Loading...
CM-2026-233 - 9/18/2026 SUPPLEMENTAL AGREEMENT NO.3 TO"CITY OF ROUND ROCK AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES RELATED TO THE DESIGN OF THE LAWN ON BRUSHY CREEK DOWNTOWN PARK WITH DESIGN WORKSHOP,INC." CITY OF ROUND ROCK § STATE OF TEXAS § KNOW ALL BY THESE PRESENTS: COUNTY OF TRAVIS § COUNTY OF WILLIAMSON § THIS SUPPLEMENTAL AGREEMENT NO. 3 to "City of Round Rock Agreement for Professional Consulting Services related to the Design of the Lawn on Brushy Creek Downtown Park with Design Workshop, Inc.," called "Supplemental Agreement No. 3," is made by and between the CITY OF ROUND ROCK, TEXAS, a home-rule municipality, with offices located at 221 East Main Street, Round Rock, Texas 78664-5299 (referred to herein as the "City"),and DESIGN WORKSHOP,INC.,whose offices are located at 1390 Lawrence Street, #100,Denver,Colorado 80204(referred to herein as the"Consultant"). WHEREAS,the City and Consultant previously executed the referenced"City of Round Rock Agreement for Professional Consulting Services related to the Design of the Lawn on Brushy Creek Downtown Park,"hereinafter called the"Agreement"on March 9,2023;and WHEREAS, the City and Consultant subsequently executed Supplemental Agreement No. 1 modifying the scope of services and adding additional costs in the amount of$39,000.00 to increase total costs to$316,834.00;and WHEREAS, the City and Consultant subsequently executed Supplemental Agreement No. 2 modifying the scope of services related to the Flats Park Project(f/k/a "Lawn on Brushy Creek Downtown Park Project"); adding additional costs in the amount of$1,398,000.00 related to the Flats Park Project;adding a new scope of services for the related Town Green Project;and adding costs for the Town Green Project in the amount of $412,000.00 for new total not to exceed amount of$2,126,834.00 for the Agreement;and • WHEREAS, additionally the City and Consultant desire to further modify the scope of services for the Flats Park Project portion of the Agreement and add costs for said additional scope of services in the amount of$52,640.00 as set forth herein; NOW THEREFORE, in consideration of the mutual promises and obligations in the Agreement and this Supplemental Agreement No. 3, the City and Consultant agree that said Agreement is amended and supplemented as follows: Crl —202(c -233 I. Section 2.01 of the Agreement is hereby amended to read as follows: 2.0 SCOPE OF SERVICES Consultant has issued its proposal for services for the "Flats Park Project" and "Town Green Park Project" for the tasks delineated therein, such proposal for services being attached to this Agreement as Exhibit "A" titled "Scope of Services" and the Addendum to Exhibit "A," attached hereto and incorporated herein by reference for all purposes, modifying the "Scope of Services,"which shall be referred to as the Scope of Services of this Agreement and incorporated herein by reference for all purposes. Consultant shall satisfactorily provide all services described herein and as set forth in Exhibit "A" and the Addendum to Exhibit "A," pursuant to a schedule agreed upon by City. Consultant shall perform services in accordance with this Agreement, in accordance with the appended Scope of Services and in accordance with due care and prevailing consulting industry standards for comparable services. II. Section 3.01 of the Agreement is hereby amended to read as follows: 3.0 LIMITATION TO SCOPE OF SERVICES Consultant's undertaking shall be limited to performing services for City and/or advising City concerning those matters on which Consultant has been specifically engaged. Consultant and City agree that the Scope of Services to be performed is enumerated in Exhibit"A" and the Addendum to Exhibit"A," attached hereto and incorporated herein by reference, and may only be modified by a written Supplemental Agreement executed by both parties as described in Section 9.0. III. Section 4.01 of the Agreement is hereby amended to read as follows: 4.0 CONTRACT AMOUNT A. Flats Park Project. In consideration for the professional consulting services to be performed by Consultant, City agrees to pay Consultant an amount not to exceed One Million Seven Hundred Sixty-Seven Thousand Four Hundred Seventy-Four and No/100 Dollars ($1.767,474.00)as set forth in Exhibit"A"and the attached Addendum to Exhibit"A." Reimbursable expenses shall not exceed Thirty Thousand and No/100 Dollars ($30,000.00) and are included in the total not-to-exceed amount of$1,767,474.00 for the Flats Park Project. 