R-2026-235 - 9/10/2026
RESOLUTION NO. R-2026-235 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ("Contract") with Plummer Associates, Inc. for the BCRWWS East Wastewater Treatment Plant Expansion to 40 MGD Project; and WHEREAS Plummer Associates, Inc. has submitted Supplemental Contract No. 3 to the Contract to modify the provisions for the scope of services and to increase the compensation; and WHEREAS, the City Council desires to enter into said Supplemental Contract No. 3 with Plummer Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Contract No. 3 to the Contract with Plummer Associates, Inc., a copy of same being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,Texas Government Code, as amended. RESOLVED this 10th day of September, 2026. CRAI o MO';%AN, Mayor City o Rou Rock,Texas ATTEST: AN FRANKLIN, City Clerk 0112.20262 EXHIBIT A STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL CONTRACT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES FIRM: PLUMMER ASSOCIATES,INC. ("Engineer") ADDRESS: 8911 N. Capital of TX Hwv,Building 1, Suite 1350, Austin,TX 78759 PROJECT: BCRWWS East Wastewater Treatment Plant Expansion to 40MGD This Supplemental Contract No. 3 to Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Plummer Associates, Inc., hereinafter called the"Engineer." WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 2nd day of November, 2023 for the BCRWWS East Wastewater Treatment Plant Expansion to 40 MGD Project in the amount of$6,072,849.00; and WHEREAS,the City and Engineer executed Supplemental Contract No. 1 on November 7,2024 to amend the scope of services and to increase the compensation by $1,256,618.00 to a total of $7,329,467.00; and WHEREAS, the City and Engineer executed Supplemental Contract No. 2 on July 24, 2025 to amend the scope of services and to increase the compensation by $567,307.00 for the 40 MGD Expansion ($338,513.00) and Rehabilitation ($228,794.00) for a project total of$7,896,774.00; and WHEREAS,it has become necessary to amend the Contract to modify the provisions for the scope of services and to increase the compensation by$149,061.00 to a total of$8,045,835.00; NOW THEREFORE,premises considered,the City and the Engineer agree that said Contract is amended as follows: I. Article 1, City Services and Exhibit A,City Services shall be amended as set forth in the attached Addendum To Exhibit A. II. Article 2,Engineering Services and Exhibit B,Engineering Services shall be amended as set forth in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth in the attached Addendum to Exhibit C. Supplemental Contract Rev.06/16 0199.202334 84275 1 III. Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $149,061.00 the maximum amount payable under the Contract for a total of $8,045,835.00, as shown by the attached Addendum to Exhibit D. IN WITNESS WHEREOF,the City and the Engineer have executed this Supplemental Contract in duplicate. [signature pages follow] Supplemental Contract Rev.06/16 0199.202334 84275 2 PLUMMER ASSOCIATES, INC. By: 74 - Printed Name: Mary Portillo, PE, PMP Title: Principal Date Signed: 8/19/2026 Supplemental Contract Rev.06/16 0199.202334 84275 3 CITY OF ROUND ROCK APPROVED AS TO FORM: By: Craig Morgan,Mayor Stephanie L. Sandre, City Attorney Date Supplemental Contract Rev.06/16 0199.202334 84275 4 Brushy Creek East Regional WWTP 40 MGD Expansion Project Y Supplemental Contract#3 ,` P LU M M E R (0982-018-01) ADDENDUM TO EXHIBIT A City Services The City of Round Rock will furnish to the Engineer the following items/information: • Attend kickoff meeting and progress meetings. • Designate a person to act as City's representative with respect to the services to be performed or furnished by the Engineer.This representation will have authority to transmit instructions, receive information, interpret, and define City's policies and decisions with respect to engineering services. • Provide criteria and full information as to City's requirements for the project, including objectives and constraints and