Loading...
Contract - Spawglass Constructors, Inc. - 9/24/2026 „....,,,,..-.''-''.:.AIA Document G701 - 2017 Change Order PROJECT:(Name and address) CONTRACT INFORMATION: CHANGE ORDER INFORMATION: CoRR-Old Settler's Park Contract For:Lakeview Change Order Number 001 3300 E.Palm Valley Blvd Date:03-03-2026 Date:03-03-2026 Round Rock,TX 78665 OWNER:(Name and address) ARCHITECT:(Name and address) CONTRACTOR:(Name and address) City of Round Rock Waeltz&Prete.Inc. SpawGlass Contractors,Inc. 221 East Main Street 211 N.A.W.Grimes Blvd. 1111 Smith Road Round Rock,TX 78664 Round Rock.TX 78665 Austin,TX 78721 THE CONTRACT IS CHANGED AS FOLLOWS: (Insert a detailed description of the change and, if applicable,attach or reference specific exhibits Also include agreed upon adjustments attributable to executed Construction Change Directives.) This change order includes the Change Order Requests 030,073,and 076 for the Lakeview Package. COR 030-Playground Grading Revisions COR 073-RFI 140-Pavilion Ramp Landings Steel Modifications COR 076-Yonder's Point Electrical Pedestal Relocations The original Contract Sum was $ 13,494,260.00 The net change by previously authorized Change Orders $ 0.00 The Contract Sum prior to this Change Order was $ 13,494,260.00 The Contract Sum will be increased by this Change Order in the amount of $ 92,486.00 The new Contract Sum including this Change Order will be $ 13,586,746.00 The Contract Time will be increased by Twenty-Four(24)days. The new date of Substantial Completion will be 10-30-2025 NOTE:This Change Order does not include adjustments to the Contract Sum or Guaranteed Maximum Price,or the Contract Time, that have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and Contractor,in which case a Change Order is executed to supersede the Constriction Change Directive. NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER. 1.2- ARCH CT(Si na[ur) co (Signature) OWNE (Signature giTit".N — -q17S1 `► / WGl2t1 - ex Cc or c cayor /Prin ed name,title,and (Pri ed name and tit el (Printed r e and title) license number if required)Date j-t A-U`,, 24 �Q I\l 12.t((� . Hi Date Da AIA Document G701—201 r Copyright©1979.19B7 2000,2001 and 2017.Al'rights reserved.'The American Institute of Architects.'`Ameican Institute of Architects,”"AIA,"the AIA Logo,and'AIA Contrac:DocJments"are trademarks of The American Institute of Architects Th.s document was oroduced at 16:45:09 CDT on 06/11/2026.order Subscription No.20250142682 whici expires on 0006/2026,is not for resale,is licensed for one-time use only,and may only be used in accordance with the AIA Contract Documents^Terms of Service To report copyr ght violations,e-mail docinfo@aiacontracts.com User Notes: (3a2ae4aede0a2c4604322dc4) 2e2 - 2i-t-5 spawGlassj CONTRACT CHANGE ORDER Project Name: CoRR - OSP Buildout Lakeview Date: 2025-05-23 Owner: City of Round Rock Change Order No.: OCO 0001 2008 Enterprise, Contractor Project No.: 3023148.01 Round Rock, TX 78664 Architect Project No.: Quote No. Change Order Description Amount CCD-0030 COR 030 - ASI 003 - Playground Grading and Seat Wall Revisions $0.00 Notes: This change order extends the overall completion date for the Lakeview Package based on the delay incurred due to grading and seat wall revisions for the Playground areas. Extension of Time This Change Order: 24 Working Days Original Contract Amount $13,494,260.00 Previous Extension of Time: 0 Total Previous Change Orders $0.00 Total Extension of Time to Date: 24 Working Days Contract Amt. Prior to this C.O. $13,494,260.00 Original Contract Substantial Completion: 2025-9-26 Total This Change Order $0.00 Revision Substantial Completion: 2025-10-30 Current Contract Amount $13,494,260.00 OWNER ARCHITECT CONTRACTOR By: By: By: _ Date: ( 2024 Date: Date: The Contractor hereby reserves its right to claim additional time and/or monies for the cumulative impact of project changes. SpawGkass CONTRACT CHANGE ORDER Project Name: CoRR - OSP Buildout Lakeview Date: 2026-02-24 Owner: City of Round Rock Change Order No.: OCO-0002 2008 Enterprise, Contractor Project No.: 3023148.01 Round Rock,TX 78664 Architect Project No.: Quote No. Change Order Description Amount CCD-0073 COR 073 RFI 140 - Pavilion Ramp Landings Steel Modifications S73,254.00 CCD-0076 COR 076 -Yonder's Point Electrical Pedestal Relocations $19,232.00 Notes: Extension of Time This Change Order 0 Original Contract Amount $13,494,260.00 Previous Extension of Time 0 Total Previous Change Orders $0.00 Total Extension of Time to Date Contract Amt. Prior to this C.O. $13,494,260.00 Original Contract Completion Date: 2025-10-30 Total This Change Order$92,486.00 Revision Completion Date: 2025-10-30 Current Contract Amount $13,586,746.00 OWNER ARCHITECT CONTRACTOR By: By: By: Date: & 2- ZZ(Q Date: Date: The Contractor hereby reserves its right to claim additional time and/or monies for the cumulative impact of project changes. 10/9/25,9:45 AM Mail-Parker Blaschke-Outlook f Outlook RE: CoRR OSP - Lakeview - Outstanding Change Orders from Outside GMP From Gina Cordeiro <gcordeiro@roundrocktexas.gov> Date Thu 10/9/2025 9:39 AM To Parker Blaschke <Parker.Blaschke@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Katie Baker <kbaker@roundrocktexas.gov> Cc Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Harrison Holley <Harry.Holley@SpawGlass.com>; Cullen Schoener <Cullen.Schoener@SpawGlass.com> Both are approved. Thanks Gina Cordeiro Project Manager Building Construction City of Round Rock I General Services Building Construction & Property Maintenance 212 Commerce Blvd. I Round Rock, TX 78664 ■ 512.218.5473 Cell 512.608.2762 Fax 512.218.5576 gcordeiro@roundrocktexas.gov ROUND ROCK TEXAS From: Parker Blaschke<Parker.Blaschke@SpawGlass.com> Sent:Thursday, October 9, 2025 9:22 AM To:Gina Cordeiro<gcordeiro@roundrocktexas.gov>; Richard Will<richardwill@roundrocktexas.gov>; Katie Baker <kbaker@ round rocktexas.gov> Cc:Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGlass.com>; Cullen Schoener<Cullen.Schoener@SpawGlass.com> Subject:CoRR OSP-Lakeview-Outstanding Change Orders from Outside GMP Gina, Following up on our conversation, attached are the emails for both COR 073 - Pavilion Ramp Modifications and COR 076 - Yonder's Electrical Pedestal Relocations that are shown to be funded from outside of the GMP. We discussed COR 073 at the OAC this week and I reached hops://outlook.office.com/mail/iinbox/id/AAkALgAAAAAAHYQDEapmEc2byACgAC%2FEWg0AxReKW79i7UG%2606dOMxNTaAAE%2BF 7rJgAA?nat... 1/2 10/14/25,8:47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook Outlook RE: CoRR OSP - Lakeview - COR 030 - ASI 03 Playground Grading and Seat Wall Revisions From Katie Baker <kbaker@roundrocktexas.gov> Date Fri 5/23/2025 1:58 PM To Parker Blaschke <Parker.Blaschke@SpawGlass.com>;Gina Cordeiro <gcordeiro@roundrocktexas.gov> Cc Joseph Hudson <jhudson@roundrocktexas.gov>;Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley <Harry.Holley@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>;Joseph Witherspoon <J.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>;Antonio Prete <tony@w-pinc.com> about:blank?windowld=SecondaryReadingPane3 1/4 10,14'25.8 47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook Looks good, Parker— Thanks for working to get this pricing finalized. Thanks, Katie From: Parker Blaschke<Parker.Blaschke@SpawGlass.com> Sent: Friday, May 23, 2025 1:54 PM To: Katie Baker<kbaker@roundrocktexas.gov>; Gina Cordeiro <gcordeiro@roundrocktexas.gov> Cc: Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>;Joseph Witherspoon <J.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Antonio Prete<tony@w-pinc.com> Subject: RE: CoRR OSP- Lakeview- COR 030-ASI 03 Playground Grading and Seat Wall Revisions Team, Following up on this initial COR 030. Please see the attached revised COR 030 — Revision 1 per the exhibit provided on 5/19. As shown, this change is proposed to be funded solely from Owner's Contingency. Please let me know if you have any questions or comments regarding this revised pricing. Based on the email direction below, we'll be proceeding with this change order as submitted. Thanks! Parker Blaschke Senior Project Manager/Employee Owner SpawGlass o. 512-719-5251 c. 512-552-9988 SpawGlass.corn �]a Provithng the Absolute Be:; Rcy -i--- Constructrnn f:xpertenre >ool{ Spuu'Gluss Builds...Comm unities about:blank?windowld=SecondaryReadingPane3 2 4 10/14/25,8:47 AM RE CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook From: Katie Baker<kbaker@roundrocktexas.gov> Sent: Monday, May 19, 2025 4:05 PM To: Parker Blaschke<Parker.8laschke@SpawGlass.com>; Gina Cordeiro <gcordeiroProundrocktexas.gov> Cc:Joseph Hudson<jhudsonJroundrocktexas.gov>; Cullen Schoener <Cullen.Schoener_f@SpawGlass.com>; Harrison Holley<Harry.Holley_@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@DSpawGlass.com>;Joseph Witherspoon <J.WitherspoonPSpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>;Antonio Prete<tony@w-pinc.com> Subject: RE:CoRR OSP- Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions Parker— See attached wall markup. This shows the limits of wall and size / material of each wall. This should bring the number down some based on what was priced below. Assuming SpawGlass agrees in principle that this should bring the price down (decreasing the amount of wall, the width of wall in place, and overall extent of masonry) or at least not exceed the pricing below— please proceed with these changes as shown while the pricing is finalized. Like I mentioned today in our meeting, Tony says there should not be any issues grading the areas out in the areas the walls were removed. Please let me know if you have any questions. Thanks, Katie Baker, PLA, CPRP Park Development Manager City of Round Rock Parks and Recreation (0) 512.341.3355 From: Parker Blaschke<Parker.Blaschkef@SpawGlass.com> Sent: Friday, May 16, 2025 4:15 PM To:Gina Cordeiro<gcordeiro@roundrocktexas.gov> Cc:Joseph Hudson<jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley<Harry.Holley_@SpawGlass.com>;Tyler Wenzel<Tyler.Wenzel@SpawGlass.com>; Katie Baker<kbaker@roundrocktexas.gov>;Joseph Witherspoon<1.