Contract - Freese and Nichols, Inc. - 7/9/2026 STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 6 TO CONTRACT FOR ENGINEERING SERVICES FIRM: FREESE AND NICHOLS,INC. ("Engineer") ADDRESS: 10431 Morado Circle, Suite 300, Bldg. 5,Austin,TX 78759 PROJECT: Chisholm Trail South Imarovements (Old Town) This Supplemental Contract No. 6 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Freese and Nichols, Inc., hereinafter called the"Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the"Contract,"on the 24th day of March,2022 for the Chisholm Trail South Improvements (Old Town)Project in the amount of$389,055.00;and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on October, 14, 2022 to amend the Contract to modify the provisions for the scope of services, work schedule, and fee schedule; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on June 8, 2023 to amend the scope of services and to increase the compensation by $584,885.00 to a total of $973,940.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 3 on March 8, 2024 to amend the scope of services and to increase the compensation by $49,679.00 to a total of $1,023,619.00; and WHEREAS,the City and Engineer executed Supplemental Contract No.4 on November 18,2024 to amend the scope of services and to increase the compensation by $49,934.00 to a total of $1,073,553.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 5 on May 22, 2025 to amend the scope of services and to increase the compensation by $145,470.00 to a total of $1,219,023.00; and WHEREAS,it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by $221,103.00 to a total of$1,440,126.00; NOW THEREFORE,premises considered,the City and the Engineer agree that said Contract is amended as follows: Supplemental Contract Rev.06/16 0199.202204 84275 �� — �,I � , n (J1 I. Article 2,Engineering Services and Exhibit B, Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. II. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $221,103.00 the lump sum amount payable under the Contract for a total of $1,440,126.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF,the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.202204 84275 2 FREESE AND NICHOLS, INC. B144i? 4� ILMady: Printed Name: Clayton C. Barnard, PE Title: Vice President/ Principal Date Signed: June 17, 2026 Supplemental Contract Rev.06/16 0199.202204 84275 3 CITY OF ROUND ROCK APPROVED AS TO FORM: By: A 9 r — � � Craig an,M y <ie:-p�hanie L. Sandre,City Attorney ZA 9 �QW Date Supplemental Contract Rev.06/16 0199.202204 84275 4 Services to be Provided by City — Chisholm Trail South (Old Town) Improvements ADDENDUM TO EXHIBIT A CITY SERVICES The CITY OF ROUND ROCK ("CITY") is proposing to develop a 0.44 mi segment of Chisholm Trail Road between Sam Bass Road and RM 620. The work to be performed under this work authorization by FREESE AND NICHOLS, INC. ("CONSULTANT') will consist of final design services for the Brushy Creek culvert extension project at the low water crossing, to be prepared as a standalone bid package. City services will remain unchanged with this amendment. Page 1 of 1 Services to be Provided by Consultant— Chisholm Trail South (Old Town) Improvements ADDENDUM TO EXHIBIT B ENGINEERING SERVICES The CITY OF ROUND ROCK ("CITY") is proposing to develop a 0.44 mi segment of Chisholm Trail Road between Sam Bass Road and RM 620. The work to be performed under this work authorization by FREESE AND NICHOLS, INC. ("CONSULTANT") will consist of final design services for the Brushy Creek culvert extension project at the low water crossing, to be prepared as a standalone bid package. The original scope will remain unchanged except as noted below. 