furnish copies of standards which City will require to be included in the project. • Assist Engineer by placing available information pertinent to the Project, including previous information and other data relative to the Project at the Engineer's disposal. Engineer will reasonably rely upon the accuracy,timeliness, and completeness of the information provided by the City. • City will give prompt notice to Engineer whenever City observe or become aware of development that affects the scope or timing of Engineer's services. • Provide digital design files or records available which would assist in the completion of the project development. • Governmental review fees, submittal fees, recordation fees, and other fees associated with the project shall be paid for directly by the City. • Timely review and comment,within 10 business days, on the deliverables. Brushy Creek East Regional WWTP 40 MGD Expansion Project Supplemental Contract #3 0982-018-01 ADDENDUM TO EXHIBIT B Engineering Services Engineering Services to be provided for the ILS improvements and BCE Structure Evaluations(Supplemental Contract#3) of the 40 MGD Expansion project: Background The Brushy Creek East Regional Wastewater Treatment Plant (Plant) is owned by the Brushy Creek Regional Wastewater System (BCRWWS), who are the Cities of Round Rock, Cedar Park, Leander and Austin (Partners).The engineering team, led by Prime consultant Plummer Associates,and sub consultants Freese & Nichols and Lochner (Engineer) designed the most recent 10 MGD expansion, increasing the Plant's capacity from 30 MGD to 40 MGD.This Supplemental Contract is adding services to the 40MGD Expansion design project. SCOPE —Additional Services The purpose of this scope of services is to provide additional services for: 1. ILS 1 and 2 Ragging Issues Review 2. BCE Structure Flood Risk Evaluations Task 1:ILS 1 and 2 Ragging Issues Review(Preliminary Report) Due to persistent ragging and clogging issues at ILS 1, the City of Round Rock has requested a preliminary evaluation of mitigation alternatives. The goal of this task is to identify and compare feasible solutions to include upstream screening, improve pump reliability, reduce maintenance frequency, and improve the operability of the lift station. Tasks: The scope of work for Task 1 is further defined in the following sub-tasks including: A. Project Management B. Quality Management C. Data Collection and Existing Conditions Review D. Technical Memorandum E. Review Workshop A. Project Management The ENGINEER includes PM effort for this under the budget for communication and coordination with the City and internal team coordination, scope, schedule and budget management, monthly invoicing, status reports and other activities associated with project management. B. Quality Management ENGINEER will perform QA/QC reviews on the draft and final ILS Ragging Issues Technical Memorandum and incorporate internal review comments prior to submission to the City. Page 1 of 5 Brushy Creek East Regional WWTP 40 MGD Expansion Project Supplemental Contract#3 0982-018-01 C. Data Collection and Existing Conditions Review ENGINEER will review available record drawings, pump data sheets, and system layout, conduct and coordinate with City staff to identify maintenance constraints, operational concerns and priorities. Meetings: N/A Deliverables:N/A D. Technical Memorandum—ILS Ragging Issues Feasible alternatives to mitigate ragging and system performance will be evaluated.They include: • Upstream coarse screening — high level evaluation of up to two (2) screen types and placement and consideration of constructability and maintainability. • Pump upgrades—evaluate up to two(2) options to mitigate ragging, including a review of manufacturer recommendations, compatibility with existing pumps and motors,hydraulic performance implications, and anticipated maintenance and reliability impacts. • Electrical and structural review—coordinate with the electrical and structural engineering design team to discuss impacts