2 B. Town Green Park Project. In consideration for the professional consulting services to be performed by Consultant, City agrees to pay Consultant an amount not to exceed Four Hundred and No/100 Dollars ($400,000.00) as set forth in Exhibit "A" and the attached Addendum to Exhibit"A." Reimbursable expenses shall not exceed Twelve Thousand and No/100 Dollars ($12,000.00)and are included in the total not-to-exceed amount of$412,000.00 for the Lawn on Brushy Creek Downtown Project. C. The total amount of costs set forth in the Agreement for the Flats Park Project and the Town Green Park Project collectively shall not exceed$2,179A74.00. IV. This Supplemental Agreement No.3 shall amend the original Agreement only as set forth herein with no other changes in terms or conditions of the original Agreement. IN WITNESS WHEREOF, the City and Consultant have executed this Supplemental Agreement No. 3 to be effective as of the last date of due execution by both parties. CITY OF ROUND ROCK,TEXAS DESIGN WORKSHOP,INC. Gn�uc ( ND By: n,,,,„" ,� By: Printed Name: '�j ee I/IJi7T Printed Name: Title: G + J g Title: Vifthitith't Date Signed: /q 1181 i24, Date Signed: 67122../ ATTEST: By: I Ann F'r in,City Clerk FOR CITY, APPROVED AS TO FORM: By: " _ Stephanie L. Sandre,City Attorney 3 Design Workshop,Inc. Landscape Architecture Addendum to Exhibit "A" Planning Urban Design Strategic Services 812 San Antonio Street June 23.2026 Suite 401 Austin,Texas 78701 512.499.0222 Katie Baker 512.499.0229 fax Parks Development Manager designworkshop corn 221 E.Main Street,Ste 221 Round Rock,Texas 78664 RE:Additional Services 03 City of Round Rock the Flats(formerly Lawn on Brushy)-Additional Model Runs and Elevated Boardwalk Structural Services Dear Katie: Design Workshop respectfully requests authorization for additional civil engineering and structural engineering services associated with the relocation and redesign of the pedestrian bridge within The Flats project. During the initial design phase,the pedestrian bridge and boardwalk were proposed at the eastern portion of Veterans Park,with supporting park improvements coordinated around that location.The original concept included a 330 ft bridge connection to the Heritage Trail on the north side of Brushy Creek and a south-side connection utilizing an elevated embankment and sidewalk system. IP 1 411p 41. 1)1 Bridge location shown in Project Book DESIGNWORKSHOP Design Workshop,Inc. Addendum to Exhibit "A" During the March 28,2025,project meeting,the city requested that the pedestrian bridge be relocated west of Veterans Park onto the newly acquired Ruby Tract to preserve the existing parking lot and basketball court and maintain the original bridge span as close to the original length as possible.The design team identified a new bridge landing location to keep the overall bridge length and user experience as consistent as possible with the original design. ROUND ROCK LAWN ON BRUSHY Overall Plan p1 1 --__ ___ Trad bas81ng } ( Ai II 1 -• j 4 1 .1- 1 1 l .J 1 1 1Original 1 It ; Bridge Bridge j Alignment s""hyGe°I` 1 1 1 1 1 1 1 1 •' `. etcrenft ` i F. Perk �\ Ems- i ______ W_ _.��— __- \E 1 -- 8 spaces vuiud'q. ; o'.. 3 ADA Elevated %1\ • ADA Roodplain(Typ)I Boardwalk: \ 1 t I \ 1 \ \ \ \ \ \ i \ 1 \ .' \ Et) 77= 77 \- - NORTH d 40 80' ISO' • Schematic Design Presentation,July 18,2025 The revised bridge alignment altered bridge geometry,support locations,floodplain interactions,and adjacent site improvements,As a result,additional hydraulic modeling was required beyond the original scope of services to evaluate floodplain impacts,develop mitigation measures,and verify compliance with no-rise floodplain requirements. 