R-2026-245 - 9/24/2026 RESOLUTION NO. R-2026-245
WHEREAS, the City of Round Rock ("City") entered into a contract on December 21, 2023
with SpawGlass Contractors, Inc., entitled "Standard Form of Agreement Between Owner and
Construction Manager as Constructor where the basis of payment is the Cost of Work Plus a Fee with a
Guaranteed Maximum Price" ("Agreement"), and such contract is for the Old Settlers Park Buildout
Project(Lakeview); and
WHEREAS,the Council has determined that it is necessary to make adjustments/changes to the
quantity of work to be performed or materials, equipment, or supplies to be provided; and
WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said
Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City,Change Order
No. 1 to the Agreement with SpawGlass Contractors, Inc. for the Old Settlers Park Buildout Project
(Lakeview), a copy of said change order being attached hereto as Exhibit "A" and incorporated herein
for all purposes.
The City Council hereby finds and declares that written notice of the date,hour,place and subject
of the meeting at which this Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and the subject matter hereof were
discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,
Texas Government Code, as amended.
RESOLVED this 24th day of September, 2026.
0112.20262
CRAIG MORGAN, Mayo
City of Round Rock, Texas
ATTEST:
Cit410,1" Aditi/O
ANN FRANKLIN, City Clerk
2
EXHIBIT
A
! AIA Document G701 2017
Change Order
PROJECT:(Mane and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION:
CoRR-Old Settler's Park Contract For Lakevics Chang:Order Numbct 001
3300 E.Palm Valley Blvd Date:03 03 2026 Date 03-03 2026
Round Rock.TX 78665
OWNER:(Name and address) ARCHITECT:'Nana•end.,drlress) CONTRACTOR:(Name and address)
City of Round Rock Waeltz&Prete.Inc SpaveGlass Contractors.Inc
221 East Main Street 211 N A W Games Blvd 1 111 Smith Road
Round Rock,TX 78664 Round Rock,TX 78665 Austin,TX 78721
THE CONTRACT IS CHANGED AS FOLLOWS:
(Insert a detailed description oldie change and of applrabk attach or re%•cnec speech exhibits Also include agreed upon
adjustments attrih,dahle to executed Construction Change Drrectn es)
This change order includes the Change Order Requests 030,073,and 076 for the Lakeview Package
COR 030 Playground Grading Revisions
COR 073—RFI 140—Pavilion Ramp Landings Steel Modifications
COR 076—Yonder's Point Electrical Pedestal Relocations
The original Contract Sum was S 13,494,260.00
The net change by previously authorized Change Orders $ 0.00
The Contract Sum prior to this Change Order was S 13,494,260.00
The Contract Sum will be increased by this Change Order in the amount of S 92,486.00
The new Contract Sum including this Change Order will be S 13,586,746.00
The Contract Time will be increased by Twenty-Four(24)days
The new date of Substantial Completion will be 10-30-2025
NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Puce,or the Contract Time,
that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor,in which case a Change Order is executed to supersede the Constraction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
AR S HI Cr aig er CONTRAC r aturel OWNER(Signature)
0/44
7 S; Tjlw eel — P X
EN IN�
/Printed none,title,and /Printed name and title) (Printed name and title)
license number if retinas eV)
4-4.13 Z(o 1
Date Darr Darr
AIA Document G701-201 r Copyright 32 1979 196/ 2000.2001 and 2017 A7 nghts reserved. The American Institute of AsMirects,"Ameicai Institute tit
Architects,' AIA.'the AIA Logo,and'AIA Contrac:Doc.ments'are trademarks of The American institute of Architects Th s document wee produced at 16:45.09
COT on 06/1'/2026 under Subscription No 20250142682 wfac,expires on 0/r06 2026.is not for resale.is licensed for one-I me use only,aid may only be used
rn accordan_a with the AlA Contract Documents"Terms of Service To report copyr grit violations c mail docrnfo@aiecontrads.com
User Notes: (iazae4aedeUa2e4604322dc41
SpaMiliiss
CONTRACT CHANGE ORDER
Project Name: CoRR -OSP Buildout Lakeview Date: 2025-05-23
Owner: City of Round Rock Change Order No.: OCO 0001
2008 Enterprise, Contractor Project No.: 3023148 01
Round Rock,TX 78664 Architect Project No.:
Quote No. Change Order Description Amount
CCD-0030 COR 030 -AS!003 - Playground Grading and Seat Wall Revisions $0.00
Notes: This change order extends the overall completion date for the Lakeview Package based on the delay incurred due to grading
and seat wall revisions for the Playground areas.
Extension of Time This Change Order: 24 Working Days Original Contract Amount$13,494,260.00
Previous Extension of Time: 0 Total Previous Change Orders$0.00
Total Extension of Time to Date: 24 Working Days Contract Amt. Prior to this C.O.$13,494,260.00
Original Contract Substantial Completion: 2025-9-26 Total This Change Order$0.00
Revision Substantial Completion: 2025-10-30 Current Contract Amount$13,494,260.00
OWNER ARCHITECT CONTRACTOR
By: By: By:
Date: Date: Date:
The Contractor hereby reserves its right to claim additional time and/or monies for the cumulative impact of project changes
Spiiti1't;Liss
CONTRACT CHANGE ORDER
Project Name: CoRR - OSP Bui dout Lakeview Date: 2026 02 24
Owner: City of Round Rock Change Order No.: OCO-0002
2008 Enterprise, Contractor Project No.: 3023148.01
Round Rock, TX 78664 Architect Project No.:
Quote No. Change Order Description Amount
CCD-0073 COR 073 RFI 140 - Pavilion Ramp Land ngs Steel Modifications $73,254.00
CCD-0076 COR 076 - Yonder s Point Electrical Pedestal Relocations $19,232.00
Notes:
Extension of Time This Change Order 0 Original Contract Amount $13,494,260.00
Previous Extension of Time 0 Total Previous Change Orders$0.00
Total Extension of Time to Date Contract Amt. Prior to this C.O. $13,494,260.00
Original Contract Completion Date: 2025-10-30 Total This Change Order$92,486.00
Revision Completion Date: 2025-10-30 Current Contract Amount$13,586,746.00
OWNER ARCHITECT CONTRACTOR
By: By: By:Date: Date: Date:
The Contractor hereby reserves its right to claim additional time and/or monies for the cumulative impact of project changes
10/9/25.9.45 AM Mail-Parker Blaschke-Outlook
al Outlook
RE: CoRR OSP - Lakeview - Outstanding Change Orders from Outside GMP
From Gina Cordeiro <gcordeiro@roundrocktexas gov>
Date Thu 10/9/2025 9 39 AM
To Parker Blaschke <Parker.Blaschke@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Katie
Baker <kbaker@roundrocktexas.gov>
Cc Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Harrison Holley <Harry.Holley@SpawGlass.com>; Cullen
Schoener <Cullen.Schoener@SpawGlass.com>
Both are approved.
Thanks
Gina Cordeiro
Project Manager Building Construction
City of Round Rock I General Services
Building Construction & Property Maintenance
212 Commerce Blvd. I Round Rock, TX 78664
■ 512.218.5473
Cell 512.608.2762
Fax 512.218.5576
gcoroeirQin%roundrocktexas.gov
ROUND ROCK TEXAS
From:Parker Blaschke<Parker.Blaschke@SpawGtass corn>
Sent:Thursday, October 9,2025 9:22 AM
To:Gina Cordeiro<gcordeiro@roundrocktexas.gov>; Richard Wil' <richardwill@roundrocktexas.gov>; Katie Baker
<kbaker@roundrocktexas gov>
Cc: Tyler Wenzel<Tyler.Wenzel@SpawGlass corm.; Harrison Holley<Harry Holley@SpawGlass.com>; Cullen
Schoener<Cullen.Schoener@SpawGlass.com>
Subject:CoRR OSP Lakeview- Outstanding Change Orders from Outside GMP
Gina,
Following up on our conversation, attached are the emails for both COR 073 - Pavilion Ramp
Modifications and COR 076 - Yonder's Electrical Pedestal Relocations that are shown to be
funded from outside of the GMP. We discussed COR 073 at the OAC this week and I reached
https://outlook office comlmadrinbox/d AAkALgAAAAAAHYODEaprnL. 2byACgAC%2FEWg0AxReKW7917UG%28O6doMxN7aAAE%2BF7rJgAA?nat 1 2
10/1405 8 47 AM RE CoRR OSP-Lakeview-COR 030-ASI 03 Playground Gracing and Seat Wall Rev sions-Ryan Janssen-Outlook
Outlook
RE: CoRR OSP - Lakeview - COR 030 - ASI 03 Playground Grading and Seat Wall Revisions
From Katie Baker <kbaker@roundrocktexas.gov>
Date Fri 5/23/2025 1.58 PM
To Parker Blaschke <Parker.Blaschke@SpawGlass.com>; Gina Cordeiro <gcordeiro@roundrocktexas.gov>
Cc Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>;
Harrison Holley <Harry Holley@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>;Joseph
Witherspoon <J.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>;Antonio
Prete <tony@w pmc corn>
about blank?windowld=SecondaryReadingPane3 1 4
10/14/25 8 47 AM RE CoRR OSP-Lakeview COR 030-ASI 03 Playground Grading and Seat Wall Revisions•Ryan Janssen-Outlook
Looks good, Parker—
Thanks for working to get this pricing finalized.
Thanks,
Katie
From: Parker Blaschke<Parker.Blaschke@SpawGlass.com>
Sent: Friday, May 23, 2025 1:54 PM
To: Katie Baker<kbaker@roundrocktexas.gov>; Gina Cordeiro
<gcordeiro@roundrocktexas.gov>
Cc:Joseph Hudson<jhudson@roundrocktexas.gov>;Cullen Schoener
<Cullen.Schoener@SpawGlass.com>;Harrison Holley<Harry.Holley@SpawGlass.com>;Tyler
Wenzel<Tyler.Wenzel@SpawGlass.com>;Joseph Witherspoon
<J.Witherspoon@SpawGlass.com>; Richard Will<richardwill@roundrocktexas.gov>;Antonio
Prete<tony@w-pinc.com>
Subject: RE: CoRR OSP- Lakeview COR 030 ASI 03 Playground Grading and Seat Wall
Revisions
Team,
Following up on this initial COR 030. Please see the attached revised COR 030 -
Revision 1 per the exhibit provided on 5/19. As shown, this change is proposed to
be funded solely from Owner's Contingency. Please let me know if you have any
questions or comments regarding this revised pricing. Based on the email direction
below, we'll be proceeding with this change order as submitted.
Thanks!
Parker Blaschke
Senior Project Manager/Employee Owner
SpawGlass
o. 512-719-5251
c. 512-552-9988
Spa wGlass.com
SpawGlass PrCowuitiuriru rtrhoer A Gvtree rBcrPr t oft(
per
root-
Spau'Glass Builds...Comm rarities
about blank?windowld=SecondaryReadingPane3 1
10/14/25,8 47 AM RE CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen Outlook
From: Katie Baker<kbakerProundrocktexas.gov>
Sent:Monday, May 19,2025 4:05 PM
To: Parker Blaschke<Parise-aid,chkeilk5pawGlass corn>, Gina Cordeiro
<gcordeiroPio,indrocktexas got>
Cc:Joseph Hudson<lhudsonProundr2cktexas gQy>;Cullen Schoener
<Cullen.Schoenerj pawGlass.corn>;Harrison Holley<Harry.Holley@SpawGlass.com>;Tyler
Wenzel<Tyler.Wenze alpawGlass,,;, >;Joseph Witherspoon
<J.Wrtherspqo0,5paw5lass.corr>;Richard Will <richardwll�roundrocktexas.gov>; Antonio
Prete<tony_@w prnc.com>
Subject:RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall
Revisions
Parker—
See attached wall markup. This shows the limits of wall and size / material of
each wall. This should bring the number down some based on what was
priced below. Assuming SpawGlass agrees in principle that this should bring
the price down (decreasing the amount of wall, the width of wall in place, and
overall extent of masonry) or at least not exceed the pricing below— please
proceed with these changes as shown while the pricing is finalized.
Like I mentioned today in our meeting, Tony says there should not be any
issues grading the areas out in the areas the walls were removed.
Please let me know if you have any questions.