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>;Antonio Prete<tonyffw-pinc.com> Subject: CoRR OSP- Lakeview-COR 030- ASI 03 Playground Grading and Seat Wall Revisions Gina, about:blank?windowld=SecondaryReadingPane3 3/4 10/14/25,8:47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook Please see the attached COR 030 for the Lakeview Package and formal Schedule Delay Notice regarding the ASI 003 Playground Grading and Seat Wall Revisions. As noted in the letter, we have an incurred a delay to the overall project schedule based on the revised drawings. Per the schedule included in the letter attached, the revised Substantial Completion Late-Finish date for the Lakeview Package is now 10/30/2025. Please let me know if you have any questions regarding the current pricing or the schedule delay. Please note, per the revised schedule, we need written approval on this pricing by 5/23/2025 in order to maintain the revised schedule submitted. Please feel free to give me a call if you have any questions! Thanks, Parker Blaschke Senior Project Manager/Employee Owner SpawGlass o. 512-719-5251 c. 512-552-9988 SpawGlass.com Sn�,� ,S Providing theAissobut Bat R( tom"v Construction Experience � coo►{ SpawGlass Builds...Communities about:blank?windowld=SecondaryReadingPane3 4/4 10/9/25,9:45 AM Mail-Parker Blaschke-Outlook out to Katie about COR 076 this morning. Please let me know if you can provide written direction on both of these CORs and we'll get started with the electrical work based on that approval. Our understanding is that these will be funded via Owner Change Order to the Lakeview contract or a future GMP package. Please let me know if you need any additional information from SpawGlass. Thanks, Parker Blaschke Senior Project Manager/Employee Owner SpawGlass o. 512-719-5251 c. 512-552-9988 SpawGlass.com cp�i'l8SS Providing the Absolute Best ()/ Construction Experience R d/ TOO►{ SpaunGlass Builds...Communities https://outlook.office.com/mail/inbox/idlAAkALgAAAAAAHYODEapmEc2byACgAC%2FEWg0AxReKW79j7UG%2B06dOMxNTaAAE%2BF7rJgAA?nat.. 2/2 CHANGE ORDER/COST LOG cam u.ur..or... .,.,ro alai .. .�•.•. ...r,� .u.,—...�.r...,...a_-....�......s.«.... cos.®•ft. MM u••w•e.s ..«e rwtnmuwn, II ft. 4.011 0 AM Mar -•.rr•Mad,arm ar •r.rrw.«.M•w•.�..•rer M.all an Or SIN•M.L.-ram Mara.rMaw.a•ar a wr.w Ma M•o.•• _i•••sT_,•m••.•••.r ems• • meatus _ MM MOP•M•.L•MMr•M HOYwM• me el FM.Maw Ala 1.1111.111 CM M« ••.•Sa et Ma•..•...•...«...M. • HMO ...Awl.: .•.«a OM MI•T.• •.o••.....•,•. • .lolls ma pp am nay. paom coo en apg jfi aL ire..••• vAs•:u..M..•.m•w•°««......•..•••.. • mao. • • I•.......... ....,MAP a,,..,... _ - i ' a' • 3,'....., °aa.r .. A ....... . _M.. calm.Mal W.• Nan U«..• MAUL Mfr. � • M.M.M.. . •• .- m7Timmeserm .9 tadi _�• $11.1.1 .... ,,. • 11.03. MW= Ma.CY COO Om � Page 1 Spa Gass CONTRACT CHANGE ORDER Project Name: CoRR- OSP Buildout Lakeview Date: 2026-02-24 Owner: City of Round Rock Change Order No.: OCO-0002 2008 Enterprise, Contractor Project No.: 3023148.01 Round Rock,TX 78664 Architect Project No.: Quote No. Change Order Description Amount CCD-0073 COR 073 RFI 140 - Pavilion Ramp Landings Steel Modifications $73,254.00 CCD-0076 COR 076 -Yonder's Point Electrical Pedestal Relocations $19,232.00 Notes: Extension of Time This Change Order 0 Original Contract Amount $13,494,260.00 Previous Extension of Time 0 Total Previous Change Orders $0.00 Total Extension of Time to Date Contract Amt. Prior to this C.O. $13,494,260.00 Original Contract Completion Date: 2025-10-30 Total This Change Order $92,486.00 Revision Completion Date: 2025-10-30 Current Contract Amount $13,586,746.00 OWNER ARCHITECT CONTRACTOR By: By: By: Date: Date: Date: The Contractor hereby reserves Its right to claim additional time and/or monies for the cumulative Impact of project changes. 10/14/25,8:47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook Looks good, Parker— Thanks for working to get this pricing finalized. Thanks, Katie From: Parker Blaschke<Parker.Blaschke@SpawGlass.com> Sent: Friday, May 23, 2025 1:54 PM To: Katie Baker<kbaker@roundrocktexas.gov>; Gina Cordeiro <gco rd e i ro @ ro u n d ro c ktexa s.gov> Cc:Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Joseph Witherspoon <J.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Antonio Prete<tony@w-pinc.com> Subject: RE: CoRR OSP- Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions Team, Following up on this initial COR 030. Please see the attached revised COR 030 — Revision 1 per the exhibit provided on 5/19. As shown, this change is proposed to be funded solely from Owner's Contingency. Please let me know if you have any questions or comments regarding this revised pricing. Based on the email direction below, we'll be proceeding with this change order as submitted. Thanks! Parker Blaschke Senior Project Manager/Employee Owner SpawGlass o. 512-719-5251 c. 512-552-9988 SpawGlass.comn SpawGlass i Providing the Absolute Best R(�j Corutruction Experience ��II .. Too►o SpatwGlass Builds...Communities about:blank?windowld=SecondaryReadingPane3 2/4 10/14/25,8:47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook From: Katie Baker<kbaker@roundrocktexas.gov> Sent: Monday, May 19, 2025 4:05 PM To: Parker Blaschke<Parker.BlaschkejSpawGlass.com>; Gina Cordeiro <gcordei ro@ round rocktexas.gov> Cc:Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley<Harry.Holley_@SpawGlass.com>; Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Joseph Witherspoon <J.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Antonio Prete<tony@w-pinc.com> Subject: RE: CoRR OSP - Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions Parker — See attached wall markup. This shows the limits of wall and size / material of each wall. This should bring the number down some based on what was priced below. Assuming SpawGlass agrees in principle that this should bring the price down (decreasing the amount of wall, the width of wall in place, and overall extent of masonry) or at least not exceed the pricing below— please proceed with these changes as shown while the pricing is finalized. Like I mentioned today in our meeting, Tony says there should not be any issues grading the areas out in the areas the walls were removed. Please let me know if you have any questions. Thanks, Katie Baker, PLA, CPRP Park Development Manager City of Round Rock Parks and Recreation (0) 512.341.3355 From: Parker Blaschke<Parker.Blaschke@SpawGlass.com> Sent: Friday, May 16, 2025 4:15 PM To: Gina Cordeiro<gcordeiro@roundrocktexas.gov> Cc:Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Katie Baker<kbaker(« roundrocktexas.gov>;Joseph Witherspoon <1.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Antonio Prete<tony@w-pinc.com> Subject: CoRR OSP- Lakeview -COR 030 -ASI 03 Playground Grading and Seat Wall Revisions Gina, about:blank?windowld=SecondaryReadingPane3 3/4 10/14/25,8:47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook Please see the attached COR 030 for the Lakeview Package and formal Schedule Delay Notice regarding the ASI 003 Playground Grading and Seat Wall Revisions. As noted in the letter, we have an incurred a delay to the overall project schedule based on the revised drawings. Per the schedule included in the letter attached, the revised Substantial Completion Late-Finish date for the Lakeview Package is now 10/30/2025. Please let me know if you have any questions regarding the current pricing or the schedule delay. Please note, per the revised schedule, we need written approval on this pricing by 5/23/2025 in order to maintain the revised schedule submitted. Please feel free to give me a call if you have any questions! Thanks, Parker Blaschke Senior Project Manager/Employee Owner SpawGlass o. 512-719-5251 c. 512-552-9988 SpawGlass.corn • S 1WGIaSS - Providing the Absolute Best ZERO/ Construction + - �/ Too►{ Spau'Glass Builds...Communities about:blank?windowld=SecondaryReadingPane3 4/4 10/9/25,9:45 AM Mail-Parker Blaschke-Outlook out to Katie about COR 076 this morning. Please let me know if you can provide written direction on both of these CORs and we'll get started with the electrical work based on that approval. Our understanding is that these will be funded via Owner Change Order to the Lakeview contract or a future GMP package. Please let me know if you need any additional information from SpawGlass. Thanks, Parker Blaschke Senior Project Manager/Employee Owner SpawGlass o. 512-719-5251 c. 512-552-9988 SpawGlass.corn SpawGlass Pyoviding the Absolute Best 019 Construction •Experience Z SpawGlass Builds...Connn unities hops://outlook.office.com/mail/inbox/id/AAkALgAAAAAAHYQDEapmEc2byACgAC%2FEWg0AxReKW79j7UG%2B06dOMxNTaAAE%2BF7rJgAA?nat... 2/2 SpawGlass Change Order Request p NO. CCD-0030 Title: COR 030 -ASI 003- Playground Grading and Seat Wall Revisions Project No.:3023148.01 Project: CoRR -OSP Buildout Lakeview Quoted Date:23-May-25 To: Expiration Date:06-Jun-25 SpawGlass Construction hereby submits a Change Quotation for the following changes in contract work This change order includes changes to the playground pods grading, seat walls and additional retaining walls and stairs as shown on ASI 03 as issued by Waltz and Prete and the exhibit provided by CoRR PARD on 5/19/25. Grading from ASI 03 to be utilized and seat wall/concrete curb to follow exhibit provided.This change is shown to be funded from Owner's Contingency as this was a contract drawing change driven by Playground Manufacturer requirements. Vendor Work Description Labor Material Equip. Sub Other Total Action Decorating, Inc PAINTING 0.00 0.00 0.00 1,440.00 0.00 1,440.00 Brazos Masonry, Inc. MASONRY 0.00 0.00 0.00 -6,970.00 0.00 -6,970.00 Champion Site Prep Inc. EARTHWORK 0.00 0.00 0.00 20,221.00 0.00 20,221.00 The George D.Alan Co. LLC dba ALL WATERPROOFING 0.00 0.00 0.00 2,193.00 0.00 2,193.00 GDA Contractors Lithko TX, LLC ALL TURNKEY CONCRETE 0.00 0.00 0.00 129,477.00 0.00 129,477.00 Metalink,LLC. SITE RAILINGS 0.00 0.00 0.00 19,370.00 0.00 19,370.00 Schmidt Electric Company, Inc ALL ELECTRICAL 0.00 0.00 0.00 6,217.00 0.00 6,217.00 UTZ Environmental Services ALL LANDSCAPING 0.00 0.00 0.00 -42,697.00 0.00 -42,697.00 SpawGlass Contractors, Inc. OWNER'S CONTINGENCY 0.00 0.00 0.00 0.00 -129,251.00 -129,251.00 0.00 0.00 0.00 129,251.00 -129,251.00 0.00 TOTAL $0.00 CALENDAR DAYS EXTENSION TO CONTRACT COMPLETION DATE 24 We have proceeded with this change as per written direction. X We have not proceeded with this change. In order to proceed, please return a signed copy of this proposal request.Thank you. APPROVED BY: SpawGlass Contractors,Inc. Date Architect/Engineer Date Owner Date SpawGlass Contractors, Inc., 1111 Smith Rd,Austin,TX 78721 (Phone)512 719-5251 10/14/25,8:47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook al Outlook RE: CoRR OSP - Lakeview - COR 030 - ASI 03 Playground Grading and Seat Wall Revisions From Katie Baker <kbaker@roundrocktexas.gov> Date Fri 5/23/2025 1:58 PM To Parker Blaschke <Parker.Blaschke@SpawGlass.com>; Gina Cordeiro <gcordeiro@roundrocktexas.gov> Cc Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley <Harry.Holley@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Joseph Witherspoon <J.