associated with alternatives evaluated, including available power capacity, starter/VFD compatibility, control logic modifications, structural implications and feasibility. • Review available hydraulic and operational data to assess potential impacts to system head conditions, wet well operations, and pump performance associated with the project. Prepare a technical memorandum documenting the existing conditions and description of ragging issues and operational impacts,a comparative analysis on the alternatives, available power supply, structural implications, Class 5 OPCC, and a recommendation to inform a decision on next steps. Meetings:N/A Deliverables: One (1) draft Technical Memorandum (soft copy) and one (1) final ILS Ragging Issues Technical Memorandum (soft copy) A. Review Workshop One (1) virtual review workshop with the City and the design team to present findings, review alternatives and Class 5 OPCC and obtain feedback on the draft technical memorandum. Meetings:One(1) Virtual Client Review Workshop, up to 1 hour Deliverables:Meeting notes Task 2:BCE Structure Flood Risk Evaluation Because portions of the BCE WWTP are located within the 100-year floodplain,the City of Round Rock has requested an evaluation of critical facilities and structures to assess potential flood risk.This task will provide a site plan exhibit that identifies structures and equipment vulnerable to flooding based on a comparison of available elevation data with the applicable 100-year flood elevation. Page 2 of 5 Brushy Creek East Regional WWTP 40 MGD Expansion Project Supplemental Contract#3 0982-018-01 Tasks: The scope of work for Task 2 is further defined in the following tasks including: A. Project Management B. Quality Management C. Data Collection and Existing Conditions Review D. Site Plan Exhibit A. Project Management The ENGINEER includes PM effort for this under the budget for communication and coordination with the City and internal team coordination, scope, schedule and budget management, monthly invoicing, status reports and other activities associated with project management. B. Quality Management ENGINEER will perform QA/QC reviews on the draft and final site plan exhibit and incorporate internal review comments prior to submission to the City. C. Data Collection and Existing Conditions Review ENGINEER will obtain and review available data, including record drawings, plan sets and floodplain data. Identify key structures and equipment for evaluation, including electrical buildings, pump stations and process structures and outdoor equipment. D. Site Plan Exhibit ENGINEER will extract and compile elevations from available documentation and drawings including: • Finished floor elevations • Top of wall elevations for process structures • Equipment pad elevations and electrical equipment elevations Compare the elevations to the 100-year flood elevation and perform a screening-level assessment to identify structures at or below the 100-year flood elevation, identify structures with limited freeboard and highlight critical assets with elevated risk exposure. A risk categorization framework(High/Moderate/Low Risk)will be developed based on the relative elevation to the 100-year flood elevation. Key vulnerabilities such as electrical and control systems will be identified. A Site Plan Exhibit including structure locations, annotated elevations, 100-year flood elevation reference and a graphical representation of relative flood risk will be drafted for the City's review. Incorporation of feedback from the City will be included in the Final Site Plan Exhibit. Meetings:One(1)internal coordination meeting(Plummer and FNI), up to 1 hour Deliverables: One (1) Draft Site Plan Exhibit(soft copy), One (1)Final Site Plan Exhibit(soft and hard copy) Page 3 of 5 Brushy Creek East Regional WWTP 40 MGD Expansion Project Supplemental Contract#3 0982-018-01 LIST OF ASSUMPTIONS The following assumptions were used when developing the scope of service and estimating the compensation to CONSULTANT: 1. No design work and construction services work is included in the above-mentioned scope of services. 