CM-2026-243 - 10/2/2026 STATE OF TEXAS §
COUNTY OF WILLIAMSON §
SUPPLEMENTAL CONTRACT NO. 1
TO CONTRACT FOR ENGINEERING SERVICES
FIRM: THE ESTES GROUP,LLC ("Engineer")
ADDRESS: 9025 W State Hwv 29#205,Liberty Hill,TX 78642
PROJECT: Arterial SMP—Smyers Lane/CR 122 Rehabilitation
This Supplemental Contract No. 1 to Contract for Engineering Services is made by and between
the City of Round Rock, Texas, hereinafter called the "City" and The Estes Group, LLC,
hereinafter called the"Engineer."
WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract," on the 14th day of August,2025 for the Arterial SMP— Smyers Lane/CR
122 Rehabilitation Project in the amount of$300,610.65; and
WHEREAS,it has become necessary to amend the Contract to modify the provisions for the scope
of services and to increase the compensation by $20,936.00 to a total of$321,546.65;
NOW THEREFORE,premises considered,the City and the Engineer agree that said Contract is
amended as follows:
I.
Article 2,Engineering Services and Exhibit B, Engineering Services shall be amended as set forth
in the attached Addendum to Exhibit B. Exhibit C, Work Schedule shall be amended as set forth
in the attached Addendum to Exhibit C.
II.
Article 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by
$20,936.00 the lump sum amount payable under the Contract for a total of$321,546.65, as shown
by the attached Addendum to Exhibit D.
IN WITNESS WHEREOF,the City and the Engineer have executed this Supplemental Contract
in duplicate.
[signature pages follow]
Supplemental Contract Rev.06/16
0199.202521 84275
M2o2 - 24 1
THE ESTES GROUP, LLC
By: h� . 4 :).,
Printed Name:
Kristina N Estes
Title: Chief Executive Officer
Date Signed: 9/16/2026
Supplemental Contract Rev.06/16
0199.202521 84275
2
CITY OF ROUND ROCK APPROVED AS TO FORM:
By: i�/ to
1 Stephanie L. Sandre, City Attorney
Printed Name: ea () („JiSc Wb►n
Title: 1 IS40%-d 04 y Ma►a9er
Date Signed: 1O1-2/aC
Supplemental Contract Rev.06/16
0199.202521 84275
3
ADDENDUM TO EXHIBIT B
Engineering Services
Project Background
Project Background
The City of Round Rock (the "City") proposes roadway rehabilitation/reconstruction of Smyers
Lane from RM 620 to Wyoming Springs Drive (0.6 Miles) and CR 122 from Red Bud Lane to south of
the low water crossing (0.75 Miles) (the "Project") utilizing the services of The Estes Group, LLC.,
(the "Engineer") as the prime consultant. The Engineer will provide Geotechnical investigations
and preparation of plans, specification, and estimates (PS&E). The current understanding of the
project is to hold and maintain the existing edge of payment width of approximately 20-22' (two
10' lanes) for both roadways and safety improvements for the upstream end of one cross culvert
on Smyers Lane.
This Addendum is to add Construction Phase Services
Project Team Consultants
a. Raba Kistner,Inc.
Task 1: Data Collection
No change
Task 2: Field Surveying(OMIT)
Task 3: Right-of-Way(OMIT)
Task 4: Surface Utility Engineering(OMIT)
Task 5: Geotechnical Investigation and Recommendations
No change
Task 6: Environmental Technical Memorandum (OMIT)
Task 7:TCEQ Coordination (OMIT)
Task 8: Geologic Assessment(GA) (OMIT)
Task 9: Public Involvement(OMIT)
Task 10:Traffic Study(OMIT)
Task 11: Preliminary Design (OMIT)
Task 12: Plans.Specifications.&Estimate
No change
Task 13: Construction Engineering
The Engineer shall provide Construction Phase Services anticipated though December 2026.
The services include the following:
a. Bid Phase Services
No change
b. Construction Phase Services
1.Attend preconstruction meeting (1)and field meetings as requested by the City
2.Technical review of material submittals and provide responses as necessary.Maintain submittal
log and document coordination between the City,Contractor,and TEG(10 Submittals)
3.Review material test reports and provide engineering recommendations if there are any
nonconforming results or as requested by the City
4. Review and respond to RFI. Develop and maintain RFI log and document coordination between
the City,Contractor,and TEG
5. Develop and maintain revision log and document coordination between the City,Contractor,and
TEG
6. Revise plan sheets to support change orders as requested by the City
7.Review and authorize the contractor's monthly pay application
8.Walk Though/Punch List
The Engineer will accompany the City Representative and Contractor on final walk-though when
Contractor notifies the City that the project is substantially complete and ready for final inspection.
