CM-2026-208 - 8/7/2026 Texas Water
Development Board
P.O.Box 13231, 1700 N.Congress Ave.
Austin,TX 78711-3231,www.twdb.texas.gov
Phone(512)463-7847,Fax(512)475-2053
Fiscal Sustainability Plan (FSP) Certification
This certification applies to loan applications submitted on or after October 1,2014,that involve the repair,replacement,or
expansion of a publically owned treatment works in accordance with the Water Resources Reform and Development Act of 2014
(WRRDA),Section 603(d)(1)(E). FSPs are not required for new treatment works unless they are physically replacing an existing
treatment works or expanding the treatment capacity of an existing system or for projects involving an upgrade that does not
involve repair/replacement or expansion of the treatment capacity(e.g.,adding advanced treatment).
Name of Entity: Round Rock
TWDB Project Number: 74016
Brushy Creek Regional Wastewater Treatment System East Plant-40 MGD Expansion
Project Name:
WRRDA Section 603 (d)(1)(E)states that: for a treatment works proposed for repair, replacement, or expansion,
and eligible for assistance under subsection(c)(1), the recipient of a loan shall—
(i) develop and implement a fiscal sustainability plan that includes—
(1) an inventory of critical assets that are a part of the treatment works;
(11) an evaluation of the condition and performance of inventoried assets or asset groupings;
(III) a certification that the recipient has evaluated and will be implementing water and energy
conservation efforts as part of the plan;and
(I V) a plan for maintaining, repairing, and, as necessary, replacing the treatment works and a plan
for funding such activities; or
(ii) certify that the recipient has developed and implemented a plan that meets the requirements under clause
(i)
Check the appropriate statement below and sign the signature block.
❑ By signing below,the loan recipient certifies a plan has been developed and is being implemented to
meet the requirements under clause(i)above.
By signing below,the loan recipient agrees to develop and implement a fiscal sustainability plan,and
will certify, using this certification form,the plan meets the requirements under clause(i)above as a
deliverable under the loan agreement. In this case,the loan recipient shall submit the certification
form to the TWDB prior to the final funds disbursement on the final contract of the stated project.
tgnature of Authorized Offici1V Date
Printed Name of Authorized Official
Title of Audiorized Official
TWDB-1700-A � TWDB Use Only—Review Engineer's Acceptance ❑ Initials
Revised 08/22/16