Loading...
R-00-04-13-10D2 - 4/13/2000Mayor Robert A. Sauk.% Jr. Mayor Pro -tem Marsha A. Chavez Council Members Tom Nielson Earl M. Hairston Rick Stewart Elul Palmer Jimmy Joseph City Manager Robert L Bennett, Jr, City Attorney Stephan L. Sheets CITY OF ROUND ROCK June 23, 2000 Mr. Mike Godfrey Spencer Godfrey Architects 1106 S. Mays, Suite 120 Round Rock, Texas 78664 Dear Mr. Godfrey: Sincerely, Christine Martinez Assistant City Secretary Enclosures Fax: 512- 218 -7097 221 East Main Street Round Rock, Texas 78664 512 -218 -5400 The Round Rock City Council approved Resolution No. R- 00- 04- 13 -10D2 at their regularly scheduled meeting on April 13, 2000. This resolution approves Change Order No. 2 to the Contract with R. J. King Construction, Ltd. for the construction of the Clay Madsen Recreation Center. Enclosed is a copy of the resolution and change order for your files. If you have any questions, please do not hesitate to contact Sharon Prete at 218 -5540. 1 -800- 735 -2989 TDD 1- 800 -735 -2988 Voice www.ci.round- rock.tx.us -, CITY OF ROUND ROCK PC • � • 'kv..iird Mayor Robert A. Sauka, Jr. Mayor Pro -tent Martha A. Chavez Council Members Tom Nielson Earl M. Hairston Rick Stewart Earl Palmer Jimmy Joseph City Manager Robert L Bennett, Jr City Attorney Stephan L Sheets June 23, 2000 Mr. Steve Roach R. J. King Construction, Ltd. P.O. Box 825 Temple, Texas 76503 -0825 Dear Mr. Roach: The Round Rock City Council approved Resolution No. R- 00- 04- 13 -10D2 at their regularly scheduled meeting on April 13, 2000. This resolution approves Change Order No. 2 for the construction of the Clay Madsen Recreation Center. Enclosed is a copy of the resolution and change order for your files. If you have any questions, please do not hesitate to contact Sharon Prete at 218 -5540. Sincerely, Christine Martinez Assistant City Secretary Enclosures Fax: 512 -218 -7097 1 -800- 735 -2989 TDD 1- 800-735 -2988 Voice www,ci.round- rock.tx.us 221 East Main Street Round Rock, Texas 78664 512- 218 -5400 RESOLUTION NO. R- 00- 04- 13 -10D2 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with R. J. King Construction, Ltd. for the construction of the Clay Madsen Recreation Center, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with R. J. King Construction, Ltd. for the construction of the Clay Madsen Recreation Center. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 13th day of April 2000. LAND, City Secretary x: \wenocs \aesowrs \Rooa13Da.wPU /sc 1 / 4A / y ,,/ T A. TLUKA, JR., Mayor AT'.ST: City of Round Rock, Texas 1106 SOUTH MAYS PROJECT NAME: Clay Madsen Indoor Recreation Center PROJECT NO: 97020 TO CONTRACTOR: R. J. King Construction, Ltd. ATTN: Steve Roach PO Box 825 Temple, Texas 76503 -0825 Total: Spencer Godfrey Architects ARCHITECT 1106 South Mays, Suite 120 Address BY DATE SUITE MOM SPENCER �h • GODFREY \ /\\ ARCHITECTS 120 • ROUND ROCK, TEXAS 78664 • (512 CHANGE ORDER CHANGES TO THE CONTRACT ARE AS FOLLOWS: 1. Add stainless steel return duct at pool. $ 8,465.00 2. Revise painting in gym to add green accent stripe. $ 2,045.00 3. Revise finishes on east exterior wall. Delete CMU, add EIFS. $ 1,775.00 4. Delete use of VCT; Install "Safe Dek "; and raise wood floor 3/8 ". $ 33,328.00 $ 45,613.00 The original (Contract Sum / C•. ^•^ ^ ^^ ^ -j^ . ^ °n ^ was $ 4,777,400.00 Net change by previously authorized Change Orders $ 32,904.00 The (Contract Sum / ) prior to this Change Order was $ 4,744,496.00 The (Contract Sum / ) will be (increased ) by this Change Order in the amount of $ 45,613.00 The Contingency /Betterment Allowances will be (' unchanged) by this Change Order in the amount of $ 0.00 The new (Contact Sum / ) including this Change Order will be $ 4,790,109.00 The Contract Time will be (incwaa acai / unchanged) by The date of Substantial Completion as of this Change Order therefore is (as per CO #3) R. J. King Construction, Ltd. CONTRACTOR P. 0. Box 825 Address Roun2 Texas 78664 Temple Texas 765Q3 - 0825 BY DATE DATE: April 3, 2000 CHANGE ORDER NO.: 006R Council Change Order #2 CONTRACT DATE: April 8, 1999 CONTRACT FOR: New Construction THIS DOCUMENT IS NOT VALID UNTIL SIGNED BY THE OWNER, ARCHITECT, AND CONTRACTOR. City of Round Rock OWNER 221 E. Main Street Address ❑ Owner ❑ Architect ❑ Contractor 388.0677 • FAX (512) 388 - 0752 0 DAYS. June 17, 1999. DATE: April 7, 2000 SUBJECT: City Council Meeting — April 13, 2000 ITEM: 10.D.2. Consider a resolution authorizing the Mayor to execute Change Order No. 2 to the contract with R.J. King Construction, Ltd. for the Clay Madsen Recreation Center. This change order is an addition to the contract in the amount of $45,613.00 and includes the following: (a) change HVAC duct at pool to stainless steel due to corrosive chemicals and moisture — $8,465.00 (b) revise painting in gym to separate CMU block wall and sound paneling on wall - $2,045.00 (c) revise incorrect detail on CMU block wall on east exterior wall - $1,775.00 and (d) add a walking /jogging track around the perimeter gymnasiums - $33,328. Staff Resource Person: Sharon Prete, Parks and Recreation Director.