Loading...
CM-2026-142 - 5/15/2026 = Document G802 — 2017 Amendment to the Professional Services Agreement PROJECT:(name and address) AGREEMENT INFORMATION: AMENDMENT INFORMATION: Bob Bennett Phases I,III,and IV Date: April 2,2026 Amendment Number:002 3400 Sunrise Road,Round Rock,Texas 78665 MGl Date:April- 6 ,2026 OWNER:(name and address) ARCHITECT:(name and address) City of Round Rock Jacobs Engineering Group,Inc. 221 East Main Street,Round Rock, 1999 Bryan Street,Suite 3500,Dallas, Texas 78664 Texas 75201 The Owner and Architect amend the Agreement as follows: Amendment to Scope of Services as set forth in Exhibit"A,"attached hereto and incorporated by reference for all purposes, resulting in a deduction of the Architect's Compensation. The Architect's compensation and schedule shall be adjusted as follows: Compensation Adjustment: Deduction of$448,791.00 from the original Compensation amount of$4,181,800.00 for a new Compensation amount of $3,733,009.00. Schedule Adjustment: N/A SIGNATURES: Jacobs En_ineerin_ Grou City of Round Rock ARCHITECT 'irm nam! ' OWNER(Firm name) SIG R'An till" 'We 1 1 `,,S Di or �� rSk; f - ) O eration a , i`"� PRINT • NAM D LE PRINTED NAME D TITLE _ " C� /lC7Za24, DATE DATE AIA Document GB02—2017.Copyright m 2000,2007 and 2017.All rights reserved. The American Institute of Architects,"'American Institute of Architects,' `AIA,'the AIA Logo,and'AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 11:46:44 ET on 1 04/02/2026 under Order No.500040023 which expires on 04/02/2027,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents°Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. User Notes: (369ADA30) ,- City of Round Rock Bob Bennett Complex Jacobs February 12,2026 EXHIBIT A SCOPE OF SERVICE Amendment#2 CITY OF ROUND ROCK—BOB BENNETT FACILITY REMOVAL OF FUEL AND WASH FACILITIES ADDITION OF NORTHERN DRIVEWAY TO PHASE V. CONNECTION TO PHASE 3 SITE The following Scope items are modifications to the original Bob Bennett Complex scope of services for Phase V. Scope reduction for the removal of the fueling and wash facilities.The addition of the Northern roadway access to Eagles Nest from the Phase V property will include survey services,civil/drainage design,electrical and telecom and project management. Extended connection to the future phase 3 site including partial demolition of a storage canopy. ASSUMPTIONS The following assumptions are modification or additions or modifications of the original scope: 1. CoRR has obtained contractual approval with the adjacent property owner to use and modify the access roadway. 2. Utility documents are available to show grading of underground drainage systems. Civil design will determine if drainage can be modified. 3. CoRR will provide the Geotechnical analysis of the roadway site as needed. 4. Design and construction of the Northern Roadway will be scheduled to be built with Phase V pending approvals from property owners. 5. Damages or impacted existing landscape will be noted to be repaired and/or replaced in kind. 6. Civil services includes TCEQ and Re-platting of the Phase 2&5 sites as one site 7. Scope and Fee removed Mechanical, Fire protection, Equipment, Plumbing,and Interiors. 8. Scope and Fee Reduced for Structural,electrical,telecom and Architectural. 9. Scope increased or remained the same for Civil, Landscape and Project Management. 10. Reimbursements included in Scope for Fuel and Wash consultants and Geological survey. This cost will be paid by Jacobs to be reimbursed by CoRR. SCOPE OF SERVICES 1. Survey of the existing Northern Roadway and connection to the Phase V and Phase III sites. These services will include but not be limited to: a. Design survey of the area to be re-constructed for the driveway connection. b. Document the boundary for the adjacent(Burke Group tracts)to develop access and temporary construction easements. The boundary survey to locate and/or set existing property corners to reestablish the property boundaries. c. Prepare field notes and a sketch for the Access Easement to be presented to the City legal team for their inclusion in the dedicatory package. d. Prepare field notes and a sketch for Temporary Construction Easements to be presented to the City legal team for their inclusion in the dedicatory package. e. Title Commitments for all property involved will be provided by the client. 