The Engineer will develop a written punch list of items yet to be completed,to be adjusted,
removed and/or replaced.The Engineer will all accompany the City Representative and contractor
for verification walk through. Following the project acceptance,the Final Acceptance Letter will be
completed,and the contractor field notes will be included in as-built drawing as part of the As-
Built Plan deliverables.
Task 14:General Project Management
a. General Project Management
The Engineer shall establish and maintain project schedule and budgets,develop monthly progress
reports,and prepare invoices.
b. Subconsultant Supervision
No Change
c. Project Coordination Meeting
No Change
d. Quality Assurance/Quality Control
The Engineer shall review all work to assure that the work is in accordance with City requirements
and that the work is completed in a timely and efficient manner.
ADDENDUM TO EXHIBIT C
Work Schedule
Attached Behind This Page
Exhibit C-1
FM(i20 to Wyoming Springs Dr
SMYERS LANE REHABILITATION(Construction Phase)
Project
Stall Dee 7/1/202e(Wedneeday) Display Period 1
THE ESTES GROUP
Project Lead Display Weekly
' g ; gS
9; 1g1,
A 1T.4 .7, ,$ 9
o g n A
L L
1 Smyers Lane Rehabilitation
Wed 7/01/28 Toll 12/31/28 183 0% 1
2 Construction Starts
2.1 Stan Date Wed 7/0126 Wed 7,01126 0 0% 1
3 Construction Engineering
31 Construction Durabon Dr Wed 2r01/26 Thu 12/31/26 183 0% 132
work flt1rr0r12.ron Thu 12/31/28 Thu 12/31/26 0 0% 0
Exhibit C
Pegs 1 all
ADDENDUM TO EXHIBIT D
Fee Schedule
Attached Behind This Page
EXHIBIT D-1
FEE SCHEDULE
FOR
THE ESTES GROUP, LLC
Smyers Lane Rehabilitation
PS&E
For services described in the Scope of Services, we request the compensation as
detailed below. Cost breakdowns for engineering services and explanation of
expenses are shown on the following pages.
LUMP SUM AMOUNT
$20,936.00
Page 1 of 4
EXHIBIT D-1
Fee Schedule
Description of Work or Task Cost/ Task
Totals
Smvers Lane Rehabilitation
The Estes Group, LLC (TEG)
Task 13: Construction Engineering $15,390.00
Task 14: General Project Management $5,110.00
Direct Expenses $436.00
TEG FEE SCHEDULE SUMMARY $20,936.00
SMYERS LANE REHABILITATION SUBTOTAL $20,936.00
TOTAL FEE $20,936.00
Page 2 of 4
Summary of Manhours by Classification
The Estes Group,LLC(TEG)
Assumed Project Engineer Engineer Engineer EIT Sr.Engr Admin/ Staff
Description of Work or Task Number Manager (Senior) (Project) (Design) Technician Clerical Staff-Hr. Cost/ Task
of Sheets $250.00/Hr $235.00/Hr $240.00/Hr $190.00/Hr $140.00/Hr $190.00/Hr $110.00/Hr Totals Totals
Smyers Lane Rehabilitation
Task 13:Construction Engineering
b.Construction Phase Services 0
1 Construction Meetings 4 2 8 14 $2,590.00
2 Material Submittal 4 8 12 $2,120.00
3 Review Material Reports 2 4 6 $1,060.00
4 RFI Log 4 8 12 $2,120.00
5 Revision Log 2 8 10 $1,620.00
6 Revised Plan Sheets 4 2 8 14 $2,590.00
7 Pay Application 3 3 6 $1,170.00
8 Walk Through/Punch List 4 8 12 $2,120.00
Construction Engineering Subtotal 27 4 0 0 56 0 0 86 $15,390.00
Task 14:General Project Management
a.General Project management 3 6 9 $1,410.00
b.Subconsultant Supervision 0 $0.00
c.Project Coordination Meeting 0 $0.00
d.Quality Assurance/Quantity Control 10 5 15 $3,700.00
General Project Management Subtotal 13 0 5 0 0 0 6 24 $5,110.00
Smyers Lane Rehabilitation Subtotal $20,500.00
TEG SUMMARY 40 4 5 0 55 0 6 110 1 $20,500.00
Page 3 of 4
Summary of Direct Expenses
The Estes Group, LLC (TEG)
Item Description Unit Quantity Unit Cost Total Cost
Direct Expenses
I. Mileage mile 480 $0.700 $336.00
II. Copies- 11 x 17 each 200 $0.20 $40.00
Ill. Overnight shipping/Courier each 3 $20.00 $60.00
TEG Direct Expenses $436.00
Page 4 of 4