BCRUA-2026-021 - 10/19/2026 RESOLUTION NO. BCRUA-2026-021 WHEREAS,the Brushy Creek Regional Utility Authority("BCRUA")has previously entered into a contract ("Contract") with Webber Waterworks, LLC for the Phase 2A Water Treatment Plant Expansion Project,and WHEREAS,the BCRUA has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials,equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Change Order No. 1,Now Therefore BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE BRUSHY CREEK REGIONAL UTILITY AUTHORITY: That the Board President is hereby authorized and directed to execute on behalf of the BCRUA, Change Order No. 1 to the Contract with Webber Waterworks, LLC for the Phase 2A Water Treatment Plant Expansion Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A"and incorporated herein for all purposes. The Board of Directors hereby fmds and declares that written notice of the date,hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed,considered and formally acted upon,all as required by the Open Meetings Act,Chapter 551,Texas Government Code, as amended. RESOLVED this 19th day of October,2026. RE E FLORES,Pres t Brushy Creek Regional Utility Authority TIES • ANNE DUFFY, Seci t ry 0330 20241 EXHIBIT A Change Order No. 001 Date of Issuance: 10/9/2026 Effective Date: Project BCRUA Phase 2A WTP Expansion Iowaer BCRUA Owner's Contract No.:NA Contract Date of Contract December 15,2025 Contractor Webber Waterworks,LLC Engineer's Project No.:3-00867 The Contract Documents are modified as follows upon execution of this Change Order. See attached summary for the following Change Proposals: RCP-001 (CPR-001),TSC Admin CPR-002,TSS Potholing;CPR-003, Filter Gallery Changes;and CPR-004,Direct Costs for TSS Over-Excavation of Non-Native Material and Backfill. Attachments: (list documents supporting change): Change Proposal Summary Sheet,RCP-001,CPR-002,CPR-003,and CPR-004 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑Working days X Calendar days Substantial completion(days or date):tune 12,2028(910 Calendar Days) S97.619.149.00 Ready for final payment(days or date):September 10.2028(1.000 Calendar Days) [Increase][Decrease]from previously approved Change Orders [Increase][Decrease] from previously approved Change Orders No. NLA to No. N/A • No. N/A to No. N/A • Substantial completion(days):910 $0.00 Ready for final payment(days):90 Contract Price prior to this Change Order Contract Times prior to this Change Order. Substantial completion(days or date):910 $97.619.149.00 Ready for final payment(days or date):90 [Increase][Beesrax]of this Change Order. [Increase][Decrease]of this Change Order. Substantial completion(days or date):0 $398S70.17 Ready for final payment(days or date):0 Contract Price incorporating this Change Order. Contract Times with all approved Change Orders: Substantial completion(days or date):June 12-2028 598.017.719.17 Ready for final payment(days or date):,5egtem ber 10.2028 RECOMMENDED: ACCEPTED: ACCEPTED: ?ete#-T. Bailed By: By: By. Peter T.Bailey(Oct 12,202 8 00:05 CDT) Peter T.Bailey,President-Webber Waterworks eer orized Signature) Owner(Authorized Signature) Contractor(Authorized Signature) Date:10/9/2026 Date: Date: 10/12/2026 Approved by Funding Agency(if applicable): Date: CHANGE PROPOSAL SUMMARY SHEET Client: Brushy Creek Regional Utility Authority Project: BCRUA Phase 2A Water Treatment Plant Expansion Contractor: Webber Waterworks,LLC CO No.: 001 Date: 10/9/2026 CONTRACT AMOUNT BEFORE THIS CHANGE: $ 97,619,149.00 QUANTITY CONTRACT UNIT ADJUSTED UNIT ITEM No. (Add/Deduct) UNIT DESCRIPTION PRICE PRICE UNIT PRICE AMOUNT 1 1 LS RCP-001,CPR-001,TSC Admin Network N/A N/A $ - $ - 2 1 LS CPR-002,TSS Potholing N/A N/A $ 2,304.72 $ 2,304.72 3 1 LS