CM-2026-288 - 11/13/2026 SUPPLEMENTAL AGREEMENT NO. 2
TO "AGREEMENT BETWEEN THE CITY OF ROUND ROCK
AND STV INCORPORATED
FOR PROFESSIONAL CONSULTING SERVICES RELATED TO
THE KENNEY FORT BLVD. SEGMENT 5
24-INCH WATERLINE EXTENSION PROJECT"
CITY OF ROUND ROCK §
STATE OF TEXAS § KNOW ALL BY THESE PRESENTS:
COUNTY OF TRAVIS §
COUNTY OF WILLIAMSON §
THIS SUPPLEMENTAL AGREEMENT NO. 2 to "Agreement between the City of
Round Rock and STV Incorporated f/k/a"CP&Y, Inc. d/b/a STV Infrastructure" for Professional
Consulting Services related to the Kenney Fort Blvd. Segment 5 24-inch Waterline Extension
Project" (the "Agreement"), hereinafter called "Supplemental Agreement No. 2," is made by and
between the City of Round Rock, Texas, a home-rule municipality, hereinafter called the "City"
and STV Incorporated, hereinafter called the "Consultant," located at 13809 Research
Boulevard, Suite 300,Austin, Texas 78750.
WHEREAS, the City and Consultant previously executed the referenced Agreement in
the amount of$46,039.00; and
WHEREAS, it was previously necessary to amend the Scope of Services and add
additional costs to the Agreement in the amount of$338,681.00; and
WHEREAS, it is necessary to further amend the Scope of Services and add additional
costs to the Agreement in the amount of$29,273.00;
NOW THEREFORE, in consideration of the mutual promises and obligations in the
Agreement and this Supplemental Agreement No. 2, the City and Consultant agree that said
Agreement is amended and supplemented as follows:
I.
Section 2.0 of the Agreement is hereby amended to read as follows:
2.0 SCOPE OF SERVICES
A. City shall provide the services set forth in Exhibit "A" titled, "City Services,"
which shall be incorporated herein by reference for all purposes.
B. Consultant has provided its proposal for Consulting Services, such proposal for
Consulting Services being attached hereto as Exhibit"B"titled "Scope of Services,"which shall
be referred to as the Scope of Services of this Agreement and incorporated herein by reference
for all purposes.
C. Consultant shall satisfactorily provide all services described herein and as set
forth in Exhibit "B." Consultant's undertaking shall be limited to performing Consulting
Services for City and/or advising City concerning those matters on which Consultant has been
specifically engaged. Consultant shall perform the Consulting Services in accordance with this
Agreement in a professional and workmanlike manner pursuant to the Work Schedule attached
hereto as Exhibit"C," and incorporated herein by reference for all purposes.
II.
Section 3.0 of the Agreement is hereby amended to read as follows:
3.0 LIMITATION TO SCOPE OF SERVICES
Consultant's undertaking shall be limited to performing services for City and/or advising
City concerning those matters on which Consultant has been specifically engaged. Consultant
and City agree that the Scope of Services to be performed is enumerated in Exhibit "B," and
may only be modified by written Supplemental Agreement executed by both parties as described
in Section 9.0.
III.
Section 4.0 of the Agreement is hereby amended to read as follows:
4.0 CONTRACT AMOUNT
A. In consideration for providing the Consulting Services, Consultant shall be paid
on the basis of actual hours worked provided by Consultant in accordance with the Price Sheet
attached hereto as Exhibit"D," and incorporated herein by reference for all purposes.
B. Consultant's total compensation for Consulting Services hereunder shall not
exceed $413,993.00. This amount represents the absolute limit of City's liability to Consultant
hereunder unless same shall be changed by Supplemental Agreement, and City shall pay, strictly
within the not-to-exceed sum recited herein, Consultant's fees for work done on behalf of the
City.
IV.
This Supplemental Agreement No. 2 shall amend the original Agreement only as set forth
herein with no other changes in terms or conditions of the original Agreement.
2
IN WITNESS WHEREOF, the City and Consultant have executed this Supplemental
Agreement to be effective as of the last date of due execution by both parties.
