Contract - AP Gulf States, Inc d/b/a "Adolfson & Peterson Construction - 8/27/2026 Page 1 of 2 t301.— Contract Quantity Adjustment/Change Order ROUND MOCK rev,01/16 Department: General Services Project Name: Public Safety Training Center Phase 2 Date: 8/3/26 City Project Change Order/Quantity ID Number Adjustment No. 1 AN GUIr stares, Inc. a.o.a. Aaoirson Zit Vendor Peterson Construction 807 Las Cimas, Suite 225 Austin,TX 78746 512.410.7659 Company Name Address Phone No. Justification EVOC Regrading is due to the 8 weeks of substantial rain fall.The subgrade track is needed to be regraded to the original design finished elevation before placement of new concrete.The Existing Tilt Wall Refinish and Master Meter Installation are CORR GS and CORR Public Works added scope requests.The Site Perimeter Fencing is needed to keep the animals out of the new track area for safety.ASI 07-Police Shed Air System was not included in the original drawings and specifications. Fire Hydrant Relocation additional details requested by CORR Engineering and Inspections Department due to existing burned utilities. The existing Tilt Wall Repair is an existing structural issue from Phase 1. SUMMARY Amount %Change Original Contact Price: $15,102,231.00 0 Previous Quantity Adjustment(s): $0.00 0 This Quantity Adjustment: $0.00 0 Total Quantity Adjustment(s): $0.00 0 Total Contract Price with Quantity Adjustment(s): $15,102,231.00 0 Previous Change Order(s): $0.00 0% This Change Order: $923,988.25 6% Total Change Order(s)To Date: $923,988.25 6% Adjusted Contract Price [Original Contract Price Plus Quantity Adjistment(s)Plus Change Order(s)]: $16,026,219.25 Difference between Original and Adjusted Contract Prices: $923,988.25 Original Contract Time: 456 Calendar Days Time Adjustment by previous Quan.Adj./Change Order: 0 Time Adjustment by this Quan.Adj./Change Order: 0 New Contract Time: 456 Calendar Days Submitted for Approval Prepared By: (1. 4,,,vi ..../ Matthew Smith, Project Manager, City of Round Rock 8/3/26 Signature Printed Name,Title, Company Date Approvals - 9 �/ Contractor: 41, / J.�fie/- -Al-A00A/*O..le i4-1 /4,C ILf f•* �//—S� i� Signatur Printed Name,Title, Company f Date City Project , Manager: Corey Amidon, Director General Services 8/3/26 g atur- Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Page 2 of 2 AP"— Contract Quantity Adjustment/Change Order ROUND cam rev,01/16 Project Name: Public Safety Training Center Phase 2 Quan. Adj./Change Order No.: 1 Change Order Data Contract Time Adjustment Item # Item Description Unit Qty. Unit Price Amount lnavcl 1 EVOC Track Regrading 1 1 $203,772.80 $203,772.80 0 2 Existing Tilt Wall Refinish 1 1 $279,667.92 $279,667.92 0 3 Master Meter Installation 1 1 $185,255.84 $185,255.84 0 4 Site Perimeter Fencing 1 1 $44,800.00 $44,800.00 0 5 ASI -07 Police Shed Air System 1 1 $31,361.13 $31,361.13 0 Fire Hydrant Relocation -Concrete 6 Patchback 1 1 $11,130.56 $11,130.56 0 7 Existing Tilt Wall Panel Repair 1 1 $168,000.00 $168,000.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $923,988.25 0