Thanks,
Katie Baker, PLA, CPRP
Park Development Manager
City of Round Rock Parks and Recreation
(0)512.341.3355
From: Parker Blaschke<Parker.Blaschke( pawGlass.com>
Sent: Friday, May 16, 2025 4:15 PM
To:Gina Cordeiro<gcordeiroProundrocktexas.gov>
Cc:Joseph Hudson<ihudsonProundrocktexas,ggy>;Cullen Schoener
<Cullen.SchoenerCthSpawGlass.com>; Harrison Holley<Harr,y.Hol eyJ. pawGlass.com>;Tyler
Wenzel<Tyler.Wenzel tiL$pawGiass.c.,rn>; Katie Baker<kbakerPa rQundrocktexakgov>;Joseph
Witherspoon<1.WitherspoonfE5pawGlass.com>; Richard Will
<ri hara.sillproundrocktexas.gov>;Antonio Prete<tonyPa w-pinc.Com>
Subject:CoRR OSP Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions
Gina,
about.blank?windowld=SecondaryReadingPane3 3 4
10/14/25,8 47 AM RE CoRR OSP•Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook
Please see the attached COR 030 for the Lakeview Package and formal Schedule
Delay Notice regarding the ASI 003 Playground Grading and Seat Wall
Revisions. As noted in the letter, we have an ncurred a delay to the overall
project schedule based on the revised drawings. Per the schedule included in the
letter attached, the revised Substantial Completion Late-Finish date for the
Lakeview Package is now 10/30/2025. Please let me know if you have any
questions regarding the current pricing or the schedule delay. Please note, per the
revised schedule, we need written approval on this pricing by 5/23/2025 in order
to maintain the revised schedule submitted.
Please feel free to give me a call if you have any questions!
Thanks,
Parker Blaschke
Senior Project Manager/Employee Owner
SpawGlass
o. 512-719-5251
c. 512-552-9988
4 kl\1't.r�iltis ProntdrrtR the ALiolutrBest g.
1 Coastructrarr E:��rerrerur .Gso�
1.4
SpatvGlass Builds..Comm unities
abouttlank7windowid=SecondaryReadingPane3 4,4
10/9/25,9:45 AM Mail-Parker Blaschke-Outlook
out to Katie about COR 076 this morning. Please let me know if you can provide written
direction on both of these CORs and well get started with the electrical work based on that
approval. Our understanding is that these will be funded via Owner Change Order to the
Lakeview contract or a future GMP package. Please let me know if you need any additional
information from SpawGlass.
Thanks,
Parker Blaschke
Senior Project Manager/Employee Owner
SpawGlass
o. 512-719-5251
c. 512-552-9988
apawGlass.com
I ;i v(�lacs J'rovirJing rl eilbsolru H
Constrr! 0,n Faprinrec-eest woe
SpawGGus Builds...Communities
https_lloutlook.office.com/maillinbox/id/AMALgAAAAAAHYQOEapmEc2byACgAC%2FEWg0AxReKW79i7UG%2006dOMxNTaAAE%2BF7rJgAA?nat 2:7
CHANGE OOGM/COST LOG .,,,,...
...w..r� r..:.,,aa .:- a;>�•a�n.Laa...=a,.•.• -r.'.•r r ..a'._.,n:..._w.�.
-SAY - I ,
••1r .a. .a••.
alai.ar•aa••.a a .ate•.. _ ,
Mafia
elf..•a••..•r.w *Ma -
R lL•I•••Irr.r.l.... W.W.
•r. .a. •
.•r a...rr••..•air. • a•a .
•a.aa..•.•r rru.w... I .
•a.E :l.•a,.r WY • MUM
WIWI
.I.ac.r.1............. 1
JWYLfia.1•.•i•a1••a•faaYl.•.rr••.au.ir -• .♦..i - _
e 1�...aJa� •t�
f�•Mr.•a.aaf..•aas J:aYa •
I MAIM..••r•r•a•YA••• .r to •W 1
•
I1ItIE
ro.♦•r. rra. •
. J
•. �s�•L
..aafatsr•riirar••r.ra.••••arr...r.••••w•••••R aa•a•ra..r.a••.• I. YAM • i
r.w.•.._rr ..w.......
sea .,.
...a +J
ea .a• ...ra• wall +
•UM�.a.�ss.Y - • us.. 1
•.•.••.....w..a.ra.
.1•la..e.•Iaa+....ra.++w.0 .
Ma..•.••.+.....r... -
.aa...le.........
Ls..1.1Y.•.•a....r....•. i.•a.•. �.
S al. • - • -
•.•................. I I I• •aw.
Mal..r..............•... 1
-ill...aaamar•a•aa µ a•w.; 1. _ _
wma { .. •.. a aa.
I
.. a•o.•r....•r
i. .
.. lrrr 1•
J•..at_ { 4 st....
.▪w•AB.•••r.•.r..•.r • •
.S.} rr4.M�'�.
.J..•...r .r.a
Ma.ar.rra� 1. ar.) ..
•�� .
la ._...tea... I
•a. •_` . .y...
-MSS ••aaa..••_••a•r••••I. • AMa-• aY•ia- JY.l•A.. .
.si't rralaaewr AA., }.- -
li
L i.=« _1..... ni.wl L_ Lw_aL .
.Pm... 3 w• ,`�0.I •a'.s. I• u_
il
£Yai�:aA ..•• . ..�.
11,1
• •� _ I..1 i ..•.•
Page 1
Spin(;is ss
CONTRACT CHANGE ORDER
Project Name: CoRR OSP Buildout Lakeview Date: 2026 02 24
Owner: City of Round Rock Change Order No.: OCO-0002
2008 Enterprise, Contractor Project No.: 3023148.01
Round Rock,TX 78664 Architect Project No.:
Quota No. Change Order Description Amount
CCD-0073 COR 073 RFI 140 - Pavilion Ramp Landings Steel Modifications $73,254.00
CCD-0076 COR 076 -Yonder's Point Electrical Pedestal Relocations $19,232.00
Notes:
Extension of Time This Change Order 0 Original Contract Amount$13,494,260.00
Previous Extension of Time 0 Total Previous Change Orders$0.00
Total Extension of Time to Date Contract Amt. Prior to this C.O. $13,494,260.00
Original Contract Completion Date: 2025-10-30 Total This Change Order$92,486.00
Revision Completion Date: 2025-10-30 Current Contract Amount $13,586,746.00
OWNER ARCHITECT CONTRACTOR
By: _ By: By:
Date: Date: Date:
The Contractor hereby reserves Its right to claim additional time and/or monies for the cumulative Impact of project changes
10/14/25,8:47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading end Seat Wall Revisions-Ryan Janssen-Outlook
Looks good, Parker—
Thanks for working to get this pricing finalized.
Thanks,
Katie
From: Parker Blaschke<Parker.Blaschke@SpawGlass.com>
Sent: Friday, May 23,2025 1:54 PM
To:Katie Baker<kbaker@roundrocktexas.gov>;Gina Cordeiro
<gcordeiro@roundrocktexas.gov>
Cc:Joseph Hudson<jhudson@roundrocktexas.gov>;Cullen Schoener
<Cullen.Schoener@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGiass.com>;Tyler
Wenzel<Tyler.Wenzel@SpawGlass.com>;Joseph Witherspoon
<J.Witherspoon@SpawGlass.com>;Richard Will <richardwill@roundrocktexas.gov>;Antonio
Prete<tony@w-pinc.com>
Subject: RE: CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall
Revisions
Team,
Following up on this initial COR 030. Please see the attached revised COR 030 —
Revision 1 per the exhibit provided on 5/19. As shown, this change is proposed to
be funded solely from Owner's Contingency. Please let me know if you have any
questions or comments regarding this revised pricing. Based on the email direction
below, we'll be proceeding with this change order as submitted.
Thanks!
Parker Blaschke
Senior Project Manager/Employee Owner
SpawGlass
o. 512-719-5251
c. 512-552-9988
SpawGlass.corn
s invaacs Prorndinq thr,IGsolutr Rest R�
Construrtiw1 l:.y rrirnrr
SpawGlass Builds...Communities
about:blank?windowld=SecondaryReadingPane3 2/4
10/14125,8:47 AM RE:CoRR OSP-Lakeview-COR 030 ASI 03 Playground Grading and Seat waa Revisions Ryan Janssen Outlook
From:Katie Baker<kbaker@rourtdrQcktexas,ggy>
Sent: Monday, May 19, 2025 4:05 PM
To: Parker Blaschke<parker,Blaschke@SrawGlass,com>;Gina Cordeiro
<gcordeiroProundrocktex ggY>
Cc:Joseph Hudson<jhudson@roundrQtktex :gQY>;Cullen Schoener
<Cullen.Schoener@SpluiGIIss.com>; Harrison Holley<HarJ hQjieyR5pAwGiass.com>;Tyler
Wenzel<Iyler.WenzelRSpawGtass.corn>;Joseph Witherspoon
<!_Wither5poon0SpawGiass.cvm>; Richard Will<richardwillProundrQcktexas.goy>;Antonio
Prete<toay@ :.pinc.com>
Subject: RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall
Revisions
Parker—
See attached wall markup. This shows the limits of wall and size / material of
each wall. This should bring the number down some based on what was
priced below. Assuming SpawGlass agrees in principle that this should bring
the price down (decreasing the amount of wall, the width of wall in place, and
overall extent of masonry) or at least not exceed the pricing below— please
proceed with these changes as shown while the pricing is finalized.
Like I mentioned today in our meeting, Tony says there should not be any
issues grading the areas out in the areas the walls were removed.
Please let me know if you have any questions.
Thanks,
Katie Baker, PLA, CPRP
Park Development Manager
City of Round Rock Parks and Recreation
(0)512.341.3355
From:Parker Blaschke<Parker.Blaschke@SpawGlass.com>
Sent: Friday, May 16,2025 4:15 PM
To:Gina Cordeiro<gcQrdcirga.roundrgcklexas.gov>
Cc:Joseph Hudson<jhudson@roundroektexas.g y>; Cullen Schoener
<Gillen.Schoentr@SpawCIa5Lcom>; Harrison Holley<Harry Holly.@SpawGlass.com>;Tyler
Wenzel<TylerWentel@SpawQlass.com>; Katie Baker<kbakerProundrocktexas,gov>;Joseph
Witherspoon <,I,Witherwoon{alSp r+ Glass,com>; Richard Will
<ricje rid ijl@rour1dlocktexas.gov>;Antonio Prete<tony.@.w.pinc.com>
Subject:CoRR OSP- Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions
Gina,
about:blank?windowld=SecondaryReadingPane3 3i 4
10/14/25,8:47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook
Please see the attached COR 030 for the Lakeview Package and formal Schedule
Delay Notice regarding the ASI 003 Playground Grading and Seat Wall
Revisions. As noted in the letter, we have an incurred a delay to the overall
project schedule based on the revised drawings. Per the schedule included in the
letter attached, the revised Substantial Completion Late-Finish date for the
Lakeview Package is now 10/30/2025. Please let me know if you have any
questions regarding the current pricing or the schedule delay. Please note, per the
revised schedule, we need written approval on this pricing by 5/23/2025 in order
to maintain the revised schedule submitted.
Please feel free to give me a call if you have any questions!
Thanks,
Parker Blaschke
Senior Project Manager/Employee Owner
SpawGlass
o. 512-719-5251
c. 512-552-9988
SpawGlass.com
S }iawGlass lrvvfdti,,�Il/e'AGrolr�lr f1eu1 ���+Rc.
t.oMll�tICt10�7 rl:.��lPrlt'�1ft f.�+
pow:,
SpawGlass Builds...Comm unities
about:blank?windowld=SecondaryReadingPane3 4i4
1 UJ91.2b,9:4b AM Mall rarxer tflasc1Ke UutlooK
out to Katie about COR 076 this morning. Please let me know if you can provide written
direction on both of these CORs and we'll get started with the electrical work based on that
approval. Our understanding is that these will be funded via Owner Change Order to the
Lakeview contract or a future GMP package. Please let me know if you need any additional
information from SpawGlass.
Thanks,
Parker Blaschke
Senior Project Manager/Employee Owner
SpawGlass
o. 512-719-5251
c. 512-552-9988
5pawGlass,corn
Si) \Ir V I titi (.nrutrnR th.e iGsolet t r Best is RC
RC
uit r
•
7.000
SpawGlass Builds...Comm unities
httpslloutlook.office.cornlmailAnboxlid/AAkAIgAAAAMHYODEapmEc2byACgAC%2FEWg0AxReKW79j7UG%2B06dOWNTaAAE%2BF7rJgAA?nat 2/2
Change Order Request
SpawGlass NO. CCD-0030
This: COR 030-ASI 003-Playground Grading and Seat Wall Revisions Project No.:3023148.01
Project: CoRR-OSP Buildout Lakeview Quoted Date:23-May-25
To: Expiration Date:06-Jun-25
SpewGlass Construction hereby submits a Change Quotation for the following changes In contract work
This change order includes changes to the playground pods grading,seat walls and additional retaining walls and stairs as shown on ASI 03 as
issued by Waltz and Prete and the exhibit provided by CoRR PARD on 5/19/25. Grading from ASI 03 to be utilized and seat walVconcrete curb
to follow exhibit provided.This change Is shown to be funded from Owner's Contingency as this was a contract drawing change driven by
Playground Manufacturer requirements.