145.0 PROJECT MANAGEMENT 145.1 PROJECT ADMINISTRATION SERVICES Project Administration Services will be extended by twelve (12) months 160.0 ROADWAY DESIGN SERVICES 160.1 BRUSHY CREEK CULVERT EXTENSION ROADWAY PLANS The CONSULTANT will prepare roadway plan sheets for the Brushy Creek Culvert Extension project, consisting of 90% and 100% PS&E submittals, including: • Title Sheet (1 sheet) • Index (1 sheet) • Project Layout (1 sheet) • Existing & Proposed Typical Sections (1 sheet) • General Notes (2 sheets) • Survey Control Data Sheet (1 sheet) • Removal Layout (1 sheet) • Horizontal Alignment Data Sheet (1 sheet) • Roadway Details (2 sheets) • Roadway Standards (5 sheets) • Quantity Summary Sheet (1 sheet) Deliverables: • 90% and 100% Brushy Creek Roadway Plan, Quantity Summary, and Standard Sheets 161.0 DRAINAGE DESIGN SERVICES 161.1 BRUSHY CREEK CULVERT EXTENSION DRAINAGE PLANS The CONSULTANT will refine the previously prepared hydraulic model and drainage report for the Brushy Creek culvert extension. The CONSULTANT will prepare 90% and 100% Drainage sheets for the Brushy Creek Culvert Extension, including: • Hydraulic Data Sheets (2 sheets) Page 1 of 5 Services to be Provided by Consultant — Chisholm Trail South (Old Town) Improvements • Culvert Layout Sheet (1 sheet) • Grading Layout Sheet (1 sheet) • Culvert Structural Details (2 sheets) • Drainage Standards (2 sheets) Deliverables: • 90% and 100% Brushy Creek Drainage Plan, Quantity Summary, and Standard Sheets 162.0 SIGNING AND PAVEMENT MARKINGS SERVICES 162.1 BRUSHY CREEK CULVERT EXTENSION PAVEMENT MARKING PLANS The CONSULTANT will prepare 90% and 100% pavement marking sheets for the Brushy Creek culvert extension, including: • Pavement Marking Layout (1 sheet) • CITY and TxDOT Standards (2 sheets) • Quantity Summary Sheet (1 sheet) Deliverables: • 90% and 100% Brushy Creek Pavement Marking Plan, Quantity Summary, and Standard Sheets 163.0 MISCELLANEOUS (ROADWAY) 163.1 TRAFFIC CONTROL PLAN DESIGN SERVICES The CONSULTANT will prepare 90% and 100% Traffic Control sheets for the Brushy Creek culvert extension, including: • Sequence of Work and Narrative (1 sheet) • Advance Warning Sign Layout (1 sheet) • Traffic Control Typical Sections (1 phase) (1 Sheet) • Traffic Control Layouts (1 phase) (4 Sheets) • Detour Plan (1 phase) (1 sheet) • CITY and TxDOT Standards (15 sheets) • Quantity Summary Sheet (1 sheet) 163.2 STORMWATER MANAGEMENT & TREE PRESERVATION DESIGN SERVICES The CONSULTANT will revise the issued for bid SW3P layouts to incorporate the proposed sidewalk connection. The CONSULTANT will prepare 90% and 100% SW3P sheets for the Brushy Creek culvert extension, including: o SW3P Layouts o Environmental Standards Page 2 of 5 Services to be Provided by Consultant — Chisholm Trail South (Old Town) Improvements 163.3 PEDESTRIAN ILLUMINATION DEISGN SERVICES The CONSULTANT will revise the issued for bid illumination layouts and circuit diagram/service data sheet such that illumination poles are provided at 50' spacing on both sides of the road. (Changer Order#2) 163.4 SUPPLEMENTAL DEISGN DOCUMENT SERVICES The CONSULTANT will prepare 90% and 100% supplemental design documents for the Brushy Creek culvert extension, including: • OPCC • Project Manual • CTD • TLDR registration/RAS review and inspection Deliverables: • 90% and 100% Brushy Creek TCP Plan, Quantity Summary, and Standard Sheets • Prefinal and Final Chisholm Revised SW3P Plan Sheets • 90% and 100% Brushy Creek SW3P Plan, Quantity Summary, and Standard Sheets • Revised Chisholm Illumination Plan Sheets (CO #2) • 90% and 100% Brushy Creek OPCC • 90% and 100% Brushy Creek Project Manual • 90% and 100% Brushy Creek CTD • Proof of Brushy Creek TDLR Registration 163.5 BRUSHY CREEK CULVERT EXTENSION SUBMITTAL REQUIREMENTS Submittals will include the following: 1. 