CM-2026-150 - 5/22/2026 ROUND ROCK TEXAS PARKS AND RECREATION April 09,2026 RE: Recommendation to Award—Old Settlers Park Cross Country Improvement Project 2026 Dear Mr. Atkins, As you are aware, on March 31, 2026, bids were received for the Old Settlers Park Cross Country Improvement Project 2026. In total,ten(10)bids were received with amounts ranging between$237,309.80 to $3,284,488.28. The highest bidder had a unit price discrepancy that made their bid out of the range of normal for this project(and what they put for their bid total for the project). Had this unit price discrepancy not been present,their bid would have been for$294,488.28 (still not the lowest bidder). If this bid was excluded entirely,the bids would range from $237,309.80 to$721,782.50. Based upon my review of the bid and analysis of the funding available, I recommend the City of Round Rock accept the Bid as submitted by T.F. Harper&Associates in the amount of$237,309.80. In addition to being the lowest bid received,the City has worked with T.F. Harper&Associates in the past with good results. If additional information is required,please advise. Sincerely, Mayor Craig Morgan Katie Baker,PLA I ASLA Mayor Pro-tem Park Development Manager Krisin Stevens City of Round Rock—Parks and Recreation Department Council Members Michelle Ly Rene Flores Enclosures Melissa Fleming cc: Project File Frank Ortega Kristin Stevens Hilda Montgomery City Manager Brooks Bennett City Attorney CA'20214 - 150 Stephanie Sandre CITY OF ROUND ROCK—PARKS AND RECREATION DEPARTMENT—301 West Bagdad,Suite 250--Round Rock,Texas 78664 Phone:512.218.5540—Fax:512.218.5548—www.ci.round-rock.tx.us THE CITY OF ROUND ROCK PARKS& RECREATION DEPARTMENT BIDS EXTENDED AND CHECKED 301 West Bagdad BY: JH Round Rock, Texas 78664 DATE: 4/6/2026 (512)218-5540 BID TABULATION SHEET: 1 of 3 CONTRACT : Old Settlers Park Cross Country Improvement Project 2026 LOCATION:M icrosoft Teams Besa Builders Trimbuilt Construction, BSH Construction DATE: March 31,2026 @ 11am Ina APPROX. UNIT UNIT UNIT UNIT # ITEM UNIT QTY. PRICE COST PRICE COST PRICE COST PRICE COST 1 Mobilization LS 1 $12,500.00 $12,500.00 $14,000.00 $14,000.00 $63,402.95 $63,402.95 $50,000.00 $50,000.00 2 Stabilized Construction Entrance EA 2 $2,300.00 $4,600.00 $2,500.00 $5,000.00 $2,047.50 $4,095.00 $3,500.00 $7,000.00 3 Concrete Washout EA 2 $575.00 $1,150.00 $1,000.00 $2,000.00 $1,102.50 $2,205.00 $900.00 $1,800.00 4 Tree Protection Fencing LF 1,200 $5.20 $6,240.00 $8.00 $9,600.00 $3.99 $4,788.00 $6.50 $7,800.00 5 Erosion Control Log LF 455 $5.06 $2,302.30 $5.00 $2,275.00 $7.35 $3,344.25 $14.00 $6,370.00 6 Re-vegetation of all disturbed aeas using Bermuda Hydroseed LS 1 $4,000.00 $4,000.00 $5,000.00 $5,000.00 $5,250.00 $5,250.00 $18,000.00 $18,000.00 7 All Electric Work-Start/Fi nish Structure&Awards Pavi I i o LS 1 $30,000.00 $30,000.00 $45,000.00 $45,000.00 $13,282.50 $13,282.50 $35,000.00 $35,000.00 8 Undassified Excavation& Embankment LS 1 $19,488.00 $19,488.00 $6,000.00 $6,000.00 $13,125.00 $13,125.00 $12,000.00 $12,000.00 9 Concretesidervalk(4"thick) SF 970 $12.00 $11,640.00 $10.00 $9,700.00 $8.93 $8,662.10 $10.00 $9,700.00 10 Awards Pavilion LS 1 $51,168.00 $51,168.00 $52,800.00 $52,800.00 $55,440.00 $55,440.00 $33,000.00 $33,000.00 11 18"Concrete Ribbon Curb LF 25.5 $25.00 $637.50 $120.00 $3,060.00 $23.10 $589.05 $55.00 $1,402.50 12 24"Concrete Ribbon Curb LF 66 $32.00 $2,112.00 $130.00 $8,580.00 $36.75 $2,425.50 $60.00 $3,960.00 13 18"Concrete Ribbon Curb with Turndown LF 50 $32.00 $1,600.00 $185.00 $9,250.00 $59.40 $2,970.00 $65.00 $3,250.00 14 4"PVC Si derval k Sleeves LF 18 $74.00 $1,332.00 $28.00 $504.00 $52.50 $945.00 $50.00 $900.00 15 Awards Pavilion column footers& coordination EA 8 $2,650.00 $21,200.00 $1,500.00 $12,000.00 $2,100.00 $16,800.00 $1,500.00 $12,000.00 16 Irrigation RepairAllowaice LS 1 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 Structural Metal Erection of Stat/Finish Structure induding 17 footer/foundation and all appurtaiames LS 1 $23,340.00 $23,340.00 $40,000.00 $40,000.00 $48,142.50 $48,142.50 $40,000.00 $40,000.00 18 CM Column Masonry LS 1 $12,000.00 $12,000.00 $8,000.00 $8,000.00 $11,772.00 $11,772.00 $15,000.00 $15,000.00 19 4"Li mestone Chop Stone Col umn Facade LS 1 $17,000.00 $17,000.00 $8,000.00 $8,000.00 $0.00 $0.00 $12,000.00 $12,000.00 TOTAL BASE BID: $237,309.80_ $255,769.00 $272,238.85 $284,182.50 Discrepency between Unit Price and Tctal Price THE CITY OF ROUND ROCK PARKS& RECREATION DEPARTMENT BIDS EXTENDED AND CHECKED 301 West Bagdad BY: JH Round Rock, Texas 78664 DATE: 4/6/2026 (512)218-5540 BID TABULATION SHEET: 2 of 3 CONTRACT: Old Settlers Park Cross Country Improvement Project 2026 LOCATION:Microsoft Teams Majestic Services,Inc. HCSIna Commerdal Utz Environmental SYNTH Construction DATE: March 31,2026 @ 11am General Contractor Services APPROX. UNIT UNIT UNIT UNIT # ITEM UNIT QTY. PRICE COST PRICE COST PRICE COST PRICE COST 1 Mobilization LS 1 $50,000.00 $50,000.00 $32,000.00 $32,000.00 $24,877.64 $24,877.64 $28,000.00 $28,000.00 2 Stabilized Construction Entrance EA 2 $2,500.00 $5,000.00 $2,200.00 $4,400.00 $8,512.95 $17,025.90 $4,500.00 $9,000.00 3 Concrete Washout EA 2 $750.00 $1,500.00 $1,500.00 $3,000.00 $1,875.89 $3,751.78 $1,250.00 $2,500.00 4 Tree Protection Fencing LF 1,200 $2,500.00 $3,000,000.00 $6.00 $7,200.00 $10.30 $12,360.00 $8.50 $10,200.00 5 Erosion Control Log LF 455 $2.20 $1,001.00 $5.00 $2,275.00 $15.45 $7,029.75 $11.00 $5,005.00 6 Re-vegetation of all disturbed seas using Bermuda Hydroseed LS 1 $2,500.00 $2,500.00 $7,500.00 $7,500.00 $4,171.50 $4,171.50 $15,000.00 $15,000.00 7 All Electric Work-Start/Finish Structure&Awads Pavilior LS 1 $31,000.00 $31,000.00 $36,000.00 $36,000.00 $53,431.25 $53,431.25 $56,000.00 $56,000.00 8 Unclassified Excavation& Embankment LS 1 $20,000.00 $20,000.00 $38,000.00 $38,000.00 $14,183.10 $14,183.10 $37,000.00 $37,000.00 9 Concrete sidewalk(4"thick) SF 970 $14.43 $13,997.10 $16.00 $15,520.00 $8.80 $8,536.00 $26.00 $25,220.00 10 Awads Pavilion Slab LS 1 $29,000.00 $29,000.00 $33,500.00 $33,500.00 $49,993.63 $49,993.63 $66,384.00 $66,384.00 11 18"Concrete Ribbon Curb LF 25.5 $98.04 $2,500.02 $75.00 $1,912.50 $676.48 $17,250.24 $126.00 $3,213.00 12 24"Concrete Ribbon Curb LF 66 $75.76 $5,000.16 $50.00 $3,300.00 $350.00 $23,100.00 $50.00 $3,300.00 13 18"Concrete Ribbon Curb with Turndown LF 50 $400.00 $20,000.00 $275.00 $13,750.00 $275.00 $13,750.00 $300.00 $15,000.00 14 4"PVC Sidewalk Sleeves LF 