2. Civil Design Services 3. Electrical and Telecom Services 4. Project Management Services Page 1 of 5 ,, City of Round Rock Bob Bennett Complex Jacobs FINAL DESIGN SERVICES: 1.0 Schematic Design (30%submittal) 1.1 REMOVAL OF FUELING AND WASH DESIGN.ADDITION OF NORTHERN ROADWAY ACCESS TO PHASE V AND ACCESS TO PHASE III SITE— a. REMOVE ALL DESIGN AND CONSTRUCTION SERVICES FOR THE FUEL ISLAND AND WASH FACILITY IN PHASE V. b. 30%Schematic Design Drawings: • The Architect and Civil Engineer will prepare drawings,which are in sufficient detail to illustrate design concepts, systems concepts, interfaces,scale,and relationships. The drawings will identify all project components, civil, electrical,systems, circulation,and access, including,site plans,temporary access plans.A Preliminary Table of Content(TOC)for the expected program specifications will be provided for review. Civil services will coordinate with all public utilities,procure releases as necessary,and document/design to abandon/redesign the existing PUE running between phase 5 and phase 2 sites.The schematic design documents will define the following: • Existing conditions base file that includes property boundaries,existing pavement,utilities and topography. • Site layout including vehicle access,circulation, service access and parking.Jacobs will use the Autoturn program to verify trucks with trailers have accurate turning space. • Utility locations(coordination with CoRR) • Preliminary drainage and grading plans • Coordination of preliminary plan and profile • Preliminary electrical power and lighting layout • Preliminary telecom layout • Preliminary retaining wall layout • Preliminary Landscape layout • Specification TOC c. Estimate of Probable Costs to be developed by CMAR The Architect will review the cost estimate based on the complete Schematic Design Documents. Comments will be provided to CORR and the CMAR Contractor 2 weeks after receipt of official estimate. 30%Schematic Design Deliverables • Schematic Design Drawings • Review of Estimate of Probable Costs 2.0 Design Development(65%Submittal) 2.1 REMOVAL OF FUELING AND WASH DESIGN.ADDITION OF NORTHERN ROADWAY ACCESS TO PHASE V AND ACCESS TO PHASE ill SITE— Based upon approved Schematic Design Documents,the architect and civil engineer will prepare Design Development Documents which establish and describe the size,scope, character, material composition, systems,sequence of operation/control and other features by means of plans, sections and elevations,specifications that identify major materials and systems and establish in general their quality levels. Early construction packages will be considered pending coordination with the Construction Manager. Design Development drawings will be developed to a 65%level of detail and include the following: a. Civil and Infrastructure Page 2 of 5 City of Round Rock Bob Bennett Complex Jacobs Grading, drainage, paving, fencing, and erosion control plans including existing contours, final contours, mathematized horizontal and vertical geometry, horizontal and vertical clearances, storm sewer, drainage structures and details of special structures. Civil drawings will include: a. Site development plan(horizontal control) b. Site grading plan(vertical control) c. Pavements, roadways plan d. Site utilities plan, including above and below-ground utilities. e. Retaining wall,screen wall or other site structures f. Storm Water Pollution Prevention Permit b. Electrical/Telecom Electrical Systems and Telecom Systems will be designed to accommodate lighting and security for access to the Phase V site. All utilities for electrical and telecom will come from within the Phase V site. Electrical and Telecom drawings will include: • Site plan showing electrical and telecom sources • Lighting location and footcandle levels • Security card readers, access and egress controls • Security CCTV • Vertical and horizontal distribution schematics • Operational procedures and installation details for a complete security system. c. Landscape and Irrigation Landscape plans will include overall and enlarged planting/xeriscape plans, hardscape plans, and irrigation plans to fully cover proposed planting as defined by CoRR Guidelines. • Planting plans • Soil Amendment plans • Hardscape plans • Irrigation plans • Fencing and screening wall sections and elevations 65%Design Development Deliverables • Design Development Drawings • Outline Technical Specifications • Review of Estimate of Probable Construction Costs 3.0 Contract Documents(95%submittal) 3.1 REMOVAL OF FUELING AND WASH DESIGN,ADDITION OF NORTHERN ROADWAY ACCESS TO PHASE V AND ACCESS TO PHASE III SITE— Based upon approved Design Development Documents and the incorporation of any changes or adjustments directed by the CoRR Project Manager,the Civil Engineer will prepare complete Construction Documents.The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the construction work based on a CMAR project delivery method. Construction Documents which establish and describe the complete size,scope,character, material composition,systems, sequence of operation/control and other features by means of plans,sections and