2. The following professional services are not included in this phase of work: Geotechnical investigations, environmental assessments, architectural design, and subsurface utility investigations. 3. Roadway and/or access route design to each process/structure are not in the scope of work. 4. GIS mapping services or assistance with these services are not in the scope of work. S. Site visits and field verification are not in the scope of work. 6. Additional effort associated with preparing bid packages or equipment selection for the ongoing 40 MGD/Rehabilitation work is not included. Page 4 of 5 Brushy Creek East Regional WWTP 40 MGD Expansion Project Supplemental Contract #3 0982-018-01 Summary table—List of meetings and deliverables Task Meetings Deliverables ,,, • One(1)client virtual review • Meeting materials and notes workshop • Draft ILS Ragging Issues Technical Memorandum 3 ro (soft copy) Q1 • Final ILS Ragging Issues Technical Memorandum (soft copy) cc • One (1)virtual internal • Meeting materials and notes z Y c coordination meeting • One (1) Draft Site Plan Exhibit (soft copy) .0-, 0 Yj • One(1) Final Site Plan Exhibit(soft and hard copy) N o io w > U w Refer to Exhibit C for the tentative proposed schedule. Refer to Exhibit D for the fee schedule. Page 5 of 5 ADDENDUM TO EXHIBIT C Work Schedule Attached Behind This Page L�• Wail C•IS Pump Em4.06.owl N'!}m�n�nd floc#dd{0rlson]1fSdmIermoulCororo913311 IlOjed Sd.Ji y�6i{ M . trod) I' Narr �Mwd� �" 1M1M z.i Mll ., M!M LIE If};rith.'E1113Y31E:EIMN'ir�il/ Irian'ii I E6 llir I a t 1w ti 6 L_�L__. _ slsY�r f�rlsl sssi3 ]lrls ajE Ills r) ss f Ielsisll+rl.Ir�rtaEy3,+eir'IiMif..�::siaM..r�.' �.�.st'r..Is"..'f. I 1 PM,Mrw6ewer ]I days Mn9/3/76 Mn 144/76 2 1 I15I tW)66rM9Iowa Swim 71 dwrt 6b 11/3/16 Mn 11/9/26 3 1 Draft TM S0 dry, Man S/3/26 fri 10/9/26 4 1 Arrow Wortl609 1 day Mn 10/11/16 Mon 10/11/26 3 1 Cny bedew 10daya Mn 10/12/16 In 10/23/26 3 6 I I.bdate rM l0dayl Mn 10/76/26 ir111/6/16 5 [Mal TM to Cny I day' Mn 11/9/16 Mon 11/9/16 6 • d 9C3 Sernoare flood 6n6 lralua0<K daya7 Ma,6/3/16 Mm 10/5/16 9 I Oran 5ne 1.nmt }a day, roe 6/4/26 M.9/6/16 10 1 Cnyilarlew l0 dayl Mn9/1/16 M.9/16/16 9 II I UoMle 5tte(did 10 d, Mn 9/11/16 In 10/7/26 10 Il I f0W 50e Cd•O to City 100 r' Mon 10/5/76 Mon 10/5/26 11 nej.a AritendWn 3 nrjeCl S T... 6nn'I Iti run dwa6�<da sn'oM C o 2Mo60. 0 Ir�rrgr Dot.rn 6/3/16 M f+6in6a+uY f----'—'"l wrd.6.n.r 1 Mrrswr6dy naWM ] WM.r • trrra • War Tali W.V. 93113trtml.1 ....user r 1'� ernedrr r+w f30r 1 1 ADDENDUM TO EXHIBIT D Fee Schedule Attached Behind This Page City of Routs Rock Brushy Creek East Expansion to 40 MGD EXP-ILS2 Pump Evaluation&OutfaII Modifications Prk.clpa4OA OC u.EYO En` Pr*Mr Prof Env E1r COD I Clerical Total Sue<o*iunanln, Toul Faa P.rc.nt on (Ns) tnnl (Ills) Ian) 1Bnl CAD) VW Nw.ls tea Ill Kin 011 (0) Taal F.. 2 AS 1 ar.02 Raggnq Bows R.r3w 10 65 10 1 159 t 39330 6 Alf 005 6 39564 3 1113010 23.9% Ro4ac1 Iaanagwn of al 1 Qaa5t7 Wna9emmt 10 Data Collect,..n0 Eanarq Conditions Reran 1 Taal al.me :0 .. Rats.*In...shoo S 3 BCE Ibuauls Flood 0.s.Evaluation 13 20 30 10 1 M t 21 1a0 6 11 641 1 32621 22.1% Project 1anap..nent IS 0 Quaky wn.tit Ilan IS Data C0llaoto.anal EoSar.p Co...Ravlau 10 Ma Pan Ea3ubn 10 20 II TOTAL wog Total Plummer labor Nouns 25 0 90 110 0 10 a 213 605,0 e.CO. 47.225 Total Noolam.By labor Category $ 9000 1 • $ 24300 5 24100 6 • $ 1.130 $ 1.160 3 60310 1 1`096 $ 42225 t 14a3]1 labor Calaeen P.rcant of Total labor 149% 00% 402% 40.a% 00% 3.1% 10% TOTAL EXPENSES la99 breakdown bobs) mal9ueconsonanta $ as 321 Total RaM.eulsabas t 230 TOTAL 3 149,061 ]FEE IS BASED ON A LUMP SUM AMOUNT] 1120 S.Capital of Texas Highway Austin,TX 78746 al Lochner CityView 2,Suite 100,512.338.1704 hwlochner.com ®egis SCOPE OF SERVICES Brushy Creek East Regional WWTP 40 MGD Expansion Detailed Design Amendment 3-ILS#1 and ILS#2 Influent Ragging Evaluation The Brushy Creek East Regional