Contract - Smith Contracting Co., Inc. - 10/22/2026 Page 1 of 4 Contract Ouantitv Adiustment/Chance Order -P1111"- .o«a..,_, iev.06/25 Department: Transportation Department Date: 9/10/26 Project Name: Gattis School Road Improvements Segment 6 City Project ID Change Order/Quantity Number: Adjustment No. 2 Vendor: Smith Contracting Co., Inc. 15308 Ginger St.,Austin,TX-78728 (512)990-7640 Company Name Address Phone No. Justification This CO covers additional and proposed work directed by CORR representatives, including de-energizing an existing illumination pole,the proposed installation of two new school flashing beacons, updating project quantities to reflect work completed to date,and work at Driveway #7A(Veterinary Center),including irrigation repairs and utility conduit relocation. It also includes the requested nighttime installation of Waterline F across Red Bud Lane, north of Gattis School Road. SUMMARY Amount %Change Original Contract Price: $20,453,212.86 Previous Quantity Adjustment(s): -$865,434.00 This Quantity Adjustment: -$248,892.85 Total Quantity Adjustment(s): -$1,114,326.85 -5% Total Contract Price with Quantity Adjustment(s): I $19,338,886.01I Previous Change Order(s): $942,291.47 This Change Order: $50,473.65 Total Change Order(s)To Date: $992,765.12 5% Adjusted Contract Price:[Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)] $20,331,651.13 Difference between Original and Adjusted Contract Prices: -$121,561.73 -0.59% Original Contract Time: 650 Time Adjustment by previous Quan.Adj./Change Order: 78 Time Adjustment by this Quan.Adj./Change Order: 36 New Contract Time: 764 Submitted for Approval / Prepared By: Christopher Lopez,Project Manager,Smith Contracting Co.,Inc. ( / ,L_e ? 9/10/26 Printed Name,Title,Company Signa re o Date Approvals / Contractor: Christopher Lopez,Project Manager,Smith Contracting Co.,Inc. L ,L,d ? 9/10/26 Printed Name,Title,Company Sig re/VJ Date City Project Manager: . 7-IL 11 / Printed Name,Title Sig to Date Mayor/City / �/ Manager: .+ Mc cc ILc �\`� 10 24 20 Printed,N me,Title Si ature Date _:-ft01 `0 — ZS1 Page 2of.3 Project Name: Gattis School Road Improvements Segment 6 Change Order/Quantity Adjustment No. 2 Change Order Data Contract Time Bid Item # Item Description Unit Qty. Unit Price Amount Adjustment(Days) CO-2-1 Irrigation &Utility Relocate at Driveway #7A EA 1 $ 10,773.40 $10,773.40 3 CO-2-2 Demo Parking Lot Light Pole EA 1 $1,241.43 $1,241.43 1 RDFB SCHOOL FLASHER-W/ DRIVER CO-2-3 FEEDBACK- RTC TIMECLOCK EA 2 $16,063.06 $32,126.12 2 Nighttime Construction and Traffic Control CO-2-4 Services EA 1 $ 6,332.70 $6,332.