Vendor Work Description Labor Material Equip. Sub Other Total
Action Decorating,Inc PAINTING 0.00 0.00 0.00 1,440.00 0.00 1,440.00
Brazos Masonry,Inc. MASONRY 0.00 0.00 0.00 6,970.00 0.00 -6,970.00
Champion Site Prep Inc. EARTHWORK 0.00 0.00 0.00 20,221.00 0.00 20,221.00
The George D.Alan Co.LLC dba ALL WATERPROOFING 0.00 0.00 0.00 2,193.00 0.00 2,193.00
GDA Contractors
Uthko TX,LLC ALL TURNKEY CONCRETE 0.00 0.00 0.00 129,477.00 0.00 129,477.00
Metalink,LLC. SITE RAILINGS 0.00 0.00 0.00 19,370.00 0.00 19,370.00
Schmidt Electric Company,Inc ALL ELECTRICAL 0.00 0.00 0.00 6,217.00 0.00 6,217.00
UTZ Environmental Services ALL LANDSCAPING 0.00 0.00 0.00 -42,697.00 0.00 -42,697.00
SpawGlass Contractors,Inc. OWNER'S CONTINGENCY 0.00 0.00 0.00 0.00 -129,251.00 -129,251.00
0.00 0.00 0.00 129,251.00 -129,251.00 0.00
TOTAL $0.00
CALENDAR DAYS EXTENSION TO CONTRACT COMPLETION DATE 24
Ti We have proceeded with this change as per written direction.
lX We have not proceeded with this change.In order to proceed,please return a signed copy of this proposal request.Thank you.
APPROVED BY:
SpawGlass Contractors,Inc. Date Archltect/Englneer Date Owner Date
SpawGlass Contractors,Inc.,1111 Smith Rd,Austin,TX 78721 (Phone)512 719-5251
1 ur147LO,0:41 AM Kt:I.OPQ vw--Laxevlew-t..Ur V3U-AJI to rlaygrouna hraaing ana seat wan Kevisions-t yan Janssen uunook
Outlook
RE: CoRR OSP - Lakeview - COR 030 - ASI 03 Playground Grading and Seat Wall Revisions
From Katie Baker <kbaker@roundrocktexas.gov>
Date Fri 5/23/2025 1:58 PM
To Parker Blaschke <Parker.Blaschke@SpawGlass.com>;Gina Cordeiro <gcordeiro@roundrocktexas.gov>
Cc Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>;
Harrison Holley <Harry,Holley@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>;Joseph
Witherspoon <J.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>;Antonio
Prete <tony@w-pinc.com>
about:blanklwindowld=SecondaryReadingPane3 114
10/1425,8:47 AM RE:CORK OSP-Lakeview-GUK USU ASI U3 I- aygrouna uraatng ana Seat watt i evisions-t<yan Janssen-vuUOOK
Looks good, Parker--
Thanks for working to get this pricing finalized.
Thanks,
Katie
From:Parker Blaschke<Parker.Blaschke@SpawGlass.com>
Sent:Friday, May 23, 2025 1:54 PM
To: Katie Baker<kbaker@roundrocktexas.gov>; Gina Cordeiro
<gcordeiro@roundrocktexas.gov>
Cc:Joseph Hudson<jhudson@roundrocktexas.gov>;Cullen Schoener
<Cullen.Schoener@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGlass.com>;Tyler
Wenzel<Tyler.Wenzel@SpawGiass.com>;Joseph Witherspoon
<J.Witherspoon@SpawGlass.com>; Richard Will<richardwill@roundrocktexas.gov>; Antonio
Prete<tony@w-pinc.com>
Subject: RE:CoRR OSP- Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall
Revisions
Team,
Following up on this initial COR 030. Please see the attached revised COR 030 -
Revision 1 per the exhibit provided on 5/19. As shown, this change is proposed to
be funded solely from Owner's Contingency. Please let me know if you have any
questions or comments regarding this revised pricing. Based on the email direction
below, we'll be proceeding with this change order as submitted.
Thanks!
Parker Blaschke
Senior Project Manager/Employee Owner
SpawGlass
o. 512-719-5251
c. 512-552-9988
5pawGlass,cem_
1'rouidiu tl,e ill olrrtc Rear
)i111t r��l�ti a 9
Caustruetiat L:ipe'rie.rcr'
v►a
SpawGlass Builds...Comm unities
about:blank7windowld=SecondaryReadingPane3 214
,. ..... - . .,. .r. ....•........ �.........•• vv........ .w...,.. ...,y.....n..v......q,viw w.....m...o•ww.w .,o...•o..owI -VYVWN
From:Katie Baker<kbakerProupdrocktexas.ggy>
Sent: Monday, May 19, 2025 4:05 PM
To: Parker Blaschke<Parker.Blaschke@SpawGlass,com>; Gina Cordeiro
<gcordeiroProundrocktexas.ggy>
Cci Joseph Hudson<jhudson@roundrocktexas,ggs>;Cullen Schoener
<Cullen.5choener@.5pawGlass.com>; Harrison Holley< Lry tiollgy-@�PAWQlaK,sot11>;Tyler
Wenzel<Iyler.Wenzel@SpawGlass,com>;Joseph Witherspoon
<J.Wither5poon@SpawGlass.com>; Richard Will<richardwill@rouriglroc c�texas.ggy>;Antonio
Prete<tony.@ pinc,com>
Subject: RE: CoRR OSP.- Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall
Revisions
Parker—
See attached wall markup. This shows the limits of wall and size / material of
each wall. This should bring the number down some based on what was
priced below. Assuming SpawGlass agrees in principle that this should bring
the price down (decreasing the amount of wall, the width of wall in place, and
overall extent of masonry) or at least not exceed the pricing below— please
proceed with these changes as shown while the pricing is finalized.
Like I mentioned today in our meeting, Tony says there should not be any
issues grading the areas out in the areas the walls were removed.
Please let me know if you have any questions.
Thanks,
Katie Baker, PLA, CPRP
Park Development Manager
City of Round Rock Parks and Recreation
(0) 512.341.3355
From: Parker Blaschke <Parker.Blaschke@SpawGlass.com>
Sent: Friday, May 16,2025 4:15 PM
To:Gina Cordeiro <gcordeiro@rgvndrocktexas,gQy>
Cc:Joseph Hudson <jhudsonPrgundrocktexas,goy>; Cullen Schoener
<Cullen.SchoenerPSpawGlass.com>; Harrison Holley<Harry.Holleyjla SpawGlass.com>; Tyler
Wenzel<Tyler.Wenzel@SpawGlass.com>; Katie Baker<kbaker@roundrocktexas gov>;Joseph
Witherspoon 4.Witherwoon@SpawGlass.corn>; Richard Will
<riLhardwill@roundrocktexas,gov>;Antonio Prete<tony@w-pinc.com>
Subject:CoRR OSP- Lakeview- COR 030 ASI 03 Playground Grading and Seat Wall Revisions
Gina,
about:blank?windowld=SecondaryReadingPane3 3;4
1U/14/Z0,0:4/AM Kt:t.AM<VJr-LakeVtew-l.Vrt VJU-NJt VJ rtayyruurtu VIdWIIy alas aunt vim'Nevin:mu t -rya I Janaanu-wuwn
Please see the attached COR 030 for the Lakeview Package and formal Schedule
Delay Notice regarding the ASI 003 Playground Grading and Seat Wall
Revisions. As noted in the letter, we have an incurred a delay to the overall
project schedule based on the revised drawings. Per the schedule included in the
letter attached, the revised Substantial Completion Late-Finish date for the
Lakeview Package is now 10/30/2025. Please let me know if you have any
questions regarding the current pricing or the schedule delay. Please note, per the
revised schedule, we need written approval on this pricing by 5/23/2025 in order
to maintain the revised schedule submitted.
Please feel free to give me a call if you have any questions!
Thanks,
Parker Blaschke
Senior Project Manager/Employee Owner
SpawGlass
o. 512-719-5251
c. 512-552-9988
SpawGlass.com
�1?iltl'Gla.sS, '+dm the ilkoltue first ��
1 Lonstrurtson Up crier ce
l too►y
SpawGlass Builds...Communities
about:blank?windowld=SecondaryReadingPane3 414
ACTION DECORATING, INC.
MBE HUB ID: 1742675891500
Commercial & Residential Painting 11002 Plains Trail
Austin, Texas 78758
512-491-8900
May 7,2025
SpawGlass Commercial, Inc.
Attn: Parker Blaschke
Re:Old Settlers Park-Existing Pavilion
Our bid is based upon the following specifications:
1) The scope of this protect
a) Paint handrail extensions at playground area as shown yellow below
b) Prevailing wages of$25.11 per man hour is included
c) Pricing does not include entire perimeter of bench seat walls
d) Bid as regular hours
2) Exclusions
a) Sales Tax or Bid Bond
b) After hours/Phasing/Accelerated scheduling
usi
i r it
Base Bid $ 1,440.00
Should you have any questions or comments regarding this bid,please contact us Thank you for considering Action
Decorating for this project
4:721md XirkhAN1
Amy Kirkham for Action Decorating,Inc.
1of 1
FROM PLAYGROUND SEAT WALLS
4 iCif#M1111
A I , • Y
SINCE 1 9 e 9
REVISED: 5/1 6 120 2 5
ATTN: Parker Blaschke DATE: 5/16/2025
PROJECT: CoRR OSP-Lakeview
LOCATION: 1800 Harrel Pkwy,Round Rock,TX 78885
CREDIT PROPOSAL
Below you will 6d pricing to credit*dating work on the above referenced project.
DESCRIPTION OF CREW: Credit for materieb and labor asaodaled with the ptayyro sd seat web shown on page H4
Hardscepe Plane.
Per.H4 Hardecape Plans BMI Prtdng Requeet6 8
I IMEASURB LABbir� j MAT I MAT I
Foreman -38 HRS. $ 39.00 41,482.00 $ - $0.00 41,482.00
Masons -162 HRS. $ 28.97 44,403.44 $ - $0.00 44.403.44
Labor -228 HRS. $ 19.47 44,439.18 $ - 80.00 -$4,439.18
Opsrela AppwWce -38 HRS. $ 23.07 4878.88 $ - $0.00 4878.88
4-,r,r,12°Grey Lueder Stone -77 tons $ - $0.00 $ 155.00 411,935.00 411,935.00
8'CMU -1920 es. $ - $0.00 $ 1.64 43,148.80 43,148.80
Palle Fes -20 ss. $ - $0.00 $ 25.00 4500.00 4500.00
CMU De0vsry -2 is $ - $0.00 $ 385.00 4730.00 4730.00
TypeS Lime -11 800 Baps $ - $0.00 $ 17.35 4190.85 -$190.85
Lehigh Portland Cernerd -21 809 Begs $ - 80.00 $ 10.60 -$220.50 4220.60
Specbum Pigmented PEL-Type N,Stone Buff Mortar -110 800 BOO $ - $0.00 $ 22.65 42,491.50 42.491.50
C144 Masonry Sand -23 tore $ - $0.00 $ 18.50 4379.50 4379.50
Course Grout -14 Verde $ 95.00 41,330.00 $ 103.00 41,442.00 42,772.00
Freight(Super)-C144 Masonry Sand -23 tom $ - $0.00 $ 18.51 -$379.73 4379.73
Wattdown -3413 SF $ 0.20 4882.80 $ 0.45 41,535.85 42,218.45
Fodift -38 HRS. $ - $0.00 $ 15.40 4585.20 458520
Miscellaneous Toots&Equipment -38 HRS. $ - $0.00 $ 45.00 41,710.00 41,710.00
SUB TOTAL 413,213.88 425,248.93 438,482.79
GRAND TOTAL DEDUCT 438,483.00
Duration of Working Days ADDED to Centred Schedule:I
Please send a deductive change order as soon as possible If this credit is to take place This credit will NOT take place unless formal deductive
change order Is received.
Any alteration to this credit without the approval of Brazos Masonry Is prohibited and will void the credit proposal
Sincerely,
Brazos Masonry,Inc 73
Andrew Btarlottone
Project Manager
V/e t Ill 11.0 1...I\1 11✓I t
BRAZOSMASONRY
Start ISIS
ATTN: Parker Blaschke OATS: 5122/2025
PROJECT: CoRR OSP-Lakeview
LOCATION: 1800 Hanel Pkwy,Round Rock TX 78685
CHANGE ORDER PROPOSAL
Below you we hall pricing to perform additional walk on the above referenced project
DESCRIPTION OF CHANGE: Playground seat wall revisions per'Pteyground W at Mark Up(002}' The below pricing assumes the
following quallMatlons.CMU b per eerier RFI&Addendum establishing 6'CMU at the seat wads
w181 a 1'air gap on ether sere. Reber reinforcement b assumed to be by other,.The below pricing
assumes the scale is correct on the the provided 144'drawing(-1 in =2011.).