Wastewater Treatment Plant (Plant) is owned by the Brushy Creek Regional Wastewater System (BCRWWS), who are the Cities of Round Rock, Cedar Park, and Austin (Partners).The City of Leander will become a part owner on completion of the current expansion from 20 MGD to 30 MGD, which is currently under construction. Lochner is a subconsultant to Plummer Associates for this expansion to 30 MGD,and also for the design of the next expansion to 40 MGD.The expansion to 40 MGD is currently at the final engineering phase and is expected to be advertised for public bidding in late 2026. The purpose of this scope of services is to provide additional detailed designed services for the evaluation of mitigation measures for the ragging issues currently being experienced at ILS#1 and ILS #2.The evaluation will review existing pump equipment,wet well configuration, operating conditions, and relevant maintenance and performance history. Lochner will evaluate different options for mitigating the ragging issues, such as replacement of the existing impellers, installation of upstream grinders/choppers in addition to the submersible ILS pumps, or other potential mitigation measures. Lochner will evaluate up to two(2)viable mitigation measures.Plummer will be evaluating the feasibility of upstream screening to remove rags, and Lochner will coordinate with Plummer to develop a summary of findings and recommendations that will be provided in a Technical Memorandum. The following details Lochner's scope of services,schedule,fee, and assumptions for the Project. SCOPE OF SERVICES: 1. Project Management — This task includes routine communication and coordination with the Partners; managing manpower, budgets, and schedules; monthly invoicing and status reports; implementing and monitoring of QA/QC efforts;and other activities associated with managing the project. 2. Quality Management — Lochner will conduct Project Design Team (PDT) and Independent Technical Review Team(ITRT)QA/QC reviews for all materials to be submitted to the Partners. 3. Existing Conditions Review — Lochner will review available pump data, operations and maintenance records, and recent ragging-related maintenance events at ILS#1 and ILS#2. 4. Ragging Mitigation Evaluation— Lochner will evaluate up to two (2) options for mitigating ragging, including a review of manufacturer recommendations, compatibility with existing pumps and motors, hydraulic performance implications, and anticipated maintenance and reliability impacts. 5. Electrical Coordination — Lochner will coordinate with the electrical engineering design team to discuss impacts associated with options evaluated, including available power capacity, starter/VFD compatibility, and control logic modifications. 6. Cost Estimating — Lochner will prepare a preliminary cost estimate for up to two (2) viable options evaluated. 7. Technical Memorandum — Lochner will prepare and submit a technical memorandum consisting of a summary of the feasibility of the mitigation measures, cost estimates, and a recommendation for the Partners to evaluate. 8. Review Workshop—Lochner will attend one(1) virtual review workshop with the Partners and the design team to review the recommendations in the technical memorandum, and finalize a decision on how to proceed with ILS#1 and ILS#2 influent ragging mitigations. Amendment 3 1 June 3,2026 d2- Lochner ©egis SCHEDULE; Lochner proposes completing the project according to the following schedule, assuming a Notice to Proceed (NTP) is issued on August 3,2026: • Draft submittal to Partners—October 9'h, 2026 • Comments from Partners—October 23rd, 2026 • Final submittal to Partners— November 9th, 2026 FEE: The estimated fee for the basic services described above is a lump sum of$37,360.00. A fee breakdown by task is included herein. ASSUMPTIONS: • No design is included in this scope of services and Lochner will be performing feasibility analyses only. If the Partners elect to move forward with detailed design, additional services will be required. • Plummer