RCP-002,CPR-003,Filter Gallery Changes N/A N/A $ 19,408.45 $ 19,408.45 RFI-045,CPR-004,TSS Over-Excavation of 4 1 LS Non-Native Material and Backfill(Direct N/A N/A $ 376,857.00 $ 376,857.00 Charges Only) 5 $ - 6 $ - 7 $ - 8 $ - 9 $ - 10 $ - GRAND TOTAL THIS CHANGE: $ 398,570.17 REVISED CONTRACT AMOUNT AFTER THIS CHANGE: $ 98,017,719.17 Request for Change Proposal (Not a Change Order) Request No. 001 Date of Issuance: February 16,2026 Initiated by: Owner/Engineer Owner:BCRUA Owner's Contract No.:NA Project:Phase 2A WTP Expansion Date of Contract:12/15/2026 Contractor:Webber Waterworks,LLC Engineer's Project No.:3-00867 Please submit an itemized proposal for changes In the Contract Sum and/or Contract Times for the proposed modifications to the Contract Documents described herein: Description: Remove the Administrative network components from Treatment Structure Central including router,network switches,SFP, wireless access points,and associated CAT6 cabling.This system has already been installed and is functioning.The requirement for updating IP addressing scheme on the Admin network has not been removed. The Moxa IKS series network switches were originally specified for the SCADA,camera,and access control networks.To match with the Phase 2 projects and understanding that the IKS series is late in its lifecycle the network switches will be changed to Moxa RKS series.Provide 8 port Gigabit Ethemet option cards for all the ports shown in the updated drawings. Attachments: RCP-001 drawings This is not a Change Order. All work shall be in accordance with terms and conditions of original Contract Documents. CHANGE WILL: CHANGE WILL: [Increase][Decrease]Contract Price by: [Increase][Decrease]Contract Time by: $ Calendar Days IN No Change to Contract Price • No Change to Contract Time • RECOMMENDED • ACCEPTED ❑ NOT RECOMMENDED 0 NOT ACCEPTED By: Stair eftvpA' By: By:--/e" Contractor(Authorized Signature) Eng' er( orized Signature) Owner(Authorized Signature) Date: 6/9/26 Date: 6/25/2026 Date: 6/29/2026 Change Proposal (Not a Change Order) Request No. 002 Date of Issuance: June 25,2026 Initiated by: Contractor Owner:BCRUA Owner's Contract No.:NA Project:Phase 2A WTP Expansion Date of Contract:12/15/2025 Contractor:Webber Waterworks,LLC Engineer's Project No.:3-00867 Please submit an itemized proposal for changes In the Contract Sum and/or Contract Times for the proposed modifications to the Contract Documents described herein: Description(Insert written description of the Work): Field Directive to perform pothole excavation of Treatment Structure South(TSS)to determine extent of non-native material located below planned treatment structures.Work performed as Time and Material tracking of additional excavation effort. Attachments:(List attached documents that support description): See Approved CPR-002. This is not a Change Order. All work shall be in accordance with terms and conditions of original Contract Documents. CHANGE WILL: CHANGE WILL: [Increase][Decrease]Contract Price by: [Increase][Decrease]Contract Time by: $2,304.72 0 Calendar Days ❑ No Change to Contract Price ■ No Change to Contract Time • RECOMMENDED • ACCEPTED ❑ NOT RECOMMENDED 0 NOT ACCEPTED Teter 77 Salley By: Peter T.Bailey(Oct 12.2026 16 00 05 CDT) By: By: Contractor(Authorized Signature) E eel orized Signature) Owner(Authorized Signature) Peter T.Bailey,President-Webber Waterworks Date: 10/12/2026 Date: 10/9/2026 Date: Change Proposal (Not a Change Order) Request No. 003 Date of Issuance: August 27,2026 Initiated by: Owner Owner:BCRUA Owner's Contract No.:NA Project:Phase 2A WTP Expansion Date of Contract: 12/15/2025 Contractor:Webber Waterworks,LLC Engineer's Project No.:3-00867 Please submit an itemized proposal for changes