2 Design Workshop,Inc. Addendum to Exhibit "A" The relocation also constrained the southern bridge landing area,making the originally proposed embankment sidewalk connection infeasible.After evaluating alternative solutions and identifying site constraints,the design team determined that an elevated boardwalk would best accommodate the revised bridge alignment while maintaining accessible pedestrian connections between Lewis Street, Veterans Park,and the future pedestrian bridge.The elevated boardwalk also aligned with the City's vision for the project by creating an enhanced visual feature and focal point when viewed from the Ruby Hotel and surrounding public spaces. Ruby Tract in image below is shown in blue. CityView M1 • tit• Ruby Ho eI future Outdo. Venue I.. • a. Exists 1 Rulb�yr deten ion " Hotel • +i ►• d sg + , x � .! t — Meeting dated April 14,2025 The bridge relocation resulted in the need for a custom elevated boardwalk structure rather than the originally planned embankment sidewalk connection.Due to the boardwalk's unique geometry, structural loading requirements,and integration with the bridge and surrounding site improvements, dedicated structural engineering services were required to design,document,coordinate,and support construction of the improvement.This structure was not included in the original structural engineering scope of services. 3 Design Workshop,Inc. Addendum to Exhibit "A" The following additional services were performed in response to these project modifications, Task 1:Task G:Hydraulic Impact Analysis and CLOMR The original scope included two hydraulic model runs.Revisions to the bridge alignment and associated site improvements required additional modeling and floodplain analysis beyond the original scope to evaluate project impacts and achieve a no-rise condition. Scope of Services 1. Perform additional hydraulic and floodplain modeling associated with revised bridge and site designs. 2. Evaluate floodplain impacts resulting from bridge alignment,bent location,and site improvement modifications. 3. Develop and evaluate mitigation concepts to eliminate adverse floodplain impacts. 4. Update hydraulic models and supporting calculations through Schematic Design and Design Development phases. 5. Support CLOMR-related documentation and coordination. Services Provided Freese and Nichols completed four additional hydraulic model runs beyond the original scope of services.These efforts included evaluation of revised bridge configurations,re-analysis of floodplain impacts associated with modifications at Veterans Park and the McConico Tract,development of mitigation alternatives,and preparation of updated modeling necessary to achieve a no-rise condition within the Brushy Creek floodplain.The additional modeling and coordination exceeded the original assumptions contained within Task G and were required to support the City's revised bridge configuration and associated park improvements. Task 2:Elevated Boardwalk Structural Services. The elevated boardwalk connection required because of the bridge relocation was not included in the original structural engineering scope of services and therefore required additional structural engineering design and construction administration services. Scope of Services 1. Coordinate with the design team regarding boardwalk layout,geometry,and structural requirements. 2. Prepare structural analysis and design of the elevated boardwalk structure. 3. Prepare structural construction drawings and details. 4. Review shop drawings,product submittals,and testing reports. 5, Respond to contractor requests for information and field clarifications. 6. Prepare supplemental sketches as required during construction. 7, Perform site observations during construction, 4 Design Workshop,Inc. Addendum to Exhibit "A" Services Provided PKA provided structural engineering services for the elevated boardwalk structure located at the south end of the pedestrian bridge.Services included design coordination,structural analysis and design,preparation of structural construction documents,review of contractor submittals,responses to field questions,issuance of supplemental sketches,and construction-phase support including five site visits. These services were required solely because of the bridge relocation and resulting boardwalk improvements and were not included in the original structural engineering agreement. The following is a summary of the fees associated with this effort: Task G: Hydraulic Impact Analysis+CLOMR $25,760.00 Elevated Boardwalk Structural Services $26,880.00 Total Additional Services Request $52,640.00 Design Workshop respectfully requests written authorization for the additional services described above, This proposal is based on the terms and conditions of the prime agreement between the City of Round Rock and Design Workshop,Inc.dated February 8,2024. Sincerely, DESIGN WOR OP, INC, Conners Ladner Principal APPROVED BY CLIENT: By: Date: Title: 5