will be performing an evaluation of upstream screening for the ILS#1 and ILS#2 Influent Ragging Evaluation. Lochner will coordinate with Plummer to evaluate all influent ragging mitigation measures and to provide a final recommendation to the Partners. • The Partners will provide to Lochner all available data in the Partners' possession relating to Lochner's services on the Project. Lochner will reasonably rely upon the accuracy, timeliness, and completeness of the information provided by the Partners. • The Partners will give prompt notice to Lochner whenever the Partners observes or becomes aware of any development that affects the scope or timing of Lochner's services. • The Partners shall examine information submitted by Lochner and provide written comments and decisions in a timely manner. • All governmental review fees, submittal fees, recordation fees, and other fees associated with the project shall be paid for directly by the Partners. • The project will be performed in a continuous manner without significant work stoppages or delays. • The following professional services are not included in this phase of work: Geotechnical investigations, structural engineering, electrical engineering, environmental assessments, architectural design, and subsurface utility investigations. 2 MANPOWER/BUDGET ESTIMATE-AMENDMENT 3 BRUSHY CREEK REGIONAL WASTEWATER TREATMENT FACIUTY-EAST PLANT EXPANSION TO 40 MGD Project ONOC Senior Project Senior Labor Total Task Principal Manager Engineer Engineer Engineer EIT Technicier Admin Total Cost Expenses Cost Hrs Hrs Hrs Hrs Hrs Hrs Hrs Hrs Hrs $ $ $ 1 Project Management 4 I 4 8 51.320 51,320 • 2 Ouakty Management 2 10 12 53.600 $3,600 3 Existing Conditions Review _ 2 2 4 4 12 52,480 $2,460 4 Ragging Mitigation Evaluation 10 6 _18 32 84 $12,380 $12.380 5 Electrical Coordination 2 4 4 _ 10 $1,910 $1,910 8 Cost Estimating 2 2 8 10 _ 20 83,850 $3,650 7 Technical Memorandum 6 4 12 20 42 S8,150 $8.150 8 Review Workshop 2 4 6 6 18 53.890 53.890 dotal Nnsndment 3 4 3D 10 14 • 48 78 0 4 188 S37.360 50 $37.380 Lochner a,1lS028 f im o F R ES E E Innovative approaches Practical results <NICHOLS Outstanding service 10431 Morado Circle Building 5,Suite 300 n Austin,Texas 78759 u 512-617-3100 n fax 817-735-7491 www.freese.com June 11, 2026 Plummer, Inc. 8911 N CAPITAL OF TX HWY,Suite 1250 Austin,Texas,78759 Re: Brushy Creek East Regional WWTP 40 MGD Expansion Amendment#3—ILS#2 Pump Evaluation & Outfall Modifications Dear Sheryl Chia, Freese and Nichols, Inc. (FNI) is pleased to submit this proposal to provide professional structural and electrical engineering services to Plummer Associates, Inc. (Client) in support of Amendment#3 for the Brushy Creek East Regional Wastewater Treatment Plant (BCE WWTP)40 MGD Expansion project. PROJECT UNDERSTANDING It is our understanding that Client will serve as the Prime consultant to the Brushy Creek Regional Wastewater System Partners (Owner). H.W. Lochner(Lochner)and FNI will be sub-consultants to Client on this project. FNI will provide additional design and bid phase services for electrical and structural engineering in relation to the following items: • ILS 2/ILS1 Screening Studies:The Owner has requested evaluation of options to address influent ragging issues at ILS1 and ILS2. Plummer is evaluating the installation of new course screen structures upstream from each lift station and related improvements that could potentially be implemented as part of the 40 MGD/Rehabilitation project. Lochner will be providing review of additional grinder pumps and impeller replacements. FNI will provide electrical and structural study support to assist in general feasibility,evaluating power needs,structural implications, and planning-level cost impacts associated with the additions under consideration. • 100-year Flood Risk Assessment: 100-Year flood criteria previously applicable to the site is being updated which may pose a risk to existing assets at BCE Trains 1/2 and 3.The Owner has requested a site plan exhibit and