Loading...
R-00-05-11-14C4 - 5/11/2000RESOLUTION NO. R- 00- 05- 11 -14C4 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Austin Bridge and Road for the construction of the Greenlawn Boulevard Extension, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Austin Bridge and Road for the construction of the Greenlawn Boulevard Extension. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this llth day of May, 2 A TEST: dAF£ D City Secretar L��iVisr�n� m��6ai , RSSI. R� HPDOCS \RSSOLUTI \ROOS11C4.WPD / e0 RN. T A. STLUKA,UJR., Mayor City of Round Rock, Texas Baker - Aicklen & Associates, Inc. Consulting Engineers Contract For: Owner: Contractor: Austin Bridge and Road U ENEO U MAY - 5 2000 PUBLIC ROUND DEPT. 0 CONTRACT CHANGE ORDER NO. 2 Greenlawn Boulevard Street Improvements City of Round Rock Date: 5/2/00 Sheet No. 1 of 4 Job No. 601- 543 -23 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE Description of Changes Contract Price Contract Price 1) Add 5' Diameter Manhole —1 @ $3,000/EA $ $ 3,000.00 2) Add Electrical Fencing - 425 LF @ $2.25/LF $ $ 956.25 3) Add Regular Fencing (Dell Tract) — 2,019 LF @ $3.00/LF $ $ 6,057.00 4) Median Breaks & Right Turn Lane at Louis Henna 4a) Add Flexible Base (17 ") - 825 SY @ $8.00 /SY $ $ 6,600.00 4b) Add 4" HMAC Type C Surface Course - 764 SY @ $6.50 /SY $ $ 4,966.00 4c) Add Curb and Gutter for Median — 322 LF @ $6.00/LF $ $ 1,932.00 4d) Add Curb & Gutter for Islands — 456 LF @ $10.25/LF $ $ 4,674.00 4e) Add Embankment behind Curb — 280 CY @ $3.00 /CY $ $ 840.00 4f) Add 5'x5' Junction Box w/ 4'x4' Grate — 1 @ $5,500.00/EA $ $ 5,500.00 4g) Add Concrete Driveway Approaches — 2,291 SF @ $8.00 /SF $ $ 18,328.00 4h) Add Curb & Gutter for Driveway Curb Returns — 152 LF @ $6.00/LF $ $ 912.00 4i) Remove Curb & Gutter (Greenlawn) at Prop. Driveways — 281 LF @ $6.00/LF $ 1,686.00 $ 4j) Add 24" Steel Casing —125 LF @ $103.75/LF $ $ 12,968.75 4k) Revise Existing Manhole to Make it Traffic Bearing — 1 LS @ $4,450.00/LS $ $ 4,450.00 Baker - Aicklen & Associates, Inc. Consulting Engineers Description of Changes CONTRACT CHANGE ORDER NO. 2 (cont'.) Date: 5/2/00 Sheet No. 2 of 4 Job No. 601-543-23 DECREASE INCREASE Contract Price Contract Price 5) 8" Wastewater Line 5a) Add — 8" Wastewater Line - 286 LF @ $114.00/LF $ $ 32,604.00 5b) Add 1 — 4' Dia. Manhole @ $6,309.00/EA $ $ 6,309.00 5c) Add 1 — 4' Dia. Drop Manhole @ $12,964.00/EA $ $ 12,964.00 6) Over excavation for clay subgrade 6a) Add Excavation — 750 CY @ $5.00 /CY $ $ 3,750.00 6b) Add Sub -Base — 375 CY @ $3.00 /CY $ $ 1,125.00 6c) Add Flexible Base — 664 ton @ $8.56 /ton $ $ 5,683.84 7) Existing Driveways 7a) Add Concrete Driveway Approach for Existing Driveways - 700 SF @ $8.00 /SF $ $ 5,600.00 7b) Add Gravel Driveway — 1,276 SF @ $2.00 /SF $ $ 2,552.00 7c) Remove Curb & Gutter (Greenlawn) — 70 LF @ $6.00/LF $ 420.00 $ 8) 12" Water Line 8a) Add 12" Gate Valve - 1 EA @ $1,380.00 /SF $ $ 1,380.00 8b) Add 12" Class 250 Waterline with Fittings — 20 LF @ $118.00/LF $ $ 2,360.00 9) Storm Drain Repair /Clean -up Caused by Other Contractor— 1 LS @ $10,000.00/LS $ $ 10,000.00 10) HMAC & Base Repair @ Guy Wires —1 LS @ $4,000.00/LS $ $ 4,000.00 11) Escalation 11a) 4" HMAC Type C Surface Course - 27,260 SY @ $1.15 /SY $ $ 31,349.00 11b) 17" Flexible Base — 2,336 SY @ $0.50 /SY $ $ 1,168.00 11c) Fuel for Equipment — 11,700 gal. @ $0.25/gal. $ $ 2,925.00 Baker - Aicklen & Associates, Inc. Consulting Engineers Justification: Client's Request CONTRACT CHANGE ORDER NO. 2 (cont'.) Date: 5/2/00 Sheet No. 3 of 4 Job No. 601- 543 -23 DECREASE INCREASE Description of Changes Contract Price Contract Price 12) De- mobilization & Remobilization — 1 LS @ $48,000/LS $ $ 48,000.00 13) Relocate Air Release Valve —1 LS @ $1,250.00/LS $ $ 1,250.00 14) Additional Rental for Barricades — 4 mo. @ $1,000.00 /mo. $ $ 4,000.00 $ 2,106.00 $ 248,203.84 Net Changes in Contract Price $ $ 246,097.84 From January 6, 2000 to April 10, 2000 (when the contract was to be completed) is 96 Calendar Days. An additional 24 days shall be added to the Contract to perform the additional items for Revision Number 2. The City of Round Rock is expected to approve this Change Order May 11, 2000. The new contract completion date will be September 8, 2000. Baker- Aiclden & Associates, Inc. Consulting Engineers The amount of the Contract before this Change