Loading...
R-2026-256 - 10/22/2026 RESOLUTION NO. R-2026-256 WHEREAS,the City of Round Rock("City")has previously entered into a contract("Contract") with Dan Williams Company for the CR 112 East Segment from CR 117 to CR 110 Project, and WHEREAS,the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 1 to the Contract with Dan Williams Company for the CR 112 East Segment from CR 117 to CR 110 Project,a copy of said quantity adjustment/change order being attached hereto as Exhibit"A"and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date,hour,place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of October, 2026. CRAI MOR AN, Mayor City o Roun ock,Texas ATTEST: ANatisT\ itcskiig KLIN, City Clerk 0112.20262 EXHIBIT ,A P:ig� I of 3 Contract Quantity Adjustment/Change Order ROUND ROCK TEXAS TV 06/25 Department: PUBLIC WORKS Date: 8/14/26 Project Name: CR 112 East City Project ID Change Order/Quantity Number: IFB 24-416 Adjustment No. 1 Vendor: DAN WILLIAMS COMPANY 'N.CAPITOL OF TX HWY, BUILDING 3, SUITE 380,AUSTIN,TX 7 512-320-1410 Company Name Address Phone No, Justification Changes per Enginner on Record and City Staff.Storm Sewer inlets incorrectly labeled in the plan set and not caputred in item summary. Adjusting of manholes; due to change in roadway grades per existing site conditions. Also,includes quantities for constructing a detour connection between the East and West segments of CR 112. SUMMARY Amount %Change Original Contract Price: l $20,434,128.21 Previous Quantity Adjustment(s): $0.00 This Quantity Adjustment: $71,321.05 Total Quantity Adjustrnent(s): $71,321.05 0% Total Contract Price with Quantity Adjustment(s): $20,505,449.45 Previous Change Order(s): $0.00 This Change Order: $0.00 Total Change Orders)To Date: $0.00 0% Adjusted Contract Price: [Original Contract Price Pius Quantity Adjustment(s)Plus Change Order(s)] $20,505,449.45 Difference between Original and Adjusted Contract Prices: $71,321.05 0% Original Contract Time: Time Adjustment by previous Quan.Adj./Change Order: Time Adjustment by this Quan.Adj./Change Order: New Contract Time: 0 Submitted for Approval Prepared By: CLAYTON SWANSON,PROJECT ENGINEER,DAN WILLIAMS COMPANY / 'L �`/7-2 G Printed Name,Title,Company Signature Date Approvals Contractor: CLAYTON SWANSON,PROJECT ENGINEER,DAN WILLIAMS COMPANY 1-/7 LG Printed Name,Title,Company Signature Date City Project II N � Manager: c�l � -Gl.b�e\�% 1 P' 1 '(uw4. of " 17—2io Printed Name,Title Signature Date Mayor/City Manager: Printed Name,Title Signature Date Page 2of3 1RO1°I.'--- Contract Quantity Adjustment/Change Order LAND ROCK TEXA: MY.06/25 Project Name: CR 112 East Change Order/Quantity Adjustment No. 1 Change Order Data Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment(Days) - $0.00 0 $0.00 0 $0.00 0 $0.00 $0.00_ $0.00 $0.00 $0.00 $0.00 . $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $0.00 0 Page 1 of 3 Contract Quantity Adjustment/Change Order RIX1b ROCX T[XA5 T.Oy2S Project Name: CR 112 East Change Order/Quantity Adjustment No. 1 Quantity Adjustment Data Contract Time Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment(Days) 496-6008 REMOV STR(BOX CULVERT) LF 12 $250.00 $3,000.00 465-6015 INLET (COMP) PCO 3 FT(RIGHT) EA 2 $5,500.00 $11,000.00 465-6017 INLET (COMP)PCO 4 FT(NONE) EA 1 $6,000.00 $6,000.00 465-6018 INLET (COMP)PCO 4 FT(LEFT) EA 1 $6,500.00 $6,500.00 465-6019 INLET (COMP)PCO 4 FT(RIGHT) EA I $6,000.00 $6,000.00 479-6001 ADJUSTINT MANHOLES EA 2 $2,500.00 $5,000.00 508-6001 CONSTRUCTING DETOURS SY 157 $110.00 $17,270.00 512-6001 PORT CTB(FUR&INST)(LOW PRO)TY 1 LF 320 $20.00 $6,400.00 512-6010 PORT CTB(FUR&INST)(LOW PRO)TY 2 LF 160 $20.00 $3,200.00 662-6093 WK ZN PAY MRK REMOV(Y)4"(SLD) LF 2009 $1.20 $2,410.80 403-6001 TEMPORARY SPL SHORING SF 165.1 $27.50 $4,540.25 $0.00 $0.00 $0.00 • $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $71,321.05 0