R-2026-257 - 10/22/2026 RESOLUTION NO. R-2026-257
WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with
Smith Contracting Co., Inc. for the Gattis School Road Improvements Segment 6 Project, and
WHEREAS,the Council has determined that it is necessary to make adjustments/changes to the
quantity of work to be performed or materials, equipment, or supplies to be provided, and
WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said
Contract in accordance with the attached Quantity Adjustment/Change Order No. 2, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity
Adjustment/Change Order No. 2 to the Contract with Smith Contracting Co., Inc. for the Gattis School
Road Improvements Segment 6 Project, a copy of said quantity adjustment/change order being attached
hereto as Exhibit"A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date,hour,place and subject
of the meeting at which this Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and the subject matter hereof were
discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,
Texas Government Code, as amended.
RESOLVED this 22nd day of October, 2026.
/
C G MO GAN,Mayor
City of Rou d Rock, Texas
ATTEST:
ANNq-11-- AA64.13
ANKLIN, City Clerk
0112.20262
Page l of4
EXHIBIT
1ROContract Ouantitv Adiustment/Chance Order A
ROUND ROCK I,u.5
re,.06/25
Department: Transportation Department Date: 9/10/26
Project Name: Gattis School Road Improvements Segment 6
City Project ID Change Order/Quantity
Number: Adjustment No. 2
Vendor: Smith Contracting Co., Inc. 15308 Ginger St.,Austin,TX- 78728 (512)990-7640
Company Name Address Phone No.
Justification
This CO covers additional and proposed work directed by CORR representatives, including de-energizing an existing illumination pole,the
proposed installation of two new school flashing beacons, updating project quantities to reflect work completed to date, and work at Driveway
#7A(Veterinary Center), including irrigation repairs and utility conduit relocation. It also includes the requested nighttime installation of
Waterline F across Red Bud Lane, north of Gattis School Road.
SUMMARY Amount %Change
Original Contract Price: $20,453,212.861
Previous Quantity Adjustment(s): -$865,434.00
This Quantity Adjustment: -$248,892.85
Total Quantity Adjustment(s): -$1,114,326.85 -5%
Total Contract Price with Quantity Adjustment(s): I $19,338,886.01I
Previous Change Order(s): $942,291.47
This Change Order: $50,473.65
Total Change Order(s)To Date: $992,765.12 5%
Adjusted Contract Price:[Original Contract Price Plus Quantity Adjustment(s)Plus Change
Order(s)1 $20,331,651.13
Difference between Original and Adjusted Contract Prices: -$121,561.73 -0.59%
Original Contract Time: 650
Time Adjustment by previous Quan.Adj./Change Order: 78
Time Adjustment by this Quan.Adj./Change Order: 36
New Contract Time: 764
Submitted for Approval ` / _
Prepared By: Christopher Lopez,Project Manager,Smith Contracting Co.,Inc. ,Le ? 9/10/26
Printed Name,Title,Company Signatere ( 1 Date
Approvals
Contractor: Christopher Lopez, Project Manager,Smith Contracting Co.,Inc. C ,L..9 4j 9/10/26
Printed Name,Title,Company Sign ure Date
City Project '(� L�++ tt '' �A n'/�/ q
Manager: �r �� v'[ O�l ti P/ t e)J a I -16 ?1
Printed Name,Title Signature Date
Mayor/City
Manager:
Printed Name,Title Signature Date
Page 2of4
Project Name: Gattis School Road Improvements Segment 6
Change Order/Quantity Adjustment No. 2
Change Order Data
Contract Time
Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment(Days)
CO-2-1 Irrigation&Utility Relocate at Driveway#7A EA 1 $ 10,773.40 $10,773.40 3
CO-2-2 Demo Parking Lot Light Pole EA 1 $1,241.43 $1,241.43 1
RDFB SCHOOL FLASHER-W/ DRIVER
CO-2-3 FEEDBACK- RTC TIMECLOCK EA 2 $16,063.06 $32,126.12 2
Nighttime Construction and Traffic Control
CO-2-4 Services EA 1 $ 6,332.70 $6,332.70
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS: $50,473.65 6
Page 3 of 4
Project Name: Gattis School Road Improvements Segment 6
Change Order/Quantity Adjustment No. 2
Quantity Adjustment Data
Contract Time
Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment(Days)
100-6003 PREPARING ROW(TREE)(5"TO
2 12" DIA) EA 51 $500.00 $25,500.00 5
100-6004 PREPARING ROW(TREE)(12"TO
3 24"DIA) EA 12 $700.00 $8,400.00 2
CORR 501-1 JACKING OR BORING 18 IN.