Per;Pte ound Wall Mark Up(002) BMI Prtdng Request:*a(Upton r2)
`= rrEki 1 Ouu4TrTY UNIT of I tUP I"YoYAL 1 - 00 TOTAL tOTAL
1 �& ASURq LABOR LAIfbR ltA1' -aft- _ __-.
Foreman 24 HRS $ 39.00 $836.00 $ -
$0.00 $938.00
Mesons 98 HRS. $ 28.97 $2781.12 i - $0.00 $2,781.12
Labor 144 HRS. $ 19.47 $2,803.88$ - $0.00 $2,803.68
Operator/Apprentice 24 HRS. $ 23.07 $553.68 i •
$O.00 $553.68
4',8',8',12'Grey Lueder Stone 18 tons $ - 10.00 $ 155.00 $2,790.00 $2,790.00
8'CMU 1152 aa. $ - $0.00 $ 1.64 $1,889.28 $1,88928
12'CMU 288 ea. $ - 80.00 $ 2.98 $858.24 $858 24
Pallet Fee 18 es. $ • $0.00 $ 25.00 $450.00 $450.00
CMU Delivery 2 ea. $ - $0.00 i 385.00 $730.03 $730.00
Cast Stone Radios Pieces 1 LS $ - r $O.00 $ 5,309.00 $5,309.00 $5,309.00
Type-S Lime 21 80f/Bags $ - $0.00 $ 17.35 6384.35 $384.35
Lehigh Portend Cement 41 BOO Bags $ - $0.00 $ 10.50 $430.50 $430.50
Spectrum Pigmented P&L-Type N.Stone Buff Molar 27 80r Begs $ • $0.00 $ 22.85 $811.55 1811.55
C144 Masonry Sand 12 tons $ - $0.00 $ 18.50 $198.00 $198.00
Course Grout 8 Yards $ 95.00 $760.00 $ 103.00 $824.00 $1,564.00
Freight(Super)-C144 Masonry Send 12 tons $ • $0.00 $ 18.51 i/98.12 $196.12
Washdown 705 SF $ 0.20 $141.00 $ 0.45 $317.25 S456.25
Forklift 24 HRS. $ - $0.00 $ 15.40 $389.80 $389.60
Miscelerreous Tools&Equipment 24 MRS. $ - $0.00 $ 45.00 $1,080.00 i1,080.00
SUB TOTAL $7,975.48 $18,419.89 124,395.37
LABOR BURDEN Q 38.00% S2,671.1/
MATERIAL TAX 0.00% S0.00
SUB TOTAL S27268.64
OVERHEADQ 1000% S2,726.65
PROFIT Q 5.00% $1,499.66
GRAND TOTAL Add 131.43.00
Duration of Working Days ADDED to Contract Schedule: 3
Please send a dtangs order as soon as possible If this work Is to take piece Work under this proposal will NOT take place unless format change
order is received
Any'Mershon to this change order without the approval of Brazos Masonry Is prohibited and will void the change order Change order price is good
for 30 days After 30 days costs may be reevaluated
Sincerely,
Brazos Masonry,Inc.
aet 1444! It' Oe'Ki
Andrew Becketone
Project Manager
CHAMPION SITE PREP
030 1 N INTERSTATE 35
GEORGETOWN, TX 78033
OFFICE l5 12}803.3453 FAX 45 IZIB03-3403
ADDITIONAL WORK / CHANGE AUTHORIZATION
QRANDONbi2IDIGDJI T,g0M
CORR OSP -LAKEVIEW/ PLAYGROUND
DATE: 05/01/25 JOB NAME: CORR OSP-LAKEVIEW
TO: SPAWGIASS ESTIMATOR: BT
ATTN: PARKER BLASCHKE LOCATION: ROUND ROCK TX
DESCRIPTION QTY UNIT RATE
1. ONSITE IMPORT 960 CY $5.95 $5,712.00
2. SITE EMBANKMENT 960 LS $6.25 $6,000.00
3. ADDITIONAL SURVEY 1 LS $1,350.00 $1,350.00
4. ADDITIONAL SUPERVISION 1 LS $8.30.00 $880.00
SUBTOTAL: $13,942.00
OH/P 15% $2,091.30 $2,091.30
TOTAL: $16,033.30
Description of Work PRICING ABOVE FOR GRADING CHANGES SHOWN UPDATED PLAYGROUND PLANS
The scope Items above include Items not part of overhead Including: FUEL,OIL,GREASE,
MAINTENANCE,INSURANCE,SMALL TOOLS,UGHT TRUCKS,SURVEY/CAD EQUIPMENT,AND
OVERTIME IF APPUCABLE.
NOTE: Pricing per GC REQUEST.Scope not listed above is not included Price is valid for 30 days
ACCEPTANCE OF PROPOSAL The above prices,specifications and conditions are satisfactory and are hereby accepted
AUTHORIZED SIGNATURE DATE OF ACCEPTANCE
r'J
CHAMPION SITE PREP
030 I N INTERSTATE 35
GEOROETOWN. TX 78033
OFFICE (5 121803-3453 FAX (5 12)803-3403
ADDITIONAL WORK/ CHANGE AUTHORIZATION
BRANDON7&IDIGDIRT.COM
CORR OSP -LAKEVIEW/ ASI 03 R1
DATE: 05/12/25 JOB NAME: CORR OSP-LAKEVIEW
TO: SPAWGLASS ESTIMATOR: BT
ATTN: PARKER BLASCHKE LOCATION: ROUND ROCK TX
DESCRIPTION QTY UNIT RATE
1. ONSITE IMPORT 128 CY $5.95 $761.60
2. SITE EMBANKMENT 104 LS $6.25 $650.00
3. ADDITIONAL SURVEY 1 LS $1,350.00 $1,350.00
4. ADDITIONAL SUPERVISION 1 LS $880.00 $880.00
SUBTOTAL: $3,641.60
OH/P 15% $546.24 $546.24
TOTAL: $4,187.84
Description of Work:PRICING ABOVE FOR GRADING CHANGES SHOWN UPDATED PLAYGROUND PLANS.
The scope Items above include hems not part of overhead Including:FUEL,OIL,GREASE,
MAINTENANCE,INSURANCE,SMALL TOOLS,LIGHT TRUCKS,SURVEY/CAD EQUIPMENT,AND
OVERTIME IF APPUCABLE.
NOTE: Pricing per GC REQUEST.Scope not listed above is not included.Price is valid for 30 days.
ACCEPTANCE OF PROPOSAL The above prices,specifications and conditions are satisfactory and are hereby accepted
AUTHORIZED SIGNATURE DATE OF ACCEPTANCE
Voiume Report CORR Old Settlers Lakevic
Deakin vs.ExlitIna ASI-03 Changes Vs Curren
Area Volume Comp/Ratio Compact Export Change
NM Total Cut FI11 OnGrads Cut nil Cut Fill Cut Fill lmoort Per 0.1 ft
Raglon 2 21,020 1,918 6,151 12,951 24 128 1.00 1.00 24 128 -104 78
{' s • c to
o • swam
111
IIIIIIIIIIIIIIIII k� F0.25 , •
r` ON•GD•t COMB F0•24 il. F0.77 >>2-: 'c vvEE '
i
(„,
pp...\011.
i
ice . co
ra•ws
ON+GD'-- F0.24 FO.02 F1+23
1
\1
,i_rotAWEEPS
9.oC t
3'.. ON+00 F0.1$ C0.37 ON.GD ON.GD \3 s
•
_ —may
r�, r,
• / ON•GD F0.11 6 F0.15 ON.GO .0' ON*00
... ,1 v r.4n • 1
.............. ..........._114
A\ON.GO ON+GD C0.15 �tt
FL
1.
I J ,.
\ 0141.-CjI) ..-.°°-°
. \
0
'�,\ 1
Page 1 of 2
G DA
CONTRACTORS
BID/QUOTATION
To: Spawgtass
Attn: Joseph Witherspoon
Project: GDA COR-CoRR Old Settlers Park-The Lakeview Playground Area
Date: 5/22/2025
item: Description: Rem Price: Total Amount:
s co Asl-03 Joint Sealeant
at Interior and Exterior of Cast stone where CMU meets Cast stone $ 1,254
at Cast Stone $ 939
at Masonry Control Joints $ 872
'Take off as perH4 Sheet only)
Total for Joint Sealeant at 5-12 Playground Area Playground Area $ 2,193
•
owledye Addenda: t.luots I.valid for 30 Days
Exeluslons
r -Excludes Blinding envelope testing,My work not dearly showmen construction documents,Composite Cleanup UNO,Job Spedlic Software,BIM,non-working
upervislon
_ •Fxdudes Sealants 0 Root,Parapet,Metal Panels,Metal Panels to other,Sheet Metal&Flashing.Glaze 8(Oozing,EIFS,Aluminum,Drywall,Tile,Mut Work.
•limb Fixtures,and Concrete Repair.Custom Cobh. Interior finish sealants_
.: •• , .•_Excludes Cable trays.pvtty pads,ftrestopping or smoke sealing penetrations and joints at all non-rated assemblies UNO
r•.•:r,. —Exdudea patch concrete holes/honeycomb greater than W; Insulation at waterproofing areas only
it . r_ r • •-Excludes all roof expansion joint assemblies UNO, hlodcouts,substrate leveling or repair for Els Precon meeting required to coordinate size of EJ and
r.lockout before concrete is poured.
-Excludes ail metal flashing and thru wall flashing UNO, thermal Insulation UNO.3rd party Inspection/testing
I ,., .1. -Fxdrdwa Taping Insulation-lointx2-Gifts_MAntal Fl+tyfying� _.- .-•. r__. - __ __ _ _
Sincerely,
GDA Contractors
Falak Sheth
6809 Lee Manor Cove, Manor, TX 78653
512.452.3800 GDACONTRACTORS.COM
Page 2 of 2
G DA
CONTRACTOR BID I QUOTATION
To: Spawgtass
Attn: Joseph Witherspoon
Project: GDA COR-CoRR Old Settlers Park-The Lakeview Playground Area
Date: 5/22/2025
IItem: I Description: Item Price: Total Amount:
fsheth@rtdacontr rtors corn
(512)879-9103
6809 Lee Manor Cove, Manor, TX 78653
512.452.3800 GDACONTRACTORS.COM
Q VW ring. of MILE L1`.� MATCHLINE SHEET H5
a Masonry cH-tr,s TCNLisr�-*-I��H3 �. .� ,� �,� •SO4(i■■• - i .Rrr i.rsi.`ssiran■ ssa SSE. a6 maim mai�as■
•
,a se lit---..--— • ..\. 'a ', -.Asla. ..' _
• r-,
III
, ‘1.. F. i,
e _4...
~arm
wan / it
ft , :
•
1 ..
.. _. . ...
T
`. ?, .. . •
, M A
•o". IW
! p $ r t ! , • ```` �` raw
/ � i•. ►
. . -. . •V ii-.4.--,...„, , \ . 0
\=......re.
\ �" J
Aluorry r tmm flee yy .•. _ Mwa•Y •
Dx .o a�.t A oso.s....... Z
, MINN g
11• _1ova tYP sr.r•par yw"w+v r o.•••••i•"w.• D d.
t '..,% IL
mar tLA
.....reidi, i ‘ 1\ , . _ •
g-,
•
r® `-=` wi NR---,L. _ ____. 4 M✓ /, e� - (may/�\�� roi ; _ te
If• -�` •
„� W
a M --� �__ ►tnTHiuLsa+mULE
r
a :.- ...�
t t fl •
an••na
imi
•
r �`t y tom. lb.
Z-
t fy� , ntv / %. :s��� s I
' Tf. t ` r..;
4111) 1 0:I 10•l r „Nag all
.,:.01.0L..7•1".".......:
• mOlf.•M.*'.u.a
•
ewQ w wr
tl �
• •,.U.: . 0))
wrr...arw �.
I .. ...•n��,•�.• H4 a
UM.
Job Maim Lrkaylam CORR OW Sa66an rwo«a Caromor.r
Job f.22731
Linn*611.r
Dam 611572026 572212025 R1
eggLiggEdIpERL
ROM Pricing ler 3i7 LF o6 coat In pima bd0lebaIL 11S LF
d CM Bock beano only.246 LF o/mad IwYlboCMso 61 LF
of ribbon cub,and iM LF d rind up curb.
