CM-2026-233 - 9/18/2026 SUPPLEMENTAL AGREEMENT NO.3
TO"CITY OF ROUND ROCK AGREEMENT FOR
PROFESSIONAL CONSULTING SERVICES RELATED TO
THE DESIGN OF THE LAWN ON BRUSHY CREEK DOWNTOWN PARK
WITH
DESIGN WORKSHOP,INC."
CITY OF ROUND ROCK §
STATE OF TEXAS § KNOW ALL BY THESE PRESENTS:
COUNTY OF TRAVIS §
COUNTY OF WILLIAMSON §
THIS SUPPLEMENTAL AGREEMENT NO. 3 to "City of Round Rock Agreement for
Professional Consulting Services related to the Design of the Lawn on Brushy Creek Downtown
Park with Design Workshop, Inc.," called "Supplemental Agreement No. 3," is made by and
between the CITY OF ROUND ROCK, TEXAS, a home-rule municipality, with offices
located at 221 East Main Street, Round Rock, Texas 78664-5299 (referred to herein as the
"City"),and DESIGN WORKSHOP,INC.,whose offices are located at 1390 Lawrence Street,
#100,Denver,Colorado 80204(referred to herein as the"Consultant").
WHEREAS,the City and Consultant previously executed the referenced"City of Round
Rock Agreement for Professional Consulting Services related to the Design of the Lawn on
Brushy Creek Downtown Park,"hereinafter called the"Agreement"on March 9,2023;and
WHEREAS, the City and Consultant subsequently executed Supplemental Agreement
No. 1 modifying the scope of services and adding additional costs in the amount of$39,000.00 to
increase total costs to$316,834.00;and
WHEREAS, the City and Consultant subsequently executed Supplemental Agreement
No. 2 modifying the scope of services related to the Flats Park Project(f/k/a "Lawn on Brushy
Creek Downtown Park Project"); adding additional costs in the amount of$1,398,000.00 related
to the Flats Park Project;adding a new scope of services for the related Town Green Project;and
adding costs for the Town Green Project in the amount of $412,000.00 for new total not to
exceed amount of$2,126,834.00 for the Agreement;and •
WHEREAS, additionally the City and Consultant desire to further modify the scope of
services for the Flats Park Project portion of the Agreement and add costs for said additional
scope of services in the amount of$52,640.00 as set forth herein;
NOW THEREFORE, in consideration of the mutual promises and obligations in the
Agreement and this Supplemental Agreement No. 3, the City and Consultant agree that said
Agreement is amended and supplemented as follows:
Crl —202(c -233
I.
Section 2.01 of the Agreement is hereby amended to read as follows:
2.0 SCOPE OF SERVICES
Consultant has issued its proposal for services for the "Flats Park Project" and "Town
Green Park Project" for the tasks delineated therein, such proposal for services being attached to
this Agreement as Exhibit "A" titled "Scope of Services" and the Addendum to Exhibit "A,"
attached hereto and incorporated herein by reference for all purposes, modifying the "Scope of
Services,"which shall be referred to as the Scope of Services of this Agreement and incorporated
herein by reference for all purposes.
Consultant shall satisfactorily provide all services described herein and as set forth in
Exhibit "A" and the Addendum to Exhibit "A," pursuant to a schedule agreed upon by City.
Consultant shall perform services in accordance with this Agreement, in accordance with the
appended Scope of Services and in accordance with due care and prevailing consulting industry
standards for comparable services.
II.
Section 3.01 of the Agreement is hereby amended to read as follows:
3.0 LIMITATION TO SCOPE OF SERVICES
Consultant's undertaking shall be limited to performing services for City and/or advising
City concerning those matters on which Consultant has been specifically engaged. Consultant
and City agree that the Scope of Services to be performed is enumerated in Exhibit"A" and the
Addendum to Exhibit"A," attached hereto and incorporated herein by reference, and may only
be modified by a written Supplemental Agreement executed by both parties as described in
Section 9.0.
III.
Section 4.01 of the Agreement is hereby amended to read as follows:
4.0 CONTRACT AMOUNT
A. Flats Park Project. In consideration for the professional consulting services to be
performed by Consultant, City agrees to pay Consultant an amount not to exceed One Million
Seven Hundred Sixty-Seven Thousand Four Hundred Seventy-Four and No/100 Dollars
($1.767,474.00)as set forth in Exhibit"A"and the attached Addendum to Exhibit"A."