CITY OF ROUND ROCK,TEXAS STV INCORPORATED
B B Mai,!,Thev1 w vfil a
y: / y:Ma sa Trevino Vergara(Nov 9,20 15 33/4 CST)
Printed Name: e OOk$ /l ++ Printed Name:Marisa Trevino Vergara
Title: Ci ' 1 Mafftqa. Title:Senior Vice President
Date Signed: 11115C21.021.0 Date Signed:11/09/2026
ATTEST:
By: 1 6-1 -
An Frank m, City Clerk
FOR CITY,APPROVED AS TO FORM:
By: cS�'____ _.
Stephanie L. Sandre, City Attorney
3
. 13809 Research Blvd.Suite 300
SIN Austin,TX 78750
o.512.349.0700 I f.512.349.0727
stvinc.com
EXHIBIT A
SUPPLEMENTAL CITY SERVICES FOR
KENNEY FORT BLVD SEGMENT 5 24-INCH WATERLINE EXTENSION DESIGN
ROUND ROCK,TEXAS
OCTOBER 28,2026
City Services
A. The following items are not included in the Engineer's scope. The City will provide the
following in a timely manner.
1. City will provide the Engineer with all criteria and full information as to the City's
requirements for the Project,including study objectives and constraints,space,capacity
and performance requirements, flexibility, and expandability, and any budgetary
limitations; and furnish copies of all design and construction standards which the City
will require to be included in study, and Drawings and Specifications; and furnish
copies of the City's standard forms, conditions,and related documents for Engineer to
include in the Bidding Documents,when applicable.
2. City will provide proposed water pipe size to meet capacity needs.
3. City will provide electronic copies of available and relative information, including the
following:
a. GIS source layers available, including utility infrastructure, streets, property lines,
and easements.
b. Record drawings and available pipe shop drawing submittals for pipelines proposed
for connection, and pipelines in the project area.
c. Known public projects and private development projects within subject area that
may impact the project.
4. City will give prompt written notice to Engineer whenever the City observes or
otherwise becomes aware of a hazardous environmental condition or of any other
development that affects the scope or time of performance of Engineer's services, or
any defect or nonconformance in Engineer's services or in the work of any Contractor.
5. City will arrange for legal access and/or right-of-entry for Engineer and Subconsultants
to enter upon public and private property as required to perform services under the
Agreement. Engineer will not be responsible for acquiring Right-of-Entry permits.
6. City will engage the services of a right of way agent to perform any required easement
negotiations, title reports, appraisals, and any other services required to support right
of way/easement negotiations.
7. City will examine all alternate solutions, studies, reports, sketches, drawings,
specifications, proposals, and other documents presented by Engineer (including
obtaining advice of an attorney, insurance counselor,and other advisors or consultants
as City deems appropriate with respect to such examination) and render in writing
timely decisions pertaining thereto.Written review comments are to be delivered to the
Engineer within fourteen (14)calendar days after receipt of each submittal.
KFB Seg 5 24in Supplemental Design Exhibit A City Services 10/28/2026 1
st.N. 13809 Research Blvd.,Suite 300
Austin,TX 78750
o.512.349.0700 I f.512.349.0727
stvinc.com
8. City will prepare front end documents and provide to the Engineer for inclusion in the
Project Manual.
9. City will pay any permit application fees associated with the project, sign permits,and
all permits will be under the City's name.
10. Pay for costs associated with newspaper public notice for bid advertisement.
11. Provide construction inspection and construction testing services including
coordination and scope of services.
12. Review the Application for Payment and supporting documentation submitted by the
Contractor.
13. Manage construction documentation submitted by the Contractor.
KFB Seg 5 24in Supplemental Design Exhibit A City Services 10/28/2026 2
st\v 13809 Research Blvd.,Suite 300
Austin,TX 78750
o.512.349.0700 I f.512.349.0727
stvinc.com
EXHIBIT B
SUPPLEMENTAL ENGINEERING SERVICES FOR
KENNEY FORT BLVD SEGMENT 5 24-INCH WATERLINE EXTENSION DESIGN
ROUND ROCK,TEXAS
OCTOBER 28,2026
Background
STV Incorporated(Engineer)will provide supplemental engineering services for the City of
Round Rock's(City's)Kenney Fort Blvd Segment 5 24-inch Waterline Extension Design
project, hereinafter referred to as the"Project."Engineering services will include design for a
proposed 8-inch waterline totaling approximately 105 LF and a 12-inch wastewater line
extension totaling approximately 110 LF crossing perpendicular to the proposed Kenny Fort
Blvd.