supporting summary information to better understand flood risk for existing plant structures, buildings, and select outdoor equipment relative to the 100- year flood elevation. FNI will provide electrical review of existing Train 1/2/3 equipment using available drawings and elevation information provided by the Client and/or City. Page 2 SCOPE OF SERVICES ARTICLE I-BASIC SERVICES FNI will render the following professional services in connection with the development of Amendment #3: TASK 1-PROJECT MANAGEMENT 1. Provide additional project management,quality assurance,and quality control for Structural and Electrical services. 2. Monitor and maintain scope, schedule, and budget for Structural and Electrical tasks. 3. Participate and support one(1)virtual review workshop with the Client and Owner in relation to the preliminary engineering findings. TASK 2-ILS 2/ILS1 SCREENING STUDIES 1. Provide a high-level electrical review of available site power for screening equipment proposed by Lochner and the Client to address influent ragging issues at ILS1 and ILS2. Electrical study services will be provided for one(1)equipment option set based on the Client's/Lochner's selections.Additional alternatives are not included as part of the evaluation. 2. Review of available power consumption information and identify,at a planning level, likely points from which power could be drawn for proposed screening equipment. FNI will provide high level recommendations for possible electrical work required to provide additional power. 3. Provide a structural feasibility review of up to two(2)coarse screens(one at each lift station) based on dimension requirements provided by Plummer. FNI will also review the feasibility of additional structural modifications,access improvements,or support being considered by Plummer.Large improvements or rehabilitation not explicitly mentioned such as additional structures, major demolition, or large structural modifications are not included as part of this review. 4. Support Lochner/Client in the electrical evaluation of up to two (2) pump selections as an alternative to screening. It is understood that the ultimate horsepower decision will fall within the capacity of the existing electrical system so as not to require any analysis or redesign of the existing electrical system. 5. Prepare a Class 5 OPCC for structural and electrical items being considered under this study. It is our understanding that Plummer will coordinate and compile the complete OPCC for the Owner's review. 6. Provide input to a short memorandum or report, as prepared by Plummer,summarizing structural and electrical considerations, implementation constraints, and order-of-magnitude cost implications. 7. Detailed design of screening facilities,grinder pumps, impeller replacements,structural modifications, or electrical upgrades is not included under this Task. Deliverables:Structural/Electrical OPCC input, Input to a technical memorandum or report. TASK 3-100-YEAR FLOOD RISK ASSESSMENT 1. Review current plans and available elevation information provided by the Client and/or City and assist the Client with development of a site plan exhibit depicting possible risk to select site electrical equipment relative to new 100-year flood elevation.This review will be performed using existing drawings and information provided by the Client and/or City.Surveying,field verification of elevations,hydrologic/hydraulic analysis,floodplain modeling,and floodplain permitting are not included. Page 3 2. Attend one(1) internal coordination meeting with the Client regarding the 100-year flood risk assessment. 3. Assist the Client with preparation of a summary table identifying the electrical equipment reviewed and their relative flood risk based on available elevation information. Deliverables: Electrical site plan exhibit, Equipment flood risk summary table ARTICLE II-ADDITIONAL SERVICES/EXCLUSIONS Any services performed by FNI that are not included in the Basic Services described above are Additional Services.Additional Services to be performed by FM, if authorized by Client upon negotiated fees, are described as follows: 1. Construction services such as response to RFIs, review contractor's submittals,attend pre- construction meetings, site visits, record drawings, etc.during construction. 