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Antonio Prete <tony@w-pinc.com> about:blank?windowld=SecondaryReadingPane3 1/4 10/14/25,8:47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook Looks good, Parker— Thanks for working to get this pricing finalized. Thanks, Katie From: Parker Blaschke <Parker.Blaschke@SpawGlass.com> Sent: Friday, May 23, 2025 1:54 PM To: Katie Baker<kbaker@roundrocktexas.gov>; Gina Cordeiro <gcordeiro@roundrocktexas.gov> Cc:Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Joseph Witherspoon <J.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Antonio Prete<tony@w-pinc.com> Subject: RE: CoRR OSP - Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions Team, Following up on this initial COR 030. Please see the attached revised COR 030 — Revision 1 per the exhibit provided on 5/19. As shown, this change is proposed to be funded solely from Owner's Contingency. Please let me know if you have any questions or comments regarding this revised pricing. Based on the email direction below, we'll be proceeding with this change order as submitted. Thanks! Parker Blaschke Senior Project Manager/Employee Owner SpawGlass o. 512-719-5251 c. 512-552-9988 SpawGlass.com ll Providing the Absolute Best (� ass Construction Experience �R . Too►� SpawGlass Builds...Communities about:blank?windowld=SecondaryReadingPane3 2/4 10/14/25,8:47 AM RE: CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook From: Katie Baker<kbaker@roundrocktexas.gov> Sent: Monday, May 19, 2025 4:05 PM To: Parker Blaschke <Parker.Blaschke@SpawGlass.com>; Gina Cordeiro <gcordeiro@roundrocktexas.gov> Cc:Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGlass.com>;Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>;Joseph Witherspoon <1.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Antonio Prete <tonyyw-pinc.com> Subject: RE: CoRR OSP - Lakeview- COR 030-ASI 03 Playground Grading and Seat Wall Revisions Parker — See attached wall markup. This shows the limits of wall and size / material of each wall. This should bring the number down some based on what was priced below. Assuming SpawGlass agrees in principle that this should bring the price down (decreasing the amount of wall, the width of wall in place, and overall extent of masonry) or at least not exceed the pricing below— please proceed with these changes as shown while the pricing is finalized. Like I mentioned today in our meeting, Tony says there should not be any issues grading the areas out in the areas the walls were removed. Please let me know if you have any questions. Thanks, Katie Baker, PLA, CPRP Park Development Manager City of Round Rock Parks and Recreation (0) 512.341.3355 From: Parker Blaschke<Parker.Blaschke(SpawGlass.com> Sent: Friday, May 16, 2025 4:15 PM To: Gina Cordeiro<gcordeiro@roundrocktexas.gov> Cc:Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGlass.com>; Tyler Wenzel <Tyler.Wenzel_PSpawGlass.com>; Katie Baker<kbakerProundrocktexas.gov>; Joseph Witherspoon <J.Witherspoon(ESpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Antonio Prete<tony@w-pinc.com> Subject: CoRR OSP - Lakeview - COR 030 - ASI 03 Playground Grading and Seat Wall Revisions Gina, about:blank?windowld=SecondaryReadingPane3 3/4 10/14/25,8:47 AM RE: CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook Please see the attached COR 030 for the Lakeview Package and formal Schedule Delay Notice regarding the ASI 003 Playground Grading and Seat Wall Revisions. As noted in the letter, we have an incurred a delay to the overall project schedule based on the revised drawings. Per the schedule included in the letter attached, the revised Substantial Completion Late-Finish date for the Lakeview Package is now 10/30/2025. Please let me know if you have any questions regarding the current pricing or the schedule delay. Please note, per the revised schedule, we need written approval on this pricing by 5/23/2025 in order to maintain the revised schedule submitted. Please feel free to give me a call if you have any questions! Thanks, Parker Blaschke Senior Project Manager/Employee Owner SpawGlass o. 512-719-5251 c. 512-552-9988 SpawGlass.com Providing the solute Best ZE O( SpawGlass Construction, • ...,,' R d TO D►{ Spau,Glass Builds...Comm n ties about:blank?windowld=SecondaryReadingPane3 4/4 ACTION DECORATING, INC. MBE HUB ID: 1742675891500 Commercial & Residential Painting 11002 Plains Trail Austin, Texas 78758 512-491-8900 May 7, 2025 SpawGlass Commercial, Inc. Attn: Parker Blaschke Re: Old Settlers Park—Existing Pavilion Our bid is based upon the following specifications: 1) The scope of this project a) Paint handrail extensions at playground area as shown yellow below b) Prevailing wages of$25.11 per man hour is included c) Pricing does not include entire perimeter of bench seat walls d) Bid as regular hours 2) Exclusions a) Sales Tax or Bid Bond b) After hours/Phasing/Accelerated scheduling • Base Bid $ 1,440.00 Should you have any questions or comments regarding this bid, please contact us. Thank you for considering Action Decorating for this project. Amy J;irkhnm Amy Kirkham for Action Decorating, Inc. I of I UHtUI I I U HtMUVE ALL MASUNHY VtNttH FROM PLAYGROUND SEAT WALLS BRAZOSMASONRY SINCE met REVISED: 5/16/2025 ATTN: Parker Blaschke DATE: 5/16/2025 PROJECT: CoRR OSP-Lakeview LOCATION: 1800 Harrell Pkwy,Round Rock,TX 78665 CREDIT PROPOSAL Below you will find pricing to credit existing work on the above referenced project. DESCRIPTION OF CREDIT: Credit for materials and labor associated with the playground seat walls shown on page H4 Hardscape Plans. Per:H4 Hardscape Plans BMI Pncing Request:# 8 ITEM I QUANTITY I UNIT OF I U/P I TOTAL I U/P I TOTAL I TOTAL I (MEASURE{ LABOR I LABOR I MAT I MAT I Foreman -38 HRS. $ 39.00 -$1,482.00 $ - $0.00 -$1,482.00 Masons -152 HRS. $ 28.97 -$4,403.44 $ - $0.00 -$4,403.44 Labor -228 HRS. $ 19.47 -$4,439.16 $ - $0.00 -$4,439.16 Operator/Apprentice -38 HRS. $ 23.07 -$876 66 $ - $0.00 -$876.66 4",6",8",12"Grey Lueder Stone -77 tons $ - $0.00 $ 155.00 -$11,935.00 -$11,935.00 6"CMU -1920 ea. $ - $0.00 $ 1 64 -$3,148.80 -$3,148.80 Pallet Fee -20 ea. $ - $0.00 $ 25.00 -$500.00 -$500.00 CMU Delivery -2 ea. $ - $0.00 $ 365.00 -$730.00 -$730.00 Type-S Lime -11 80#Bags $ - $0.00 $ 17-35 -$190.85 -$190.85 Lehigh Portland Cement -21 80#Bags $ - $0.00 $ 10.50 -$220.50 -$220.50 Spectrum Pigmented P&L-Type N,Stone Buff Mortar -110 80#Bags $ - $0.00 $ 22.65 -$2,491.50 -$2,491.50 C144 Masonry Sand -23 tons $ - $0.00 $ 16.50 -$379.50 -$379.50 Course Grout -14 Yards $ 95.00 -$1,330.00 $ 103.00 -$1,442.00 -$2,772.00 Freight(Super)-C144 Masonry Sand -23 tons $ - $0.00 $ 16.51 -$379.73 -$379.73 Washdown -3413 SF $ 0.20 -$682.60 $ 0.45 -$1,535.85 -$2,218.45 Forklift -38 HRS. $ - $0.00 $ 15.40 -$585.20 -$585.20 Miscellaneous Tools&Equipment -38 HRS. $ - $0.00 $ 45.00 -$1,710.00 -$1,710.00 SUB TOTAL -$13,213.86 -$25,248.93 -$38,462.79 GRAND TOTAL DEDUCT -$38,463.00 Duration of Working Days ADDED to Contract Schedule: Please send a deductive change order as soon as possible if this credit is to take place. This credit will NOT take place unless formal deductive change order is received. Any alteration to this credit without the approval of Brazos Masonry is prohibited and will void the credit proposal. Sincerely, Brazos Masonry,Inc. ,y azivGtLGW Bea.cho iOst-G Andrew Blackstone Project Manager ON PARD EXHIBIT r..tz.... . BRAZOSMASONRY SINCE 1 9 8 9 ATTN. Parker Blaschke DATE: 5/22/2025 PROJECT: CoRR OSP-Lakeview LOCATION: 1800 Harrell Pkwy,Round Rock,TX 78665 CHANGE ORDER PROPOSAL Below you will find pricing to perform additional work on the above referenced project DESCRIPTION OF CHANGE: Playground seat wall revisions per"Playground Wall Mark Up(002)".The below pricing assumes the following qualifications.CMU is per earlier RFI&Addendum establishing 6"CMU at the seat walls with a 1"air gap on either side. Rebar reinforcement is assumed to be by others.The below pricing assumes the scale is correct on the the provided"H4"drawing(-1in =20ft) Per.Playground Wall Mark Up(002) BMI Pricing Request:#6(Option#2) ITEM I QUANTITY I UNIT OF I U/P I TOTAL I U/P I TOTAL I TOTAL I !MEASURE' LABOR I LABOR I MAT I MAT I Foreman 24 HRS. $ 39.00 $936 00 $ - $0.00 $936 00 Masons 96 HRS. $ 28.97 $2,781.12 $ - $0.00 $2,781 12 Labor 144 HRS $ 19.47 $2,803.68 $ - $0.00 $2,803.68 Operator/Apprentice 24 HRS. $ 23.07 $553.68 $ - $0.00 $553.68 4",6",8",12"Grey Lueder Stone 18 tons $ - $0.00 $ 155.00 $2,790.00 $2,790.00 6"CMU 1152 ea $ - $0.00 $ 1 64 $1,889.28 $1,889.28 12"CMU 288 ea. $ - $0.00 $ 2.98 $858.24 $858.24 Pallet Fee 18 ea. $ - $0.00 $ 25.00 $450.00 $450 00 CMU Delivery 2 ea. $ - $0 00 $ 365.00 $730.00 $730.00 Cast Stone Radius Pieces 1 LS $ - $0.00 $ 5,309.00 $5,309.00 $5,309.00 Type-S Lime 21 80#Bags $ - $0.00 $ 17.35 $364.35 $364.35 Lehigh Portland Cement 41 80#Bags $ - $0.00 $ 10.50 $430.50 $430.50 Spectrum Pigmented P&L-Type N,Stone Buff Mortar 27 00#Bags $ - $0.00 $ 22.65 $611.55 $611.55 C144 Masonry Sand 12 tons $ - $0.00 $ 16.50 $198.00 $198.00 Course Grout 8 Yards $ 95.00 $760.00 $ 103.00 $824.00 $1,584.00 Freight(Super)-C144 Masonry Sand 12 tons $ - $0.00 $ 16 51 $198.12 $198.12 Washdown 705 SF $ 0.20 $141.00 $ 0.45 $317.25 $458.25 Forklift 24 HRS. $ - $0.00 $ 15.40 $369.60 $369.60 Miscellaneous Tools&Equipment 24 HRS. $ - $0.00 $ 45.00 $1,080.00 $1,080.00 SUB TOTAL $7,975.48 $16,419.89 $24,395.37 LABOR BURDEN @ 36.00% $2,871 17 MATERIAL TAX 0.00% $0.00 SUB TOTAL $27,266.54 OVERHEAD @ 10.00% $2,726.65 PROFIT @ 5.00% $1,499.66 GRAND TOTAL Add $31,493.00 Duration of Working Days ADDED to Contract Schedule: 3 Please send a change order as soon as possible if this