90% Submittal: • Provide two (2) paper copies for review of the items listed below and a PDF containing electronic copies. Plan sheets and cross-sections will be prepared and submitted in 11"x17" paper format. • The submittal will include the following, unless otherwise agreed to in writing with the CITY: o Title Sheet o Index of Sheets o Project Layout Sheets o Existing & Proposed Typical Sections o General Notes o Quantity Summary Sheets o Sequence of Work o Traffic Control Plan Sheets o Traffic Control Standards o Survey Control Data Sheet o Horizontal Alignment Data Sheet o Removal Layout o Roadway Plan & Profile Sheets o Roadway Details o Roadway Standards o Hydraulic Data Sheets Page 3 of 5 Services to be Provided by Consultant— Chisholm Trail South (Old Town) Improvements o Culvert Layout Sheet o Grading Layout Sheet o Culvert Structural Details o Drainage Standards o Signing & Pavement Marking Layout o Signing & Pavement Marking Standards o SW3P Layouts o Environmental Standards o OPCC o CTD o Project Manual o Draft Drainage Report o Proof of project registration with TDLR 100% Submittal: • Updated 90% Items • Provide two (2) original signed and sealed 11"x17" tabloid paper sets of the Final Construction Drawings • Provide two (2) original Project Manuals and Bid Documentation for advertisement and letting 190.0 BID PHASE SERVICES 190.1 BRUSHY CREEK CULVERT EXTENSION The CONSULTANT will complete bid phase services for the Brushy Creek Culvert Extension: • The CONSULTANT will attend the Pre-Bid Meeting with the CITY and prospective bidders. For the purpose of scoping, one (1) four (4) hour in-person meeting, including travel time and agenda and meeting minute prep, is assumed with two (2) attendees. The CONSULTANT will prepare meeting minutes and submit to the CITY within three (3) business days. • The CONSULTANT will respond to Contractor questions raised during the bidding process and develop addenda to the Bid Documentation as required. • The CONSULTANT will prepare a bid tabulation, analyze Contractor bids, check references and provide a Recommendation to Award to the apparent lowest responsive responsible bidder within five (5) business days of receiving the bid documents from the CITY. • The CONSULTANT will furnish a set of Final Construction Contract Documents including plan sheets, Project Manual and SW3P to the awarded Contractor. 310.0 CONSTRUCTION PHASE SERVICES The original Construction Phase Services scope of services and exclusions will remain unchanged and be applicable to all subtasks within this task. 310.1 CHISHOLM TRAIL SOUTH Page 4 of 5 Services to be Provided by Consultant — Chisholm Trail South (Old Town) Improvements The CONSULTANT will provide an additional twelve (12) hours each of Construction Phase Services for two (2) staff members each month for the remaining six (6) months of the project for traffic control revisions as needed and general management support. The CONSULTANT will complete revisions to the storm sewer system in response to utility and other conflicts encountered during construction. 310.2 BRUSHY CREEK CULVERT EXTENSION The CONSULTANT will provide eight (8) hours each of Construction Phase Services for two (2) staff members each month for the remaining three (3) months of the project for traffic control revisions as needed and general management support. The CONSULTANT will complete up to one (1) change to the culvert hydraulic or structural details if needed during construction. The CONSULTANT will complete a RAS inspection and a draft and final RAS inspection reports. The CONSULTANT will close out the TDLR permit. 1200.0 ADDITIONAL SOCIAL/ECON/ENVIRON STUDIES These services will only be completed with written approval from City staff. 