Contract - Cash Construction Company, Inc. - 11/5/2026 Page of 3
Contract Quantity Adjustment/Change Order
red,01/16
Department: Public Works
Project Name: Gatos School Road Segment 3 Date: 9/17/26
City Project ID Change Order/Quantity
Number Adjustment No. 3
Vendor Cash Construction Company 217 Kngston Lacy Blvd 512-251-7872
Company Name Address Phone No.
Justification
Addition of improvements to existing HOA sign,addition of irrigation sleeves,removal of a median and paving added where the median was shown to be placed but not needed for
Clay Madsen center,and relocate a hydrant on Windy Park not shown in the plans. The change order also includes additional B mix HMAC due to plan quantity being incorrect,
driveway access needed to be added,additional HMAC was needed along AW Grimes not shown for detouring to keep traffic moving and not bottlenecked,TCP revisions causing more
B mix due to the existing pole line not being removed timely by Oncor,additional B mix for areas where poles were still remaining,overbuild of curb and gutter and medians caused
overrun,as well as general yield of HMAC due to all these added factors in placing the HMAC.
SUMMARY Amount We Change
Original Contract Price: $26,735,973.35
Previous Quantity Adjustment(s): $170,651.20
This Quantity Adjustment: $457,841.50
Total Quantity Adjustment(s): $628,492.70
Total Contract Price with Quantity Adjustment(s): $27,364,466.05
Previous Change Order(s): $250,358.86 1%
This Change Order: $39,919.77 0%
Total Change Order(s)To Date: $290,278.63 1%
Adjusted Contract Price [Original Contract Price Plus Quantity Adjustment(s)Plus Change Order(s)]: $27,654,744.68
Difference between Original and Adjusted Contract Prices: $918,771.33
Original Contract Time: 700
Time Adjustment by previous Quan.Adj./Change Order: 28
Time Adjustment by this Quan.Adj./Change Order: 15
New Contract Time: 743
Submitted for Approval
Prepared By: Scott Blanda,Project Manager,Cash Construction 9/17/26
Signature Printed Name,Title,Company Date
Approvals
Contractor: � . Scott Blanda,Project Manager,Cash Construction 9/17/26
Signature Printed Name,Title,Company Date
City Project �,1n� t _ I I
Manager: 8 L)it �J�JQe.ih ( ) • 12 ' 2
7ture /^ Printed Name,Title ,A /1 Date
Manage Mayor/City
�\ t I�oR�Qn M {� 1 I Lt c
Se lted NamelTitle I Date
2,C, -Z �%
Pit Contract Quantity Adjustment/Change Order
Project Name:Gattis School Road Segment 3
Quan.Adj./Change Order No.: 3
Change Order Dab
Contract
Time
Adjustment
Item# Item Description Unit Qty. Unit Price Amount (Days)
1 CPR#27-Enclave HOA Sign Improvement-Landscaping LS 1 $10,917.57 $10,917.57 0
2 CPR#27-Enclave HOA Sign Improvement-Electrical LS 1 $5,209.18 $5,209.18 0
3 CPR#29-Turtle Creek Imgation Sleeves LS 1 $4,859.52 $4,859.52 1
4 CPR#30-Demo Clay Madsen Median LS 1 $4,761.92 $4,761.92 1
CPR#31-Fire Hydrant Relocation(Same Bid Item Price as CPR#bon CO
5 #2) EA 1 $1,328.51 $1,328.51 0
6 CPR#32-Dry Stack Rock Wall LS 1 $2,832.62 $2,832.62 1
7 CPR#33-Concrete Curb Cuts LS 1 $10,010.45 $10,010.45 2
TOTALS: $39,919.77 5
Page 3 of 3
Contract Quantity Adjustment/Change Order
Project Name:Gattis School Road Segment 3
Quan.Adj./Change Order No.: 3
Quantity Adjustment Data
I Contract
Time
Adjustment
Bid Item# Item Description Unit Qty. Unit Price Amount (navcl
CPR#26
3076-6003 D-GR HMA TY-B PG64-22 Tons 3995.22 $125.00 $499,402.50 10
I CPR#30
3076-6079 D-GR HMA TY C PG70-22(EXEMPT) Tons 10 $129.00 $1,290.00 0
CPR#31
531-6002 CONC SIDEWALKS(5") SY 59 _ $76.00 $4,484.00 1
530-6004 DRIVEWAYS(CONC) SY 20 $102.00 $2,040.00 0
529-6008 CONC CURB&GUTTER(TY II) LF 15 $21.00 $315.00 0
CPR#34
474-6022 PRE-CAST TRENCH DRAIN(IN CONC PAVEMENT) LF -30 $467.00 -$14,010.00 -1
WW-35(510) PRESSURE TAP(6-IN DIA X 16-IN DIA) EA -1 $8,580.00 -$8,580.00 0
WW-37(510) INSTL OR RECON LAT SVC TO REP PIPE(1.5-IN SVC X 16-IN PIPE) EA -10 $2,710.00 -$27,100.00 0
TOTALS: S457.841.50 10