work is to take place. Work under this proposal will NOT take place unless formal change order is received. Any alteration to this change order without the approval of Brazos Masonry is prohibited and will void the change order.Change order price is good for 30 days.After 30 days costs may be reevaluated Sincerely, Brazos Masonry,Inc ee '' � (/�Y ve44, }3L.Ghnc Andrew Blackstone Project Manager CHAMPION SITE PREP 630 1 N INTERSTATE 35 GEORGETOWN, TX 78633 OFFICE (5 121863-3453 / FAX (3 121863-3463 ADDITIONAL WORK / CHANGE AUTHORIZATION BRANDON(@IDIGDIRT.COM CORR OSP -LAKEVIEW/ PLAYGROUND DATE: 05/01/25 JOB NAME: CORR OSP-LAKEVIEW TO: SPAWGLASS ESTIMATOR: BT ATTN: PARKER BLASCHKE LOCATION: ROUND ROCK TX DESCRIPTION QTY UNIT RATE 1. ONSITE IMPORT 960 CY $5.95 $5,712.00 2. SITE EMBANKMENT 960 LS $6.25 $6,000.00 3. ADDITIONAL SURVEY 1 LS $1,350.00 $1,350.00 4. ADDITIONAL SUPERVISION 1 LS $880.00 $880.00 SUBTOTAL: $13,942.00 OH/P 15% $2,091.30 $2,091.30 TOTAL: $16,033.30 Description of Work:PRICING ABOVE FOR GRADING CHANGES SHOWN UPDATED PLAYGROUND PLANS. The scope items above include items not part of overhead including: FUEL,OIL,GREASE, MAINTENANCE,INSURANCE,SMALL TOOLS,LIGHT TRUCKS,SURVEY/CAD EQUIPMENT,AND OVERTIME IF APPLICABLE. NOTE: Pricing per GC REQUEST.Scope not listed above is not included.Price is valid for 30 days. ACCEPTANCE OF PROPOSAL-The above prices,specifications and conditions are satisfactory and are hereby accepted. AUTHORIZED SIGNATURE DATE OF ACCEPTANCE CHAMPION SITE PREP 6301 N INTERSTATE 35 GEORGETOWN. TX 78633 OFFICE 15 12)863-3453 FAX (5 12)663-3463 ADDITIONAL WORK / CHANGE AUTHORIZATION BRANDON(a�IDIGDIRT.COM CORR OSP -LAKEVIEW/ ASI 03 R1 DATE: 05/12/25 JOB NAME: CORR OSP-LAKEVIEW TO: SPAWGLASS ESTIMATOR: BT ATTN: PARKER BLASCHKE LOCATION: ROUND ROCK TX DESCRIPTION QTY UNIT RATE 1. ONSITE IMPORT 128 CY $5.95 $761.60 2. SITE EMBANKMENT 104 LS $6.25 $650.00 3. ADDITIONAL SURVEY 1 LS $1,350.00 $1,350.00 4. ADDITIONAL SUPERVISION 1 LS $880.00 $880.00 SUBTOTAL: $3,641.60 OH/P 15% $546.24 $546.24 TOTAL: $4,187.84 Description of Work:PRICING ABOVE FOR GRADING CHANGES SHOWN UPDATED PLAYGROUND PLANS. The scope items above include items not part of overhead including: FUEL,OIL,GREASE, MAINTENANCE,INSURANCE,SMALL TOOLS,LIGHT TRUCKS,SURVEY/CAD EQUIPMENT,AND OVERTIME IF APPLICABLE. NOTE: Pricing per GC REQUEST.Scope not listed above is not included.Price is valid for 30 days. ACCEPTANCE OF PROPOSAL-The above prices,specifications and conditions are satisfactory and are hereby accepted. AUTHORIZED SIGNATURE DATE OF ACCEPTANCE Volume Report CORR Old Settlers Lakevie Design vs.Existing ASI-03 Changes Vs Curren Area Volume Comp/Ratio Compact Export Change Name Total Cut Fill OnGrade Cut Fill Cut Fill Cut Fill -Import Per 0.1 ft Region-2 21,020 1,918 6,151 12,951 24 128 1.00 1.00 24 128 -104 78 •r-SW..blr'w ON+GDFO+26 1110 ` \ /71- OTE 1N 4111N\ \ ,E. ON+GD �C C0+46 F0+24 F0+77 11-1•HA WEEP 24-•C • 1 ON+GD ---- F0+24 F0+62... F1+23 `` ' r ,• ..Ipa WEEPS I N.... ,.........„, _____,. ION+GD F0+18 C0+37 ON+GD ON+GD \ ----...Y \\N--......... "--... 43% /1,5% 4!' • o ON+GD FO+1i F0+15a ON*GD ON+GD v i.r • ,.5% 7 ilgi6N ---- ON+GD ON+GD C0+15 1 / :::: i've ` •68600 • Page 1 of 2 G DA CONTRACTORS BID / QUOTATION To: Spawglass Attn: Joseph Witherspoon Project: GDA COR-CoRR Old Settlers Park-The Lakeview Playground Area Date: 5/22/2025 Item: Description: Item Price: Total Amount: #Co ASI-03 Joint Sealeant at Interior and Exterior of Cast stone where CMU meets Cast stone $ 1,254 at Cast Stone $ 939 at Masonry Control Joints $ 672 (*Take off as per H4 Sheet only) Total for Joint Sealeant at 5-12 Playground Area Playground Area $ 2,193 Acknowledge Addenda: Quote is valid for 30 Days Exclusions General-Excludes Building envelope testing.Any work not clearly shown on construction documents,Composite Cleanup UNO,Job Specific Software,BIM,non-working supervision Sealants-Excludes Sealants @ Roof,Parapet,Metal Panels,Metal Panels to other:Sheet Metal&Flashing,Glass 8 Glazing,EIFS,Aluminum,Drywall,Tile,Mill Work, Plumb Fixtures,and Concrete Repair.Custom Colors. Interior finish sealants Firestopping-Excludes Cable trays,putty pads.firestopping or smoke sealing penetrations and'pints at all non-rated assemblies UNO. Waterproofing—Excludes patch concrete holes/honeycomb greater than% Insulation at waterproofing areas only Expansion Joints-Excludes all roof expansion joint assemblies UNO, Blockouts,substrate leveling or repair for EJ's. Precon meeting required to coordinate size of EJ and tllockout before concrete is poured. Air Barrier-Excludes all metal flashing and thru wall flashing UNO, thermal insulation UNO,3rd party inspection/testing ,Inb Snerific-Fxrludes Tanina Insulation Joints 7-Girls Metal Flashing Sincerely, GDA Contractors Falak Sheth 6809 Lee Manor Cove, Manor, TX 78653 512.452.3800 GDACONTRACTORS.COM Page 2 of 2 G DA CONTRACTORS BID /QUOTATION To: Spawglass Attn: Joseph Witherspoon Project: GDA COR-CoRR Old Settlers Park-The Lakeview Playground Area Date: 5/22/2025 Item: I Description: Item Price: Total Amount: fsheth@gdacontractors.com (512)878-9103 6809 Lee Manor Cove, Manor, TX 78653 512.452.3800 GDACONTRACTORS.COM JS @ cast stone•01 133 LF 15'concrete ' JS@Masonry CJa-o10EA BEET N3 �I. + `� ;.® MATCHLINE SHEET H5 \ • ■ - t NENE A \ ; \.. '. I, • ,, '� .�•.\ ... . nsr•o•oaaan u•. •ua,n \ el __ if, COMMIT '� ` � 1 - w 1 ��'A'� rNwa arm ••wno. �\ v\ • \ '° ,_' w•c n�u /10DEPo�,o.or. `� :i�'�' - _ 15'concrete _ .,w«o.. \, _ems __I I all.ryP . , _ re,w 1 2 / leimoo \, `"�^�T`; //��Tyi `•\ i /. OOL �./ «.e.e�..•,.� wvr• vunE�a \ - - t/ mean DADA / `\ `� ell• LL 9 ' ' \ iiii -5k61,,,,,, i' II- W + , , 1 1.71 a. tea,. Illlil°I I,\ s \ all s. 4Itz 10,01....... ' /••"', 4 10 l'f, '''''' - 4)II AMOS ‘• 4/ ts.0 . . ,,......4 , t \,/ 7 ...iiii, ,.., -100,-:--.. \\\t ° 411 Ale �• • 1 n Nii . Cr / r ._ .. _F/ ' \ Allier �nNIOwDWcpC ' T5•�\, 1 �m•�.\nax" \�1 I >n•m LU --��� f/ , masonry COMM IJsnawncm _ _ a.�• \w..d �• :gym Wens.VP. a•. a '• :�•,..11,1,4 K:E•. ` •.. Moof \ wI)(�t•1:••• r1\ \ / I'•,O, o ,,% 1 \wTwnn••rx � , W W CL _ \ E.ratac t U 6'wide ro 1 \ . _, O \ concrete i 43 �,``r•\) \ t•I �- '1 \ r' wall Tit■' \/ ` — �► \ O • / ----- WO' ' \ 15 7 1 0 < ---1-----1,or-- . --....___ n 7 MATERIAL SCHEDULE Y / I The/ l N�. T'+s. t,. /acLl�OliY •.. �• —� \I/ ii , 4167 21153 . i. ' \, • O ••••A•••••• •r. / 1 T wNEO•I�OY1wa --_ \ / 1 \ DATE n.:T.]e r \/ 11.- ,25 , TlS3] , a L‘4 10. 6,jszsi . /. 25522 1 liliir 'AM" I T••)a •••YM♦1 • rr.t•.r.•rfJIi �'� r �\ .rave .w+iwt�•w or1/ / \ .... •� ••ra•al•YY•aaaa•••4t mT w's"' ���\ • n+n ramo • \`\`1 \\ /„\ 111 1 I Lrrstarc MEeR \ &MET wr •Ia•• 1 WNW/MP OW/POW -4 ., SITE LEGEND ® • B SwEET tM Ll hko TX Job Name:Lakeview CoRR Old Settlers Job R:22731 Proposed Change order Date:5/15/2025 5/22/2025 R7 Estimate sneer ?CO Deecrlotion: ROM Pricing for 387 LF of cast In place footing/wall,118 LF of CMU Block footing only,246 LF of seat wall/footing,61 LF of ribbon curb,and 169 LF of stand up curb. QTY UM HOURS UNIT COST Labor UC Material UC Sub, UC EQUIPMENT UC Fuel RATE COSTS Material Costs Subs Costs Equipment COSTS Fuel COSTS TOTALS Excavation/prep and Installation of 387 LF of cast in place looting. Equipment included'.Mini Excavator•Skldeteer 1.00 MH 120.00 $45.00 $5,400.00 $0.00 $0.00 $0.00 $0.00 SO 00 $1.772.99 S0.00 $443.25 $7,616.24 Prep and installation of 387 cast in place walls. 1.00 MH 300.00 $45.00 $13,500.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 513,500.00 Excavation.preparation and Installation of 118 LF of CMU block footing only Equipment Included.Mini Excavator*Skidsteer 1.00 MH 30.00 $45.00 $1,350.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,772.99 $0.00 $443.25 53,566.24 Excavation,preparation and Installation of 246 LF of seat wall fooling Equipment included'.Mini Excavator•Sk dnteer 1.00 MH 90.00 $45.00 54,050.00 $0.00 $0.00 50.00 $0.00 $0.00 $1,772.99 5000 S443.25 56,266.24 Prep and installation of 246 LF of seat walls. 1.00 MH 120.00 $45.00 $5,400.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $5,400.00 Prep and installation of 61 LF of 8'ribbon curb.and 169 LF of 6'stand up curb 1.00 MH 60.00 $45.00 $2,700.00 $0.00 $0.00 $0.00 $0.00 SO 00 5805.00 SO 00 S201.25 $3,706.25 Patching of all walls. 1.00 MH 95.00 $45.00 $4,275.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $4,275.00 Formwork system rental.freight included. 1.00 LS 0.00 $45.00 $0 00 $0.00 $0.00 $0.00 $8,565.00 $0.00 $0.00 50.00 $0.00 $8,565.00 Concrete for all components 1.00 LS 0.00 $0.00 $0.00 $0.00 $39,861.00 $0 00 $0.00 $0.00 $0.00 $0.00 $0.00 539,861.00 Reber and rebar installation for all components 1.00 LS 0.00 $0.00 $0.00 $0.00 $14,153.30 $0.00 $5,679.00 $0.00 $0.00 50.00 $0.00 $19,832 30 Subtotal 815.00 $36,675.00 $54,014.30 $14,244 00 $6,123.97 $1,530.99 $112,588.26 Sales Tax 0.00%. $0.00 $0.00 SO 00 $0.00 Subtotal 0 $36,l,71' S54,0/430 $14,244.00 $6,12357 51,53099 $112088.26 Overhead 10% $3,667.50' $5,401.43 $1,424.40 $612.40 $153.10 $11,258.83 Profit 5% $1,833.75 $2,700.72 $712.20 $306.20 576.55 55,62941 Grand Total $42,176.25 $62,116.45 $16,380.60 $7,042.57 $1,760.64 $129,477 Additional Days Requested-. 0 QUOTATION Quote Number: 10500 ETA NK Quote Date: May 7, 2025 Page: 1 9201 U.S. Highway 183 S AUSTIN,TX 78747-2058 Voice: 512-243-2900 Fax: 512-243-2907 Quoted To: Ship To: SPAWGLASS CONTRACTOR SPAWGLASS CONTRACTOR 1111 SMITH ROAD CORR LAKEVIEW AUSTIN, TX 78721 JOSEPH WITHERSPOON ROUND ROCK, TX Customer ID Good Thru Payment Terms Sales Rep SPAWGLASS CONTRACTOR 6/6/25 Net 30 Days DEVIN Quantity ! Item Description Unit Price Amount 1.00 COR:ADDED RAIL AT PLAYGROUND. 1.00 FURNISH & INSTALL APPROX. 58 L.F. GUARDRAIL, 18" HIGH AND 19,370.00 19,370.00 APPROX. 58 L.F. STAIR RAILS, FORA TOTAL OF APPROX. 116 L.F. ADDED RAIL. 1.00 PER SHEETS H4 &H9 OF H9 DATED 4.11.25 1.00 SHOP PRIME FINISH. PAINT BY OTHERS. Subtotal 19,370.00 Sales Tax Thank you for your business. Have a great day! TOTAL 19,370.00 City of Round Rock Old Settlers Park Buildout City of Round Rock General Services Change in Work -Cost Analysis Form (To Be Completed All Subcontractors,Suppliers&Contractors Associated with the Change Proposal) Project No.