1200.1 FISH RECOVERY AND RELOCATION SERVICES In the case that the Brushy Creek culvert extension project is constructed/dewatered in more than one step due to drainage restrictions, the CONSULTANT will complete additional Fish Recovery and Relocation services for up to three (3) additional steps. The previously approved Fish Recovery and Relocation scope will remain unchanged, and the new work will follow the previously approved scope. Page 5 of 5 ADDENDUM TO EXHIBIT C WORK SCHEDULE Attached Behind This Page EXHIBIT C ID Task Name Duration Start Finish Resource Names % Predecesso 2026 2027 Com tete r 4 tOtr I Brushy Creek Culvert Extension PS&E,Bidding and CPS, 308 days Fri 3/20/26 Fri 6/18/27 13% Additional Chisholm Trail CPS(PSSA 6) 2 PSSA 6 Prep&Review 69 days Fri 3/20/26 Thu 6/25/26 City,FNl(1146) 100% City,FN 1(1146) 3 PSSA 6 Council Award 0 days Thu 6/25/26 Thu 6/25/26 City,FNl(1146) 0%2 ;6/2S 4 PSSA 6 NTP and subconsultant agreements 10 days Fri 6/26/26 Mon 7/13/26 EDGE 0%2 EDGE 5 Chisholm Trail Reconstruction 120 days Mon 6/1/26 Tue 11/17/26 0% 6 Submit Illumination Change Order(CO k2) 0 days Wed 7/1/26 Wed 7/1/26 FNI(1146) 0% ♦ 7/1 7 Additional CPS 6 mons Mon 6/1/26 Tue 11/17/26 FNI(1146),EDGE 0% FNI(1146),EDGE a Brushy Creek PS&E 119 days Tue 7/14/26 Fri 1/15/27 0% 9 90%PS&E Development 74 days Tue 7/14/26 Fri 10/23/26 0% �1 10 90%PS&E Development 39 days Tue 7/14/26 Fri 9/4/26 EDGE,FNI(1146),FNI(1124) 0%4 -EDGE,FNI(1146),FNI(1124) 11 90%QC(Incl.Plans,OPCC,Project Manual,Draft 15 days Mon 9/7/26 Fri 9/25/26 EDGE,FNI(1146),FNI(1124) 0%10 .EDGE,FNI(1146),FNI(1124) Drainage Report&Model) 12 90%Due toCity 0days Fri 9/25/26 Fri 9/25/26 EDGE,FNI(1146),FNI(1124) 0%11 r9/25 13 90%City Review 15 days Mon 9/28/26 Fri 10/16/26 City 0%12 71 City 14 90%RAS Review/TDLR Registration 20 days Mon 9/28/26 Fri 10/23/26 TBD Sub 0%12 TBD Sub 15 TCEQ WPAP Permitting 85 days Mon 8/31/26 Fri 1/15/27 0% Imo' 16 Prepare WPAP Permit Package 20 days Mon 8/31/26 Fri 9/25/26 FNI(1171) 0%11FF �kN1�1171) 17 Submit WPAP Package to TCEQ 0 days Fri 9/25/26 Fri 9/25/26 FNI(1171) 0%12 ♦�9/#5 18 TCEQ WPAP Permit Review 65 days Mon 9/28/26 Fri 1/15/27 TCEQ 0%17 t TCEQ 19 100%PS&E Development 20 days Mon 10/19/26 Fri 11/13/26 0% 20 100%PS&E Development 10 days Mon 10/19/26 Fri 10/30/26 EDGE,FNI(1146),FNI(1124) 0%13 .+L,EDGE,FNI(1146),FNI(1124) 21 100%CIC(Incl.Plans,OPCC,Project Manual,Final 0 days Fri 10/30/26 Fri 10/30/26 EDGE,FNI(1146),FNI(1124) 0%20 +10/30 Drainage Report&Model) 22 100%Due to City 10 days Mon 11/2/26 Fri 11/13/26 City 0%21 CRY 23 TPWD Fish Relocation Permitting 40 days Mon 9/21/26 Fri 11/13/26 0% 24 Prepare Permit Package 20 days Mon 9/21/26 Fri 10/16/26 FNI(1171) 0%13FF NI(1171) 25 Submit Permit Package to TPWD 0 days Fri 10/16/26 Fri 10/16/26 FNI(1171) 0%24 j V10//6 26 TPWD Permit Review 20 days Mon 10/19/26 Fri 11/13/26 TPWD 0%25 TPWD 27 Bidding 50 days Mon 1/18/27 Fri 3/26/27 0% 28 Advertise 2 mons Mon 1/18/27 Fri 3/12/27 FNI(1146),City 0%19,23,15 „,FNI(1146),City 29 Bid Opening 0 days Fri 3/12/27 Fri 3/12/27 City 0%28 13/12 30 Tabulation/References Check/Recommendation 8 days Mon 3/15/27 Wed 3/24/27 FNI(1146) 0%29 - FNI(1146) 31 Award 2 days Thu 3/25/27 Fri 3/26/27 City 0%30 j City 32 Construction&TPWD Fish Relocation 3 mons Mon 3/29/27 Fri 6/18/27 FNI,Contractor 0%31 FNI,Contractor Task Project Summary Manual Task I .