 Page 2 00090656 Performance Bond I I PAYMENT BOND BOND NO.: HSIFSU0666038 THE STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS: COUNTY OF WILLIAMSON § That JKB Construction Co.,LLC , of the City of Leander Williamson County of and State of Texas as Principal, and International Fidelity Insurance IJ authorized under the laws of the State of Texas to act as Surety on Bonds for Principals, are held Company and firmly bound unto THE CITY OF ROUND ROCK, (OWNER), and all subcontractors, workers, laborers, mechanics and suppliers as their interest may appear, all of whom shall have the right to sue upon this bond, in the penal sum of One Hundred and Twelve Thousand Eight Hundred and Ninety Dollars and No Cents ($ 112,890.00 Dollars ) for the payment whereof, well and truly be made the said Principal and Surety bind themselves and their heirs, administrators, executors, successors, and assigns,jointly and severally, by these presents: WHEREAS, the Principal has entered into a certain written Agreement with the Owner, dated the day of UiVeMP.-r- , 20 Pet; to which Agreement is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein consisting of: Channel Erosion at Harvey Penick Drive (Name of the Project) NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall well and truly pay all subcontractors, workers, laborers, mechanics, and suppliers, all monies to them owing by said Principals for subcontracts, work, labor, equipment, supplies and materials done and furnished for the construction of the improvements of said Agreement, then this obligation shall be and become null and void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253, Texas Government code, as amended, and all liabilities on this bond shall be determined in C accordance with the provisions of said Chapter 2253 to the same extent as if it were copied at length herein. 00620 7-2009 Page 1 00090656 Payment Bond ii: i i't PAYMENT BOND (continued) Surety, for value received, stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement, or to the Work performed thereunder, or the plans, specifications or drawings accompanying the same shall in anywise affect it's obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract, or to the work to be performed thereunder, IN WITNESS WHEREOF, the said Principal and Surety have signed and sealed this Instrument this 21st day of October , 20 14 . JKB Construction Co.,LLC Principa International Fidelity Insurance Company Surety Printed Name l Kenneth Nitsche Printed Name By: Title: sid a By /✓ • Address: 350 North Bagdad Road Titl Attorney-In-Fact Address: 10077 Grogans Mill Road,Suite 250 Leander,Texas 78641 ._The Woodlands TX 77380 Resident Agent of Surety: Signature Robert James Nitsche Printed Name 143 E.Austin Street Address Giddings,TX 78942 1 1 1 t1 00620 7-2009 Page 2 00090656 Payment Bond U iClient#:51563 JKBCON ACORDTM CERTIFICATE OF LIABILITY INSURANCE DATE(MM/DD/YYYY) I 10/21/2014 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT:If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed.If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT The Nitsche Group PHONE 979 542-3666 FAX I 143 East Austin (A/c,No,Ext): (A/c,No): E-MAIL Giddings,TX 78942-3299 ADDRESS: 979 542-3666 INSURER(S)AFFORDING COVERAGE NAIC# INSURER A:Bituminous Casualty Corporation 20095 I INSURED INSURER B: JKB Construction Company, LLC P O Box 1001 INSURER C Liberty Hill,TX 78642 INSURERD: IINSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD IINDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS !1 CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER LTR TYPE OF INSURANCE INSR WVD POLICY NUMBER (MM/DDYEFF) (MM/DDY ) LIMITS A GENERAL LIABILITY CLP3600923B 03/04/2014 03/04/2015 EACH OCCURRENCE $1,000,000 X COMMERCIAL GENERAL LIABILITY DAMAGE TO occurrence) $100,000 CLAIMS-MADE X OCCUR MED EXP(Any one person) $5,000 _ X PD Ded:2,000 PERSONAL&ADV INJURY $1,000,000 1 GENERAL AGGREGATE _$2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $2,000,000 7 POLICY X PRO JECT LOC $ I A AUTOMOBILE LIABILITY CAP3600916B 03/04/2014 03/04/2015 Ea COMBIaccideNEDnt)SINGLE LIMIT ( - X ANY AUTO BODILY INJURY(Per person) $ $1,000,000 ALL OWNED SCHEDULED AUTOS AUTOS BODILY INJURY(Per accident) $ X HIRED AUTOS XAUNON-OTOSWNED PROPERTY DAMAGE _ (Per accident) $ A X UMBRELLA LIAB X OCCUR CUP2804011 B 03/04/2014 03/04/2015 EACH OCCURRENCE $2,000,000 EXCESS LIAB CLAIMS-MADE AGGREGATE $2,000,000 IIDED X RETENTION$10000 $ A WORKERS COMPENSATION WC3600920 03/04/2014 03/04!2015 X WC STATU- OTH- ER• AND EMPLOYERS'LIABILITY TORY LIMITS ANY PROPRIETOR/PARTNER/EXECUTIVE Y/N E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? y N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 IDESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,if more space is required) RE: Channel Erosion at Harvey Penick Drive As per policy provision,Certificate Holder is listed as additional insured in regard to the auto and Igeneral liability policies as provided by additional insured endorsement. General liability,auto and workers compensation policies include(s)a 30 Days Notice of Cancellation endorsement providing 30 days advance notice if policy is canceled by the company other than for nonpayment Iof premium,or direct cancellation by named insured as per policy provision. CERTIFICATE HOLDER CANCELLATION I City of Round Rock SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN City Manager ACCORDANCE WITH THE POLICY PROVISIONS. 221 E. Main St. Round Rock,TX 78664 AUTHORIZED REPRESENTATIVE I / a.,*L--4_ ©1988-2010 ACORD CORPORATION.All rights reserved. I ACORD 25(2010/05) 1 of 1 The ACORD name and logo are registered marks of ACORD #S544241/M531755 066