R-2026-268 - 11/5/2026 RESOLUTION NO. R-2026-268 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Cash Construction Company, Inc. for the Gattis School Road Segment 3 Project, and WHEREAS,the Council has determined that it is necessary to make adjustments/changes to the quantity of work to be performed or materials,equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to adjust/change the quantities in said Contract in accordance with the attached Quantity Adjustment/Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City, Quantity Adjustment/Change Order No. 3 to the Contract with Cash Construction Company, Inc. for the Gattis School Road Segment 3 Project, a copy of said quantity adjustment/change order being attached hereto as Exhibit"A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date,hour,place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 5th day of November, 2026. C G MO AN, Mayor City of Ro d Rock,Texas A ST: FRANKLIN, City Clerk 0112.20262 EXHIBIT A Page 1 of 3 Contract Quantity Adjustment/Change Order rev,01/16 Department: Public Works Project Name: Gattis School Road Segment 3 Date: 9/17/26 City Project ID Change Order/Quantity Number Adjustment No. 3 Vendor Cash Construction Company 2171Gngston Lacy Blvd 512-251-7872 Company Name Address Phone No. Justification Addition of improvements to existing HOA sign,addition of irrigation sleeves,removal of a median and paving added where the median was shown to be placed but not needed for Clay Madsen center,and relocate a hydrant on Windy Park not shown in the plans. The change order also includes additional 8 mix HMAC due to plan quantity being incorrect, driveway access needed to be added,additional HMAC was needed along AW Grimes not shown for detouring to keep traffic moving and not bottlenecked,TCP revisions causing more B mix due to the existing pole line not being removed timely by Oncor,additional B mix for areas where poles were still remaining,overbuild of curb and gutter and medians caused overrun,as well as general yield of HMAC due to all these added factors in placing the HMAC. SUMMARY Amount %Change Original Contract Price: $26,735,973.35 Previous Quantity Adjustment(s): $170,651.20 This Quantity Adjustment: $457,841.50 Total Quantity Adjustment(s): $628,492.70 Total Contract Price with Quantity Adjustment(s): $27,364,466.05 Previous Change Order(s): $250,358.86 1% This Change Order: $39,919.77 0% Total Change Order(s)To Date: $290,278.63 1% Adjusted Contract Price [Original Contract Price Plus Quantity Adjustments)Plus Change Order(s)): $27,654,744.68 Difference between Original and Adjusted Contract Prices: $918,771.33 Original Contract Tree: 700 Time Adjustment by previous Quan.Adj./Change Order: 28 Time Adjustment by this Quan.Adj./Change Order: 15 New Contract Time: 743 Submitted for Approval Prepared By: Scott Blanda,Project Manager,Cash Construction 9/17/26 Signature Printed Name,Title,Company Date Approvals Contractor: [ . Scott Blanda,Project Manager,Cash Construction 9/17/26 Signature Printed Name,Title,Company Date City Project $r - 1511 S- 1� Manager: � i �lh (Q ` 12 '2C Signature Printed Name,Title Date Mayor/City Manager Signature Printed Name,Title Date Contract Quantity Adjustment/Change Order Project Name:Gattis School Road Segment 3 Quan.Adj./Change Order No.: 3 Change Order Data Contract Time Adjustment Item# Item Description Unit Qty. Unit Price Amount (Days) 1 CPR#27-Enclave HOA Sign Improvement-Landscaping LS 1 $10,917.57 $10,917.57 0 2 CPR#27-Enclave HOA Sign Improvement-Electrical LS 1 $5,209.18 $5,209.18' 0 3 CPR#29-Turtle Creek Irrigation Sleeves LS 1 $4,859.52 $4,859.52 1 4 CPR#30-Demo Clay Madsen Median LS 1 $4,761.92 $4,761.92 1 CPR#31-Fire Hydrant Relocation(Same Bid Item Price as CPR#8 on CO 5 #2) EA 1 $1,328.51 $1,328.51 0 6 CPR#32-Dry Stack Rock Wall LS 1 $2,832.62 $2,832.62 1 7 CPR#33-Concrete Curb Cuts LS 1 $10,010.45 $10,010.45 2 TOTALS: S39,919.77 5 l' Contract Quantity Adjustment/Change Order Project Name:Gattis School Road Segment 3 Quan.Adj./Change Order No,- 3 Quantity Adjustment Data Contract Time Adjustment Bid Item# Item Description Unit Qty. Unit Price Amount 1Dava1 CPR#26 3076-6003 D-GR HMA TV-B PG64-22 Tons 3995.22 $125.00 $499,402.50 10 I CPR#30 3076-6079 D-GR HMA TV-C PG70-22(EXEMPT) Tons 10 $129.00 $1,290.00 0 CPR#31 531-6002 CONC SIDEWALKS(5") SY 59 $76.00 $4,484.00 1 — 530-6004 DRIVEWAYS(CONC) SY - 20 — $102.00 $2,090.00 _ 0 529-6008 CONC CURB&GUTTER(TY II) LF 15 $21.00 $315.00 0 CPR#34 474-6022 PRE-CAST TRENCH DRAIN(IN CONC PAVEMENT) LF -30 $467.00 -$14,010.00 -1 WW-35(510) PRESSURE TAP(6-IN DIA X 16-IN DIA) EA , -1 $8,580.00 -$8,580.00. 0 WW-37(510) INSTL OR RECON LAT SVC TO REP PIPE(1.5-IN SVC X 16-IN PIPE) EA -10 $2,710.00 -$27,100.00 0 TOTALS: S457,841.50 10