in the Contract Sum and/or Contract Times for the proposed modifications to the Contract Documents described herein: Description(Insert written description of the Work): Request for Change Proposal No.002(RCP-002)clarified filter gallery piping modifications and added additional steel pipe changes to the 36-inch Waste Backwash Line(WBW)to accommodate future phases of the Treatment Plant.Webber's proposal (CPR-003)is acceptable. Attachments:(List attached documents that support description): See Approved CPR-003 and RCP-002. This is not a Change Order. All work shall be in accordance with terms and conditions of original Contract Documents. CHANGE WILL: CHANGE WILL: [Increase][Degrease]Contract Price by: [Increase][Decrease]Contract Time by: $19,408.45 0 Calendar Days ❑ No Change to Contract Price ■ No Change to Contract Time ■ RECOMMENDED • ACCEPTED 0 NOT RECOMMENDED ❑ NOT ACCEPTED Teter-7 &?fie By: Fever T Bailey(Oct 12 26 16 00 05 CDT) By: By: Contractor(Authorized Signature) E eer orized Signature) Owner(Authorized Signature) Peter T.Bailey,President-Webber Waterworks Date: 10/12/2026 Date: 10/9/2026 Date: Change Proposal (Not a Change Order) Request No. 004 Date of Issuance: September 8,2026 Initiated by: Owner Owner:BCRUA Owner's Contract No.:NA Project:Phase 2A WTP Expansion Date of Contract:12/15/2025 Contractor:Webber Waterworks,LLC Engineer's Project No.:3-00867 Please submit an Itemized proposal for changes in the Contract Sum and/or Contract Times for the proposed modifications to the Contract Documents described herein: Description(Insert written description of the Work): RFI-045 directed additional excavation of non-native materials in the Treatment Structure South(TSS)excavation and additional backfill of the over-excavated areas to facilitate construction of the treatment structure. CPR-004 includes approved Time and Material timesheets from Contractor and Subcontractor for the additional work.Delay associated with the additional work is currently under review and will be handled as a separate Change Proposal. Attachments:(List attached documents that support description): See RFI-045 response and approved CPR-004. This is not a Change Order. All work shall be in accordance with terms and conditions of original Contract Documents. CHANGE WILL: CHANGE WILL: [Increase][Decrease]Contract Price by: [Increase][Decrease]Contract Time by: $376,857.00 0 Calendar Days ❑ No Change to Contract Price ■ No Change to Contract Time • RECOMMENDED ■ ACCEPTED ❑ NOT RECOMMENDED ❑ NOT ACCEPTED ?eteiT. Earle] By: Peter T.Bailey(Oct 12,202 6:00.05 CDT) By: By: Contractor(Authorized Signature) E eer orized Signature) Owner(Authorized Signature) Peter T.Bailey,President-Webber Waterworks Date: 10/12/2026 Date: 10/9/2026 Date: BCRUA Ph2A WTP_CO 001 _RCP-001 , CPR-002, CPR-003, and CPR-004 Final Audit Report 2026-10-12 Created: 2026-10-12 By: Lori Brown(Ibrown@wwebber.com) Status: Signed Transaction ID: CBJCHBCAABAAfMJW2xl9T_C_hPd3gAZPTuYoX536FT9n "BCRUA Ph2A WTP_CO 001_RCP-001 , CPR-002, CPR-003, an d CPR-004" History Document created by Lori Brown (Ibrown@wwebber.com) 2026-10-12-7:43:01 PM GMT-IP address: 144.125.240.237 , Document emailed to peter.bailey@wwebber.com for signature 2026-10-12-7:45:33 PM GMT 5 Email viewed by peter.bailey@wwebber.com 2026-10-12-8:54:22 PM GMT-IP address: 104.47.11.62 FSp Signer peter.bailey@wwebber.com entered name at signing as Peter T. Bailey 2026-10-12-9:00:03 PM GMT-IP address: 144.125.240.237 (S© Document e-signed by Peter T. Bailey (peter.bailey@wwebber.com) Signature Date:2026-10-12-9:00:05 PM GMT-Time Source:server-IP address: 144.125.240.237-Signature Appearance Selected: TYPE O Agreement completed. 2026-10-12-9:00:05 PM GMT Powered by ferroviat I Adobe