2. Develop Civil and site work except providing electrical power distribution equipment,electrical duct banks,and light poles as needed. 3. Design of the interface between motor controllers/control panels and System Integrator supplied instrumentation,SCADA,and networking cabinets. 4. Obtain local and state permits. 5. Roadway and/or access route design to each process/structure. 6. Evaluate the existing structures. 7. Provide hard copies of the deliverable. 8. Design for other disciplines except structural and electrical. 9. Site visits except those listed in this proposal. 10. Field investigation work such as Geotechnical exploration,Geotechnical report,topographic survey and SUE. 11. Value engineering. 12. GIS mapping services or assistance with these services. 13. Making property, boundary and right-of-way surveys, preparation of easement and deed descriptions, including title search and examination of deed records. 14. Preparing applications and supporting documents for government grants, loans,or planning advances and providing data for detailed applications. 15. Providingenvironmental support pport services including the design and implementation of ecological baseline studies,environmental monitoring, impact assessment and analyses, permitting assistance,and other assistance required to address environmental issues. 16. Design services in relation to any task included herein. 17. Additional equipment selections or revisions to said selections beyond those established or identified under basic services. 18. Additional effort associated with preparing a bid/permitting package separate from the ongoing 40 MGD/Rehabilitation set of drawings and specifications. PROJECT SCHEDULE Final schedule will be determined as agreed between Plummer, Owner,and FNI.We estimate the completion of the scope will span 3 months.The following tentative schedule is proposed: • ILS1/2 Screening Study and Flood Risk Assessment Reports o Draft Submittal to Partners-September/October 2026 o Final Submittal to Partners-October/November 2026 Page 4 COMPENSATION FNI proposes to provide services as described herein for the lump sum fee of Forty-Two Thousand Nine Hundred Thirty-Two Dollars ($42,932). Task Fee BASIC SERVICES ILS 1/2 Screening Study PM $ 2,795 Structural $ 12,610 Electrical $ 16,944 100-year Flood Risk Assessment PM $ 1,274 Electrical $9,309 TOTAL FOR SERVICES $42,932 We appreciate this opportunity to submit this proposal. If additional information or clarification is desired, please do not hesitate to contact us. If you agree with the services described above and wish for us to proceed with this assignment, please initiate contract proceedings. Sincerely, FREESE AND NICHOLS,INC. Scott Hubley, PE Principal,Assistant Division Manager Project Fee Summary BCE 40 MGD/Rehab Amd 63-I1.3112 Screening&100-YR Flood Assessment Basic Services S 42.932 611212026 Special Services S Detailed Cost Breakdown Additional Services S • Total Protect S 42932 I Labor " "' . .a Pan APe sews Medal Aiwak. See Pimp esn Wide TOW ROIIa Task Description• - r" " "' W^'o iv ac i Pt ur - a ' PE Br m — BIMler • Task I.Protect Manerm.ot _ _.. • KKAOR t r __ I _- 1 Virtual Workaigp I 1 ' Manta in and rootlike Scapa. 8 2 If »Page Reports 2 _ 10 Coe 2 Tarn Memos 2 - 2 Omani 3 - 3 Teaks At IASI kneeing StudN I.-- Gathering Dina 2 ♦ 1 ♦ _.- 71 __... Tech Memo Pcodectnn(Draft awe 6 MalPttase) 6 12 1 12 21 2 37 0Pe4 _ 6 10 1 6 2 24 QC _ 1 I 6 2 9 Ykwel Werldiop II) 1 1 1 P 04Mtoe I2 pumps) 2 6 3 Hs. 10 Submit fiW Memo 3 5 3 11 Taak a-1OFTate Need 6Yk AMMONIA NNIA _-- Gathers-%Daft 6 Analysis _ 6 10 1 16 [kc[WPSWnmary TWO Production 3 5 1 9 58e(.hair(bet&rkre6 3 6 1 _ 12 Yrteel Meeting./Met II) • 1 1 2 1 17 • 2 32 6S 11''� • 13 37 4 - 2' 163