&Name: CoRR OSP-Lakeview Contractor Name: Schmidt Electric Change Proposal No. 15 Description of Change ASI 003 PLAYGROUND SIGN-Instersept exiting I"conduit to platground area,Add I-17 X 30 Non Traffic Rated pull box,160 LF Trench&Backfill,Instal 1"Conduit with 3-#8 wires. Each line is for labor or materialequipment or Subcontracted work(n y one) II Item# Description Material& p Quantity Unit Unit Cost Labor Equipment Hid Pricing 1 Trench&Backfill with 1"Sch 40 PVC Conduit 160.00 S 23.66 S 3,785.60 2 Install 1-17"X 30"Non-Traffic Rated Pullbox 1.00 S 900.00 S 900.00 3 Install 200 LF 3-#8 conductors from Restroom to New Sign. S 829 28 S 502.35 S 821 S 502 I$ 4,686 A B D Subtotal(Non-Bid Pricing) Subtotal(A+B) S 1,332 Overhead&Profit(15%) $ 200 Bid Pricing(No Additional Fee Added) Subtotal D $ 4,686 TOTAL FOR THIS CHANGE PROPOSAL* $ 6,217 UTZ ENVIRONMENTAL Lakeview @ Old Settlers SERVICES Parker Blaschke-Spawglass May 9, 2025 parker.blaschke@spawglass.com ADD2:6/17/24 Addenda Received: ADD3:6/27/24 Plan Sheets Plan Date Architect S1-S7 9/10/2024 Bradley T Jones 11-112 9/10/2024 Kyle Elliott Irrigation Design Build by Utz Environmental Monument Sign Item Size/Unit Quantity 1/4"Thick Carbon Steel Monument Sign w/Aluminum Letters LS 1 *Power Provided by Others Subtotal: $18,750.00 Playground Drainage Item Size/Unit Quantity Excavation&Haul Off LS -1 6"Sch40 Perforated Drain Pipe LF -985 Drainage Gravel-6"Depth Tns -447 Concrete Headwall LS -1 Subtotal: -$63,130.00 Shade Trees Item Size/Unit Quantity Burr Oak 3"Cal/B&B 1 Live Oak 3"Cal/B&B -1 Mexican Sycamore 3"Cal/B&B -2 Monterrey Oak 3"Cal/B&B 0 Excavation, Haul-Off and Imported Planting Mix LS 1 Native Texas Hardwood Mulch 2 CF Bags -6 T-Posts(3 per Tree) 6'Ht. -6 'Trees to be dug and ready for transport at time of pick up `Pick Up location to be within.5 miles of LOW Subtotal: -$734.00 Ornamental Trees Item Size/Unit Quantity Crape Myrtle'Natchez' 2"Cal/B&B 4 Southern Wax Myrtle 2"Cal/B&B 0 Texas Redbud 2"Cal/B&B 0 Tree Yaupon 2"Cal/B&B -2 10948 E. Crystal Falls Pkwy., Leander TX 78641 I UtzEnvironmentalServices.com Excavation, Haul-Off and Imported Planting Mix LS 1 Native Texas Hardwood Mulch CY 0 T-Posts(3 per Tree) 6'Ht. 6 *Trees to be dug and ready for transport at time of pick up 'Pick Up location to be within.5 miles of LOW Subtotal: $645.00 Shrubs, Grasses and Succulents Item Size/Unit Quantity Big Muhly 5 Gal 10 Gulf Muhly 5 Gal 64 Knockout Rose 5 Gal 0 Red Yucca 5 Gal 7 Texas Sage 5 Gal 9 Bicolor Iris @ 30"OC 1 Gal 38 Cherry Sage @ 30"OC 1 Gal 0 New Gold Lantana @ 24"OC 1 Gal 32 White Sage @ 30"OC 1 Gal 4 Subtotal: $3,890.00 Bed Preparation Item Size/Unit Quantity Bed Area Excavation and Haul-Off LS 1 Imported Planting Mix Backfill-4"depth CY 6 Native Texas Hardwood Mulch-3"depth 2 CF Bags 59 Native Texas Hardwood Mulch-3"depth 2 CF Bags 241 6"Wide Concrete Edging LF -30 Bed Area Excavation and Haul-Off LS 1 Imported Planting Mix Backfill-Raised Planter-Varying Depth CY 54 Native Texas Hardwood Mulch-Raised Planter-3"depth 2 CF Bags 121 *Waterproofing&Drainage @ Raised Planters to be provided by Others Subtotal: $5,331.50 Turf and Soil Preparation Item Size/Unit Quantity TIFF Bermuda Sod SF -2,250 Imported Topsoil-Chocolate Loam-2"Depth CY -14 'Sod to be install per hatching. Any areas outside hatching are excluded and can be priced upon request Subtotal: -$1,812.50 *Dino Dirt to be installed at Ampitheatre Seating ONLY Irrigation Item Size/Unit Quantity Hunter PCN-10-R Tree Bubbler(2 per Tree) Ea. -2 Netafim Techline TLHCVXR5 Drip Tubing-Bed Area SF 1,090 Air/Vacuum Relief Valve Ea. 1 Manual Flushing Valve Ea. 1 12" Indicator Spray Ea. 1 Hunter PROS-04-PRS40-CV-R Turf Spray wIMP Nozzles Ea. -14 Hunter PROS-04-PRS40-CV-R Turf Spray w/MP Nozzles Ea. -4 Encased in Concrete 1"Rainbird XCZ-PRB-LC-R Drip Valve Kit Ea. 1 13"x 20"Valve Box Ea. 1 Reclaim Parts&Material LS 1 *All areas north of parking area are excluded. 'ADD Alternate has been provided below. Subtotal: $462.00 Irrigation Sleeve Item Size/Unit Quantity 2"Sch 40 PVC Irrigation Sleeve LF 40 Subtotal: $260.00 Bid Recap: Monument Sign $18,750.00 Playground Drainage -$63,130.00 Shade Trees -$734.00 Ornamental Trees $645.00 Shrubs, Grasses and Succulents $3,890.00 Bed Preparation $5,331.50 Turf and Soil Preparation -$1,812.50 Irrigation $462.00 Irrigation Sleeves $260.00 Total Landscape Construction -$36,338.00 OH&P -$5,450.70 P&P -$908.45 Bid Notes: 1. Includes all Applicable Taxes 2. Excludes Water Meters(and cost of water),Hand Watering, Electric Meter, Irrigation and Electrical Sleeving, and Road Bores if necessary. 3. Excludes Bond, if applicable add 3% 4. Excludes Surveying, Barricades,Traffic Control. 5. Proposal valid for(30)thirty days. 6. Limited Warranty-No replacements will be authorized or made without an inspection by one of Utz Environmental Services staff. Warranty is limited to replacement only, not refund. All Warranties will become null and voide if any of the following is determined:failure to water properly,drought,freezing, insect damage, abuse or mandated water restrictions imposed by local governments. It is the customers responsibility to maintain property if a maintenance contract is not agreed upon. Respectfully Submitted, OrII Chris L. Utz Approved by: Licensed Irrigator#5625 MATCHLINE SHEET HS -.06 • . NE in 1 IN is • Emil •MMMMM swam wow' swim • 0 NEN •■1■ier •` sts9 ••■■sit •-� �.: •ell�i1 fri \ , cal 3 ' (;,1 0 Lro9loWE�a,•E,E•. \\\ ® ,• •OAlCOW ERRE./ �\••. r�eLW QrE• MIT: \ \ • �° anansRawRoo �.�»•iW.010015•COnaeDe vv vI moo ) ; ��� r REF[E... °" �� No, :@:: Wall,tyP•• 6r T.• w¢„revuOV .cnW»E+n•� n,v vonma ■ \,\ -- ' p» m 'R°W \\\\COMIRRETE worm. ��. / i SW, PORT FOE M aua001 WALL WTI /i /, w, .� \\ 01Wk6f r 1 ANIMeveaR.m. ' \ y, • /' :,--- .._.4,E..- ili A I �.'I \ 41111451s, J• jEREF OCTAL A 4.11.• [ , REF Ss � O `I I .. RI Of PRANG TO RATE,rAWI A 4. \ TS,.\ _ X L \ ._ � ; _„ , rzewr , , . li s\\ ee i.„„,„ • , \ ,. ..__ .Ins. i . lss.s. 4 • 1 i .� OW WAtl WKL W N 1 J Masonry . I rR� y '' '\ EIRYEOIEW9la.rv. 4111.11111kk COMMIE haw 7e /�•`• Wall.per \Eo9Rr s .o,ar OLOCK®iTn. ,��e� _g E�Er now plans,lyp. ' 11.1008.10.11 '°"Y^ /� % \• `lie,E-.CM .o K191EN1E \ TWRIWAKIiRE ERROR EWER n»w D1jel co r ii at 1e37\\ I" 1 T61 OI 67I Q W oOWR.bN + WW n0NO .' T5173 I art �W roN ,arm \ , \ 1 R0 MIRn•i°" �i Y`• ‘ 6"wide ill, \ . e e • \* -__.ti @8 concrete \, waILNP �I ��� \ �� _ • 0 ...061111 ‘,.. fp ./. , .._ ._. .4. /44•,.... ' '.... w ,. ._., 71.1114%111i •1 ,`� MATERIAL SCHEDULE i ! mea . art \ — - Mow U E.AWN. 40 • •6Ww6a \ ase2 / / WTIIIMMIWEW W»n -- ___ \ ' I • ev / I �� •17' • \\\ WW+.4 MTE DI-IT-M I \\' Tfe16 \ SCALE,'•IO 1 es ,. TEe21 \\\\ \\\ WEEP.CAE wn ��j]hJ 1 \ \ (jatr =11 �me 1 i 1ell 1 • \I ;Ly4o.�.w .:AI E el E 1 fWErWOW E•,W,•.GM, 45111)-0 •W^'•e.•�~ens an..• M1 • nln \ Ta640 Th r 1 µ EAT CONCRETE SEAT WALL AT A% EATER • \ RE.ERENQ L.'WL VlIW9 VP • • \ .E 6.0 WA-1.YE, \ 1 / , _ I - ESTONE VENEER \ \ • „ XTA_se!RUT YE Shod \Tae19 „ ® - EdR... EET.4I H4 °` H9 \ OVA RE CUT.nESTOSE s + W Osrts uo■io ® OETA..R " l JOBS E15E15 CORR 05P-Lakeview UPDATED CHANGE ORDER/COST LOG 5/23/1015 CO/AMEND• DESCRIPTION BUYOUT SAVINGS CM CONTINGENCY OWNERS EXTERNAL CHANGE STATUS NOTES CONTINGENCY ORDER ORIGINAL AMOUNT 5 1,045,820.00 5 404.828 00 $ 404,528 00 S APPROVED COO 001 Oncor Primary Ductlmk i 111,471.00 Orrn9e of WO*ANO Xne CO*001 Envelope Consultant-Acton'v.v. 5 4,150.00 COO 003 Additionel Tee.Removal-9/10/14 Dr0vdM Up.. 5 13,194.00 O TR-009 Utility V.I.O.Punhw 5 56,793.00 COO 005 A51 001 5 59,961.09 COO 004 RFT 0037-R.movel of Tree.for WWI A 1 3,315.00 COO 007 Rod N'RMr fiber RmEstsentshmant 5 69,253.00 COR 009 RFI 047-Pavillun Decorative Ugly Power Add 5 1,174.00 COR 006 RFI 034-Transformer Com.N Reroute 5 15,316.00 S TD-010 Tens Mr Casing Unpent Puna 5 (31,411.00) 6T8-009 3 Tim Drinking Fount.,-Alan $ 1,697.00 , COO 0/0 RR 056-eel.srree and Grading Conniff(HP and 1.Iwlw LOC) $ 3,271.00 COA 011 ASI 002-R.vls.d Cell Gosling for Tree Mipgetbn 5 (7,416.00) COO 013 01 071-Gaa 604 Ru nay..Credo 5 (45,410.00( COO 014 RFI 057-POvlilon TOOT..Slab for Ramp Posta $ 1,131.00 COR 015 Hand Dryer Revision to ADA Mad. 5 1,433.00 COR 016 RR 079-H.rdwv9 R.vbions-Allowance to buyout Savings 5 (6,495.00) Trans.remaining Tm.E Tom Electrified Hedwnn to buyout eves COR 017 Finish.Ceno.t.floor Protection $ 31,195.00 COO 012 Additional Red Ovava.0n on°now DucW.nk and 2'R91oco0.n 9 59,123.00 COR 016 Atm Loop Street UOht Connection 0 24,171.00 6TR 011 R.tr0d0al.6u11eds 32,109.00 6TR 020 RFI 070-10 wlin6s 9 17,410.00 COR 019 hwealhred GWelum.Roofing-Premium C01or 5 6,591.00 6TR 011 Reconcile Unspent.Morenae to buyout Savings 9 (105,000.00) COR 020 Yonder a Petit-Tee.1nst.11sti0n 1 0,306.00 COO 021 R.1 099-Time Well Flushing et Stag.Ston.Veneer 1 2,467.00 COO 013 RFI 077-095-Elehiol Chas.Drainage and Downspout Revisions 1 17,444.00 COP 034 RR 100-6109.Oo0et Coiling.red Insulation $ 3,333.00 COR 037 CORK R99uwt0d Toilet Peeper Dispenser Chenge 5 1,471.00 COO 033 Eledriml R.-Routing et Yonder'.Point $ 11,1915.00 COR 014 Powder Cwt PMish et Down0porrt Boob 5 1,117.00 COR 035 Upslzing In-Motion Cenn.ctbru to 3- $ 21,016.00 CO*021 RFI 047-DUm1Ntr Encloses..Slab.04 CMU D.t.11. 9 1,643.00 SUOmOt.d 4/21 COR 836 Thrust RI..et Mainline 9 17,176.00 , Submitted 4/28 COR 026 6016ti0 PAv1110n Improvement. 