Contract - Royal Vista, Inc. - 5/28/2026 Page 1 of 3
'"•'��'� Contract Quantity Adjustment/Change Order
rev.04/25
Department: Public Works Date: 4/23/26
Project Name: Cycle 4-Basins 1&2 Wastewater Main Rehabilitation
City Project ID Change Order/Quantity
Number: C4612 Adjustment No. 1
Vendor: Royal Vista, Inc. 350 CR 260, Liberty Hill,TX 78642 512-515-6824
Company Name Address Phone No.
Justification
Due to the adverse conditions of manhole#1434334,additional repair methods are necessary, including cementitious buildback,grout to stop
infiltration,and Spraywall. It was also necessary to lift an additional 50 linear feet of pvc pipe to re-establish slope and maintain proper
draininage along Mays Street.
SUMMARY Amount %Change
Original Contract Price: $1,646,653.61
Previous Quantity Adjustment(s): $0.00
This Quantity Adjustment: $19,028.50
Total Quantity Adjustment(s): $19,028.50 1%
Total Contract Price with Quantity Adjustment(s):
$1,665,682.11
Previous Change Order(s): $0.00
This Change Omer: $61,720.00
Total Change Order(s)To Date: $61,720.00 4%
Adjusted Contract Price: [Original Contract Price Plus Quantity Adjustment(s)Plus Change
Order(s)]
$1,727,402.11
Difference between Original and Adjusted Contract Prices: $80,748.50 5%
Original Contract Time: 260
Time Adjustment by previous Quan.Adj./Change Order:
Time Adjustment by this Quan.Adj./Change Order: 7
New Contract Time: 267
Submitted for Approval
Prepared By: Kaitlyn Saucedo, Engineer Associate&Project Manager
Printed Name,Title,Company Signature Date
Approvals
Contractor: Steven R. Green (Vice President) Royal Vista, Inc. Q26
Printed Name,Title,Company Signature Date
City Project
Manager: Kaitlyn Saucedo,Engineer AssociatePrinted Name,Name,Title Signatu a Date
Mayor/City
Manager. (`( n
Printed Nle,Titld I Signa) l5ake
Page 2 of 3
�►. Contract Quantity Adjustment/Change Order
rev.06!25
Project Name: Cycle 4- Basins 1&2 Wastewater Main Rehabilitation
Change Order/Quantity Adjustment No. 1
Change Order Data
Contract Time
Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment(Days)
1 Rehab for the existing manhole#1434334 LS 1 $61,720.00 $61,720.00 7
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS: $61,720.00 7
Page 3 of 3
_ Contract Quantity Adjustment/Change Order
nw.06/[5
Project Name: Cycle 4-Basins 1&2 Wastewater Main Rehabilitation
Change Order/Quantity Adjustment No. 1
Quantity Adjustment Data
Contract Time
Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment(Days)
Furnish all materials,equipment, tools&
labor necessary to eliminate 10"
wastewater line, including pre-videoing to
determine defect location,post-videoing to
confirm repair, backfill**per standard
details,ad surface restpration to existing
16 conditions LF 50 $380.57 $19,028.50 0
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 _
$0.00
$0.00
TOTALS: $19,028.50 0
Royal Vista, Inc.
350 C.R.260,Liberty Hili,Texas 78642
Phone.(512)515.6824
Date: 3130/4026
Proposal
To: City of Round Rock
Attn.: Kaitlyn Saucedo
From: Stevan DeLeon
Project:CORR-Cycle 4-Basin 3 8 4 WIN Rehab
Rehab Existing Manhole CID!#1434334
Royal Wsta Proposes the Following:
Description Bid QTY Units Amount Sub Total
Prop of Existing Manhole 1 IS 7,746.00 $7,746.00
"Comentitious Bullildbock LS $15,564.00 $15,584.00
230 Mill ftraywall of Existing Manholls 1 LS $15,400.00 $15,400.00
Chemical rout to Stop Infiltration co Based on 10
Gallons of Grout and 10 Manhours to Stop Infiltration) 1 LS $5,040.00 $5,040.00
Bypass Pumping 1 LS $35,000.00 $35,000.00
Additional Overhead and Project Management for Added
Subcontract work not Included in original contract 1 LS $3,125.00 $3,125.00
Credit of Manhole From Original Bid 1 LS ($20,175.00) ($20,175.00)
Additional Grout Needed to Stop Infiltration GAL $295.00 $0.00
Additional Man Hour MR $210.00 $0.00
clays
no 555501 W-
our contract for this proposal.
Total $61,720.00
THANK YOU!
Submitted By: I � Accepted By:
Printed NameTtle:Stevan DeLeon/Project Manager Printed NameTtle:
Date: 03/30/2026 Date:
steved Pagel 3/30/2026
Royal Vista, Inc.
350 CR 260
Liberty Hill,Texas 78642
(512)515-6824 Fax(512)515-6829
REQUEST FOR INFORMATION
RFI NO.: 2503-004 DATE: 4/9/2026
PROJECT: CYCLE 4 BASIN 1 &2 RESPONSE REQUESTED BY
DATE: As Soon As Possible
TO: Hayden Mattke
REFERENCE: UID#1960361
ISSUE:
Plan Page WW-14 calls to lift bursted pipe to re-establish proper slope @ 50-117 from MH#1960360.But
the manhole is full from 0-20.Need to grade from 0-117 to achive proper drainage.
Please advise.
Recommended Solution:
Stevan De Leon, Project Manager
RESPONSE: Please proceed with the additional 50' of rehabilitation to establish
proper slope of the 10" main.
1
4/10/2026
Responder Date