R-2026-256 - 10/22/2026 RESOLUTION NO. R-2026-256
WHEREAS,the City of Round Rock("City")has previously entered into a contract("Contract")
with Dan Williams Company for the CR 112 East Segment from CR 117 to CR 110 Project, and
WHEREAS,the Council has determined that it is necessary to make adjustments/changes to the
quantity of work to be performed or materials, equipment, or supplies to be provided, and
WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said
Contract in accordance with the attached Quantity Adjustment/Change Order No. 1, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS,
That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity
Adjustment/Change Order No. 1 to the Contract with Dan Williams Company for the CR 112 East
Segment from CR 117 to CR 110 Project,a copy of said quantity adjustment/change order being attached
hereto as Exhibit"A"and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the date,hour,place and subject
of the meeting at which this Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and the subject matter hereof were
discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551,
Texas Government Code, as amended.
RESOLVED this 22nd day of October, 2026.
CRAI MOR AN, Mayor
City o Roun ock,Texas
ATTEST:
ANatisT\ itcskiig
KLIN, City Clerk
0112.20262
EXHIBIT
,A P:ig� I of 3
Contract Quantity Adjustment/Change Order
ROUND ROCK TEXAS
TV 06/25
Department: PUBLIC WORKS Date: 8/14/26
Project Name: CR 112 East
City Project ID Change Order/Quantity
Number: IFB 24-416 Adjustment No. 1
Vendor: DAN WILLIAMS COMPANY 'N.CAPITOL OF TX HWY, BUILDING 3, SUITE 380,AUSTIN,TX 7 512-320-1410
Company Name Address Phone No,
Justification
Changes per Enginner on Record and City Staff.Storm Sewer inlets incorrectly labeled in the plan set and not caputred in item summary.
Adjusting of manholes; due to change in roadway grades per existing site conditions. Also,includes quantities for constructing a detour
connection between the East and West segments of CR 112.
SUMMARY Amount %Change
Original Contract Price: l $20,434,128.21
Previous Quantity Adjustment(s): $0.00
This Quantity Adjustment: $71,321.05
Total Quantity Adjustrnent(s): $71,321.05 0%
Total Contract Price with Quantity Adjustment(s): $20,505,449.45
Previous Change Order(s): $0.00
This Change Order: $0.00
Total Change Orders)To Date: $0.00 0%
Adjusted Contract Price: [Original Contract Price Pius Quantity Adjustment(s)Plus Change
Order(s)] $20,505,449.45
Difference between Original and Adjusted Contract Prices: $71,321.05 0%
Original Contract Time:
Time Adjustment by previous Quan.Adj./Change Order:
Time Adjustment by this Quan.Adj./Change Order:
New Contract Time: 0
Submitted for Approval
Prepared By: CLAYTON SWANSON,PROJECT ENGINEER,DAN WILLIAMS COMPANY / 'L �`/7-2 G
Printed Name,Title,Company Signature Date
Approvals
Contractor: CLAYTON SWANSON,PROJECT ENGINEER,DAN WILLIAMS COMPANY 1-/7 LG
Printed Name,Title,Company Signature Date
City Project II N �
Manager: c�l � -Gl.b�e\�% 1 P' 1 '(uw4. of " 17—2io
Printed Name,Title Signature Date
Mayor/City
Manager:
Printed Name,Title Signature Date
Page 2of3
1RO1°I.'---
Contract Quantity Adjustment/Change Order
LAND ROCK TEXA:
MY.06/25
Project Name: CR 112 East
Change Order/Quantity Adjustment No. 1
Change Order Data
Contract Time
Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment(Days)
-
$0.00 0
$0.00 0
$0.00 0
$0.00
$0.00_
$0.00
$0.00
$0.00
$0.00
. $0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS: $0.00 0
Page 1 of 3
Contract Quantity Adjustment/Change Order
RIX1b ROCX T[XA5
T.Oy2S
Project Name: CR 112 East
Change Order/Quantity Adjustment No. 1
Quantity Adjustment Data
Contract Time
Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment(Days)
496-6008 REMOV STR(BOX CULVERT) LF 12 $250.00 $3,000.00
465-6015 INLET (COMP) PCO 3 FT(RIGHT) EA 2 $5,500.00 $11,000.00
465-6017 INLET (COMP)PCO 4 FT(NONE) EA 1 $6,000.00 $6,000.00
465-6018 INLET (COMP)PCO 4 FT(LEFT) EA 1 $6,500.00 $6,500.00
465-6019 INLET (COMP)PCO 4 FT(RIGHT) EA I $6,000.00 $6,000.00
479-6001 ADJUSTINT MANHOLES EA 2 $2,500.00 $5,000.00
508-6001 CONSTRUCTING DETOURS SY 157 $110.00 $17,270.00
512-6001 PORT CTB(FUR&INST)(LOW PRO)TY 1 LF 320 $20.00 $6,400.00
512-6010 PORT CTB(FUR&INST)(LOW PRO)TY 2 LF 160 $20.00 $3,200.00
662-6093 WK ZN PAY MRK REMOV(Y)4"(SLD) LF 2009 $1.20 $2,410.80
403-6001 TEMPORARY SPL SHORING SF 165.1 $27.50 $4,540.25
$0.00
$0.00
$0.00
•
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
TOTALS: $71,321.05 0