9 211,025.00 ROM sent on 4i 1 COR 030 Playground Greding end S.9t Wall R.riaiOTS 5 119,151.00 PRICE EXHIBIT REVISION FOR COST REDUCTION TOTAL $ 705,349.00 1 12,603.00 S 153,502.00 1 - PENDING l PROJECTED COO 015 90Nlbn Ramp-Oeelgn ova,Nbwew 9 51,517.00 COR 037 Suety Sea,4ty Im9roven.nt. 5 176,439.00 ROM*p.4/2,prq*q query Mock dwtlCao n. COD 029 RFI 050-Mega Utility Trend Details 9 5,521.00 Pl~d"R Steel Care-Pricing COR 031 RFI0.6-51.e1 Embed.Conflict MN Masonry Control Joints A30r9rWWed on W7,Folder awned re/pop...end OFT re410010 COR MOM RFI 096-Rwtrcem CMU Well traces Rk*q,ec0-ed on 5/7,Fokker rested w/popoW A.OFI r..pon.e TOTAL $176,439 $ 5,521.00 $ 32,517.00 $ - APPROVED $ 704,349.00 5 12,103.00 $ 113,103.00 $ - PENDING/PROJECTED $ 174,439.00 $ 5,511.00 1 51,517.00 1 - TOTAL REMADtDIG $ 166,032.00 $ 316,504.00 $ 194,709.00 $ - BUYOUT• CONT.9000CT quo MLAIIC. Original Contract $ 13,494,260 Nu $ 1,ow,e2o.00 External Changes $ on.r.A..0v00 MANGOS 1 706,34900 5 342,471.00 l Contrast Total: $13,494,260 mamma APPROVED 1 PROIECRO OOMOOS $ 176,439.00 $ 166,032.01 00NTRAc,001C0Nr7N:N09 suer ..LANCE OWNER BUDGET BREAKDOWN $ 404,82800 CUnent Contract Total $ 13494,260.00 omen UMW., S $ 02,803.00 $ 322,025.00 Buyout Savings(Remaining) $ (166,032.00) ro..unn APPROVED a 0D3Ecrw DUACe5 $ 5,521 00 $ 316,504.00 Current Cost $13,328,2211 Ominal everet$ 13,494,260 °VISOR'S CONT.INENCI wort Dlfl.nnce/SmWelrrp,I 10,032 O0IGIN4l $ 404,828.00 O.m 1PROeso CHA GLS $ 153,602.00 $ 351,716.00 rcorvrm1P9a0vs0 a m01LC110 OAN4E5 1 51,517 00 $ 198,709.00 VOID CORI COO 033 OR 044-Gr.in96ohind stage voided end p900200g per Sp0nl1ass Eaneb4 COD 033 UoST Pole R.o.pt.de Landes. Voded 09 non-issue Page 1 10/9/25.9:45 AM Mail-Parker Blaschke-Outlook al Outlook RE: CoRR OSP - Lakeview - Outstanding Change Orders from Outside GMP From Gina Cordeiro <gcordeiro@roundrocktexas.gov> Date Thu 10/9/2025 9:39 AM To Parker Blaschke <Parker.Blaschke@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Katie Baker <kbaker@roundrocktexas.gov> Cc Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Harrison Holley <Harry.Holley@SpawGlass.com>; Cullen Schoener <Cullen.Schoener@SpawGlass.com> Both are approved. Thanks Gina Cordeiro Project Manager Building Construction City of Round Rock I General Services Building Construction & Property Maintenance 212 Commerce Blvd. I Round Rock, TX 78664 a 512.218.5473 Cell 512.608.2762 Fax 512.218.5576 gcordeiro@roundrocktexas.gov ROUND ROCK TEXAS From: Parker Blaschke<Parker.Blaschke@SpawGlass.com> Sent: Thursday, October 9, 2025 9:22 AM To: Gina Cordeiro <gcordeiro@roundrocktexas.gov>; Richard Will <richardwill@roundrocktexas.gov>; Katie Baker <kbaker@roundrocktexas.gov> Cc:Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Harrison Holley<Harry.Holley@SpawGlass.com>; Cullen Schoener<Cullen.Schoener@SpawGlass.com> Subject: CoRR OSP - Lakeview- Outstanding Change Orders from Outside GMP Gina, Following up on our conversation, attached are the emails for both COR 073 - Pavilion Ramp Modifications and COR 076 - Yonder's Electrical Pedestal Relocations that are shown to be funded from outside of the GMP. We discussed COR 073 at the OAC this week and I reached https://outlook.office.com/mail/inbox/id/AAkALgAAAAAAHYODEapmEc2byACgAC%2FE Wg0AxReKW79j7UG%2B06dOMxNTaAAE%2BF7rJgAA?nat... 1/2 10/14/25,8:47 AM RE:CoRR OSP-Lakeview-COR 030-ASI 03 Playground Grading and Seat Wall Revisions-Ryan Janssen-Outlook Outlook RE: CoRR OSP - Lakeview - COR 030 - ASI 03 Playground Grading and Seat Wall Revisions From Katie Baker <kbaker@roundrocktexas.gov> Date Fri 5/23/2025 1:58 PM To Parker Blaschke <Parker.Blaschke@SpawGlass.com>; Gina Cordeiro <gcordeiro@roundrocktexas.gov> Cc Joseph Hudson <jhudson@roundrocktexas.gov>; Cullen Schoener <Cullen.Schoener@SpawGlass.com>; Harrison Holley <Harry.Holley@SpawGlass.com>; Tyler Wenzel <Tyler.Wenzel@SpawGlass.com>; Joseph Witherspoon <J.Witherspoon@SpawGlass.com>; Richard Will <richardwill@roundrocktexas.gov>; Antonio Prete <tony@w-pinc.com> about:blank?windowld=SecondaryReadingPane3 1/4 Change Order Request SpawGlass NO. CCD-0073 Title: COR 073 RFI 140 - Pavilion Ramp Landings Steel Modifications Project No.:3023148.01 Project: CoRR -OSP Buildout Lakeview Quoted Date: To: City of Round Rock Expiration Date: Arnie Hammock 2008 Enterprise Round Rock, TX 78664 SpawGlass Construction hereby submits a Change Quotation for the following changes in contract work This change includes the revisions to the Pavilion Ramp per RFI 140 to address ADA clearance issues at the landings. This change includes the cost to modify steel and remobilization cost for the concrete subcontractor as this ramp will not be ready for concrete until after the completion their remaining scope. This change is shown to be funded from outside of the contract,therefore indirect costs have been applied at GMP Rates. P&P Bond @ 0.77% General Liability @ 0.78% Builder's Risk @ 0.25% SDI @ 1.25% Fee @ 3.5% Vendor Work Description Labor Material Equip. Sub Other Total SpawGlass Contractors, Inc. FEE 0.00 0.00 0.00 0.00 2,478.00 2,478.00 SpawGlass Contractors, Inc. GC BOND 0.00 0.00 0.00 0.00 529.00 529.00 SpawGlass Contractors, Inc. SUBCONTRACTOR DEFAULT 0.00 0.00 0.00 0.00 859.00 859.00 INSURANCE SpawGlass Contractors, Inc. BUILDERS RISK INSURANCE 0.00 0.00 0.00 0.00 172.00 172.00 SpawGlass Contractors, Inc. GENERAL LIABILITY INSURANCE 0.00 0.00 0.00 0.00 536.00 536.00 Patriot Erectors, LLC STRUCTURAL STEEL 0.00 0.00 0.00 61,326.00 0.00 61,326.00 Lithko TX, LLC ALL TURNKEY CONCRETE 0.00 0.00 0.00 7,354.00 0.00 7,354.00 0.00 0.00 0.00 68,680.00 4,574.00 73,254.00 TOTAL $73,254.00 CALENDAR DAYS EXTENSION TO CONTRACT COMPLETION DATE 0 X We have proceeded with this change as per written direction. We have not proceeded with this change. In order to proceed, please return a signed copy of this proposal request. Thank you. APPROVED BY: SpawGlass Contractors,Inc. Date Architect/Engineer Date Owner Date SpawGlass Contractors, Inc., 1111 Smith Rd,Austin,TX 78721 (Phone)512 719-5251 40121=FPATRIOT ERECTORS, LLC . ) .) Steel Fobrlwlion G E•e,tion Servicee 3023 W.HWY 290 I Drlopinq Springs.Te.gs 76620 I p.512.858.9100 I I.512.858.9108 Change Order Request September 26,2025 Job.#: 2147 Attn: Parker Blaschke Patriot Quote Patriot Erectors, LLC. would like to offer this quote to FURNISH and INSTALL the following items per plans and specs. for the above referenced project. WE QUOTE THE FOLLOWING: Cost Breakdown Manhours: Fabrication $ 8,445.60 Labor 400 $ 31,458.16 Equipment $ 3,550.00 Subcontractor $ - Consumables $ 9,084.80 Subtotal $ 52,538.56 OH&Profit 15% $ 7,880.78 Subtotal $ 60,419.34 Bond 1.50% $ 906.29 TOTAL $ 61,325.63 Grand Total $ 61,325.63 Schedule Extension: 2 weeks We include the following scope: 1 RFI 140: modify Switchback Ramp Landings and handrail 2 3 We exclude the following scope: 1 Re-Mobilization Costs Detailing and Engineering are EXCLUDED from this Revision 2 pricing. These were priced separately in X025 and secured 2 in SBCO-06(COR 069). 3 'Due to the current instability of steel material pricing,this pricing is good only if accepted within 15 days of the submittal date below` Total PCO#: X024 Rev 2 $ 61,325.63 SUBMITTED: ACCEPTED: PATRIOT ERECTORS, LLC SpawGlass By. Andrew Figer By: Title. Project Manager Title: Date. September 26,2025 Date: This work is considered as additional work to the contract,with this quote being valid for 15 days from submission;price and schedule extensions subject to site considerations.Signature by an authorized agent of the contractor shall release Patriot Erectors,LLC.to proceed with this work and will indicate acceptance of the terms,scope and pricing of this change. Authorized contractor signature will allow this change(or portion applicable)to be incorporated in the appropriate billing cycle,regardless of receipt of a change order. Subcontractor Costs U/M Units Rate Total LS $ - LS $ - LS $ - Subcontractor Costs $ - Fabrication Costs U/M Units Rate Time(m*Q/R) Shop Labor HR 30.0 $ 86.28 $ 2,588.40 Bolts/Anchors LS $ 1.00 $ - Std.Fabrication Material LBS 200.0 $ 2.26 $ 451.20 Large Members.Plate,HSS LBS 1,000.0 $ 3.26 $ 3,256.00 Project Manager HR $ 85.00 $ - Purchasing HR $ 38.25 $ - Painting LS $ 1.00 $ - Detailing HR $ 90.00 $ Engineering HR $ 145.00 $ - Galvanizing LBS $ 1.32 $ - Shipping-Specialty Outside LS $ 1.00 $ - PEI Freight Per Trip 60 Miles or less 1.0 $ 650.00 $ 650.00 Per Mile over 60 $ 5.85 $ - Buy Out LS 1,500.0 $ 1.00 $ 1,500.00 Total Manhours 31.0 Fabrication Costs $ 8,445.60 Field Costs U/M Crew Size Hours Rate Time(m•Q/R) Consumables HR 400.0 $ 22.71 $ 9,084.80 Fringes/Per Diem HR 400.0 $ 21.55 $ 8,621.60 JIW Labor HR 4.0 80.0 $ 51.43 $ 16,456.32 JIW Overtime Labor HR 1.0 $ 79.75 $ - Foreman Labor HR 1.0 $ 65.60 $ - Foreman Overtime Labor HR 1.0 $ 101.01 $ - Superintendent Labor HR 1.0 80.0 $ 79.75 $ 6,380.24 Superintendent Overtime Labor HR 1.0 $ 122.25 $ - Safety/QC Professional LS 1.0 $ 97.50 $ - In-House Surveyor HR 1.0 $ 143.00 $ - In-House Ferro Scan HR 1.0 $ 240.50 $ - Total Manhours 400.0 Field Costs $ 31,458.16 Equipment Costs U/M Units Rate Total Equipment Transport Fee(Pick up and Drop Off) Round Trip $ 300.00 $ - Small Scissor 32' HR $ 35.75 $ - Large Scissor HR $ 50.38 $ - Small Boom Lift HR $ 76.38 $ - Large Boom Lift HR $ 132.44 $ - 120'Boom Lift HR $ 219.00 $ Diesel Welding Machine WK 4 $ 325.00 $ 1,300.00 Fork Lift WK 2 $ 750.00 $ 1,500.00 Duct Jack HR $ 20.00 $ Erection Truck with Minor Equipment Day 10 $ 75.00 $ 750.00 MINIMUM:Spyder Crane(2 HR Min w/Operator) $ 340.00 $Over 2 Hours with Operator HR $ 170.00 $ - MINIMUM:28 Ton Boom Truck(2 HR Min w/Operator) $ 390.00 $Over 2 Hours with Operator HR $ 195.00 $ - MINIMUM:70 Ton Crane(4 HR Min+Permit+Operator) $ 1,230.00 $Over 4 Hours with Operator HR $ 270.00 $ MINIMUM:100 Ton Crane(4 HR Min+Permit+Operator) $ 1,430.00 $Over 4 Hours with Operator HR $ 320.00 $ - Additional Operator Costs for OT/After Hours/Saturdays HR $ 50.00 $ - Lift Plans EA $ 200.00 $ - Crane Mats Day $ 45.00 $ - Other Specialty Equipment HR $ - $ - HR $ - $ - HR $ - $ - HR $ - $ - Equipment Costs $ 3,550.00 Lahko TX LLC Job Name:Lakeview CoRR Old Settlers Job*:22731 Proposed change Order Estimate Sheet Data:9/30/2025 f'CO Description: Rsmobllizatiun costs for the PF crew and pump system required to Install the ramp that was not turned over to Lkhko at the time of the pevlllion SOMD pour on 6/17.Had the ramp been available,Lkhko could have placed end finished the(13 C`I)ramp during the Initial pour using a MB's. Thiess 6 hours are being credited back.Due to the ramp not being turned over on 6I17,a separate mobilization will be necessary,resulting In additional labor end pump costs.Design change costs are not being Implemented Sc Lkhko. OTY UM HOURS UNIT COST Labor UC Material UC Sub. UC EQUIPMENT UC Fuel RATE COSTS Materiel Costs Subs Costs Equipment COSTS Fuel COSTS TOTALS 6 Place and Finish-Laborers MH 48.00 $55.00 $2,640.00 2 Piece and Finish-Pour Watch MH 16.00 $55.00 $880.00 1 Place end Finish-Lead MH 8.00 $65.00 $520.00 Protect Lead-Supervleon MH 8.00 $65.00 $520.00 Trailer-Pump system LS $2,195.00 Credit MH -8.00 $45.00 -$360.00 Subtotal 72.00 $4,200.00 $0.00 $2,195.00 $0.00 $0.00 $0.00 Sales Tax 0.00% $0.00 $0.00 $0.00 $0.00 Subtotal $4,200.00 $0.CG $2,/95.00 $0.00 $0.00 $6,395.00 Overhead 10% $420.00, $0.00 $219.50 $0.00 $0.00 $639.50 Profit 5% $210.00 $0.00 $109.75 $0.00 $0.00 $319.75 