CITY UM HOURS UIQTCosii Lees. 1 UC Mdaral UC Sub. _ UC EOUIPME$4T UC Fual
a RATE COSTS Ma * w Costs Sub' Comb Equwrwrt COSTS FuM COSTS TOTALS
EacarOtleNprp ad InYladen d 367 LF d cdR In MCP 10oe13.
Epbe11a1 Yrlldad MYa Eaaarabr•Blddeba 1.00 MH 12000 $45.00 $6,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,772.56 $0.00 $44325 $7,61624
Amp ad a10YdW1 d 347 m41 In Macs ode.
1.00 MH 300.00 $46.00 ;13,500.00 • $0.00 $0.00 $0.00 50.00 $0.00 $0.00 $0.00 $0.00 $13,500.00
-
6uombn.or4oaml ad nalddon d 116 LF d CMU Mark bang
ay.&Mamm d nCuena L6ra Earwax.Radiant
1.00 MH 30.00 ;45.00 $1,350.00 $0.00 $0.00 $0.00 $0.00 30.00 $1,772.99 , $0.00 S44325 $3,56624
Esa,aaon,pracmaam and ti.a6mn d 246 LF d ddd nil bpriF.
Earbmrd nd160.MYa EJorrb•Sldtaaar
1.00 MH 60.00 $45.00 _ 84,060.00 $0.00 $0.00 $0.00 $0.00 50.00 $1,772.90 $0.00 , S443.25 36,26624
Prop old lrldm,of 246 LF of as l ado
1.00 MH , 120.00 $45.00 $5,400.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 50.00 55,400.00
►rap.1d nradm,d61 IF Or r ratan curb.and 101 LF d r abed
w but
1.00 MH __ 60.00 $45.00 52,700.00 ;0.00 $0.00 _ 30.00 30.00 50.00 3605.00 $0.00 $201.25 $3,706.25
P++dno d r..b.
1.00 MH 06.00 $46.00 $4,275.00 ,. $0.00 50.00 $0.00 ;0.00 30.00 ` 10.00 00.00 50.00 $4,275.00
Fanaq►maim raniel.aalyd PRkalad.
1.00 LS 0.00 $45.00 _. $0.00 $0.00 $0.00 10.00 $6,565.00 $0.00 10.00 S0.00 $0.00 $6,565.00
Commie b d aaaarrar.
1 00, LB , D.00 $0.00 ;0.00 , $0.00 $39,661.00 00.00 ;DOD ;0.00 $0.00 $0.00 S0.00 $39,661.00
Baer and rabic Y1ab6aDan Ta all aprryoela6f 1.00 LS 0.00 $0.00 $0.00 $0.00 $14,153.30 $0.00 $5,679.00 $0.00 50.00 50.00 $0.00 S 10,632,30
8ubdSO4 615.00 $36,675.00 $54,014.30 514,244.00 $6,123.97 $1,530.59 $112,566.26
Sales Tut ' 0,00% _ 1940 $0,00 $0.00 ;0,00
,> $3057100 S64 014.30 S14.244.00 $6.123.97 31 530.49 3112568,20
01710660 10% 15.667.50 $5.401.43 $1,424,40 1612.40 $153.10 ;11,256.63
POI 5% 31,63375, , 32700.72 $71220 $300.20 $76,55 ;5,629.41
Grand Total S42,175 25 $62,116.45 $16,3110.60 S7,042.57 S1,760.44 3125,477
Addruonal Days Requested. 0
QUOTATION
Quote Number. 10500
T NK Quote Date: May 7,2025
Page: 1
9201 U.S. Highway 183 S
AUSTIN,TX 78747-2058
Voice: 512-243-2900
Fax: 512-243-2907
Quoted To: ip To:
SPAWGLASS CONTRACTOR � SPAWGLASS CONTRACTOR
1111 SMITH ROAD CORR LAKEVIEW
AUSTIN,TX 78721 I JOSEPH WITHERSPOON
ROUND ROCK,TX
Customer ID I Good Thru Payment Terms Sales Rep
SPAWGLASS CONTRACTOR 6/6/25 Net 30 Days DEVIN
QuantIty Item Description Unit Price Amount
1.00 COR.ADDED RAIL AT PLAYGROUND. •
1.00 FURNISH& INSTALL APPROX 58 L.F. GUARDRAIL, 18"HIGH AND 19,370.00 19,370.00
APPROX 58 L.F. STAIR RAILS, FORA TOTAL OF APPROX 116 L.F.
ADDED RAIL.
1.00 ; 'PER SHEETSH4 &H9OFH9DATED4.11.25
1.00 SHOP PRIME FINISH.PAINT BY OTHERS.
l _
Subtotal 19,370.00
Sales Tax
Thank you for your business.Have a great day!
TOTAL 19,370.00
City of Round Rock
Old Settlers Park Buildout
City of Round Rock General Services
Change in Work-Cost Analysis Form
(To Be Completed All Subcontractor,,Suppliers&Contractors Associated with the Change Proposal)
Project No.&Name: CoRR OSP-Lakeview
Contractor Name: Schmidt Electric Change Proposal No 15
Description of Change ASI 003 PLAYGROUND SIGN-tnster:err exiling I"conduit to platground area,Add 1-17 X 30 Non Traffic Rated pull box,160 LF Trench&Backfill,Instal
I"Conduit with 3-48 wires.
II Each line is for labor or material/equipment or Subcontracted work(only one) II
r
Material&
Item q Description Quantity Unit Unit Cost Labor Bid Pricing
Equipment
1 Trench&Backfill with I"Seh 40 PVC Conduit 160.00 $ 23.66 $ 3,785.60
2 Install 1-17"X 30"Non-Traffic Rated Pullbox I.00 S 900.00 S 900.00
3 Install 200 LF 3-48 conductors from Reatroom to New Sign. S 829.28 S 502.35
' S 821 S 502 1 S 4,686
A B 1 D 1
Subtotal(Non-Bid Pricing) Subtotal(A+B) S 1,332
Overhead&Profit 05%) $ 200
Bid Pricing(No Additional Fee Added) Subtotal D S 4,686
TOTAL FOR THIS CHANGE PROPOSAL* S 6,217
UTZ ENVIRONMENTAL
Lakeview @ Old Settlers SERVICES
Parker Blaschke-Spawglass
May 9,2025 parker.blaschke@asaawglass corn
ADD2:6/17/24
Addenda Received: ADD3:6/27/24
Plan Sheets Plan Date Architect
S1-S7 9/10/2024 Bradley T Jones
11-112 9/10/2024 Kyle Elliott
Irrigation Design Build by Utz Environmental
Monument Sign
Item Size/Unit Quantity
1/4"Thick Carbon Steel Monument Sign w/Aluminum Letters LS 1
'Power Provided by Others
Subtotal: $18,750.00
Playground Drainage
Item Size/Unit Quantity
Excavation&Haul Off LS -1
6"Sch40 Perforated Drain Pipe LF -985
Drainage Gravel-6"Depth Ins -447
Concrete Headwall LS -1
Subtotal: -$63,130.00
Shade Trees
Item Size/Unit Quantity
Burr Oak 3"Cal/B&B 1
Live Oak 3"Cal/B&B -1
Mexican Sycamore 3"Cal/B&B -2
Monterrey Oak 3"Cal/B&B 0
Excavation,Haul-Off and Imported Planting Mix LS 1
Native Texas Hardwood Mulch 2 CF Bags -6
T-Posts(3 per Tree) 6'Ht. -6
'Trees to be dug and ready for transport at time of pick up
'Pick Up location to be within.5 miles of LOW Subtotal: -$734.00
Ornamental Trees
Item Size/Unit Quantity
Crape Myrtle'Natchez' 2"Cat/B&B 4
Southern Wax Myrtle 2"Cal/B&B 0
Texas Redbud 2"CaUB&B 0
Tree Yaupon 2"Cal/B&B -2
10948 E. Crystal Falls Pkwy.,Leander TX 78641 I UtzEnvironmentalServices.com
Excavation,Haul-Off and Imported Planting Mix LS 1
Native Texas Hardwood Mulch CY 0
T-Posts(3 per Tree) 6'Hi 6
'Trees to be dug and ready for transport at time of pick up
•Pick Up location to be within.5 miles of LOW Subtotal: $645.00
Shrubs, Grasses and Succulents
Item Size/Unit Quantity
Big Muhly 5 Gal 10
Gulf Muhly 5 Gal 64
Knockout Rose 5 Gal 0
Red Yucca 5 Gal 7
Texas Sage 5 Gal 9
Bicolor Iris @ 30"OC 1 Gal 38
Cherry Sage @ 30"OC 1 Gal 0
New Gold Lantana @ 24'OC 1 Gal 32
White Sage @ 30'OC 1 Gal 4
Subtotal: $3,890.00
Bed Preparation
Item Size I Unit Quantity
Bed Area Excavation and Haul-Off LS 1
Imported Planting Mix Backfill-4"depth CY 6
Native Texas Hardwood Mulch-3"depth 2 CF Bags 59
Native Texas Hardwood Mulch-3"depth 2 CF Bags 241
6"Wide Concrete Edging LF -30
Bed Area Excavation and Haul-Off LS 1
Imported Planting Mix Backfill-Raised Planter-Varying Depth CY 54
Native Texas Hardwood Mulch-Raised Planter-3"depth 2 CF Bags 121
'Waterproofing&Drainage @ Raised Planters to be
provided by Others Subtotal: $5,331.50
Turf and Soil Preparation
Item Size/Unit Quantity
TIFF Bermuda Sod SF -2,250
Imported Topsoil-Chocolate Loam-2"Depth CY -14
'Sod to be Install per hatching. Any areas outside hatching are excluded
and can be priced upon request Subtotal: -$1,812.50
*Dille Dirt to be installed at Ampitheatre Seating ONLY
irrigation
Item Size I Unit Quantity
Hunter PCN-10-R Tree Bubbler(2 per Tree) Ea. -2
Netafim Techline TLHCVXR5 Drip Tubing-Bed Area SF 1,090
Air/Vacuum Relief Valve Ea. 1
Manual Flushing Valve Ea. 1
12"Indicator Spray Ea. 1
Hunter PROS-04-PRS40-CV-R Turf Spray w/MP Nozzles Ea. -14
Hunter PROS-04-PRS40-CV-R Turf Spray w/MP Nozzles Ea. -4
Encased in Concrete
1"Rainbird XCZ-PRB-LC-R Drip Valve Kit Ea. 1
13"x 20"Valve Box Ea. 1
Reclaim Parts&Material LS 1
'Ali areas north of parking area are excluded.
'ADD Alternate has been provided below. Subtotal: $462.00
Irrigation Sleeve
Item Size I Unit Quantity
2"Sch 40 PVC Irrigation Sleeve LF 40
Subtotal: $260.00
Bid Recap:
Monument Sign $18,750.00
Playground Drainage -$63,130.00
Shade Trees -$734.00
Ornamental Trees $645.00
Shrubs, Grasses and Succulents $3,890.00
Bed Preparation $5,331.50
Turf and Soil Preparation -$1,812.50
Irrigation $462.00
Irrigation Sleeves $260.00
Total Landscape Construction -$36,338.00
OH&P -$5,450.70
P&P -$908.45
Bid Notes:
1. Includes all Applicable Taxes
2. Excludes Water Meters(and cost of water),Hand Watering,Electric Meter,Irrigation and Electrical Sleeving,and
Road Bores if necessary.
3. Excludes Bond,if applicable add 3%
4. Excludes Surveying,Barricades,Traffic Control.
5. Proposal valid for(30)thirty days.
6. Limited Warranty-No replacements will be authorized or made without an inspection by one of Utz
Environmental Services staff. Warranty is limited to replacement only,not refund. All Warranties will become
null and voids if any of the following Is determined:(allure to water properly,drought,freezing,insect damage,
abuse or mandated water restrictions imposed by local governments. It is the customers responsibility to
maintain property if a maintenance contract is not agreed upon.
Respectfully Submitted,
Chris L. Utz Approved by:
Licensed Irrigator#5625
F13 MATCHLINE SHEET H5 `
•1 ATCHIIAIE SHEE'� No - , \. �wlrsrwwd■ 1 snow wrw* ww■ ■ww■ ■wi■ *w1ww■
, a :.__5111.1)_ "1--,-
ik..1-1 1,1 e` I._ _Ifi
O.c m.rr. •, •.r.•r.• 'M{ s e .
1 1
CV.140k110 M.
•I rf mu tii ,u.ror, ,� rr�rrr... \, �— ,1� +
,, k , ,_ ,,
- ' \ % '
4---4)
, , , .,_ . , ,
/ 11, ` .a+w.'w'rn",1 �i r � • �,.�+ l ;,•� � �• s
•
. ) 1
MLr T 'fib .� • \' • � . S i` i1� \ \ \\ �•
1 nn \I
.' N .
ii
c.