-A Start-only L Deadline i Project:Chisholm Trail PSSA 6 split .... Inactive Task Duration-only ': Finish-onM 7 Progress Date:6/8/2026 Milestone ♦ Inactive Milestone Manual Summary Rollup External Tasks Manual Progress Summary r ...1 Inactive Summary Manual Summary r­­1 External Milestone v Page 1 of 1 ADDENDUM TO EXHIBIT D FEE SCHEDULE Attached Behind This Page e Chisholm Trail South PSSA 6 Basic Services Project FeSumma$ 198,263.00 6/8/2026 Special Services $ 24,840.00 Detailed Cost Breakdown Additional Services $ - Total Project $ 221,103.00 Labor Task Description ft).Meese Ra iiyr 0"."En R-."QC BWdurN PE 9nictu 11 MIT 9-,-ICAD 9ruaure QC EmsWn$Mv EmsciMbtll PM/Mhxn_ &Igor Total Labor P szaato sra000 $1x000 u43 $era $iw $11a $27a $2. $v2 $1so $1]2 Total Hours Elfon 146 Project Management _ § 145.1 Project Admin Services(12 months) 12 12 12 36 E 7,140.00 160 Roadway Design Services _ -_ $ _ 180.1 Brushy Creek Roadway Plans - § Title Sheet .. _.._.._- 1 2 3 $ 540.00 Index --- -- - 2 8 10 $ 1,800.00 Project Layout - 1 2 3 $ 540.00 E-1 g 8 Proposed Typical Sections_ _ 1 4 5 _ _ _ _ E 900.00 General Notes - 1 2 3 S 803.00 Removal Layout 2 4 6 $ 1,080.00 Horizontal Alignment Data Sheets 1 4 5 $ 900.00 Roadway Details 1 4 4 9 $ 1,683.00 Roadway Standards 1 4 5 $ 900.00 Quantity Summary Sheet 1 4 5 $ 900.00 QC - ___- _-B-_._ --- - _..__ 8 $ 1,944.00 161 Drainage Design Services g 161.1 Brushy Creek Drainage Plans § Hydraulic Data Sheets_ _ 2 2 4 $ 848.00 Culvert Layout Sheet 2 12 24 38 $ 6,986.00 Grading Layout Sheet __ _ 2 12 24 38 $ 6,988.00 Culvert Structural Details 2 16 24 20 __ _ _ 62 $ 12,834.00 TxDOT BCS and Headwall Standards 2 2 8 12 $ 2,286.00 QC 8 8 $ 2,224.00 162 Signing and Pavement Marking Services $ 162.1 Brushy Creek Pavement Marking Plans I $ Pavement Marking Layout 2 8 10 $ 1,800.00 PM Standards 1 4 5 $ 900.00 Quantity Summary Sheet 1 4 5 $ 900.00 QC 2 2 $ 486.00 163 Miscellaneous(Roadway) § 163.1 Brushy Creek Traffic Control Design Services g Sequence or Work and Narrative 4 4 8 8 1,440.00 Advance Warning Sign Layout 2 4 6 $ 1,080.00 TraO1c Control Typical Section 2 4 6 $ 1,080.00 Traffic Control Layouts 4 12 16 $ 2,880.00 Detour Plan 1 4 5 $ 900.00 TCP Standards 1 4 5 $ 900.00 Quantity Summary Sheet 1 4 5 $ 900.00 163.2 Stormwater Mgmt 8 Tree Preservation Design Services § Revised Chisholm SW3P Layouts 2 8 10 $ 1,800.00 Brushy Creek SW3P Design Services § SW3P Layouts 1 4 5 $ 900.00 Environmental Standards 1 2 1 1 1 3 $ 540.00 183.3 Pedestrian Illumination Design Services § Revised Chisholm Illumination Plan Sheets 8 20 8 1 36 $ 8,984.00 163.4 Supplemental Design Document Services 1 $ OPCC 4 8 12 24 $ 4,572.00 Project Manual 8 20 20 48 $ 9,144.00 CTD 4 8 12 $ 2,160.00 TDLR Registration/Review 2 2 $ 486.00 190 Bid Phase Services $ 190.1 Bid Phase Services $ Pre-Bid Meeting 4 4 - 8 $ 1,692.00 Contractor Responses 2 4 2 8 $ 1,762.00 Bid Tabulations 2 4 8 _ 14 $ 2,648.00 Final Construction Documents 1 1 2 4 $783.00 310 Construction Phase Services § 310.1 Chisholm Trail Construction Phase Services 72 72 _ 144 $ 30,456.00 310.2 Brushy Creek Construction Phase Services 24 24 4 12 24 88 E 17,720.00 1200 Addition aI Social/Env Studies § 1200.1 Fish Recevery and Relocation Services 2 72 1 72 146 $ 24,840.00 Total Hours/Quantity 151 226 2201 102 36 14 8 72 72 12 12 885 Total Effort $ 36,693.00 $ 40,680.00 $ 39,600.00 $ 2,430.00 $ 6,116.00 E 6,480.00 $ 7,879.00 E 2,224.00 E 14,978.00 E 9,504.00 $ 2,160.00 $ 2,064.00 1 $ 170,803.00 1 of 3 L:\Clwra\OLCR\R\Round Rock,City of\Chisholm TmiRPSSA MCORR Chisholm Trail PSSA 6-EXHIBIT D .,...... Project Fee Summar Chisholm Trail South PSSA 6 Basic Services S 19 63. 6,200 6/812026Special Services $ 24,840.00 Detailed Cost Breakdown Additional Services $ Total Project $ 221,103.00 Expenses Task Description Tech Charge Miles TDLR/RAS Total Expense Effort 146 Project Management _ _ $ 145.1 Project Admin Services(12 months)_ 36 $ _ - 160 Roadway Design Services _ $ - 160.1 Brushy Creek Roadway Plans - $ - Title Sheet 3 $ Index 10 $_ Project Layout 3 $ - Existing&Proposed Typical Sections 5 $ - General Notes - _ 3 $ - Removal Layout _ _ 8 $ - Horizontal Alignment Data Sheets _ 5 $ _ - Roadway Details _ _ 9 $ Roadway Standards _ _ _ 5 $ - Quantity Summary Sheet - 5 $ QC 8 $_ 161 Drainage Design Services $ - 161.1 Brushy Creek Drainage Plans - $ - Hydraulic Data Sheets 4 $ - Culvert Layout Sheet 38 $ - Grading Layout Sheet _ 38 $ _- Culvert Structural Details 82 - TxDOT BCS and Headwall Standards 12 $ QC 8 $ 162 Signing and Pavement Marking Services $ - 162.1 Brushy Creek Pavement Marking Plans $ - Pavement Marking Layout 10 $ PM Standards 5 $_ - Quantity Summary Sheet 5 $ _ QC 2 $ 163 Miscellaneous(Roadway) $ _ 163.1 Brushy Creek Traffic Control Design Services _ _ $ - Sequence of Work and Narrative 8 $ - Advance Wanting Sign Layout 6 $ - Traffic Control Typical Section 6 $ - Traffic Control Layouts 18 $ - Detour Plan _ 5 $_ - TCPStandards 5 $ _- Quantity Summary Sheet 5 $ 163.2 Stimnwater Mgmt&Tree Preservation Design Services $ Revised Chisholm SW3P Layouts 10 $ - Brushy Creek SW3P Design Services $ _ - SW3P Layouts B24 $ - Environmental Standards $ 163.3 Pedestrian Illumination Design Services $ - Revised Chisholm Illumination Plan Sheets $ - 163.4 Supplemental Design Document Services $ _- OPCC $ Pmjeet Manual $ CTD $ TDLR Registration/Review, 2 1 1800.001$ 1,800.00 190 Bid Phase Services $ - 190A Bid Phase Services $ - Pre-Bid Meeting 8 40 $ 28.00 Contractor Responses 8 $ - Bid Tabulations 14 $ - Final Construction Documents 4 $ _ 310 Construction Phase Services $ - 310.1 Chisholm Trail Construction Phase Services _ 144 240 $ 168.00 310.2 Brushy Creek Construction Phase Services___ 1 88 1 120 1 2200.00 $ 2.284.00 1200 Additional Social/Env Studies $ - 1200.1 Fish Recovery and Relocation Services 148 $ Total Hours/Quantityl 886 1 400 4000.00 Total Effort $ $ 280.00 $ 4,000.00 $ 4,280.00 2 or 3 L.\CImnhOLCR\R\Round Rock,City of\Chmholm TmAPSSA 6\CORR Chisholm Trail PSSA 6-EXHIBIT D 6/8/2026 Project Fee Summary Chisholm Trail South PSSA 6 Basic Services $ 196,263.00 6/8/2026 Special Services $ 24,640.00 Detailed Cost Breakdown Additional Services E Total Project $ 221,103.00 Subconsultants Total Task Description EDGE Total Sub Total Effort Effort 146 Project Management ___ _ $ 145.1 Project Admin Services(12 months) E 7,140.00 160 Roadway Design Services _ $ 160.1 Brushy Creek Roadway Plans - $ True Sheet _ $ 540.00 Index E Tallow Project Layout $ 540.00 Existing&Proposed Typical Sections _ _ $ 900,00 General Notes $ 603.00 Removal Layout $ 1,060.00 Horizontal Alignment Data Sheets $ 900,00 Roadway Details $ 1,883.00 Roadway Standards - $ 900.00 Quantity Summary Sheet - $ 900.00 QC $ 1,944.00 161 Drainage Design Services $ 161.1 Brushy Creek Drainage_Plans - $ Hydraulic Data Sheets _ 27190.00 27190.00 $ 26,036.00 Culvert Layout Sheet __ _ $ 6,966.00 Grading Layout Sheet _ $ 6,906 Culvert Structural Details $ 12,634 TxDOT BCS and Headwall Standards $ 2,286 C $ 2,224 162 Signing and Pavement Marking Services $ 162.1 Brushy Creek Pavement Marking Plans $ Pavement Marking Layout $ 1,800 PM Standards _ $ 900 Quantity Surnrnary Sheet $ 900 QC — E 488 163 Miscellaneous(Roadway) $ 1.63.1 Brushy Creek Traffic Control Design Services E Sequence of Work and Narrative E 1,140 Advance Wanting Sign Layout $ 1,080 Traffic Control Typical Section E 1,080 Traffic Control Layouts E 2,880 Detour Plan $ 900 TCP Standards E 900 Quantity Summary Sheet $ 900 163.2 Stormwater Mgmt&Tree Preservation Design Services E Revised Chisholm SW3P Layouts $ 1,800 Brushy Creek SW3P Design Services E SW3P Layouts E 900 Environmental Standards $ 540 163.3 Pedestrian Illumination Design Services E Revised Chisholm Illumination Plan Sheets E 8,984 163.4 Supplemental Design Document Services E OPCC $ 4,572 Project Manual E 9,144 CTD E 2,160 TDLR Registration/Review $ 2288 190 Bid Phase Services E 190.1 Bid Phase Services E Pre-Bid Meeting E 1,720 Contractor Responses $ 1,782 Bid Tabulations $ 2,646 Final Construction Documents E 783 310 Construction Phase Services $ 310.1 Chisholm Trail Construction Phase