Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Contract - Austin Engineering Co., Inc. - 6/25/2026
Page 1 of 4 poopacN"MA Contract Quantity Adjustment/Change Order ,-06/25 Department: Transportation Date: 2/13/26 Project Name: GREENLAWN BLVD:IH35 TO SH45 City Project ID Change Order/Quantity Number: Adjustment No. 2 Vendor: Austin Engineering Company Inc. PO Box 342349 Austin,Texas 78734 (512)327-1464 Company Name Address Phone No. Justification Plan and scope changes SUMMARY Amount %Change Original Contract Price: $13,953,194.32 Previous Quantity Adjustment(s): -$3,038,566.19 This Quantity Adjustment: -$7,143.80 Total Quantity Adjustment(s): -$3,045,709.99 -22% Total Contract Price with Quantity Adjustment(s): $10,907,484.33 Previous Change Order(s): $2,893,240.80 This Change Order: $205,684.53 Total Change Order(s)To Date: $3,098,925.33 22% Adjusted Contract Price:[Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)] $14,006,409.66 Difference between Original and Adjusted Contract Prices: $53,215.34 0% Original Contract Time: 456 Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 21 New Contract Time: 477 Submitted for Approval en • � 1 Prepared By: John C.Fenle Vice President of Sales Austin Engineering Company � � Printed Name,Title,Company Signat ire Date AppXoval - Contractor: John C.Fenle,Vice President of Sales,Austin Engineering CompanyC o Printed Name,Title,Company Signature D City Project �"o n,aa_r" Manager: Reuben Ramirez, Project Manager Reuben RamirezaaAA=t 6/4/2026 Printed Name,Title Signature a Date Mayor/City Manager: 'r6 1 G' (Y el Mayor le&512021 Prin Na�ie,Title SlIgna Date "R- 20Z610 I0 Page 2 of 4 Contract Quantity Adjustment/Change Order v.06/26 Project Name: GREENLAWN BLVD:IH35 TO SH45 Change Order/Quantity Adjustment No. 2 Change Order Data Contract Time Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment(Days) REVISED UNIT PRICE ITEMS- NEW T MNEW ITEMS 256 0465-7070 INLET(COMPL)(PSL)(RC)(3FT X 3FT) EA 1 $12,640.49 $12,640.49 257 0467-7136 SET(TY I)(S=6FT)(HW=6FT)(3:1)C EA 1 $21,234.00 $21,234.00 258 0479-7001 ADJUSTING MANHOLES EA 3 $15,151.15 $45,453.45 259 0479-7005 ADJUSTING MANHOLES(CAP) EA 1 $3,354.05 $3,354.05 260 0479-7006 ADJUSTING INLETS CAP EA 2 $3,354.05 $6,708.10 261 0662 7018 WK ZN PAV MRK NON-REMOV(W)(ARROW) EA 4 $252.50 $1,010.00 262 0666-7365 PAVEMENT SLER(YLD TRI) EA 4 $25.25 $101.00 263 0678-7023 PAVE SURF PREP FOR MRK(36")(YLD TRI) EA 4 $1.26 $5.04 264 0686-7068 INS TRF SIG PL AM(S)1 ARM(65')LUM&ILSN EA 1 $50,241.12 $50,241.12 265 0529-7028 CONC CURB(RIBBON) LF 1 96 $54.17 $5,200.32 266 662-XXXX WK ZN PAV