While the assumptions are more completely stated toward the end of this Exhibit B, it assumed
existing Survey, SUE, Geotechnical, Environmental performed for the roadway project are
sufficient for use on this water and wastewater line project.
The proposed waterline and wastewater line extension will provide growth to the area on the
north side of the Kenney Fort Blvd preserving the road from damage due to excavation in the
future.
Through the project area,the following proposed roadway improvements are planned to be
designed concurrently by STV,which at this time plans to include: roadway design for Kenney
Fort Blvd segment 5, additional right of way acquisition, associated shared use path along east
side, sidewalk on the west side, retaining walls,proposed grading, buried storm sewer systems
and one culvert, street lighting, signage, signals, any associated dry utilities relocations to
accommodate roadway design and associated ROW improvements.
The work will be done in accordance with the City's Engineering Design Manual, Construction
Standards, Standard Specifications and,and Texas Commission on Environmental Quality
(TCEQ)Rules.
The Project will be bid and constructed as part of the Kenney Fort Blvd Segment 5 roadway
project. The anticipated schedule for the supplemental design phase is one(1)months.
The tasks and deliverables are more fully described in the following TASK OUTLINE.
TASK OUTLINE
I. Basic Services
A. PROJECT MANAGEMENT
1. Manage professional services to complete the Project.Provide professional services in
this task as follows:
KFB Seg 5 24in WL Ext Design Exhibit B Engineering Services 10/28/2026 1
st\v 13809 Research Blvd.,Suite 300
Austin,TX 78750
o.512.349.0700 I f.512.349.0727
stvinc.com
a. Project Startup / Initiation Meeting: Review scope of services and available data,
clarify and define the City's requirements for the Project, specifically, alignment
offsets, cover requirements, approach to conflicts with other utilities, material
preferences, etc.; Project organization, staffing and establish lines of
communication;present initial work plan Project schedule,and discuss any changes
in the scope of work after scope and fee submittal.
b. Quality Control Team: Assemble a QC Review Team comprised of Engineer's
Senior Technical Management Team. Schedule and direct one (1) internal QC
Workshop during the Design phases. QC Review Team will review project
progress,exchange ideas and information on technical elements of the Project.
c. Client Progress/Coordination Meeting:Conduct one(1)progress meeting with the
City to provide an update on the Project status, collect and disseminate Project
information, document and discuss Project action items and decisions during the
Design Phase. The Engineer will be responsible for developing the agenda and
preparing draft meeting minutes or appropriate documentation for each of the
meetings.Engineer will maintain an Action Item Log and Decision Log to maintain
project activity issue closure. Engineer will submit the documentation to the City
for review and approval. The above identified meeting will be conducted in person
at the City's Facility.
d. Design Team Coordination Meetings: Engineer will schedule and direct biweekly
coordination meetings with the engineering design team and other associated staff
to coordinate Project task assignments, action items and to maintain progress
schedule for deliverables. Engineer will maintain an internal Action Item and
Decision Log to maintain project activity issue closure.
e. Project Controls and Reporting: Prepare monthly Project Summary Reports and
submit with monthly invoice. The reporting will include the following elements
unless noted otherwise:
i. Project Budget Summary
ii. Project Schedule(monthly email update)
iii. Summary of Work Completed to Date
iv. Upcoming Project Activities(monthly email update)
B. DESIGN PHASE SERVICES
1. 90%Design
a. Site Visit:Conduct up to one(1)additional site visit with City staff and design team
members to confirm assumptions and approaches to Project elements.
b. Prepare 90% plans to be included in the current 90% set construction notes, plan
and profile drawings of proposed waterline and wastewater line, erosion/
sedimentation control plan and details, and City standard details. Plan and profile
sheets will feature right-of-way, easements, existing utilities, and topographic
features and will be prepared at a scale of 1"=40' horizontal and 1"=4' vertical.
c. Develop special details as necessary and incorporate into the plans.
d. Prepare construction sequencing/phasing plan for project.