Services 11520.00 11520.00 $ 42,144 310.2 Brushy Creek Construction Phase Services 7310.00 7310.00 $ _ 27,314 1200 Additional 3ocialfEnv,Studies $ 1200.1 Fish Recovery and Relocation Services $ 24,840 Total Hours/Quantity 46020.00 Total Effort $ 46,020.00 $ 46,020.00 1$ 221,103.00 3 of 3 L1Cliert\OLCRU31Round Rode,CM onChSholm TmiRPSSA VCORR Chisholm Trail PSSA 6-EXHIBIT D 6/612026 EDGE TBPE FIRM No.20690 7000 N Mopac Expy,Ste 325 Austin,TX 78731 ENGINEERING 512.767.1009 June 1, 2026 Andrea Bryant, PE Freese and Nichols, Inc 10431 Morado Circle,Suite 300 Austin, Texas 78759 DELIVERED VIA E-MAIL Re: CoRR Chisholm Trail—Brushy Creek Culvert Extension and Construction Services Dear Ms. Bryant: EDGE Engineering, PLLC(EDGE)appreciates the opportunity to submit this professional engineering proposal to Freese and Nichols, Inc(FNI) in support of the above referenced project.The attached scope of services outlines EDGE's proposed work,which includes: • Hydraulic modeling, reporting, and plan preparation for the extension of the Chisholm Trail culverts over Brushy Creek, refining the hydraulic modeling previously completed as part of the Preliminary Engineering Report (PER). • Construction-phase services related to the Brushy Creek Culvert Extension. • Construction-phase design services related to the roadway storm drain system and PS&E package for the improvements along Chisholm Trail from Sam Bass Road to Round Rock Avenue, including design modifications required to address the utility conflict identified during construction. We appreciate the opportunity to support FNI on this project. Please feel free to contact me directly if there are any questions regarding this proposal at 512-766-0468 or bvonasek@civil-edge.com. Sincerely, IWWOWAAM Brenna Vonasek, PE Team Lead/Associate Attachments: - Scope of Work - Fee Schedule EDGE TBPE FIRM No.20690 7000 N Mopac Expy,Ste 325 Austin,TX 78731 ENGINEERING 512.767.1009 SCOPE OF WORK EDGE shall provide hydraulic analysis, reporting, and associated H&H plan sheets for the extension of the Chisholm Trail box culverts over Brushy Creek to accommodate pedestrian facilities on the west (upstream) side of the crossing, including temporary conditions while under construction. EDGE previously completed a preliminary hydraulic analysis and report using HEC-RAS as part of the Preliminary Engineering Report (PER).This analysis will be updated and refined as needed to support final design. EDGE shall also provide construction-phase services for the roadway storm drain system design and associated plan production, specifications, and estimating for the improvements to Chisholm Trail from Sam Bass Road to Round Rock Avenue.Additional services include modifications to the storm drain design to accommodate a wastewater line conflict identified during construction. Drainage Design Services Brushy Creek Box Culvert Extension Task 1: Existing Conditions Hydraulic Analysis • No updates are anticipated for the existing models developed during the PER.These include the Brushy Creek FEMA Effective HEC-RAS model and the best available Atlas 14 HEC-RAS model. Task 2: Proposed Conditions Hydraulic Analysis • EDGE will utilize the previously developed PER HEC-RAS models and make updates as necessary to finalize the culvert extension design. Only minor refinements to the FEMA Effective and Atlas 14 models are anticipated. • The Atlas 14 model will continue to evaluate two conditions established in the PER. The first condition includes the 42"tall pedestrian rail and will simulate the higher frequency storms(2-, 5-, 10-, 25-yr).The second condition removes the pedestrian rail, which will break away via shear pins, and simulate the lower frequency storms (50-, 100-, 500-yr). • Model updates will be used to confirm that the final design