Contract - Patin Construction, LLC - 8/13/2026 Pepe I of 3 Contract Quantity Adjustment/Change Order Departmen'Pudic Works Date: 7/1/26 Project Nan West Transmission Main Valve Redac ent Protect Ury Project ID Change Order/Quantity Number: 2601 Adjustment No. 2 Vendor: Patin Construction LLC. 3800 W.2nd Street,Taylor,Tx 76574 512-2641071 Company Name Address Phone No. Justification Dunng the contractor's excavation at all three project locations prior to the delay,it was discovered that the anticipated conditions vaned considerably from the actual field conditions.Due to this,an additional 100 feet of 18-inch pipe,and 26.5 feet of 24-inch through 36-inch pipe needs to be added to the project.Due to the existing pipe material,additional large diameter standard and custom fittings are also required at all three project locations. SUMMARY Amount %Change Drginal cant—t once: ;1,463,470.00 prevous Quantity MJ—nt(s)_ $0.00 This Quantity Adjustment $107,600.00 Tow Qwnnty Adjustmengs): 107600.00 711n Tow Coonact Rke ran Quar M Ad)ustment(s): 1,571070.00 lkeyk Charge Order(s): $48,600.00 This Change order: $75,128.20 Total mange aaer(s)To Date: 123,728.20 8°L, AA)usted Contract Pk,:[Wisnol Contract Ikke Plus Quantity Ad)uennent(s)Rus Change Order(s)1 1,641,798.20 Diff—between O girds and Adjusted Cont—t vrkes: $231,328,20 Qginal contract Time: 160 T—Adxntment by rxeyious Wan.Ads_/mange oder: 20 rime An)ustment by this Wan.Adj./Change order: 244 New contract To— 424 faliaftell for Approval P,­d d ey: Mark Hurd — '— Printed Name,Title,Company Sig-Wre^• Dat. Approvals cont—toy Jeff Birkhead,VP of Preconstruction,Patin Construction LLC '7e#&%IW" 7-13-2026 minted Name,Title,Company Signature Date Cay Rolect Mark Hurd Marwger: --- rinted Name,Tree Signature Ddte mmlaty m (//I Jer: /; l Pi ln[ed N n tle Slgnatwe Date R-- 2,C- g Pape 2 of 3 Contract Quantity Adjustment/Change Order m wa Project Nan West Transmission Main Vahe Replaane t Roject Change Order/Quantity Adjustment No. 2 Change Order Data Bid Item coon t tares Zr Item DeKription UnitQty. Unit Price Amount AdFr>bmet(Dors) 1 SWPPP Inspections-during suspended MO 7 $500.00 $3,500.DO 2 Additional po"ing and collection of data m existing udlity clic shared with ineer and city project team LS 1 $15,000.00 $15,000.00 3 Additional 36"ter waterline 2A EA 1 $25,136.20 $2S,136.20 4 Rep6m existing casing-waterline 2B LF 23 $12S.00 $2,87S.00 5 Additional restrained 24'DI-install onmaterial prwded -waterline 2B LF 23 $129.00 $2,967.00 6 Additional demolition:23 LF of 24"CSC pipe and 23 LF of 36"tin hom nasi 9wl-2B LF 23 $IDO.00 $2,300.00 7 Additional restrained 24"DI-install onmaterial provided -waterline 3A LF 100 $129.00 $12,900.001 8 Additional demolition of 100 LF of 24"CSC poeline LF 100 $IDO.00 $10,000.DO 9 Additional demolition of 3.5 LF of 18"DI to con—I to exist 18"flange -38 LF 3.5 $lD0.00 $350.00 10 Deduct demolition of 8 LF of 18"DI -3A LF -8 $lDO.00 4800.00 Il Additional demolition:13.5 LF of existing 24"CSC pipe and one 1 exist CSC to DI ada e. WL-IA LF 14 100.00 $1,400.00 12 Deduct demolition of 2 LF OF 36"CSC -lA LF -2 $100.00 -$200.00 13 Deduct demolition of 3 LF of 30'CSC -lA LF -3 $100.00 -300.00 14 Tim Attustrtient on unti 0.00 244 00 0.00 0.00 00 00 0.00 0.00 00 0.00 00 00 00 00 00 00 TOTALS:11 ;75,128.201 244 Pae otI fir Contract Quantity Adjustment/Change Order Project Nan West Transmission Main Valve Reolacment Project Change Order/Quantity Adjustment No. 2 Quantity Adjustment Data Bid Item co,ro-act Th— Item Description Unit qty. Unit Price Amount edjeestn.mn(O.