18 $55.00 $990.00 $20.00 $360.00 $9.79 $176.22 $68.00 $1,224.00 15 Awads Pavilion column footers& coordination EA 8 $3,250.00 $26,000.00 $3,000.00 $24,000.00 $1,802.50 $14,420.00 $1,294.00 $10,352.00 16 Irrigation Repair Allowance LS 1 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 Structural Metal Erection of Start/Finish Structure including 17 footer/foundation aid all appurtaiaices LS 1 $17,000.00 $17,000.00 $73,500.00 $73,500.00 $83,495.00 $83,495.00 $80,847.00 $80,847.00 18 CMU Column Masonry LS 1 $19,000.00 $19,000.00 $16,500.00 $16,500.00 $5,355.23 $5,355.23 $13,500.00 $13,500.00 19 4"Limestone Chop Stone Column Facade LS 1 $25,000.00 $25,000.00 $16,500.00 $16,500.00 $5,768.00 $5,768.00 $18,500.00 $18,500.00 20 Contractor added items EA 1 $12,457.62 $12,457.62 TOTAL BASE BID: $3,284,488.28 _ $344,217.50 $373,675.24 $427,702.62 Discrepency between Unit Price and Total Price THE CITY OF ROUND ROCK PARKS& RECREATION DEPARTMENT BI DS EXTENDED AND CHECKED 301 West Bagdad BY: JH Round Rock, Texas 78664 DATE: 4/6/2026 (512)218-5540 BID TABULATION SHEET: 3 of 3 CONTRACT : Old Settlers Park Cross Country Improvement Project 2026 LOCATION: Microsoft Teams Corza Construction,LLC. Ratliff Hardscape,Ltd. DATE: March 31,2026 @ 11 am APPROX. UNIT UNIT UNIT UNIT # ITEM UNIT QTY. PRICE COST PRICE COST PRICE COST PRICE COST 1 Mobilization LS 1 $22,000.00 $22,000.00 $32,000.00 $32,000.00 $0.00 $0.00 2 Stabilized Construction Entrance EA 2 $3,750.00 $7,500.00 $10,000.00 $20,000.00 $0.00 $0.00 3 Concrete Washout EA 2 $1,800.00 $3,600.00 $4,000.00 $8,000.00 $0.00 $0.00 4 Tree Protection Fencing LF 1,200 $8.25 $9,900.00 $5.00 $6,000.00 $0.00 $0.00 5 Erosion Control Log LF 455 $11.00 $5,005.00 $7.00 $3,185.00 $0.00 $0.00 6 Re-vegetation of all disturbed areas usng Bermuda Hydroseed LS 1 $16,500.00 $16,500.00 $15,000.00 $15,000.00 $0.00 $0.00 7 All Electric Work-Start/Fi nish Structure&Awards Pavilio LS 1 $45,000.00 $45,000.00 $75,000.00 $75,000.00 $0.00 $0.00 8 Unclassified Excavation& Embankment LS 1 $79,500.00 $79,500.00 $150,000.00 $150,000.00 $0.00 $0.00 9 Concrete sidewalk(4"thick) SF 970 $11.75 $11,397.50 $15.00 $14,550.00 $0.00 $0.00 10 Awards Pavilion Slab LS 1 $27,200.00 $27,200.00 $50,000.00 $50,000.00 $0.00 $0.00 11 18"Concrete Ribbon Curb LF 25.5 $55.00 $1,402.50 $25.00 $637.50 $0.00 $0.00 12 24"Concrete Ribbon Curb LF 66 $65.00 $4,290.00 $35.00 $2,310.00 $0.00 $0.00 13 18"Concrete Ribbon Curb with Turndown LF 50 $68.00 $3,400.00 $30.00 $1,500.00 $0.00 $0.00 14 4"PVC Si dewal k Sleeves LF 18 $48.50 $873.00 $150.00 $2,700.00 $0.00 $0.00 15 Awards Pavilion column footers& coordination EA 8 $4,250.00 $34,000.00 $2,000.00 $16,000.00 $0.00 $0.00 16 I rri gati on Repai r Allowance LS 1 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $0.00 $0.00 Structural Metal Erection of Start/Fi ni sh Structure i nd udi ng 17 footer/foundation and all appurtaiances LS 1 $108,000.00 $108,000.00 $160,000.00 $160,000.00 $0.00 $0.00 18 CMU Column Masonry LS 1 $32,500.00 $32,500.00 $45,900.00 $45,900.00 $0.00 $0.00 19 4"Limestone Chop Stone Column Facade LS 1 $34,500.00 $34,500.00 $104,000.00 $104,000.00 $0.00 $0.00 TOTAL BASE BID: $461,568.00 $721,782.50 $0.00 $0.00 Discrepency between Unit Price and Total Price