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 TOTALS: $50,473.65 6 Page 3 of 4 Project Name: Gattis School Road Improvements Segment 6 Change Order/Quantity Adjustment No. 2 Quantity Adjustment Data Contract Time Bid Item# Item Description Unit Qty. Unit Price Amount Adjustment(Days) 100-6003 PREPARING ROW(TREE)(5"TO 2 12"DIA) EA 51 $500.00 $25,500.00 5 100-6004 PREPARING ROW(TREE)(12"TO 3 24" DIA) EA 12 $700.00 $8,400.00 2 CORR 501-1 JACKING OR BORING 18 IN. 189 STEEL PIPE,3/8"THICK LF -116 $570.00 -$66,120.00 CORR 505-1 18-INCH STEEL ENCASEMENT 192 PIPE LF 18 $200.00 $3,600.00 CORR 505-2 24-INCH STEEL ENCASEMENT 193 PIPE LF 146 $240.00 $35,040.00 CORR 505-4 30-INCH STEEL ENCASEMENT 194 PIPE LF 74 $300.00 $22,200.00 CORR 506-4 MAJOR MANHOLE HEIGHT 198 ADJUSTMENT,48-INCH DIA. EA 13 $4,000.00 $52,000.00 CORR 509-1 TRENCH EXCAVATION SAFETY 199 PROTECTIVE SYSTEMS(ALL DEPTHS) LF 460 $2.00 $920.00 CORR 510-1 PIPE,6-INCH DIAMETER, AWWA C151, CLASS 350(ALL DEPTHS), 200 INCLUDING EXCAVATION AND BACKFILL LF 68 $70.00 $4,760.00 CORR 510-2 PIPE,8-INCH DIAMETER, AWWA C151, CLASS 350(ALL DEPTHS), 201 INCLUDING EXCAVATION AND BACKFILL LF 57 $70.00 $3,990.00 CORR 510-3 PIPE, 12-INCH DIAMETER, AWWA C151,CLASS 350(ALL DEPTHS), 202 INCLUDING EXCAVATION AND BACKFILL LF 517.17 $70.00 $36,201.90 23 CORR 510-6 WET CONNECTIONS, 8-INCH 205 DIAMETER X 8-INCH DIAMETER EA 6 $4,000.00 $24,000.00 CORR 510-7 WET CONNECTIONS, 12-INCH 206 DIAMETER X 12-INCH DIAMETER EA 1 $5,000.00 $5,000.00 CORR 510-8 WET CONNECTIONS, 16-INCH 207 DIAMETER X 12-INCH DIAMETER EA 1 $7,000.00 $7,000.00 CORR 510-14 DUCTILE IRON FITTINGS(ALL 213 SIZES) TON 0.09 $9,000.00 $810.00 CORR 511-2 VALVES,RESILIENT WEDGE 215 GATE VALVE,6-INCH DIAMETER EA 3 $900.00 $2,700.00 CORR 511-3 VALVES, RESILIENT WEDGE 216 GATE VALVE,8-INCH DIAMETER EA 3 $1,000.00 $3,000.00 Page 4 of 4 CORR 511-4 VALVES, RESILIENT WEDGE 217 GATE VALVE, 12-INCH DIAMETER EA 1 $1,700.00 $1,700.00 CORR 511-6 FIRE HYDRANTS(SEE 219 STANDARD NO. 511S-17) EA 1 $3,000.00 $3,000.00 CORR 511-8 AUTOMATIC COMBINATION AIR/VACUUM RELEASE VALVE ASSEMBLY, 2" 221 DIAMETER EA 1 $3,000.00 $3,000.00 #1-GFB INSTALL HDPE CONDUIT BORE W/ MULE TAPE(LABOR&EQUIPMENT 225 ONLY)(ROLL DUCT) LF -4333 $88.00 -$381,304.00 #2-GFB INSTALL GFB LARGE VAULTS 30X48X36-TIER 15-POLYMER CONCRETE 226 LID-POLYMER CONCRETE BODY EA -14 $1,900.00 -$26,600.00 227 #3-GFB END CAP 4"-AIR/WATER TIGHT EA -28 $85.00 -$2,380.00 #4-GFB COUPLER 4"HDPE AIR/WATER 228 TIGHT W/SST CLAMPS EA -16 $84.00 -$1,344.00 229 #5-GFB TRACER WIRE LF -4333 $2.25 -$9,749.25 230 #6-GFB GROUNDING WIRE(VAULT WRAP) LF -630 $2.25 -$1,417.50 231 #7-GFB FURNISH RECORD AS-BUILT EA -1 $2,800.00 -$2,800.00 $0.00 TOTALS: -$248,892.85 30