MRK(TRAFFIC HANDLING) EA 2 $3,535.00 $7,070.00 267 0502-XXXX BARRICADES,SIGNS,AND TRAFFIC HANDLING EA 3 $8,383.00 $25,149.00 268 PIPE CL 250 RESTRAINED JOINT DI 16-IN DIA ALL DEPTHS),INCL EXC A LS 1 8237.96 $8,237.96 85 0512-7009 PORT CTB(FUR&INST)(LOW PROFILE)(TY 1) LF 200 $62.00 $12,400.00 86 0512-7010 PORT CTB(FUR&INST)(LOW PROFILE)(TY 2) LF 40 $71.00 $2,840.00 87 0512-7033 PORT CTB(MOVE)(LOW PROFILE)(TY 1) LF 200 $9.00 $1,800.00 88 0512-7034 PORT CTB(MOVE)(LOW PROFILE)(TY 2) LF 40 $8.00 $320.00 91 0512-5057 PORT CTB(REMOVE)(LOW PROFILE)(TY 1) LF 200 $8.00 $1,600.00 92 0512-7058 PORT CTB(REMOVE)(LOW PROFILE)(TY 2) LF 40 $8.00 $320.00 TOTALS: $205,684.53 0 Page 3 of 4 OF- HogocM",.. Contract Quantity Adjustment/Change Order n.aiss Project Name: GREENLAWN BLVD:IH35 TO SH45 Change Order/Quantity Adjustment No. 2 Quantity Adjustment Data Contract Time Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment(Days) QUANTITY ADJUSTEMENTITEMS 10 0132 7001 EMBANK(FNL)(OC)(TY A) CY 4 $5.00 $20.00 12 0160 7002 FURN&PLACE TOPSOIL(4") SY 532 $3.50 $1,862.00 13 016470 BROADCAST SEED(PERM-URBAN-CLAY) SY 532 $0.20 $106.40 14 0164 7005 BROADCAST SEED(TEMP WARM) SY 266 1 $0.20 $53.20 15 0164 7006 BROADCAST SEED(TEMP COOL) SY 266 $0.20 $53.20 16 0168 7001 VEGETATIVE WATERING TGL 79 $9.00 $711.00 17 0247 7179 FL BS(CMP IN PLC)(TY A GR 5)(FNAL POS) CY -19 $71.00 -$1,349.00 18 0250 7002 GEOGRID BASE REINFORCEMENT(TYPE 2) SY -60 $5.25 -$315.00 19 0310 7013 PRIME COAT(MC-30 OR AE-P) GAL 18 $4.00 $72.00 20 0341 7001 D-GR HMA TY-B PG64-22 TON 16 $116.00 $1,856.00 227 0341 7043 D-GR HMA TY-D PG64-22 TON 10 $140.00 $1,400.00 228 0341 7048 D-GR HMA TY-D PG70-22 TON 10 $159.45 $1,594.50 22 0344 7077 TACK COAT GAL 9 $4.00 $36.00 23 0354 7022 PLANE&TEXT ASPH CONC PAV(0"TO 2") SY -695 $4.00 -$2,780.00 24 0400-7006 CUT&RESTORING PAV SY 15 $97.00 $1,455.00 26 0402 7001 TRENCH EXCAVATION PROTECTION LF 146 $5.00 $36.00 29 0416 7044 DRILL SHAFT(TRF SIG POLE)(361N) LF 13 $145.00 $1,885.00 37 0422 7013 APPROACH SLAB CY 1.1 $893.00 $982.30 43 0450 7038 RAIL(TY C411) LF 13 $201.00 $2,613.00 45 0450-7059 RAIL(HANDRAIL)(TY B) LF 250 $118.00 $29,500.00 48 0462 7012 CONC BOX CULV(6 FT X 4 FT) LF 8 $595.00 $4,760.00 49 0464 7003 RC PIPE CL III)(18 IN) LF -19 $113.00 -$2,147.00 50 0464 7005 RC PIPE(CL III)(24 IN) LF -161 $104.00 -$16,744.00 52 0464 7009 RC PIPE(CL III)(36 IN) LF -97 $158.00 -$15,326.00 53 0464 7010 RC PIPE CL III)(42 IN) LF 1 $204.00 $204.00 55 0465 7004 MANH(COMPL)(PRM)60IN EA -1 $4,100.00 -$4,100.00 56 0465 7004 MANH(COMPL)(PRM)(72IN) EA -1 $4,800.00 -$4,800.00 57 0465 7011]CTBOX(COMPL)(P]B)(6FTX6FT) EA -1 $9,500.00 -$9,500.00 58 10465 7012 ICTBOX(COMPL)(PJB)(8FTX8FT) EA -1 $23,000.00 -$23,000.00 232 0465 7019 INLET(COMPL)(PCO)(4FT)(RIGHT) EA 1 $7,470.00 $7,470.00 234 0465 7074 INLET(COMPL)(PSL)(RC)(5FTX5FT) EA 1 $8,500.00 $8,500.00 65 0465 7128 INLET(COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT) EA -1 $6,400.00 -$6,400.00 69 0467 7132 SET(TY I)(S=6FT)(HW=SFT)(3:1)(C) EA -1 $20,000.00 -$20,000.00 76 0502 7001 BARRICADES,SIGNS AND TRAFFIC HANDLING MO 3 $7,900.00 $23,700.00 77 0506 7002 ROCK FILTER DAMS(INSTALL)(TY 2) LF -43 $53.00 -$2,279.00 78 0506 7011 ROCK FILTER DAMS(REMOVE) LF -43 $6.00 -$258.00 79 0506 7039 TEMP SEDMT CONT FENCE(INSTALL) LF -20 $4.00 -$80.00 80 0506 7041 TEMP SEDMT CONT FENCE(REMOVE) LF -20 $1.00 -$20.00 81 0506 7043 BIODEG EROSN CONT LOGS(INSTL)(8") LF 20 $4.00 $80.00 83 0506 7046 BIODEG EROSN CONT LOGS(REMOVE) LF 20 $1.00 $20.00 93 0529 7009 CONC CURB&GUTTER(TY II) LF 444 1 $31.00 $13,764.00 95 0530 7006 DRIVEWAYS(CONC) SY 16 $154.00 $2,464.00 96 0531 7001 CONC SIDEWALKS(4") SY 5 $85.00 $425.00 102 0536 7002 CONC MEDIAN SY -106 $104.00 -$11,024.00 112 0618 7054 CONDT(PVC)(SCH 80) 2" LF -60 $17.00 -$1,020.00 114 0618 7060 CONDT(PVC) SCH 80 3" LF 305 $29.00 $8,845.00 115 CONCRETE LF -160 $59.00 -$9,440.00 119 0620 7007 ELEC CONDR(NO.8)BARE LF 165 $2.00 $330.00 120 0620 7008 ELEC CONDR(NO.8)INSULATED LF 630 $2.00 $1,260.00 121 0621 7002 TRAY CABLE(3 CONDR)(12 AWG) LF 5 $2.00 $10.00 127 0644 7001 IN SM RD SN SUP&AM TYlOBWG(1)SA(P) EA -1 $967.00 -$967.00 132 0666 7018 REFL PAV MRK TY I(W)8"(DOT)(IOOMIL) LF 68 $2.00 $136.00 133 0666 7024 REFL PAV MRK TY I(W)8"(SLD)(100MIL) LF -114 $3.00 -$342.00 239 0666 7030 REFL PAV MRK TY I(W)12"(SLD)(100MIL) LF -311 $7.00 -$2,177.00 134 0666 7036 REFL PAV MRK TY I W 24"SLD IOOMIL) LF 23 $12.00 $276.00 251 0666 7045 REFL PAV MRK TY I(W)(DBL ARROW)(100MIL) EA 4 $500.00 $2,000.00 135 0666 7117 REFL PAV MRK TY I(Y)12"(SLD)(100MIL) LF 10 $6.00 $60.00 136 0666 7042 REFL PAV MRK TY I(W)(ARROW)(100MIL) EA -1 $236.00 -$236.00 137 0666 7066 REFL PAV MRK TY I(W)(WORD)(100MIL) EA -1 $266.00 -$266.00 138 0666 7090 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 1 $130.00 $130.00 139 0666 7347 PAVEMENT SLER 6" LF 19 $0.60 $11.40 140 10666 7348 PAVEMENT SLER 8" LF 1 -300 $0.70 -$210.00 Page 4 of 4 Contract Quantity Adjustment/Change Order - ROIINO RO[N 1[NAS -.06125 141 0666 7350 PAVEMENT SLER 12" LF -311 $2.00 -$622.00 142 0666 7352 PAVEMENT SLER 24" LF 72 $3.00 $216.00 143 0666 7353 PAVEMENT SLER(ARROW) EA -1 $26.00 -$26.00 144 0666 7354 PAVEMENT SLER(WORD) EA -1 $29.00 -$29.00 243 0666 7354 PAVEMENT