achieves a no-rise condition in the FEMA and Atlas 14 100-yr and a no adverse impact solution in the higher frequency events. • EDGE will utilize the existing and proposed HEC-RAS models to develop the hydraulic analysis for temporary construction conditions.The culvert extensions are expected to be built in phases, with some boxes to be offline during construction. EDGE will evaluate and document up to three potential alternatives.The temporary solution will be based on the 2-yr frequency storm. • Coordination with the City's FPA will continue through the design phase to confirm the model methods, approach, and results. One in-person meeting with the City FPA is anticipated. Task 3: Reporting EDGE will update the Drainage Report developed during the PER to document the methods and assumptions used for the hydraulic analysis.The report will document the general approach, iterations in the design, and the final design and results. Task 4: Drainage PS&E EDGE will prepare the following plan sheets: • Hydraulic Data Sheets(2 sheets) 1 C T o FIRM No.20690 7000 N Mopac Expy,Ste 325 Austin,TX 78731 ENGINEERING 512.767.1009 EDGE will also review drainage-related plan sheets prepared by others to confirm consistency with the hydraulic modeling.Sheets to be reviewed include: • Culvert Layout • Grading Layout • Temporary Drainage • Drainage Details • Drainage Standards Deliverables • Hydraulic Data Sheets • Draft Drainage Report • Final Drainage Report Exclusions The following assumptions were made during the development of this scope. If any of the below services are found to be necessary during the project, EDGE will request additional services to be considered. • Hydrologic analysis and drainage area maps. It is assumed the FEMA and Atlas 14 flows will be used and no hydrology is required. • CLOMR and LOMR EDGE is not responsible for: • Drainage Standards • Drainage Specifications • Construction estimate Construction Phase Services Chisholm Trail South Improvements • EDGE will provide design change services after the 100%submittal to address the wastewater line conflict identified in the field (Revision 2). • EDGE will provide additional design change services after the 100%submittal. Deliverables • Updated drainage sheets and quantities for Revision 2. Brushy Creek Culvert Extension • EDGE will provide additional design change services after the 100%submittal, including coordination and responding to RFIs. • EDGE will conduct a maximum of 3 field visits. Basis of Compensation EDGE proposes to provide the detailed "Scope of Work" for the Lump Sum amount of$46,020. 2 EDGE ENGINEERING EXHIBIT B FEE SCHEDULE Senior Project Design Engineer In Total Total Engineer Engineer Engineer Training Labor Labor Expense Total Task Description $250 $190 i $160 $120 Hours Cost Cost Cost Drainage Design Services Brushy Creek Box Culvert Extension 1 Existing Conditions Hydraulic Analysis(Assume no changes) 0 $0 2 Proposed Conditions Hydraulic Analysis 0 a. Effective FEMA 1 1 3 5 $770h$4,940 b. Atlas 14 1 2 6 9 $1,290 c. Solution Development 2 4 6 12 24 $3,660 c. Temporary Construction Conditions(3 max alternatives) 2 4 8 20 34 $4,940e. Floodplain Administrator Coordination(1 in-person meeting) 6 6 12 $2,640 3 Reporting 2 2 6 12 22 $3,280 $3,280 _ 4 Drainage Sheet Production a. Hydraulic Data Sheets(2 Sheets) 4 6 10 20 40 $6,140 $6,140 b. Drainage Sheets By Others(Review/coordination only:Culvert Layout,Grading Layout,Drainage Details,Standards, 3 4 8 14 29 $4,470 $4,470 Temporary Drainage) Construction Phase Services 0 $0 $0 1 Chisholm Trail South(Drainage Revision 2 and additional services) 6 6 24 42 78 $11,520 $11,520 2 Brushy Creek Culvert Extension(3 Field visits,2 RFIs) 3 16 10 16 45 $7,310 $7,310 Project Totals 27 32 65 129 253 $46,020 $0 $46,020 61112026 Lo