Reimbursable expenses shall not exceed Thirty Thousand and No/100 Dollars
($30,000.00) and are included in the total not-to-exceed amount of$1,767,474.00 for the Flats
Park Project.
2
B. Town Green Park Project. In consideration for the professional consulting
services to be performed by Consultant, City agrees to pay Consultant an amount not to exceed
Four Hundred and No/100 Dollars ($400,000.00) as set forth in Exhibit "A" and the attached
Addendum to Exhibit"A."
Reimbursable expenses shall not exceed Twelve Thousand and No/100 Dollars
($12,000.00)and are included in the total not-to-exceed amount of$412,000.00 for the Lawn on
Brushy Creek Downtown Project.
C. The total amount of costs set forth in the Agreement for the Flats Park Project and
the Town Green Park Project collectively shall not exceed$2,179A74.00.
IV.
This Supplemental Agreement No.3 shall amend the original Agreement only as set forth
herein with no other changes in terms or conditions of the original Agreement.
IN WITNESS WHEREOF, the City and Consultant have executed this Supplemental
Agreement No. 3 to be effective as of the last date of due execution by both parties.
CITY OF ROUND ROCK,TEXAS DESIGN WORKSHOP,INC.
Gn�uc ( ND
By: n,,,,„" ,� By:
Printed Name: '�j ee I/IJi7T Printed Name:
Title: G + J g Title: Vifthitith't
Date Signed: /q 1181 i24, Date Signed: 67122../
ATTEST:
By: I
Ann F'r in,City Clerk
FOR CITY, APPROVED AS TO FORM:
By: " _
Stephanie L. Sandre,City Attorney
3
Design Workshop,Inc.
Landscape Architecture Addendum to Exhibit "A"
Planning
Urban Design
Strategic Services
812 San Antonio Street June 23.2026
Suite 401
Austin,Texas 78701
512.499.0222 Katie Baker
512.499.0229 fax Parks Development Manager
designworkshop corn 221 E.Main Street,Ste 221
Round Rock,Texas 78664
RE:Additional Services 03
City of Round Rock the Flats(formerly Lawn on Brushy)-Additional Model Runs and Elevated
Boardwalk Structural Services
Dear Katie:
Design Workshop respectfully requests authorization for additional civil engineering and structural
engineering services associated with the relocation and redesign of the pedestrian bridge within The
Flats project.
During the initial design phase,the pedestrian bridge and boardwalk were proposed at the eastern
portion of Veterans Park,with supporting park improvements coordinated around that location.The
original concept included a 330 ft bridge connection to the Heritage Trail on the north side of Brushy
Creek and a south-side connection utilizing an elevated embankment and sidewalk system.
IP
1
411p 41.
1)1
Bridge location shown in Project Book
DESIGNWORKSHOP
Design Workshop,Inc.
Addendum to Exhibit "A"
During the March 28,2025,project meeting,the city requested that the pedestrian bridge be relocated
west of Veterans Park onto the newly acquired Ruby Tract to preserve the existing parking lot and
basketball court and maintain the original bridge span as close to the original length as possible.The
design team identified a new bridge landing location to keep the overall bridge length and user
experience as consistent as possible with the original design.
ROUND ROCK LAWN ON BRUSHY
Overall Plan
p1
1 --__ ___ Trad bas81ng } ( Ai
II
1 -•
j
4 1
.1- 1
1 l
.J 1 1
1Original
1
It ; Bridge
Bridge j Alignment s""hyGe°I` 1
1 1
1 1
1
1
1 •' `. etcrenft `
i F. Perk
�\ Ems- i ______
W_ _.��— __-
\E 1 -- 8 spaces vuiud'q.
; o'.. 3 ADA
Elevated %1\ • ADA Roodplain(Typ)I
Boardwalk: \ 1
t I
\ 1
\ \
\ \
\ \ i
\ 1
\ .' \ Et) 77= 77
\- - NORTH d 40 80' ISO'
•
Schematic Design Presentation,July 18,2025
The revised bridge alignment altered bridge geometry,support locations,floodplain interactions,and
adjacent site improvements,As a result,additional hydraulic modeling was required beyond the
original scope of services to evaluate floodplain impacts,develop mitigation measures,and verify
compliance with no-rise floodplain requirements.