',. \ ,
._. plwu,typ. °` n t �' '' r*'"'"°'on`, str"m...... n1» nir l y ' n•
I..uv Y
` CC en
J t ` 1 1 �_ ` •, 1 + WO '1 O
♦, jj 1 row �•
`; Z
rg
I/' .' ' , TJ "')�j - `�. _ \ ,a \--"'--/ _MATERIAL
SCHEDULE Y
/ t :nu .�• ae r ` I I .ram....
g
isI mr ''-- ter` m.++e•
,,
o .
I ; /
�— I M
11 0.'i•�n.r 1
�1 - ‘411)049
` t I
r _ F ln,a TW __ a• t_
: 0
•........
ma0 •
!I
7' --"\\ •
9„:" ....... .
...
0
� •TAM �y�--� COMM r.,.�u., `t`\
�t •rf.00 ow.ur .ram..
,,,.�. M/ a...w,uuro. H4 of H9
• f • ® ay.•.v..•
I abed
a.--MO•. wart.+Pals.aN atn usWa
aMa wows%A..W••••••a410.11.10•1 .040 t••M.aw11.4•Ili I. IWa
C { .IOa010a
ii.a'WI 1 ••tilt I comer.u14•
Wttt'tS[ I 00104.61 I ta0r0.0 n
Ntw'.I. I'- wawa
a
min I M•••1F...w0 swim Saba Aa00.4001 a.m.
o•nor1 T WWI PWW3
fit Ruin! --'4.3N.W W-a-'i1t i oo lay I •e..Main.I
(onto-no I I.W..Iw1 awes lissz•a rosm'ttt i course I an...o abiowiww
OtNe14071 I 11P1a4114I401041.* mist-O. 6 "MOM
NMiOCCIVIIN MOON IUTAAO www •W. I10011.4,10020a44.41a00
10ut'I.t • 04 4a110i i mew.moa0.••
40-ttaM t O 45r1. I mama OMawn.a.+
Mt%In f 1.401,S struli u.1O alaara..IM.w.
5 OtsM In tmlatt)
I W'alT.t ♦ atMYR I IOtty.T I MpitIINTiO•
I sit tell I Wtie. • Pr/WM 141.1N.0it.Yt01Yt
•
1 WtWI=T • WONTI a WIIT.t I f61i01WV
♦ 110t11t1 • O.-tit. I .l►Ttt• WAAL
Ye.1}.YN...a.•is w.....11wt VS w a••wl.Ir.✓ mole Wi't.eTpaiWg- aatl00
.w....M aW0.470 P?..../l'tit...ow.sad •1Mafaupae.I ny OW WY.]Wgra 10.1.-IVA I40II00
vivid•..On ir.� Winn/ I 4W IP.aal Wein.Will-iR1N- Eat Wm
w P011.At.Wiwi is..s..mad aunts • wilaillAWIlwwwwiviwvi it*Wm
warn • W.Wa.VtiiWyW.-MOM Wiyaj Ni ytO
MUMMY•MOW
I WTWTII I N'Nf t0 • 011114.01M a Waal
my/Lamm Alm Nog nn6nOi Lamm. blurb I • a.I•ra WI l•.I M webM IW IIII
Li w.al.oW UYt.7N It +1.....I.1•1R rosy N•Wa
fan 114001.1 wawaI .On4a1170+IWV114 U( .♦tia
Rn 101I000 i •.ft•T a aiU.___F.WI a•U•Wq>tt•.•�.-p.y1 SWIM
aitt'Tl I -1.0.014.0440 ala
'WI I Ue 10I4114404®iR1pY 4400ny. asas
'WWII • wadi osanw#o• u0 SW
WIWIWII . .sae twww O.W.I i11Wa.wi la am
MSC( I .....11....),N.I i WWWN-NT NMI IN aN
a-tnli • awp.y UauraM O..aal.•.M amUO IU1404-ta--at Mt Rs WO
WLNT •' W..A a•Ia•WW1.••0r•ia yam WW1-•a 1J0 tt•000
+'brit a 044WWWW aa11-WNi..t•u11 as.m
1441I4WTItI a aW.1•wail a taaswWa.Va.a.O•ldsie . mitt
wean • bib1.+•••4-4010451 4.44.0441101.0044.4 ai•■m
...sYaT I aa4E40 Will-all lW( VW It.
Waft( I •►y0•.lil0444 III WI
ililTlt I •••W.•t.il at p.m•Wry.lay' all Wm
warm • •4~0-VOw 10•0040.000 a•w.Uw.gWry/1.MaMV ti•Wm
Mitt( I .ONa•i•1 nom 1M..0 li•v*t LT•it.
Ia.1•.a'V....we.1.U.Ilt3lwa r.N..l tew yaw/ i401Wa1 I a+Nal ri.lM M www•VI•aMAry...OWN-I10 110 is.it.
W IWI I Iy41TnW.1.aawe W.M••.It It.We
WATT • m.4.•..AI at Wr4l41a+away•MI WV WV a0
1401141,141 I tarp harry POO M.•fie la IN a
1N11I11 • %WWt II Ws ty.yiil la010414111•IN i1* Ta WO
W IWI I t707 iftwW1 OW t•It}M••i t.rai Fi.0/l414iN4441•at LW •p a
't4An I ..w-i a.at arllw•I it/! p0-a1.
ZNTerur .' way~Mt wpm aW arm mews
assail •• aar..WOWS wsWilUI•WI LW OW000
wows • N-Ia•ai.Mll•IWra.moms•11.L. a..a
W'(RN a WW/WLW WIWed=INAirf I..a
•.Tlrl I t WA WWUA M/+aria-Itat IN a..a.
Ws.ra I TN NNW •a ow
W14m a aaa/itl.i'msWI We-W..
aSYTT a am,maw.wing•I.•-Wai WasWWWW. as Wm
'Wan a MOWN wivil.YIII••.+0...roar to a00
a...0 a06a.••••.0 WTIYat I WWI..Ia.git~V we 1400
01w01WaV
- I ...,.$OI' S 00.lI IO. 1 000l•lit 0T s ..nowr..111.0
r lOVM wl 11300 Alwltwl l w01 NI ♦Iwlik,lnn[na a Di JAI*Ss in •0•IlVu1
sn•.• sr••.• 194ri. 0II•/ A1S01MMO
as/Ws Doi iso,/aaaao 3DNVH7
081t001 iiv01.i-Vlp WO
a Outlook
RE: CoRR OSP - Lakeview - Outstanding Change Orders from Outside GMP
From Gina Cordeiro <gcordeiro@roundrocktexas.gov>
Date Thu 10/9/2025 9:39 AM
To Parker Blaschke <Parker.Blaschke@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Katie
Baker <kbaker@roundrocktexas.gov>
Cc Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Harrison Holley <Harry.Holley@SpawGlass.com>; Cullen
Schoener<Cullen.Schoener@SpawGlass.com>
Both are approved.
Thanks
Gina Cordeiro
Project Manager Building Construction
City of Round Rock I General Services
Building Construction &Property Maintenance
212 Commerce Blvd. I Round Rock, TX 78664
= 512.218.5473
Cell 512.608.2762
Fax 512.218.5576
gcordeiro@roundrocktexas.ggY
ROUND ROCK TEXAS
From: Parker Blaschke<Parker.Blaschke@SpawGlass.com>
Sent:Thursday,October 9, 2025 9:22 AM
To:Gina Cordeiro<gcordeiro@roundrocktexas.gov>; Richard Will<richardwill@roundrocktexas.gov>; Katie Baker
<kbaker@roundrocktexas.gov>
Cc:Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGlass.com>;Cullen
Schoener<Cullen.Schoener@SpawGlass.com>
Subject: CoRR OSP- Lakeview-Outstanding Change Orders from Outside GMP
Gina,
Following up on our conversation, attached are the emails for both COR 073 - Pavilion Ramp
Modifications and COR 076 -Yonder's Electrical Pedestal Relocations that are shown to be
funded from outside of the GMP. We discussed COR 073 at the OAC this week and I reached
hops://outlook.ofice.co m/malt/mboxl d/AAkALgAAAAAAHYQOEapmEc2byACgAC%2F EWg0AxRe KW79j 7U G%2BOfid OMxNTaAAE%2BF 7rJgAA7n at... 1,2
a Outlook
RE: CoRR OSP - Lakeview - COR 030 - ASI 03 Playground Grading and Seat Wall Revisions
From Katie Baker <kbaker@roundrocktexas.gov>
Date Fri 5/23/2025 1:58 PM
To Parker Blaschke <Parker.Blaschke@SpawGlass.com>;Gina Cordeiro <gcordeiro@roundrocktexas.gov>
Cc Joseph Hudson <jhudson@roundrocktexas.gov>;Cullen Schoener <Cullen.Schoener@SpawGlass.com>;
Harrison Holley <Harry.Holley@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>;Joseph
Witherspoon <J.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>;Antonio
Prete <tony@w-pinc.com>
about:blank?windowld=SecondaryReadingPane3 I r4
5 r�t��Class Change Order Request
NO. CCD-0073
Title: COR 073 RFI 140 Pavilion Ramp Landings Steel Modifications Project No.:3023148.01
Project: CoRR -OSP Buildout Lakeview Quoted Date:
To: City of Round Rock Expiration Date:
Arnie Hammock
2008 Enterprise
Round Rock,TX 78664
SpewGlass Construction hereby submits a Change Quotation for the following changes in contract work
This change includes the revisions to the Pavilion Ramp per RFI 140 to address ADA clearance issues at the landings.This change includes the
cost to modify steel and remobilization cost for the concrete subcontractor as this ramp will not be ready for concrete until after the completion
their remaining scope.This change is shown to be funded from outside of the contract,therefore indirect costs have been applied at GMP
Rates.
P&P Bond @ 0.77%
General Liability @ 0.78%
Builder's Risk @ 0.25%
SDI @ 1.25%
Fee @ 3.5%
Vendor Work Description Labor Material Equip. Sub Other Total
SpawGlass Contractors,Inc. FEE 0.00 0.00 0.00 0.00 2,478.00 2,478.00
SpewGlass Contractors,Inc. GC BOND 0.00 0.00 0.00 0.00 529.00 529.00
SpewGlass Contractors,Inc. SUBCONTRACTOR DEFAULT 0.00 0.00 0.00 0.00 859.00 859.00
INSURANCE
SpawGlass Contractors,Inc. BUILDERS RISK INSURANCE 0.00 0.00 0.00 0.00 172.00 172.00
SpewGlass Contractors,Inc. GENERAL LIABILITY INSURANCE 0.00 0.00 0.00 0.00 536.00 536.00
Patriot Erectors,LLC STRUCTURAL STEEL 0.00 0.00 0.00 61,326.00 0.00 61,326.00
Lithko TX,LLC ALL TURNKEY CONCRETE 0.00, 0.00 0.00 7,354.00 0.00 7,354.00
0.00 0.00 0.00 68,680.00 4,574.00 73,254.00
TOTAL $73,254.00
CALENDAR DAYS EXTENSION TO CONTRACT COMPLETION DATE 0
X We have proceeded with this change as per written direction.
We have not proceeded with this change.in order to proceed,please return a signed copy of this proposal request.Thank you.
APPROVED BY:
SpewGlass Contractors,Inc. Date Architect/Englneer Date Owner Date
SpawGtass Contractors,Inc., 1111 Smith Rd,Austin,TX 78721 (Phone)512 719 5251
Aglial ,PATRIOT ERECTORS, LLC. __
St•.l Fobri ollo,G Erection SYrvic•s
3023 W HWY 290 I Dripping Springs 1.,os 76620 I p 512.656 9100 ,1.512.656 9106
I Change Order Request 1
September 26,2025 Job.#: 2147
Attn:Parker Blaschke
Patriot Quote
Patriot Erectors,LLC. would like to offer this quote to FURNISH and INSTALL the following items per plans and specs.
for the above referenced project. WE QUOTE THE FOLLOWING:
Cost Breakdown
Manhoura:
Fabrication $ 8,445.60
Labor 400 $ 31,458.16
Equipment $ 3,550.00
Subcontractor $
Consumables $ 9,084.80
Subtotal $ 52,538.56
OH&Profit 15% $ 7,880.78
Subtotal $ 60,419.34
Bond 1.50% $ 906.29
TOTAL $ 61,325.63
$ -
Grand Total $ 61,325.63
Schedule Extension: 2 weeks
We include the following scope:
1 RFI 440:modify Switchback Ramp Landings and handrail
2
3
We exclude the following scope:
1 Re-Mobilization Costs
Detailing and Engineering are EXCLUDED from this Revision 2 pricing These were priced separately in X025 and secured
2 in SBCO-06(COR 069)
3
'Due to the current instabil.ty of steel material pricing,this pricing is good only if accepted within 15 days of the submittal date below'
Total PCO#: X024 Rev 2 $ 61,325.63
SUBMITTED: ACCEPTED:
PATRIOT ERECTORS,LLC SpawGloss
By Andrew Figer By
Title: Project Manager Title: _
Date: September 26,2025 Date:
This work Is considered as additional work to the contract,with this quote being valid for 15 days from submission,price and schedule extensions subject to site
considerations.Signature by an authorized agent of the contractor shall release Patriot Erectors,LLC.to proceed with this work and will indicate acceptance of the
terns,scope and pricing of this change Authorized contractor signature will allow this change(or portion applicable)to be incorporated in the appropriate billing
cycle,regardless of receipt of a change order
J..IRV.I..wb.w,Willi V,Mt VIIIM /l•I\t tV.W.