Grand Total $4,830.00 $0.00 $2,524.25 $0.00 $0.00 $7,354 Additional Days Requested: 0 SpawGlass Contractors, Inc. REQUEST FOR INFORMATION SpawGlass 0140 Printed On: Jul 29,2025 Page: 1 of 1 Subject: Pavilion Switchback Ramp Design Date: 07/29/2025 Project: CoRR-OSP Buildout Lakeview Job: 3023148.01 Address: 3300 E Palm Valley Blvd Owner Project Number: Round Rock TX 78665 Required: 08/01/2025 Phone: Fax: Estimated Cost Impact: Potentially To: Ken Su Estimated Days Impact: Potentially KSS Structural Engineers From: SpawGlass Contractors, Inc. Joseph Witherspoon Spec Section: Drawing Num: Request: The pavilion switchback ramp was fabricated and installed per the approved shop drawings which reflect the dimensions provided on sheet Al-101 of the contract drawings. The ramp landing sizes do not meet TAS requirements. Please provide updated Architectural and Structural drawings for code compliance Suggestion: Cost Impact: POTENTIALLY Cost Amount: Schedule Impact: POTENTIALLY Days: Answer: Accept Suggestion Please add 16 14----14 Answered By: landing to providede 5'-0" clear of handrails. Signed: Date: 7/30/2025 Distribution: Contact Company Gina Cordeiro City of Round Rock Joe Hudson City of Round Rock Katie Baker City of Round Rock Ryan Hansanuwat Mode Design Arch Antonio Prete Waeltz&Prete,Inc 5 I ' 1 3 L_ 7 - iaei5 *M 09E PAINT/FINISH SCHEDU� /...:.7/, /„WM/ Mid 091 WALLS MA9,M994wINO,Yt NM1 M.I161 1 0 3.w'�"C •1.I7, mea, M QUO WARM MA.n09999NMW16SY11001.CORM IDOL 0 11.14O.0 WNWA WO/ OIPAIKTIDMMC,OOM-r1YYCR0,ICM91.nk AVO nM .M1M10 MOON MMb19YRf9 MM99MOMA ppF pyrtM MO 00M404.Mf 00AINTE0 1.0.04.....WM/MpY9lfyiiA Wui whirr 0000APO l.wf Mw.nOSONAPI AYMNLIO.Maw LW ..Oa.°47�'•, MK maMOWIC01W0.MM9.0u9e4 .n09MMM-Iw/9YFW•4009Y99 iW-' J L y l 4 i F1:�' , M.MOM.Mu, wiTIO9.100 IMIf MYi.90091.1, � NC COMM[l1d MIMIOISMlI-IOMMI Lot COOe.9c9r.•O M� M OVET MMf 9M01 ,�' )),O .1 �.•OFt- {„4"..- -r.--4 .9/10/2024 C v UPDATED PER RFI 054 7e151•911391OLTIROUIL Z �. ,. : . r_. . . : ..._ 0 Updated a per RFI C o e 028 js� Y LLI ti " .o9r9oA99Aa O Oe O s s ? L O z 1a�e,�ti�'► roe ate, a r. ., • '. o A, . ,, s ad; _ s�,,,\ �' f O O cc eiimattaii 111 STORAGE i1 ��C� , a CUM 3 A51.01 1=1/N ..._1io e . RFbae nm/s. s RFi-os. 1/e(1. • ,, . . , . . . . 44... .._ . ...... i. ,.. .____ ____As „2 SOF I mero oawferalrt / 2RO 9-0 NIMMFR - A eroMloeDOE a 031,9-01 MO HOLD NWT COW.905010 • �h ff1�0 9/10/2024 AS kaL TRIF PANLION FIRST FLOOR PLAN M W FFi NI I.91F15 S� Truw A 1 -10 1 Pi- . I 1 I I I 2 1 — - 1- • a P.. P ., CONCRETE RAMP ON HD GALV.STEEL • ' ' 'STRUCTURE.HD GALV GUARDRAILS ' r e 'GALVANIZED STEEL PIPE ' P. ��.. GATE ON HINGES WITH LATCH �S. . 4. 4* NALL WITH BLOCK 4 .1111L B� ' D_ INTERIOR AND 'T (Al2OO • • - • 1),_ --.N66, •*44v co . . , "cirigr 03 0. CLEAR PENETRATING SEALER AT RAMP 4,,3:341' S , '9. 0• SG Note: Updated ramp provided by Mode CNA OSP un34,ro CHANGE ORDER/COST LOG C0/10•010• 014.1.104 101101,1 S.M. CON700.111C• 01.91. 07.01.1.111 COMM. C09-110.09. 011001 STAT. MOTU 0.0.190 01000 1.0.00 09 904...• 1 1 011 020 mn 079 999.. 3 17 41.011 ST.01 110.0.4.4.09 9.9.91.14 PM.N.. 119.....9j RAW* 10119.9.19.504. 0..9 3 9.9117. ona 0 to T4r. G49.4 an. 131.42199j 1.9.471.9 ...44 72.9 CO.002 ..494 G.1.991- 9..90 4.3.11••0 CO.On Aran...1 nosAmresonV P11./11 117.. C.001 01091 C.... 0.0 8.•115.1t17.14. CO.007 .999 9 111•MLIEnr$1•-•••••1•Iromn HAM.. Coor DO* no 4.- Mimes 1.1400 CO.009 lan 047- COR no aro oaf-001.11.1.1•1/1111.B...11ra LO. __J LIMO. n 011 040 asnlme$1.1.12.11•LIN (7,114111 Co.ell ,.4....011411.111.M.•11••••••••••• •111113...09409 09,100.31 CO.09 an•71- . . 3 14.4.11110 COS 01, fr, -fr•••=3111111ENII• COO 41, CP.014 .40 9.4.11.11.11•1•01.11 .173.90 C.017 nn00..S.9.l.1119..... I 11101. C.019 Ian 079 Ma.rny nem A.A.Aa ASA CO..1 PrIAAMPAI - PM 99.100 CO.en TelaJMNIMMIM_ 411.09 GO.P21 01 097-/11149.9.149.1.191•••I..V.. 34.7 COR 022 .1 011-0.•IMMO.OMB • 17.419,14 GO.023 rano..14-14•11•••n MN • II Ina. row.con nn1an rarrnmnIllbrall . /MTN CO.o. ',mon -onnrn yaw AN1.1••• • no-e. G.0. 014009 PR..1.4.49.14 • 181.1.. 909.99 V, 004 001 I 104.741 cot.2. Fun.7 ra....1 PO MI MY Doan • Lana. co.030 11.114.91109.91 • 110 1111 °wawa,SCC01142,20 LA AND'Arran- C... .1 fl. 049.440.1 and M.N. • MI.. con 000.120010011,220.0000400100.r I 11.91.09 • 17 97.99 CO.037 C•111.9...T..r••••0..11.7_51.49 1,47.09 coR.0 N.499 1. 49.1-94 .01 - SI Al.•••11.11111.1 larlant al 111100 CO.OS1 9.44....ft IASI 4.1.90 CO.0. .94.4 9019.•1 0.49 C.0. 01 111-90091'9 9404.0999.919.01. II.9001 C0.00 Tr.14.4.0 4.179 11.91 11.- 9T.10. 10,0909 COR 041 RN I.1.4.9101001%00 rm. I 119000 C.00 T.1.94 49 9 V.I..41191.1. • 11.01410 CO.••• Cr.*...v.Oft.korona h.94.PO 9 10 1.1.9.999. I! 119..7-041 C011.1 A.A...1,.•••• • .rra.o. co.na. VW. • 9041. co• .1 10 P.99,9 C01.91 OR 9.9.9 • Ooar CO.0•2 Rn 134 Tow for •99,11.4 al.-9J COM 0/1 .1{0, Cs.12n0, • LW. CCM O. R.111 R...1.4,10 00,9 COM.9 an 1/0 M1.00^Y.. tApinmoinft • 4.7 COR 021 mn .04 L.0,Tr20.4,099ii• • 11.41.. co..I 9me 04•194 at 0.101 • L.P.. 0.0. .0..8 1..09 L2,•.1 .4.014 09, C..2 Cr.Ca.trtn9-0.• • 11,11.P. CO•.• 19.121 ir PrImary C19.0 • 90909 CON Del rood .409.• • 100. C... Cm...a.,099.9.09.9 G.0444 a,0.199..... • (11.7 Oak CON.0 ud . 17 09.O. CO.044 1.2.,2 9.9.9 C44....1 • 71.100 09.4. 00.09)• so• ,11.1oosoan of Inn 9.4 441.*LE.0519.199041 11 4.431. CO.00 2t I XI.. 700.1 20,01900 • 3119.11.. • reatolra‘ PROJECT. CO.011 01 - an.%Con.l.9919 1444401C.1... 4.71.4911 M..9/1% .49.9 0.109.9,, CO... oaolon $11,41.611 ..••••1414 Ra-ASS Awn.n. S..07.00 FAA..*MI AAA.. co• 04.0.114.499 N.WI al 2.$1111.•• Plasowso••/.1 *nor ccano.a. co.on nro 14o rarnor anno nni • Ito-0001 In.III 09000000040100.00.0900 Sn 41.0110 CO.ell solkines RI.O... • ',HI. ft 74*9.t • 0.94.114 wry 0,44.9 C.072 root..C.,Soo,.n roan con..won. tams. Pro,realm C.oo• salk 031 Macon.,11.1014 n r 100.000.“ aor.ono,04.7.040.• CO.079 Pt 9.19.9•09.94. PO 000.• CO.OSO TraMers M11.1.1.ohl..111.••1*. Arr-COO An Cognsrt"MOW NSW.,P.n. • LUC.. &AI...Ms CO•CISS art 1..4 .•011 12.01010.1 ..... TOTAL 11.7,11111 11.19,311 U.S• 100,094.14 Anneoveta 1397-39. • 20.074.09 1.4.7.11.90 • rernann.roon.els 21.21.00 at kJ., • atallons0 • 13111.00 • Mina.. $ S0I4 • 0414,44.10 mummer. • I...AM CO 111.nno 1. Mona. • 113.99000 1 Lorena Tab., cor-rournacroro cow., • SUMO. • 1..." convarcronaconommt• Soon a.m.. OWNER 11UOGET•ano.$.001.1.1 carar. I 000•021 Co OIcolol...Kt rota, 0 100,510 MAO.=• 111,754.00 Buyout Sono.ritronarnron • 0107 01 •morctro owors • IMP".I ',Moo 000090000 014,041,440 • cmormaa commas. FrnAni ono.. • .0.no co o.....••••orrao oconrs .6,0-1113 kn.n -rroonoracono•rnorcoro noon, • 2,208 00 S.0 00 CO.Ow 140.0 ono cow. AAems.ea r Coe no an v.- ....1••••• veeedr..A.A.m..,/AA S....41 FAA. or,* co.417 C0710t • CO. .2.100 • •••••• Max. MA v. anis.-map..con anal moon 4,00.002 0,0:001.8.80042 CO.na 0oa01011a,02... I COR.2 I .0904 COR 044 , • 4.2.911 a..to CCA COO 07 M.o.00490. • 411400 [AI.tr.lino/organ on CN1C co.coo roononronn mr.sco moo. • aneare Cog., no - 20012. • .2.00 CO•O. SOO 21 P.*. SC C.0. 24 L.12.,0.9.9119 40 002.00 99°.0.0.9%.mono,nre Page 1 Change Order Request SpawGlass NO. CCD-0076 Title: COR 076 - Yonder's Point Electrical Pedestal Relocations Project No.:3023148.01 Project: CoRR - OSP Buildout Lakeview Quoted Date:09-Oct-25 To: City of Round Rock Expiration Date:23-Oct-25 Arnie Hammock 2008 Enterprise Round Rock, TX 78664 SpawGlass Construction hereby submits a Change Quotation for the following changes in contract work This change includes the cost for the relocation of Pedestal 2, raising Pedestal 4 and 5 on existing supports for grading and serviceability, and the new pull box pathway near Pedestal 2 for events. This change is shown to be funded from outside of original GMP so indirect costs have been applied at GMP rates. Vendor Work Description Labor Material Equip. Sub Other Total SpawGlass Contractors, Inc. FEE 0.00 0.00 0.00 0.00 651.00 651.00 SpawGlass Contractors, Inc. GC BOND 0.00 0.00 0.00 0.00 139.00 139.00 SpawGlass Contractors, Inc. SUBCONTRACTOR DEFAULT 0.00 0.00 0.00 0.00 226.00 226.00 INSURANCE SpawGlass Contractors, Inc. BUILDERS RISK INSURANCE 0.00 0.00 0.00 0.00 45.00 45.00 SpawGlass Contractors, Inc. GENERAL LIABILITY INSURANCE 0.00 0.00 0.00 0.00 141.00 141.00 Schmidt Electric Company, Inc ALL ELECTRICAL 0.00 0.00 0.00 18,030.00 0.00 18,030.00 0.00 0.00 0.00 18,030.00 1,202.00 19,232.00 TOTAL $19,232.00 CALENDAR DAYS EXTENSION TO CONTRACT COMPLETION DATE 0 We have proceeded with this change as per written direction. X We have not proceeded with this change. In order to proceed, please return a signed copy of this proposal request.Thank you. APPROVED BY: SpawGlass Contractors,Inc. Date Architect/Engineer Date Owner Date SpewGlass Contractors, Inc., 1111 Smith Rd, Austin,TX 78721 (Phone)512 719-5251 City of Round Rock Old Settlers Park Buildout City of Round Rock General Services Change in Work-Cost Analysis Form (To Be Completed All Subcontractors,Suppliers&Contractors Associated with the Change Proposal) Project No.&Name: CoRR OSP-Lakeview Contractor Name: Schmidt Electric Change Proposal No. 22R-09.28.2025 Description of Change: Yonders Point-Electrical Pedestal Revisions Each line is for labor or material/equipment or Subcontracted work only one J Material& Item# Description Quantity Unit Unit Cost Labor Equipment Bid Pricing I Trench&Backfdl 2-2"Sch 40 PVC Feeder Conduits(Pedestal#2 to#1) 199.00 LF $ 41.45 $ - $ - $ 8,248.55 2 Install Mule Tape in Repaired 2-2"Conduits from Pedestal#2 to#I) $ 108.26 $ 26.65 3 Install#4/0 Parallel Feeders from Pedestal#2 to Pedestal#1 4 Remove&Relocate One(1)Service Pedestal#2 $ 1,105.66 $ 803.30 5 Demo Three(3)17"X 30"1-Boxes. $ 321.56 $ - $ - 6 Procure&Install Two(2)17"X 30"J-Boxes. $ 450.00 $ 2,550.00 $ - 7 Trench&Backfill-1-2"Sch 40 PVC Conduit Under Sidewalk 20.00 LF $ 29.52 $ - $ - $ 590.40 8 Additional Thirty(30)LF 2"Conduit Under Sidewalk $ 199.37 $ 118.27 $ 9 Install Mule Tape in Repaired/Existing Feeder Conduits $ - $ - $ 10 Raise Pedestal#4 $ 428.74 $ 163.72 11 Raise Pedestal#5 $ 428.74 $ 163.72 12 Mini X Rental(3 Days) $ 1,124.24 I $ 3,0421 $ 4,950 I$ 8,839 A B D Subtotal(Non-Bid Pricing) Subtotal(A+B) $ 7,992 Overhead&Profit(15%) $ 1,199 Bid Pricing(No Additional Fee Added) Subtotal D $ 8,839 TOTAL FOR THIS CHANGE PROPOSAL* $ 18,030 MEET AND MATCH Caraklt, / �- EXISTING PAVEMENT.._ IBW-88717 \\ oL ... CAUTION SW• �. OVERHEAD L - I WAELTZ&PRE EE IN, UNDERGROUND . I \ UTILITIES IN AREA SW8M OW. 2 ) \ CIVIL ENGINEERS ' '•m 21 I N A W Games Blm • L. ` '�\ \ _., ROLNO ROCK.TX 78865 / MEET AND MATCH ` �_��� EXISTING CONCRETE PAD �' TM T%121G••953 102 ,\ \1SW•�� _ _ ,� R G ti•t030R (�I '',..L... NOTE:THIS IS AN ACCESSIBLE SW=BB2.27 '( \ ROUTE AND AN ACCESS DRIVE a SW=BBI65 f LEGEND \ \ \ F00.EVENT EQUIPMENT. 