+n) Furnish and Install Restrained 24"Ductile Iron Pipe (Class 250 psi)including excavation,ground and surface water cl w temeg,embedment,backfill,metallic underground warning tape,adaptors,couplings,joint restraints,thrust blocks,polyethylene wrap,surface restoration,disposal of excess material,incidental work not covered by other bid 3 items 318"F and backfill and mantes.Com Place ler . LF 13.5 85.00 847.50 mi a inffi estrai cti a non pe (Class 250 psi)inducing excavation,ground-and—face-water dewatenng,embedment backfill.metallic underground warning tape,adaptors,couplings,joint restraints,thrust blocks,polyethylene wrap,surface restoration,disposal of excess material,incidental work not covered by other bid items 3/8 F bedding and 5 lbackfill and appurtenances Complete in Place: LF -2 75.00 -$950.00 Furnish and Install Restrained 30"Ductile Iron Rpe (Class 250 psi)including excavation,ground and wrface water dewatering,embedment,backfill,metallic underground warning tape,adaptors,couplings,joint restraints,thrust docks,polyethylene wrap,wrface restoration,disposal of excess material,incidental work not covered by other bid items 3/8"F bedding and 4 backfill and a rtenances.Com in Place: LF -3 $415.00 .$1,245.00 Furnish and install Restrained 36"Ductile Iron Pipe (Class 250 psi)including excavation,ground-and wrface-water dewatenng,embedment backfill.metallic underground warning tape,adaptors,couplings,joint restraints,thblocks,polyethylene wrap,wrface restoration,disposal of excess material,incidental work not covered by other bid items 3/8'F bedding and 5 barlff�ll and a=rtenancu Com ete in Place: LF 20 $475.00. $9,500.00 Connection to existing water system transmission line(18"to 24 diameters),including ductile iron to CSC comatlons,irduding furnishing and installing DI to 43 CSC ada ers,skeves,cou ens,labor, ui t,and a rtenances,as necessary.Complete in Place. EA 1 $40,ODO.00 W,000.00 Connection to existing water system transmission line(30"to 36"diameters),including ductile iron to CSC connections,including furnishing and installing DI to 44 CSC adapters,sleeves,cotiplers,labor,equipment,and appurtenances,as necessary.Complete in Place. EA 1 $SO,000.00 $50,000.00 Connection to existing water system transmission line(IB"to 24"diameters),inducing flanged and ductile iron connections,including furnishing and installing 41 sleeves,cou ers labor, ui ent and a urtmances as necessa .Com ete in Race. EA -1 15 000.00 -$151000.00 37 Furnish and install trench safetys stem for wa[edine cons l-ti Com a in Race. LF 43 10.00 430.00 29 Fumi a insta r emen[endo or anti remov rawi OI%-01followingcan -ono .Complete in LF 40 50.00 2,000.00 34 Furnish,install,maintain,a remove Miter 2 ence ns and 5 cations.Com ete in e. LF 40 5.00 200.00 42 skives,cou ers,labor, cot,and a rtmances,as necessa .Complete in Race. EA -1 $25,000.00 -25,000.00 43 CSC ada ers,skeves cou ers labor, ent and appurtenances,as necessary.Complete in Place. EA 1 40 000.00 40 000.00 3 Class 250 - irdudi excavation, rand and wrface water dewaten ,embedment,backfill,metallk under routs wami ta ,ceder ors,cou i 'M LF -24 350.00 -$8,400.00 29 Fumi a insta r lacement anon or erxi removed rawin OIX-Ol o wi tom 'on .Com a in e. LF 100 50.00 5,000.00 34 Furnish,install,maintain,a remove hitter a 'c ence r ansa 5 cations.Com ate in LF 100 5.00 500.00 37 Furnish an in 11 trenchser em or wan me construction.Com a in ace. LF 100 10.00 1,000.00 Furnish and Install Restrained 18"Ductile Iron Pipe(Gass 250 psi),including excavation,ground and wrface water dewatering,embedment,backfill,metallic underground warning tape,adaptors,couplings,joint restraints,thrust blocks,polyethylene wrap,wrface restoration,disposal of excess 2 material,incidental work not covered by odner bid items,3/8"F bedding and backfill,and a rtenam—Complete in Race: LF 3.5 $285.00 j997.S0 Furnish and Install Restrained 18"Ductile Iron Pipe(Class 250 psi),including excavation,ground and surface water dewatering,embedment,backfill,metallic underground warning tape,adaptors,couplings,joint restraints,thrust blocks,polyethylene wrap,surface restoration,disposal of excess 2 material irddmtal work rot covered other bid Reins 3 8"F beddi and backfill,and a rtenantu.Com a in Race: LF -6 285.00 280.00 Fumi a Insta 18 Ducti Iron restrain M.).11.25 nee ss 350 psi per AWWA om ete in Place: 13 Cl 53 CFA 2 $3,500.00 $7,000.00 TOTALS: 107,600.00 0