189 STEEL PIPE, 3/8"THICK LF -116 $570.00 -$66,120.00
CORR 505-1 18-INCH STEEL ENCASEMENT
192 PIPE LF 18 $200.00 $3,600.00
CORR 505-2 24-INCH STEEL ENCASEMENT
193 PIPE LF 146 $240.00 $35,040.00
CORR 505-4 30-INCH STEEL ENCASEMENT
194 PIPE LF 74 $300.00 $22,200.00
CORR 506-4 MAJOR MANHOLE HEIGHT
198 ADJUSTMENT,48-INCH DIA. EA 13 $4,000.00 $52,000.00
CORR 509-1 TRENCH EXCAVATION SAFETY
199 PROTECTIVE SYSTEMS(ALL DEPTHS) LF 460 $2.00 $920.00
CORR 510-1 PIPE,6-INCH DIAMETER,
AWWA C151,CLASS 350(ALL DEPTHS),
200 INCLUDING EXCAVATION AND BACKFILL LF 68 $70.00 $4,760.00
CORR 510-2 PIPE,8-INCH DIAMETER,
AWWA C151,CLASS 350(ALL DEPTHS),
201 INCLUDING EXCAVATION AND BACKFILL LF 57 $70.00 $3,990.00
CORR 510-3 PIPE, 12-INCH DIAMETER,
AWWA C151,CLASS 350(ALL DEPTHS),
202 INCLUDING EXCAVATION AND BACKFILL LF 517.17 $70.00 $36,201.90 23
CORR 510-6 WET CONNECTIONS, 8-INCH
205 DIAMETER X 8-INCH DIAMETER EA 6 $4,000.00 $24,000.00
CORR 510-7 WET CONNECTIONS, 12-INCH
206 DIAMETER X 12-INCH DIAMETER EA 1 $5,000.00 $5,000.00
CORR 510-8 WET CONNECTIONS, 16-INCH
207 DIAMETER X 12-INCH DIAMETER EA 1 $7,000.00 $7,000.00
CORR 510-14 DUCTILE IRON FITTINGS(ALL
213 SIZES) TON 0.09 $9,000.00 $810.00
CORR 511-2 VALVES, RESILIENT WEDGE
215 GATE VALVE,6-INCH DIAMETER EA 3 $900.00 $2,700.00
CORR 511-3 VALVES, RESILIENT WEDGE
216 GATE VALVE,8-INCH DIAMETER EA 3 $1,000.00 $3,000.00
Page 4 of 4
CORR 511-4 VALVES, RESILIENT WEDGE
217 GATE VALVE, 12-INCH DIAMETER EA 1 $1,700.00 $1,700.00
CORR 511-6 FIRE HYDRANTS(SEE
219 STANDARD NO. 511S-17) EA 1 $3,000.00 $3,000.00
CORR 511-8 AUTOMATIC COMBINATION
AIR/VACUUM RELEASE VALVE ASSEMBLY, 2"
221 DIAMETER EA 1 $3,000.00 $3,000.00
#1-GFB INSTALL HDPE CONDUIT BORE W/
MULE TAPE(LABOR&EQUIPMENT
225 ONLY)(ROLL DUCT) LF -4333 $88.00 -$381,304.00
#2-GFB INSTALL GFB LARGE VAULTS
30X48X36-TIER 15- POLYMER CONCRETE
226 LID-POLYMER CONCRETE BODY EA -14 $1,900.00 -$26,600.00
227 #3-GFB END CAP 4"-AIR/WATER TIGHT EA -28 $85.00 -$2,380.00
#4-GFB COUPLER 4"HDPE AIR/WATER
228 TIGHT W/SST CLAMPS EA -16 $84.00 -$1,344.00
229 #5-GFB TRACER WIRE LF -4333 $2.25 -$9,749.25
230 #6-GFB GROUNDING WIRE(VAULT WRAP) LF -630 $2.25 -$1,417.50
231 #7-GFB FURNISH RECORD AS-BUILT EA -1 $2,800.00 -$2,800.00
$0.00
TOTALS: -$248,892.85 30