LS $ -
.J $ -
L5 $
Subcontractor Costs $
Fabrication Costs U/M Units Rate Time(m•Q/R)
Shop Labor HR 30.0 5 86.28 $ 2,588.40
Bolts/Anchors L5 $ 1.00 $ -
Std.Fabrication Material LBS 200.0 $ 2.26 $ 451.20
Large Members Plate,HSS LBS 1,000.0 $ 3.26 $ 3,256.00
Project Manager HR $ 85.00 $ -
Purchasing HR $ 38.25 $ -
Pa nting LS $ 1.00 $ -
Detailing HR $ 90.00 $ -
Engineering HR $ 145.00 $ -
Galvanizing LBS $ 1.32 $ -
Shipping Specialty Outside LS $ 1.00 $ -
PEI Freight Per Trip 60 Miles or less 1.0 $ 650.00 $ 650.00
Per Mile over 60 $ 5.85 $ -
Buy Out LS 1,500.0 $ 1.00 $ 1,500.00
Total Manhours 31.0 Fabrication Costs $ 8,445.60
Field Costs U/M Crew Size Hours Rate Time(m•Q/R)
Consumables HR 400.0 $ 22.71 $ 9,084.80
Fringes/Per Diem HR 400.0 $ 21.55 $ 8,621.60
JIW Labor HR 4.0 80.0 $ 51.43 $ 16,456.32
JIW Overtime Labor HR 1.0 $ 79.75 $ -
Foreman Labor HR 1.0 $ 65.60 $ -
Foreman Overtime Labor HR 1,0 $ 101.01 $ -
Superintendent Labor HR 1.0 80.0 $ 79.75 $ 6,380.24
Superintendent Overtime Labor HR 1.0 $ 122.25 $ -
Safety/QC Professional LS 1.0 $ 97.50 $ -
In-House Surveyor HR 1.0 $ 143.00 $ -
In-House Ferro Scan HR 1.0 $ 240.50 $ -
Total Manhours 400.0 Field Costs $ 31,458.16
Equipment Costs U/M Units Rate Total
Equipment Trantpon Pell(Pict up and Drop Off) Round Trip $ 300.00 $ -
Small Scissor 32' HR $ 35 75 $ -
Large Scissor HR $ 50 38 $
Small Boom Lift HR $ 76 38 $ -
Large Boom Lift HR $ 132 44 $ -
120'Boom Lift HR $ 219 00 $ -
Diesel Welding Machine WK 4 $ 325 00 $ 1,300 00
Fork Lift WK 2 $ 750.00 $ 1,500 00
Duct Jack HR $ 20.00 $
Erection Truck with M'nor Equipment Day 10 S 75.00 $ 750 00
MINIMUM:Spyder Crane(2 HR Min w/Operator) $ 340.00 $
Over 2 Hours with Operator HR $ 170 00 $
MINIMUM:28 Ton Boom Truck(2 HR Min w/Operator) $ 390 00 $
Over 2 Hours with Operator HR $ 195 00 $
MINIMUM:70 Ton Crane(4 HR Min+Permit+Operator) $ 1,230 00 $
Over 4 Hours with Operator HR $ 270 00 $
MINIMUM:100 Ton Crane(4 HR Min+Permit+Operator) $ 1,430 00 $
Over 4 Hours with Operator HR $ 320.00 $
Additional Operator Costs for OT/After Hours/Saturdays HR $ 50.00 $
Lift Plans EA $ 200.00 $ -
Crane Mats Day $ 45 00 $
Other Specialty Equipment
HR $ $
HR $ $
HR $ $
HR $ $
Equipment Costs $ 3,550.00
Mew Tx LLC
Jab tame:Labira a C.RR OW S.tS.r. proo..a Cerro.or..r
Jab It 52731
Sea:U MUS Ea�"i st1e1 ts.rs.r•n to Was If mew w mow anew tore.it WWI
So nob ant r rt Irmo/MO,la USW r M Or.19n AMNIA
IOW per r MT.OW 9n mop Moe wnrtw LSY.mild Mr
pined•••1 Fie..So rfl CY)nee ray Y YON tar e.a..tar..
Two a boos.a Neap♦.••.•Mil Ow.So ew.1 Mall Mew
ow r r17,.wp.r..iel llr.41 M..w...p,pneiq.
err.War out pep owl,.Omer dump owls an w My
Joshirol J6,Lino-
QTY UY HOURS UIST COST Labor UC H.m.rW UC Sub. UC EQUIPMENT UC Fuel
RATE COSTS Wfwal Celle Subs Coats Equipment COSTS FUN COSTS TOTALS
1 r e
it Plow NW MM.-Labour. MH 46.00 $56.00 82,840.00 , .
J P.m no rya•.pupa ewe MM 18.00 $55.00 $880.00
/Paco.r rM.p-lane
Mir 8.00 $65.00 SSZo.00
Moot -aawo" NH 8.00 $65.00 $520.00 .
T...r-Pump.vnern LS 82,195110
Pt* ARM -8.00 $5.00 -$360.00
Sulgoal - 7200 $4,200.00 S0.00 f2,195.00 $0.00 $0.00 $0.00
6.a.Tax , 0•a0% , 00 00 $0,04' 10,00 i9.90
Subtotal S4.200,00, S000 t2.195.00 S0.00 , S0.00 SL305.00
Overload 10% 8420,00 10.00 $219.50 $0.00 S000 S479.50
Grand Total $4,130.00 50.00 $2.s242s $o.o0 $0.00 $7,354
Addltbon61 Days Requested: 0
SpawGlass Contractors, Inc. REQUEST FOR INFORMATION
SpawGlass 0140
Printed On: Jul 29,2025
Page: 1 of 1
Subject: Pavilion Switchback Ramp Design Date: 07/29/2025
Project: CoRR-OSP Buiidout Lakeview Job: 3023148.01
Address: 3300 E Palm Valley Blvd Owner Project Number:
Round Rods TX 78885 Required: 08/01/2025
Phone: Fax: Estimated Cost Impact: Potentially
To: Ken Su Estimated Days Impact: Potentially
KSS Structural Engineers
From: SpewGlass Contractors,Inc. Joseph Witherspoon
Spec Section:
Drawing Num:
Request:
The pavilion switchback ramp was fabricated and installed per the approved shop drawings which reflect the dimensions provided on
sheet Al-101 of the contract drawings. The ramp landing sizes do not meet TAS requirements. Please provide updated Architectural
and Structural drawings for code compliance.
Suggestion:
Cost Impact: POTENTIALLY Cost Amount:
Schedule Impact: POTENTIALLY Days:
Answer: Accept Suggestion
Please add 16 to
An,w.r.a BY: landing to provide de 5'-0" Signed: 11208401~ •(�ti.�--���
clear of handrails
Data: 7L30/2025
Distribution:
Contact Company
Gina Cordeiro City of Round Rodc
Joe Hudson City of Round Rodc
Katie Baker City of Round Rock
Ryan Hansenuwat Mode Design Arch
Antonio Prete Weeltz&Prete,Inc
i • .,
r
r
ii i'IllIf 11
i
'ri0 - ,. t pill f ill
t t
A!e,:„ r III i Ili i ! j
rII!!1 f " /1 t. '
,Air
! :::4-,
:If
II
. •
=
. 44P4* .
,, i 4. . ,. . . . ,
• :I ti ' ' :./ 1
-13
f4"N.4 0 il# . •' • ;' ,- 0
'4 0
T
X
71
V
i OLD SETTLERS PARK LAKE VIEW PAVILION —
r
Yiii a�°*°aO4.
`
;.1 CITY OF ROUND ROCK PARD . ' ' >"r I: S.
ei z 2 s S ROUND ROCK,TX 1 '?,� ,"',1 'I Ill 30
»,os ,l'- 3P1
•
'CONCRETE RAMP ON HD GALV.STEEL. .< , •• ' . .. a '
*STRUCTURE.ND GALV GWRDMI S Jr .
•
' 'GALVANIZED STEEL PIPE
• .i GATE ON HINGES WITH � / - •
(" - A � � ' ,. �:
HALLMrtTH 6LOCK 64.s.
:o INTERIOR AND < _ ,
A1-200
41\,...A.
m • h
- . . .
- : I• 1
CLEAR PENETRAPNG SEALER AT RAMP
..
1......irs
iii
.• . .., 't9,. ... 4411%1414A01, 4:4, , , ...._s 0.
a
/ 4'
. d'• / j
•e•
SG Note: Updated ramp provided by
Mode
I abed
.rr..r.rr.Pr..t ...... • ` '''""::.3t" .':r #iig
�.. ^
ra. 4....
I I _,..l..
&,. r... , ••=mr.4••••*
�.�..�
..•at..
r~
NO.4•.e I =T I .vrt • .t,tn I yw...••• r..-. -- M... --rr--T:..r--. -
-Y(i��n:MI—T.... •_\+mow "'�"
... .....AI e}.ir i""• 1.r..i w.. �-
- �� --�1 s
— ry..w••w.d 'Aviv . 1
as.44wa/ anon, 4ant!
--- .....i•L•:Jf......... --.--.•• ...••-'-' viva r • AAA. .A•.
pPlerge . ...,.riinnnummirP1��1� 711�
nsl..ad ....�. ..r•• • 1a.rar-..1 w=
wvi.wwq ww�w. '..n • via ..mow.rwwr••.ram.ww
1 El mr•brIr •Mg •Mingii.rm.... , ril I•6
..•ws
11111. 1.e ���U•k••461.11116A— !lia
lowil
ar•--Rnm.".•aa..m• r Mi.
are
+r.w •viA
a MIMIIM•1••••••••••••1.•••••.17 arr
wows
stna
rs
.rr.rnr.wry ry
.+.7rvi vi.a7 r�
In —— Inta
—
r-
I. '.
-.11 ! -. . :
. ,
�� :
-.._` `ti
...... . . .. t ` .
.„.
......._,....,
..... . rA
._._.w....ag
Emma
MM. ».... 90r1 , •I MMO
.,m. y+l.on,.o
Change Order Request
Spat<<Glass NO. CCD-0076
Title: COR 076-Yonders Point Electrical Pedestal Relocations Project No.:3023148.01
Project: CoRR-OSP Buildout Lakeview Quoted Date:09-Oct-25
To: City of Round Rock Expiration Date:23-Oct-25
Arnie Hammock
2008 Enterprise
Round Rock,TX 78664
SpawGlass Construction hereby submits a Change Quotation for the following changes In contract work
This change includes the cost for the relocation of Pedestal 2, raising Pedestal 4 and 5 on existing supports for grading and serviceability,and
the new pull box pathway near Pedestal 2 for events.This change is shown to be funded from outside of original GMP so indirect costs have
been applied at GMP rates.
Vendor Work Description Labor Material Equip. Sub Other Total
SpawGlass Contractors,Inc. FEE 0.00 0.00 0.00 0.00 651.00 651.00
SpawGlass Contractors,Inc. GC BOND 0.00 0.00 0.00 0.00 139.00 139.00
SpawGlass Contractors,Inc. SUBCONTRACTOR DEFAULT 0.00 0.00 0.00 0.00 226.00 226.00
INSURANCE
SpawGlass Contractors,Inc. BUILDERS RISK INSURANCE 0.00 0.00 0.00 0.00 45.00 45.00
SpawGlass Contractors,Inc. GENERAL LIABILITY INSURANCE 0.00 0.00 0.00 0.00 141.00 141.00
Schmidt Electric Company,Inc ALL ELECTRICAL 0.00 0.00 0.00 18,030.00 0.00 18,030.00
0.00 0.00 0.00 18,030.00 1,202.00 19,232.00
TOTAL $19,232.00
CALENDAR DAYS EXTENSION TO CONTRACT COMPLETION DATE 0
_We have proceeded with this change as per written direction.
lWe have not proceeded with this change.In order to proceed,please return a signed copy of this proposal request.Thank you.