6W•N7.78 '�)AAI' \1 .77.----; 1 ..:......,....,_,.,::, a \l DELINEATES ACCESSIBLE ROUTE - 411;',1' .I • I, ! \ / / NOTES: ii6ao w!,T.. I • 1 THE ACCESSIBLE ROUTE SHALL NOT EXCEED 2%CROSS { Hamlin �� !�j SLOPE NOR 5%RUNNING SLOPE WITH THE EXCEPTION OF ,yA , CURB i• R.i - �— / NOR B JR]%RUN RUNNING SLOPEPS WHICH NOT EXCEED 2%CROW SLOPE ID 19/ (/ 2 REFERENCE SHEET C..FOR ABBREVIATIONS AND MASTER mw \ �' LEGEND /\I SW=6B165 3.WHEN MEETING&MATCHING AT EXISTING SIDEWALKS.THE �\SW•681.80 I TIE.IN SMALL BE MADE AT AN EXISTING CONTROL JOINT NO OLD SETTLERS PARK • PARTIAL PANEL TIEINS LAKEVIEW 1 SW=BB0.83 \ R1 3300 E PALM VALLEY BLVD ',�BW,-8B135 ROUND ROCK Tx 78665 lii \\ ALTERNATE BID REM \ YONDER'S SIDEWALK \ R•EXu88eX Raceway ROIn_ Pmvge RMeway bd Two Pull Boa -SPECIAL. \ Ptl••W 2 b PItlr1•i 1 MEET AND MATC '� ', • N. 'EXISTING SIDEWALK, Wawa underneath sidewalk I 3 \ • CITY OF ROUND ROCK I el / ... S 1..sB \ „ \ SW � i B" 681.23 City Of Round Rock �„ I.te \.- \il SW•882.62 16g11 I i � i 1`, �� ��:� AI6IAND NGSwK� ISSUED FOR• 1I " * \\n,' ' CONSTRUCTION 2. .• _ •. ����/mil Remove and Re.Install 200 Amp Somme P.MkV SW-681.20•, �\7 .882.55 \\\a..o., . Mu,Iwppn o0Mlmi6an by PARR RAmmeq b _ N Tawny b.00 Amp SMOHE \'�• \$? \ SW=68221 \,. MEET MID MATCH - I,.I SW=882 �, 8W- EXISTING SIDEWALK IIi`\ ` ^ ' ♦ .SW6BJ. 1\ SW•8821 h LBW•882J1 �8W•B8S.8] \ ,v Texas811 q �7 BW•88287 Mnew wNAYe MIOW.� I NOTE TO CONTRACTOR. \ " Y8\ SW=690 09 Cell before You dip. 7.g !PROVIDE SEPARATE LINE ITEM PRICING 'FOR THE COMPENSATOR CUT AREA.SCOPE] a.8 v^\\ \ SW;882.22 TO INCLUDE REVEOETATION.IRRIGATION,& \ a -820.12 EARTH WORK.SIDEWALK SPECIAL'SHALL \ SW sets.' d \^ kii , BE INCLUDED IN OTHER BID ITEMS. \ \9W•8B0A1 %�-, � � 777' / • POINT) , 10FP p 2W.88J.2J ` _ ' 1 Yi van mu '\ 1`\`, I,. 'I�/� GRADING- t_,;:: v V. ,1 YONOER'S P•6MIr.: fl I1\��J VONDERS (1 OF Z) ..... RMM m aeR1Y18101X18.6o0 \ 8W•88271 1',t� POINT i,��� (I OF 2) SW•B82.6 .pR-Y w•MM NO I �1 010-031 ® ,MEET AND MATCH ..ma...0.4004.41.1 Ko \ • SW=682.00 'EXISTING SIDEWALK RAM on 5. RIM on eisaq bIAWM SW•882.12`� PROJECT KEY MAP /'� `MATCHLINE-REF.SHEET C.25 FOR CONTINUATION t••500' Ko C-24 �WP rl CAUTION I OVERHEAD 6 UNDERGROUND WAELTZ&PRETE.INI UTILITIES IN AREA I CIVIL ENGINEERS 21 I N.AW.Cows BLW R PHO15 R 215 T%TBBBB \ I'� �y \ \I \ \\ \ /a FIRM T%121505B9J3 b V I,(\ \\ PEG fF IOJOB MATCHLINE-REF.SHEET C-2A FOR CONTINUA LEGEND \ \ DELINEATES ACCESSIBLE ROUTE ...' � \\\' NOTES.. Womb;;i 6A(''3} 1\ I THE ACCESSIBLE ROUTE SHALL NOT EXCEED 2%CROSS ',Z.',•L SLOPE NOR 5%RUNNING SLOPE WITH THE EXCEPTION OF .y� \ CURB RAMPS WHICH SHALL NOT EXCEED 2%CROSS SLOPE yff \ NOR 6]J%RUHHING SLOPE ID 2 REFERENCE SHEET C-A FOR ABBREVIATIONS AND MASTER j e az, PRISON LEGEND ....., OLD SETTLERS PARK LAKEVIE W I3300 E PALM VALLEY BLVD. uM ROUND ROCK,TX 76655 c \\‘_ NOTE TO CONTRACTOR: PROVIDE SEPARATE LINE ITEM PRICING - ?, 1. FOR THE COMPENSATOR CUT AREA SCOPE TO INCLUDE TATION.IRRIGATION,6 I I CITY OF ROUND ROCK SIDEWALK EARTH WORK.SIDEW LK'SPECIAL.SHALL BE INCLUDED IN OTHER BID ITEMS • I avow, P6An1Y 7 au*. OAR City Of Round Rock ISSUED FOR 1111111)) 1: CONSTRUCTION wclD DA61 v 'FEW 500YR•662.20 exass11 FEW 100YR.6a0.a0 MrlowwM1eYe DaIOW. �\ 1 / I PeAIeVaCall sear.YMr Ala. \ `\ n - TONDER'S 3 • POINT .\ �n (10F 2) A \\\�\ r .a.,ela ..1,s`� . GRADING�f ' ' YONDER'S ��,R}, .0 % * (2 OF 2) `';:101.1 POINT (2OF2) w..o%c-r. 010-031 PROJECT KEY MAP IINIMTIa p.m. C-25 CO/AMEND A DESCRIPTION BUYOUT SAVINGS CM CONTINGENCY OWNERS EXTERNAL CHANGE STATUS NOTES CONTINGENCY ORDER TOTAL $ 947,017.00 $ 283,074.00 S 396,790.00 $ - PENDING a PROJECTED COR 031 RPI 066-Steel Embeds Conflict with Masonry Control Joints . 9 4,715.00 Revised 9/26 Pending KSS COR 052 RFI 115-Additional Steel Support for Slgnage 9 52,756.00 Responeed 9/23 Pending KSS COR 066 Decorative Channel Design Changes $ 20,741.00 Ravleed 9/26 Provided final calculations for KSS Review COR 050 Additional Detailing Required per REI 53 $ 2,206.00 Responeed 9/23 Respond to KSS Comments COR 073 RFI 140-Pavilion Ramp Landings Steel Modifications $ 73,254.00 Submitted 10/1 Pending Approval COR 091 Playground Retaining Wail Revisions $ (7,255.00) Response from Katie,pending SpewGlass response COR 070 Regrading at Yonder.Point 9 54,715.00 Washout from early July Rain Events COR 097 RP/032-Planter lied Credit $ (1,599.00) Submitted 10/3 Pending Approval COR 079 Irrigation at Yonder's Sidewalk-Mainline Replacement $ 20,000.00 $ 42,235.00 Submitted 10/7 COR 059 Builder's Risk Overage $ 7,753.00 COR 076 Electrical Pedestal Relocation at Yonder's $ 19,232.00 COR 084 RFI 143-Culvert Revision at Yonder's Sidewalk $ 2,208.00 Pending field details COR 095 Urinal Adjustments for ADA Clearance $ 30,000.00 Updated dimensions provided by MODE COR 096 Closure Detail at Pavillon CMU to Steel Pending RFf response COR 097 RFI 151-Restroom Signage $ 1,800.00 TOTAL $93,364 $104,703 $2,208 $122,486 APPROVED $ 947,017.00 $ 283,074.00 $ 396,790.00 $ - PENDING/PROJECTED $ 93,364.00 $104,703 $2,208 $ 122,486.00 S 8,439.00 $ 17,051.00 $ 5,830.00 S (122,486.00) CONTRACT BREAKDOWN BUYOUT CONTINGENCY SPENT BALANCE Original Contract $ 13,494,260 ORIGINAL $ 1,048,820.00 External Changes $ 122,486.00 nne:vr'APPROVED CHANGES S 947,017.00 $ 101,803.00 I Contract Total: $13,616,746 mOOCO OP APPROVED 6 PROJECTED CHANGES $ 93,364.00 $ 8,439.00 CONTRACTOR'S CONTINGENCY SPENT BALANCE OWNER BUDGET BREAKDOWN ORIGINA, $ 404,828.00 Current Contract Total $ 13,616,746.00 P5000r APPROVED CHANGES $ 283,074.00 $ 121,754.00 Buyout Savings(Remaining) $ {8,439 00) ,OEWRD APPROVED&PROJECTED CHANGES $ 104,703.00 S 17,051.00 Current Cost $13,608,307 Onglnal Budget 5 13,494,260 OWNER'S CONTINGENCY SPENT BALANCE Difference/Remaining $ (114,047) ORIGINA. $ 404,828.00 n APPROVED CHANGES $ 396,790.00 $ 8,038.00 roor.Amo APPROVED 6 PROJECTED CHANGES $ 2,208.00 $ 5,830.00 Page 1 Czat MI L•Fn•rw or.,o CHANGE ORDER/COST LOG 4/1.".•• ,u••••• guy okra a.m..(....71. ,,=,,, .'.......... V.., ...' 0•.• ,.....0.0°5 • I O.CIO 00 5 404 Ol•00 • 404 a.ea • ."."111.11=1111111111111MMIMIIIMME WTI,' . nEr.r...111.11 IIIMMINII ETI11...fraimilliN or.rsrrO.r.••r.•••rrnnr'mriMNMimMMMMMMMMM orrrreimmunr•r...9141101INIMmilliii ••••••••••••••••••• awdmma em••••••-Yam.1•••• ••••• •*••••••I•ti..40...YE., gaa .••••-**I ma n.•.E.." .......... cm...............m op•...ma.............. •••2.1••••'MEE gm.••••••lamIla MP Aml 1.01.,I .MO mg•a...aeg aroma,.a n•ig...Mon •••••••••••ea• •••••••••••r•••••••• m••••••••••••1 Ron Meg•••••••••/1•1*.Mb••••••••pg. ••••••••...Wm••••••••• 1 am•Era 1.60.•••••••• • J152•L•• 5"- " • •My.M • RR.. 1 MO. • I no....a,.A.,... .. 5:141;;;;;;=:. .. . lal ••••oast+ ••••••...a 43i.•••••r• . •••••••••••.•••••12•••• 0••••ftlaL••.1... IR•&Mama.I1•.••••••Tn..MR& Midge And...PY•••.1 ••••••••1••••••••=g1/.••• •rbm•.••• 7•••••••••-. •• • . . • . ="'..... • 11•RM 111MEIMINI=MMI1011 NM Lt.ft.,.Ng/KU PA ...,.........g.g...0,......****....••••*, • •••••••• Mg..•••.}gm.,11••••••. a*gar Ng*,•se.Roy,.*.m.vp•NI........INI •. _ .. ... . . . • PPP. • •••••• ill Iii ...Aril . - •... ....- -.-. 1.111MIMINIMEIMMIW"."11111111.11111 II...._pa................. • ..•••• WI p••..........m••Emma so.5•0•••• • 1..... pa us gagaa.....aga',amp.... an•••rgAggg••••.*••=•••••=•••• • M.A. •••••••••••0.,.••••D•••• A _MAIER • L.*...40*.,•1••paw .M1 a......0*a••••••••••••gpg • ••g•••• WM IIIIIIIIW-'rer.IIIIIMIIIMIMIIIMIIIIIMMIIIIIIIIM WM. .. :: .• MINOW=110,... ..1.M.111.1.111111111111111111.111 M.••• •1.1 rn...0•15.....RE ...••• *,..........pg.*,***....g......... pia On aaaa,,,,ag.a.,anaa pa.**a g •j••••• gg•... 5.g r.....,......P....0.......Q....• . ,.,.... 5..... ,....,•*,............ 5....• ....,**L.............5,.....5..5 tO•1110 ••105••••M..Pe.•..1.55•510 MI*•••A* • •••••.. PM.1 Op&••••••pg,le••••• • L... 47)... ••••••••reg.&0.1•• MR egg •••150••••*.....•.••••••••••••••Mg V*. R... NM.•rgawal Ram L.P..m.Nadia.= A .2.1.•• *I 1.1.a. CP••• One./P.n..4.n.••••••• • 10.10.•• &awe.IA• Ma Olt ••••••5.5•••g.0•••••• 011••••••,oprel.... ...PS 9a•ON RP,I.••••••••••••1•*•45••••••• ...RI Oe•PO ••••••••0 Veg.,... • Sarum aftea,........ CM.1 mr........•.m.....• Mega.1.1• ....•••••••••••••••••••••••MO.* MO., ......•ft.0,. ••••••••1•••• •••••••*API. 0011 ON gr.ma 0.....*gm••ygg.e.05..g.b _ __ • la•••• aagn•••IV. •••••••01.1••• a.m.Ind aaa gag ,,.,a.,,,,,,a,a,aa,a....., a 1••••• %Maga*ans.@ ava0•0.9. gq.gal ••••5*e.g.:L....*pg..0.......• 0.1••• gag...•5*........Iglu,tea* -•. . RA"..7........5.•215..•• 1.1.11 I= • .g- .•__ . .. ..!..rillierilll1111.M.......ierillinilinliEll R.4. •••••P...01 a.m...•••I a 2-E•IJO 1 ••••• • L••••.•••• • an.rsa• • 17•••••••• • 01.4•••• •=•••••:. _ ...-' - IMO lag/.....•• •• s ...am • MIRA* • ...Mk'. Lf,•••Jeg =11 MIIIIIM l'..55/. •5 "...5 ..1111.1nri . 1 g..i'Mt..... S ft MOM rritnrirlirMini I Ca.a.T.. WARNS =5,55t5f,MWM=1111Wrir. I 1.11111111111111.1 in tirl==.11 IIII====.1 O..WOOR•••••••••• ILL,1,40•MI!KO 4 II M6 44 OZ AIM. 0 I•••,G I I .•''•• E=1=1=1. .1111110E1 O•••010•01 MUMS, ==inii .lilii user 5 11.4.0 ---•,-5.1.5 .5.7.. 111111755, or.a.......... ..r,111iRW•!11ri T""••. •- M--, EVNEMMUrriin =mew ----_ It V ...,.... _ _I_ ._--...........ftweise - ___ ----"'''•••••I../••••••••••A. ••••••••••••••• -, OM•I9 LI•••••1•••••••••.•••• MOP...... On•P M.a••••••ga OP. a •.•••• 0..... _IMAM..A1Elall_gagbaga.ILIterlags_ ... ....__ yaa ga ____, --131a213 or.,.....• _ ,_. a Lg1.10 _aaa,gaa as_.agaaaggaaaaaaa.,,, .a. la Li If ••••/•co•mg am•,,_aagaelJaeleLad ..g._ _Ia.al..- . • , . ., _9.1._So MaaatielMS¢as. a VA am _MIMI al,6,1 rea harms gan nada a aaal ea .--Ii•12•1..••9•I.0••••••.335..1_ .... R.S.......-... 1 . .000•• ..................NM __Ci,ga::: aim...01_•.-0- • ••••••• ••••••...RR O.••• ,=mom••••••••F.0•VA.P.m.. • &MY. __,_.• '0........••pg..,*.... • 0..0,M./00,nalaa ..- -.M. „galaaellMIONE.Maallgarlg.- a La.. P-c. .............. CP-. P.O.................• • - ____I i Page 1