KFB Seg 5 24in WL Ext Design Exhibit B Engineering Services 10/28/2026 2
13809 Research Blvd.,Suite 300
Austin,TX 78750
0.512.349 0700 I f.512.349.0727
stvinc.com
e. Additional waterline and wastewater line will be added to the 90%Project Manual.
Front-end documents will be prepared and provided by the City. Assemble
technical specifications from City standard specifications and, if necessary, also
prepare and include any Special Specifications and/or Special Provisions.
f. Prepare 90%Opinion of Probable Construction Cost(OPCC).
g. Perform Inter-Disciplinary Review (IDR)/QC combined review of project
documents.
h. Incorporate IDR/QC combined review comments into project documents.
i. Perform QA review of project documents.
j. Incorporate QA review comments into project documents for City submittal.
IL Deliverables
Will match the requirements of the 90% plan submittal.
III. Additional Services
Engineer will develop at the request of the Owner any changes,alterations or modifications to
the Project which appear to be advisable and feasible based on unexpected field conditions and
in the best interest of the Owner.
Work not described in the basic services must be approved by supplemental amendment to this
Contract by the Owner before the Engineer undertakes it. If the Engineer is of the opinion that
any work is beyond the scope of this Contract and constitutes additional work, the Engineer
shall promptly notify the Owner of that opinion,in writing.In the event the City finds that such
work does constitute additional work, then the City shall so advise the Engineer, in writing,
and shall provide extra compensation to the Engineer for the additional work as provided under
a supplemental amendment.
The following list includes assumptions and items that are not included in the current scope of
work for the Project.
A. Assume crossing at proposed Kenny Fort Blvd is to be open cut with steel encasement.
B. Assume steel casing to be installed by open cut for crossing of intersection with Kenney
Fort Blvd.
C. Assumed existing Survey, SUE,Geotechnical,Environmental are sufficient for use on this
waterline project.
D. Exclude ROW or easement acquisition.
E. Assume right of entries not required, and if necessary,will be obtained by others.
F. Assume no easements or ROW is required for proposed waterline and sewer line. The
waterline and sewer line will be placed within existing ROW or within ROW the City is
confident will be acquired for the roadway project.
KFB Seg 5 24in WL Ext Design Exhibit B Engineering Services 10/28/2026 3
stsv 13809 Research Blvd.,Suite 300
Austin,TX 78750
o.512.349.0700 I f.512.349.0727
stvinc.com
EXHIBIT C
SUPPLEMENTAL WORK SCHEDULE FOR
KENNEY FORT BLVD SEGMENT 5 24-INCH WATERLINE EXTENSION DESIGN
ROUND ROCK,TEXAS
OCTOBER 28,2026
I. Schedule
NTP Friday 10/30/26
Kickoff Meeting Monday 11/2/26
Submit 90%Design* Friday 11/20/26
Design Workshop No. 3 —90%* Tuesday 12/8/26
*Inclusive of original design elements. The roadway and waterline schedules will need to be
synced up prior to bidding.