SLER(DBL ARROW) EA 4 $450.00 $1,800.00 145 0666)XXX REFL PAV MRK TY I(W)6"(BRK)(100MIL) LF 19 $2.50 $47.50 146 0666 XXXX REFL PAV MRK TY I(Y)6"(SLD)(IOOMIL) LF -315 $2.00 -$630.00 147 0672 7005 REFL PAV MRKR TY II-C-C EA 9 $2.00 $18.00 148 0672 7006 REFL PAV MRKR TY II-C-R EA 1 $17.00 $17.00 245 0677 7009 ELIM EXT PM&MRKS(ARROW) EA 4 $120.00 $480.00 150 0678 7002 PAV SURF PREP FOR MRK(6") LF 19 $0.15 $2.85 151 0678 7004 PAV SURF PREP FOR MRK(8") LF -300 $0.20 -$60.00 152 0678 7006 PAV SURF PREP FOR MRK(12") LF -311 $0.25 -$77.75 153 0678 7008 PAV SURF PREP FOR MRK(24") LF 72 $0.35 $25.20 154 0678 7009 PAV SURF PREP FOR MRK(ARROW) EA -1 $1.00 -$1.00 155 0678 7016 PAV SURF PREP FOR MRK(WORD) EA -1 $1.00 -$1.00 247 0678 7010 PAV SURF PREP FOR MRK(DBL ARROW) EA 4 $2.35 $9.40 155 0678 7016 PAV SURF PREP FOR MRK(WORD) EA -1 $1.00 -$1.00 168 0684 7031 TRF SIG CBL A)(14 AWG)(5 CONDR) LF 88 $3.50 $308.00 169 0684 7033 TRF SIG CBL(TY A)(14 AWG)(7 CONDR) LF -70 $4.00 -$280.00 170 0684 7046 TRF SIG CBL(TY A)(14 AWG)(20 CONDR) LF 5 $8.00 $40.00 171 0684 7080 TRF SIG CBL(TY C)(14 AWG)(2 CONDR) LF -75 $3.00 -$225.00 248 0686 7052 INS TRF SIG PL AM(S)1 ARM(48')LUM&ILSN EA 1 $25,000.00 $25,000.00 250 0686 7264 INS TRF SIG PL AM(S)2 ARM(65-28')LUM&ILSN EA -1 $60,000.00 -$60,000.00 175 0687 7001 PED POLE ASSEMBLY EA -2 $3,545.00 -$7,090.00 177 0688 7001 PED DETECT PUSH BUTTON(APS) EA -2 $1,004.00 -$2,008.00 180 6005 7001 ITS COM CBL(ETHERNET)(CAT-5E)DETECTION LF 25 $1.00 $25.00 181 6006 7001 ITS COM CBL(ETHERNET)(CAT-5E)RADIO LF 60 $1.00 $60.00 182 6007 7001 ITS COM CBL(ETHERNET) CAT-5E)PTZ LF 15 $1.00 $15.00 195 XXXXXXXX OPTICOM CABLE-GTT MODEL 138 LF 20 $2.SO $50.00 195 401 FLOWABLE FILL CY 156 $287.00 $44,772.00 219 510 DUCTILE IRON FITTINGS TN 0.3 $6,400.00 $1,920.00 222 511 VALVES(GATE TYPE)(12-IN DIA) EA 1 $5,200.00 $5,200.00 TOTALS: -$7,143.80 #REF! Contractor expressly reserves all rights,claims,and remedies available under the Contract,at law,or in equity.Execution of this Change Order is based upon the information presently available and is limited solely to the scope,cost,and time impacts expressly identified herein.Contractor specifically reserves the right to seek additional compensation and/or time extensions for any impacts,costs,delays,disruptions,inefficiencies,cumulative impacts,or other consequences arising out of or related to the work described in this Change Order that are not presently known,filly developed,or expressly included herein,including but not limited to impacts resulting from interference,out-of-sequence work,acceleration,or coordination with other trades.