2
Design Workshop,Inc.
Addendum to Exhibit "A"
The relocation also constrained the southern bridge landing area,making the originally proposed
embankment sidewalk connection infeasible.After evaluating alternative solutions and identifying site
constraints,the design team determined that an elevated boardwalk would best accommodate the
revised bridge alignment while maintaining accessible pedestrian connections between Lewis Street,
Veterans Park,and the future pedestrian bridge.The elevated boardwalk also aligned with the City's
vision for the project by creating an enhanced visual feature and focal point when viewed from the
Ruby Hotel and surrounding public spaces.
Ruby Tract in image below is shown in blue.
CityView
M1
•
tit•
Ruby Ho eI
future Outdo.
Venue I.. • a.
Exists
1 Rulb�yr deten ion
" Hotel • +i ►• d
sg + , x � .! t
—
Meeting dated April 14,2025
The bridge relocation resulted in the need for a custom elevated boardwalk structure rather than the
originally planned embankment sidewalk connection.Due to the boardwalk's unique geometry,
structural loading requirements,and integration with the bridge and surrounding site improvements,
dedicated structural engineering services were required to design,document,coordinate,and support
construction of the improvement.This structure was not included in the original structural engineering
scope of services.
3
Design Workshop,Inc.
Addendum to Exhibit "A"
The following additional services were performed in response to these project modifications,
Task 1:Task G:Hydraulic Impact Analysis and CLOMR
The original scope included two hydraulic model runs.Revisions to the bridge alignment and
associated site improvements required additional modeling and floodplain analysis beyond the
original scope to evaluate project impacts and achieve a no-rise condition.
Scope of Services
1. Perform additional hydraulic and floodplain modeling associated with revised bridge and site
designs.
2. Evaluate floodplain impacts resulting from bridge alignment,bent location,and site
improvement modifications.
3. Develop and evaluate mitigation concepts to eliminate adverse floodplain impacts.
4. Update hydraulic models and supporting calculations through Schematic Design and Design
Development phases.
5. Support CLOMR-related documentation and coordination.
Services Provided
Freese and Nichols completed four additional hydraulic model runs beyond the original scope of
services.These efforts included evaluation of revised bridge configurations,re-analysis of floodplain
impacts associated with modifications at Veterans Park and the McConico Tract,development of
mitigation alternatives,and preparation of updated modeling necessary to achieve a no-rise condition
within the Brushy Creek floodplain.The additional modeling and coordination exceeded the original
assumptions contained within Task G and were required to support the City's revised bridge
configuration and associated park improvements.
Task 2:Elevated Boardwalk Structural Services.
The elevated boardwalk connection required because of the bridge relocation was not included in the
original structural engineering scope of services and therefore required additional structural
engineering design and construction administration services.
Scope of Services
1. Coordinate with the design team regarding boardwalk layout,geometry,and structural
requirements.
2. Prepare structural analysis and design of the elevated boardwalk structure.
3. Prepare structural construction drawings and details.
4. Review shop drawings,product submittals,and testing reports.
5, Respond to contractor requests for information and field clarifications.
6. Prepare supplemental sketches as required during construction.
7, Perform site observations during construction,
4
Design Workshop,Inc.
Addendum to Exhibit "A"
Services Provided
PKA provided structural engineering services for the elevated boardwalk structure located at the
south end of the pedestrian bridge.Services included design coordination,structural analysis and
design,preparation of structural construction documents,review of contractor submittals,responses
to field questions,issuance of supplemental sketches,and construction-phase support including five
site visits.
These services were required solely because of the bridge relocation and resulting boardwalk
improvements and were not included in the original structural engineering agreement.
The following is a summary of the fees associated with this effort:
Task G: Hydraulic Impact Analysis+CLOMR $25,760.00
Elevated Boardwalk Structural Services $26,880.00
Total Additional Services Request $52,640.00
Design Workshop respectfully requests written authorization for the additional services described
above,
This proposal is based on the terms and conditions of the prime agreement between the City of
Round Rock and Design Workshop,Inc.dated February 8,2024.
Sincerely,
DESIGN WOR OP, INC,
Conners Ladner
Principal
APPROVED BY CLIENT:
By: Date:
Title:
5