Loading...
R-2026-136 - 5/28/2026 RESOLUTION NO. R-2026-136 WHEREAS, the City of Round Rock ("City") entered into a contract on December 21, 2023 with SpawGlass Contractors, Inc., entitled "Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of Work Plus a Fee with a Guaranteed Maximum Price" ("Agreement"), and such contract is for the Old Settlers Park Buildout Project(Recreation Center); and WHEREAS, as part of the Agreement, savings during the execution of construction are returned to the City; and WHEREAS, the City Council wishes to approve the amount of$990,710.00 to be unallocated from construction via a change order in accordance with the attached Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City,Change Order No. 1 to the Agreement with SpawGlass Contractors, Inc. for the Old Settlers Park Buildout Project (Recreation Center), a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date,hour,place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 28th day of May, 2026. 0112.20262 1,4 )e4 / CRAIG MO GAN ayor City of Round Ro , Texas ATTEST: ANN FRANKLIN, City Clerk 2 EXHIBIT A WAIA Document G701 - 2017 Change Order PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: CoRR-Old Settler's Park Contract For:Rec Center Change Order Number:001 3300 E.Palm Valley Blvd Date:03-03-2026 Date. 3 4/2026 Round Rock,TX 78665 OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(Name and address) City of Round Rock Kimley-Horn SpawGlass 221 East main Street Round Rock 5301 SW Parkway Austin TX 78735 1111 Smith Road Austin TX 78721 78644 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and.if applicable,attach or reference.specific exhibits.Alco include agreed upon adjustments attributable to erecuted Construction Change Directives.) Credit to City of Round Rock for Buyout Savings and Escalation Contingency The original Contract Sum was f 5.287,121.00 The net change by previously authorized Change Orders f 71,496,519.00 The Contract Sum prior to this Change Order was f 76,783,640.00 The Contract Sum will be decreased by this Change Order in the amount of $ -990,710.00 The new Contract Sum including this Change Order will be f 75.792,930.00 The Contract Time will be unchanged by zero ( 0 ►days. The new date of Substantial Completion will be 442027 NOTE: This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time,that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. AR IITECT(Signature) CONT OR(Signature) OWNER(Signature) 4a(G4 I JLtA WX2,EL (Printed name,title,and (Printed name and title) (Printed name and title) license number if required) DaW Date Date AIA Document G701 -2017 Copyright®1979.1987.2000.2001 and 2017 All rights reserved 'The American Institute of Architects,' American Institute of Architects.''AIA.'the AIA Logo.and'AIA Contract Documents'are trademarks of The American Institute of Architects.This document was produced at 14:39:11 CDT on 03109/2026 under Subscription No.20250142682 which expires on 071062026,is not for resale.is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents`Terms of Service.To report copyright violations.e-mail docinfo@aiacontracts.com. User Notes: (69af21ced218c3ad6312b5d0) CONTRACT SUBMISSION SHEET Council Meeting Date: S I 2-8: 112A,,, Project Manager: Department: `-A Contact Person: VZ �4+?,�„ Drop off Date: Vendor Signature Status: • )ZVendor signature is already on contract • ❑Vendor signature is NOT on contract IDvendor signature is NOT on contract: • Name oMstaff collecting signature: Executed Copies Required: • Number of fully executed copies needed: Signature Copy Source: • ❑Copies pulled from Laserfiche • ❑ Copies pulled from City Clerk's Office Additional Notes/Comments: CR � &VVS s