elevations,typical construction details, Page 3 of 5 X. City of Round Rock 7 Bob Bennett Complex .,acobs including specifications that identify major materials and systems and establish in general their quality levels. Construction Document drawings and specifications will be developed to a 95%level of detail and will be inclusive of all deliverables defined in the Design Development phase above. Estimate of Probable Costs to be developed by CMAR The design team will review the cost estimate based on the completed Design Documents. Comments will be provided to CORR and the CMAR Contractor 2 weeks after receipt of official estimate. Construction Document Deliverables: • 95%Contract Documents • 95%Applicable Technical Specifications • Schedules(Prepared by Architect and CMAR) • Review of Estimate of Probable Construction Costs 4.0 Issue for Construction Documents(100%submittal) 4.1 REMOVAL OF FUELING AND WASH DESIGN,ADDITION OF NORTHERN ROADWAY ACCESS TO PHASE V AND ACCESS TO PHASE III SITE— Based upon 95%Construction Documents which have been reviewed and accepted by the CoRR and stakeholders and the incorporation of any changes or adjustments directed by the CoRR Project Manager,the Architect will prepare Issue for Construction Documents for the Northern Roadway.The intent of the IFC Documents is to include all items final changes necessary for the proper execution and completion of the construction work based on a CMAR project delivery method and all Agency and Utilities Applications and Permits. IFC Document Deliverables: • 100%Contract Documents • 100%Applicable Technical Specifications • Schedules(Prepared by Architect and CMAR) 6.0 CONSTRUCTION SUPPORT SERVICES: 6.1 REMOVAL OF FUELING AND WASH DESIGN,ADDITION OF NORTHERN ROADWAY ACCESS TO PHASE V AND ACCESS TO PHASE III SITE— The Design Team will provide Construction Support Services in support of CoRR Construction Manager. The Construction Phase begins with the Issue of Notice to Proceed(NTP)to the Contractor. Fees will be provided for all construction administration services. The Civil Engineer and Architect will provide the following services during Construction Administration: • Attend construction meetings to align with site visits of Phases II and V. • Visit project site at appropriate intervals not greater than every other week for a total of twenty(26)visits per year, complete observation reports for all disciplines. • Review and process submittals;adhere to standard procedures established by the Division 1 Specifications and the CoRR Project Manager regarding stamping and filing submittals. • Interpret contract documents. • Review and evaluate contract documents. • A&E will receive, review,and respond to all GC RFIs and Submittals and will report the status to CoRR. • A&E will prepare Change Requests I Change Orders Page 4 of 5 City of Round Rock Bob Bennett Complex Jacobs EXHIBIT E COMPENSATION SCHEDULE PROFESSIONAL SERVICES In consideration of the professional services to be performed by the Design Team in Amendment#2, the City of Round Rock agrees to pay the Architect a total sum of Five Hundred Seventy-Three thousand and nine dollars($573,009.00). This fee replaces the original Phase V contracted fee that was$1,021,800.00 in whole. The said sum is a fixed not—to—exceed amount and shall be paid as delineated as follows and includes amounts paid for Architects, Engineers, and Survey.The addition of the sum above to the master contract brings the total value to Three Million Seven Hundred Thirty-Two Thousand Two Hundred and Nine Dollars ($3,732,209.00). BASIC SCOPE THE PHASE V SCOPE CHANGES: 30%Schematic Design $ 177,000.00 Minus paid Fee -$ 132,991.00 through Invoice 13 65%Design Development $ 118,000.00 95%Construction Documents $ 158,000.00 100%Issue for Construction $ 64,000.00 Construction Phase Services $ 170,000.00 Record Drawings $ 19,000.00 FEE BASIC ABBE SCOPE with Record Drawings $ 573,009.00 The above$3,732,209.00 contains$200,000 City Contingency REIMBURSABLE EXPENSES Reimbursable expenses are included in the above cost by program phase. This includes reimbursement for our fuel and wash facility consultants and services for geological surveys. ADDITIONAL SERVICES Additional Services are defined as any service not listed as a basic service including revisions to previously approved plans that necessitate additional work for the Architect,substantive changes in the Project Scope, or additional work necessitated by unknown or reasonably unforeseen circumstances.The parties expressly agree that such additional services would be performed under a supplemental agreement negotiated at a time subsequent to this proposal. Compensation for approved Additional Services shall be computed based team members yearly salary rates. Page 5 of 5