KFB Seg 5 24in WL Ext Design Exhibit C Work Schedule 10/29/2026 1
City o/Round Rock
Kenney Fort Blvd 5
Project:Additional Watermain and Sewer Crossing Kenney Fort Blvd Segment 524-inch Waterline Estenslon DESIGN Engineering Fee Esltknate
Client City of Round Rock yy STAFF CATEGORY/HOURSY LABOR Sub-Consultants TOTALS
3ai' - C C Y 5! m O n O m
E Task Description 3 P d 0 3 c w w 4§ $3 £4£u 1 a i $S S y g r Q Z a Z 4
14 �u` Si o E -y, I- uy if, XE 8 0$ . H w y y i a� -w3 "¢w) O
r rYj d a ' I- O O
V
Contract Billing Rate -$374 $312 $299 $234 $176 $124 $150 $137 $124 S98
A-PROJECT MANAGEMENT ,
1.a Project Startup I initiation Meeting 1 I _ _ 1 $312 SO $312 $O $0 $312
1.b Quality Control Team(SC Meetings and CooNku$on) 1 1 2 2 I 8 $1,745
� - $0 $1,745 50 SD $1,745
1.0 Client Progress l Coordination Meetings(Design) 1 1 1 $312 $0 $312 S0 S0 S312
1A Design Team Coordination Meetings(Blweekly) 2 1 2 2 2 8 $1,038 S0 $1,638 S0 SO $1,830
1.e Project Controls and Reporting 1 2 3 1 8 $1,976 S0 $1,978 S0 SO $1,976
SUB TOTAL: 3 s 9 2 2 0 2 3 0 0 3 24 $3,983 So S0 I S0 I $0 I SO I S0 I S0 S0 15,903 S0 $0 $5,983
B.2-90:DESIGN PHASE SERVICES
-
2.a .Site Visit 1 3 3 6 $1,307 S0 $1,307 S0 $0 $1,307
2.c _90%Drasdngs 3 4 12 24 S9 78 $12,402 S0 S12,402 $0 SO S12,402
2.d Develop Special Betels 0 SO S0 S0 S0 S0 SO
2.e Prepare CanWoe4on BegtwsEr$IPhaskp Plan 1 1 1 3 $470 $0 8670 SO SO 11070
2.9 90%OPCC 1 - 2 2 5 51027 $0 $1,027 $O SO $1,027
2.h Perform 90%IDRIQC Combined Review 2 4 0 12 $3,790 $0 $3,790 $0 S0 $3,790
2.1 Incorporate 90%IDR4C Ceewtetlte 1 2 4 6 15 $2 470 SO 82,470 S0 so $2,470
2.) Perform 90%PA 2 2 $408 S0 8488 $0 $0 MM9
2.k Incorporate 90%OA Comments 1 2 4 $1,157 $O $1,107 SO SO $1,167
SUB TOTAL: 2 15 8 19 0 38 46 0 0 0 128 823,200 SO S0 S0 j s0 s0 s0 j s0 s0 $23,290 S0 SO $23,290
Total Recoverable Hours,Labor and Expenses 6 24 8 21 0 38 61 0 0 3 150 S29,273 S0 S0 I SO I $0 50 S0 I S0 50 229,273 SO SO S29,273
REVISED 10 22 2026 Exhibit D-Fee•KFB 5 24in WI_Ezt DESIGN.zlsx 1 of 1 10/26/2026
a
K 4 f"
GO ,A..„,,.... ..„
'3 .. \ i
� \ •a
.-- ,t ` •
j
s
,....
4. 0 ...-'''''''''''''''' '' . ir...,, A.,,, , . , ,.. ,
..., 4-,. ,r,'"'''''''''-
�,� -'" AVERY RANCH { ..
- COMPANY LTD & ' c I . ''f• - P
LSA TRUST " , c = ..
-;r ., „• : 1 R635866 e*4 •` , ,'.
•
" • 50o
.77 ACRES r.•• ' ''i"'�
8" waterline c)`-•\ ..4,.
_� - * extension ���` • . .•
z
- 12 wastewater ineiiii r• PSr_ 4 �"; ,, -
r , ► r
--
.P 1 • ,
• `
- x . , •-0 +'� *b, I -kf , • •. '' ; j • \ j,-...
. ,
` a
7
X
R ` ■ v
7
/ 1` "� .` '\t 5a"07 yea + x
.rl .. U
R 7 .. * 4 -� yr d^ , rfa r / .
I- . .. a ;• i, r 1 v
_y A irc 1:,''.Va,,.` 7r: `/ 'l ' '•.•*+ J 1 i "~ C• '`~1 ter ✓.•
V
11
v
:.a:: , yr ,
N
Mill Waterline Kenney Fort Blvd. WL Extensions -
A Ell Wastewater Line : ROUND ROCK 1 I »A',