R-2026-142 - 5/28/2026 RESOLUTION NO. R-2026-142 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract') with Royal Vista, Inc. for the Cycle 4 Basins 1 & 2—Wastewater Main Rehabilitation Project, and WHEREAS,the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials,equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Royal Vista, Inc. for the Cycle 4 Basins 1 & 2 — Wastewater Main Rehabilitation Project,a copy of said quantity adjustment/change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date,hour,place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of May, 2026. 1,4 CRArqMORfAN,Mayor City of Roun Rock, Texas ATTEST: -6Lawg ANr4 Pk.,kNkiIN, City Clerk 0112.20262 EXHIBIT A Page 1 of 3 Contract Quantity Adjustment/Change Order .4,.o.a.,,x.- rev.OW25 Department: Public Works Date: 4/23/26 Project Name: Cycle 4-Basins 1&2 Wastewater Main Rehabilitation City Project ID Change Order/Quantity Number: C4612 Adjustment No. 1 Vendor: Royal Vista,Inc. 350 CR 260, Liberty Hill,TX 78642 512-515-6824 Company Name Address Phone No. Justification Due to the adverse conditions of manhole#1434334,additional repair methods are necessary, including cementitious buildback,grout to stop infiltration,and Spraywall.It was also necessary to lift an additional 50 linear feet of pvc pipe to re-establish slope and maintain proper draininage along Mays Street. SUMMARY Amount %Change Original Contract Price: $1,646,653.61 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $19,028.50 Total Quantity Adjustment(s): $19,028.50 1% Total Contract Price with Quantity Adjustment(s): $1,665,682.11 Previous Change Order(s): $0.00 This Change Order: $61,720.00 Total Change Order(s)To Date, $61,720.00 4% Adjusted Contract Price: (Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)] $1,727,402.11 Difference between Original and Adjusted Contract Prices: $80,748.50 5% Original Contract Time: 260 Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: 7 New Contract Time: 267 Submitted for Approval Prepared By: Kaitlyn Saucedo, Enqineer Associate&Project Manager �> Printed Name,Title,Company Signature Date Approvals Contractor: Steven R. Green (Vice President) Royal Vista, Inc. __-04124L2026 Printed Name,Title,Company Signature Date City Project I/ G Manager: Kaitlyn Saucedo,Engineer Associate I�_' �— Printed Name,Title Signature Date Mayor/City Manager: Printed Name,Title Signature Date Page 2 of 3 Contract Quantity Adjustment/Change Order rev.*25 Project Name: Cycle 4-Basins 1&2 Wastewater Main Rehabilitation Change Order/Quantity Adjustment No. 1 Change Order Data contract Time Bid Item# Ibem Description Unit Qty. Unit Price Amount Adjusb+eit(Dap) 1 Rehab for the existing manhole#1434334 LS 1 $61,720.00 $61,720.00 7 $0.00 - $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS:l $61,720.00 7 Page 3 of 3 Contract Quantity Adjustment/Change Order rev.OBR5 Project Name: Cycle 4-Basins 1&2 Wastewater Main Rehabilitation Change Order/Quantity Adjustment No. i Quantity Adjustment Data on Unit tontiactTime Bid Item# Item Descripti Qty. Unit Price /!mount Adiusenerrt(Days) Furnish all materials,equipment,tools& labor necessary to eliminate 10" wastewater line,Including pre-videoing to determine defect location,post-videoing to confirm repair,backfill**per standard details,ad surface restpration to existing 16 conditions LF 50 $380.57 $19,028.50 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 - $0.00 $0.00 $0.00 $0:00 $0.00 $0.00 $0.00 $0.00 ^_ $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $19,028.50L__ 0 Royal Vista, Inc. 350 C.R.260,Liberty Hill,Texas 78642 Phone (512)515-6824 Date. 3!3012028 Proposal To: City of Round Rock Attn.: Kaitlyn Saucedo From: Stevan DeLeon Project.CORR-Cycle 4-Basin 3 &4 WW Rehab Rehab Existing Manhole CID##1434334 Royal Vista Proposes the following: Description Bid QTY Units Amount Sub Total rep of Existing Manhole 1 LS $7,746.00 $7,746.00 1^Cementitious Buildback 1 LS 515,564.00 $15,584.00 50 Mil Spraywall of Existing Manhole 1 LS $15,400.00 $15,400.00 Chemical rout to Stop infiliration(Price Based on 10 Gallons of Grout and 10 Manhours to Stop Infiltration) 1 LS $5,040.00 $5,040.00 Bypass Pumping 1 LS $35,000.00 $35,000.00 Additional Overhead and Project Management for Added Subcontract work not included in original contract 1 LS $3,125.00 $8,125.00 Credit of Manhole From Original Bid 1 LS ($20,175,00) Additional Grout Needed to Stop Infiltration GAL $295.00 $0.00 Additional Man Hour MR $210.00 $0.00 oyo al v1st �equ�7iWditianai"0a-Tendar— ays be aadd-to our contract for this proposal. Total $61,720.00 THANK YOU! 7 - / Submitted By: �/�L-�� _Accepted By: Printed NameMtle:Stevan Deleon/Project Manager Printed Name/Title: Date: 03/30/2026 Date: steved Page 1 3/30/2026 Royal Vista, Inc. 350 CR 260 Liberty Hill, Texas 78642 (512)515-6824 Fax(512)515-6829 REQUEST FOR INFORMATION RFI NO.: 2503-004 DATE: 4/912026 PROJECT: CYCLE 4 BASIN 1 &2 RESPONSE REQUESTED BY DATE: As Soon As Possible TO: Hayden Mattke REFERENCE: UID#1960361 ISSUE: Plan Page WW-14 calls to lift bursted pipe to re-establish proper slope @ 50-117 from MH#1960360. But the manhole is full from 0-20.Need to grade from 0-117 to achive proper drainage. Please advise. Recommended Solution: Stevan De Leon, Project Manager RESPONSE: Please proceed with the additional 50' of rehabilitation to establish proper slope of the 10" main. i 4/10/2026 Responder Date