APPROVED BY:
SpawGlass Contractors,Inc. Date Architect/Engineer Date Owner Date
SpawGlass Contractors,Inc.,1111 Smith Rd,Austin,TX 78721 (Phone)512 719-5251
City of Round Rock
Old Settlers Park Buildout
City of Round Rock General Services
Change in Work-Cost Analysis Form
(To Be Completed All Subcontractors,Supplier,&Contractors Associated with the Change Proposal)
Project No.&Name: CoRR OSP-Lakeview
Contractor Name: Schmidt Electric Change Proposal No 22R 09.28.2025
Description of Change: Yonder!Point-Electrical Pedestal Revisions
tEach line is for labor or material/equipment or Subcontracted work(only one) 1,1
[tern# Descrption Quantity Unit Unit Cost Labor Equ ptatrrnt Bid Pricing
1 Trench&Backfill 2.2'Sch 40 PVC Feeder Co duiu(Pedestal#2 to#1) 199.00 LF S 41.45 $ - $ - $ 8,248.55
2 Install Mule Tape in Repaired 2-2'Conduits from Pedestal#2 to#1) $ 108.26 S 26.65
3 Install#4/0 Parallel Feeders from Pedestal#2 to Pedestal#1
4 Remove&Relocate One(1)Service Pedestal#2 S 1,105.66 S 803.30
5 Demo Three(3)17"X 30"1-Boxes. _ $ 321.56 $ - $
6 Procure&Install Two(2)17"X 30"1-Boxes. S 450.00 $ 2,550.00 S
7 Trench&Backfill-1.2"Sch 40 PVC Conduit Under Sidewalk 20.00 LF $ 29.52 S - 5 - S 590.40
8 Additional Thirty(30)LF 2"Conduit Under Sidewalk $ 199.37 S 118.27 S
9 Install Mule Tape in Repaired/Existing Feeder Conduits _ S - $ - S
IO Raise Pedestal#4 $ 428.74 S 163.72
11 Raise Pedestal#5 S 428.74 $ 163.72
12 Mini X Rental(3 Days) S 1,124.24
N
S 3,042) S 4,950 S 8,839
L_A 1 B D 11
Subtotal(Non-Bid Pricing) Subtotal(A+B) S 7,992
Overhead&Profit(15%) $ 1,199
Bid Pricing(No Additional Fee Added) Subtotal D S 8,839
TOTAL FOR THIS CHANGE PROPOSAL* S 18,030
,1IN TIwo AVINI �•�``
- s1at1►q MVB�rr n o
WAWA
/ ;-4,-,11/4:.--
.4,__...- rJ ® OVA___ ' w. ‘.w....
/� a p„ WAELTZ&PRETE.IN,
u +b 1 CIVIL ENGINEERS
/w.tn
r _ ,rtutowwlal . .was :I.N.w ..w+.oR
N01Y1T 1I�� NANNw n.wn
RQ�j,T,N.RMI.E i t O OW.Nun{NO AN ROOD/Oink, A
I FOR&ea FOLK ff- / .
. oavt m.c«//.0 Ram �*�•
�`J
IFWr, , 214 cnas"RarIE IN.Ii NOT ENNUI)as OROIi `�
? 1 FEIN .aft . i slot[NOR ft,M/.G KO F NT*nrt elaFTOR Of L
MON ^r' O.R�,4WPS.R.p, - NOT MOW 1•.MINN NON
! •.� I NOR arn•R1RM gwORE
'4\ —_----
`.N.Mf.w
�� �� \•, 1 " t1A00. ems•
••,} w.wtw. 1.NA
VA KR..G a Wlp.tl AT EW1tM/iCerwA 0.INN1 Vt
' ,yy WAD rRN
ON lnI R NA a Ar.r.EAATTNC 00.21.a art No OLD SETTLERS PARK
LAKEVIEW
�` t ; (. .r .,,I K1Fl*E�tt 1E111[M
Yt51OER/a[1EMIIX
Y ��\\� •�._ C{TY OF ROUND ROCK
... I.6*,,
I .0,n City Of Round Rock ._ >
t `< S INTEN
IDCWP R ISSUED FOR
r } t �� ' CONSTRUCTION 1
• . �� r�
��.f,_ � �j Rrw.wf.....R�b.r Rim •tayy ``t
.,�.aNlyt.,r w • 9
i 7 b r le.
. Hi6T Wiii.i i t
_ ,I Ttt
i .,wn w..ta.� il
.�,,.a ., IliTexas an
.11E W,.B.Ato.O RE AREA.IOO tommanor RENAME LAN ITB.PNCNO
to.Iwl.oE RNTOCATOR PO NIX.l a .wT. OffAMR0 A-- .--� / // / 1 /
Rwrn,woa fCis.Kl('MORL'IIMLL - ;
r.nuom wtm[1ltoflY_ , w-Wt
t , - 1 PONE .-f.��._.
�` T 1OFL
��\ 7'/"-A GRADING-
. _ S1`s`A. YONDER'S
�Rt.tl alwt...rl. A. 'w..NITI I�.�• YONDER'S 41 OF 21
\ y.
1 .....1674.
D, ,. oa6mi
Pair G.
R...Ir.....Rn , \ \ IN? •wm
' • t --_--PROJECT.KEY MAP --
1otFafy Q
• Fw C4IPORO NTIMMTI01 . I-•m , ..
.I, C-24
WAELTZ&PRETE.IN,
CIVIL ENGINEERS
]„N Aw Owe 0.15
now No.Tx TWIN
- PPP• .ALC AP WWII
1M7lI:CNAa. Mw .PON CONfINN _Ip
1 �,, CEINIAT[3 ACQ51�E NOVI �'�?
`
�1` ' „RQ
II, 1 r , b , nc ACCESSIBLE navem WALL N EXCEED n COCOS
,, I I , !LOPE MCA PS ELNNO ROPE W FIN TT!EXCEPTION OP • 0.
WN
LIPS SWIM SWIM WWK XI ApT EXCEED TA CROSS Rao ti
1 NOW•11%NO NND ROPE .
t N.� \ 4 NEPENpILE NETT c a POR.r nu wo uvua APO rn �WIEI,
LEOENS Now
\\\\, OLD SETTLERS PARK
•
IEW
• \\11 mo 1 PA w,AALLEr IUD.
,� `� noun wOC TX NW
LEE PNO ,O '', i ‘ y■ ,u W
iP01 TIEOOMOIATON CUT NIL,.
'ID BIQA=NEVEM-MOCK NNOATgN• 4 - I % 11 1, CITY OF ROUND ROCK
WORK
EAST).WOlWALK 7PdaAl.NOLL i 5 fi
R NCELOW NOT/QtA Mort ,1 ,, i1, S
% awes AL ...was St
5- ` City\ Of Round Rock I
ISSUED FOP J
\ Ili, 311 CONSTRUC11ON
WaR OW IT1 1
i
tit 1 1 i ;; Texas sii
/'
Rik-wi
Emir
Qom /•' GRADING-
ii
yoNDERs
anill . .
010-031
PROJECT KEY MAP '"
C-25
`It.RIP,t'Y BUYOUT SAV:NGS CM CONTINGENCY OWNERS EXTERNAL CHANGE ,.*.,. ♦,,itn.
��. •,.n h: • CCN7:NG:!.i,. ORDER
i TOTAL _.$ 047,017.00 $ 183.074.00 • 301,710.00 $ -
FENDING•P*031C70Dpm ---{ --
cm ai I aN-saw 0in0e0r a.nka DM P w 3a
r7 CC.O. arr 6 401/166. Tj e«rae one Peril IS
n CON an M n*
s till-Aadati-al Maw 0O..ar nor 6rta!r 0 13,700.00 R..nrRlt 0/111 ~an yg igiS 00R 0Y 04ew4M Omni Dodge Pale. $ 20,743,00, RN s .a01/f0 Plm4d d One/alkidl0rI.for A53 lbw**
D014 000 AMRMsw DatOaea atrlOMrl 0l1 SI (I LAWN Sailleiatit O/b A.qeine to ASS foiwnrls
008 077 Mir 140-HMO..Rant tandlss Orr Prafttlrlr. t _ _ 6 71.1 4.00 , 614RIMe011L Aunerg am...•'
OOR 001 P1RSr.M1a RRMaMP.O Well Barn.+ ! 6 (7,210./0L Awp.nR*OM A'aer,weans tgoredasee,rp»r
Cog 070 !anaaA et YaNrs►+W f 84,71100 waaheet Ran 4a'Q'u7 Rain f41M1
COW 017 111I 032-Pleoar Odd Credit ,1 (LINAO) 0atr0Ra06 10/7 IS'Ialf A4sP0W
M CPI 079 ,P a at Y0 $s'.6Ya1MR-16.10304 0a64aarrn _ 4 7V.000.Oo f 42 3*5.00 0.Md10M 10P 4
COR060 ,ou0Aara Wok ches4 __ -f 7,763.00 .--. -
COO 070 ,el.ctrkal Pedestal Rwoadjen at Yonder'. _ .6 uy231.00
�'d*.S4 PUN - rrare R.v tabl.w.e l/w.r.1ldk
�_._---__--__.._. ,�__ 2700.00. .
_ napes Add data•
COO.OKt IMMI Mlrrr�b M ADA Par..v _ - - 7f,000.0a_ i:Af61n.P earnrnlorts Aprea•a a MODE
COO 000 Claannws Ciatfll ea Panama.C6w a oar nTMa•'P RR awn•.a __
COM 007 {RR 131-Rase esm 1Rlnsle _ 5 1„1�0.00 ---
1
-- MT'OTAL` M$03,344 $104,703• $2.100 $122,41-41 - -
•
_ AROV8D 5 7,1117.00, 0 16T 50 074.00 ,{ 3 ,760.00 5 _
r07mJ.40/►1070CTe0 $ .3r344,00 $304,703 63.200 $ 122,404.00
$ 0,439.00 $ 17,051.00 _$ 5,830.00__$ (122,486.00)1
CONTRACT BRIAKDOWN
WIY041rooer7Or01111CI Misr SALA11Ce Original ContrOa - —.— -- 13,4%160
MODAL $ 1,044,120.00 Exte"e (I4n2C1 L.. :e.
0,n.1 APPROVED O1.42173 $ 947,017 00 $ 101.603.00 I Convect Total: $13,116,746
A....o.e.D a rRO)ECYI!,OIMIGES $ 93,364.00 $ 8,439.00
0007RACToc0 0131111310111CY sir 11ALAA111 OWNER BUDGET BREAKDOWN
OC I0L $ 401,628.00 Current Contract Total 5 13,616,746.00
.,t MINAOWe25 $ 211.074.00 $ 121,754.00 Buyout Sayings(Remaining) S (3,439.00)
..asm APPROVED a PROPECTEO CHANGES $ 104,703.00 $ 17.051.00 Current Cost 513,601,307
0012,41 0,dpt 5 13494,260
Orrrarra cost.l4rCY swan act,.* 01/h1R.ara.lNh $ t11A,0r7)
0431204Nl $ 404,821.00
owe APPROVED O4lI $ 396,790.00 $ 8,038.00
w... ..o I PRO1BCTeo 0444n255 $ 2,208.00 $ 5,630.00I
Page 1
... _
_._ ...._. ..... �.• -J•tY__.—_..��. _—• --
wry—y
><�J.YY4L .r... ..._ .
Mir
-
y�1
r—i•...rrr J
1
=Is AS 0•ill•.••.YY. J .�•, , ._
ram•44•••••err_••_.• • 4 ..r. .--.. ....__.,
.••••OWN,.dinaar.r•tr • amt. •
......,.••••._-.-..mow...
SHY •.••.••••••• . ♦ ate•
.M.J/l•.r.•l••.rNa..._� -�•—•. �*.��u-1• .. .....
�_s .
! ::i
-4/144_ •,_...__...._.......t_..i • M,•.•.• 4 Midi,
JRJ••••nYrrl .. ..• ..•�_ ._
_— 1••••ram
rrrI• 7
1.
e OP 455 r.•••••• il• - ft. . 1.r....r..Yw..m•
r as.••r rri� I tall
_ _ .• M • ' .. _ . —..•. —_—
M▪N 1•...•.IS.•..- if 1
.•r r.�.....—..... y y �_ 1
•
•
I a ••• • •.•••.• • • M.,./.1.w p.n.,.
>®—.w.. ._ r—r•. fir•.-.
—•_ ..+ • a•R �.rl..• CltlMrll•M�M•tl • • r..r
w1/1,. r.•.._... • •Y
=__- 1.1 Mara
+ ` I. I f I 1 I f '
Aer... '
Page 1
r