Order is Two Million, Three Hundred Fifteen Thousand, Seven Hundred Forty One and 87/100 Dollars The Amount of the Contract will DECREASE/INCREASE by the sum of Two Hundred Forty Six Thousand, Ninety Seven and 84/100 Dollars $ 246 097.84 The CONTRACT TOTAL including this Change Order will be Two Million, Five Hundred Sixty One Thousand, Eight Hundred Thirty Nine and 71/100 Dollars This document will become a supplement to the Contract and all provisions will apply hereto. Austin Bridge and Road, ( r) C ontfacto CONTRACT CHANGE ORDER NO. 2 (cont'.) /Wc13 Date Baker- Aick1. ss ieAssociates, Inc., (Engineer) Date Round Rock, (Owner s � / 5- /1-00 Date Date: 5/2/00 Sheet No. 4 of 4 Job No. 601 - 543 - 23 $ 2 315 741.87 $ 2 561 839.71 DATE: May 5, 2000 SUBJECT: City Council Meeting — May 11, 2000 ITEM: 14.C.4. Consider a resolution authorizing the Mayor to execute Contract Change Order No. 2 to Austin Bridge and Road for the Greenlawn Boulevard Street Improvements Project. This change order provides for an increase in the contract amount and for a 24- day extension of the contract period. This change is for remobilization, casing pipe, and relocation of an air release valve, additional concrete and asphalt and includes $51,900.00 for the contractor to install 286 linear feet of 8 -inch wastewater line crossing Greenlawn Boulevard to serve the Topwater Subdivision. These funds will be provided by the Topwater Development, prior to starting any work on this 8 -inch wastewater line. This change order, which is an increase of $246,097.84 or 10.6 %, makes the current contract amount $2,561,839.71. Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director. 1 CITY OF ROUND ROCK %\ � Mayor Robert A. Stluka. Jr Mayor Pro-tern Murtha A. Chaves Council Members Tom Nielson Earl M. Hairston Rick Stewart Earl Palmer Jimmy Joseph City Manager RobertL Bennett, Jr. City Attorney Stephan L Sheets June 23, 2000 Mr. William J. Neese, Jr. Austin Bridge and Road . 8906 Wall Street, # 403 Austin, TX 78754 Dear Mr. Neese: The Round Rock City Council approved Resolution No. R- 00- 05- 11 -14C4 at their regularly scheduled meeting on May 11, 2000. This resolution approves Change Order No. 2 for the construction of the Greenlawn Boulevard Extension. Enclosed is a copy of the resolution and Change Order for your files. If you have any questions, please do not hesitate to contact Tom Word at 218 -5555. Sincerely, Ir Christine Martinez Assistant City Secretary Enclosures Fax: 512. 218.7097 1 -800- 735 -2989 TDD 1 -800- 735 -2988 Voice www.ci.round- rock.tx.us 221 East Main Street Round Rock, Texas 78664 512-218-5400 Mayor Robert A. Stluka, Jr. Mayor Pro -tem Martha Chavez Council Members Tom Nielson Earl M. Hairston Rick Stewart Earl Palmer Jimmy Joseph City Manager Robert L Bennett. Jr. City Attorney Stephan L Sheen June 23, 2000 Mr. Garrett Tuttle Baker - Aicklen & Associates, Inc. 203 E. Main Street, Suite 201 Round Rock, Texas 78664 Dear Mr. Tuttle: The Round Rock City Council approved Resolution No. R- 00- 05- 11 -14C4 at their regularly scheduled meeting on May 11, 2000. This resolution approves Change Order No. 2 to the Contract with Austin Bridge and Road for the construction of the Greenlawn Boulevard Extension. Enclosed is a copy of the resolution and Change Order for your files. If you have any questions, please do not hesitate to contact Tom Word at 218 -5555. Sincerely, 1 Christine Martinez l /1� Assistant City Secretary Enclosures Fax: 512- 218 -7097 1-800-735-2989 TDD 1- 800 -735 -2988 Voice www.ci.round- rock.lx.us 221 East Main Street Round Rock, Texas 78664 512-218-5400 Baker - Aicklen & Associates, Inc. Consulting Engineers CONTRACT CHANGE ORDER NO. 2 Contract For: Greenlawn Boulevard Street Improvements Owner: City of Round Rock Contractor: Austin Bridge and Road N MAY - 5 2000 te: 5/2/00 CITY OF ROUND ROCK Sleet No. 1 of 4 PLBLIC•WORKS DEPT. Jo No. 601 - 543 -23 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE Description of Changes Contract Price Contract Price 1) Add 5' Diameter Manhole — 1 @ $3,000/EA $ $ 3,000.00 2) Add Electrical Fencing - 425 LF ® $2.25/LF $ $ 956.25 3) Add Regular Fencing (Dell Tract) — 2,019 LF @ $3.00/LF $ $ 6,057.00 4) Median Breaks & Right Turn Lane at Louis Henna 4a) Add Flexible Base (17 ") - 825 SY @ $8.00 /SY $ $ 6,600.00 4b) Add 4" HMAC Type C Surface Course - 764 SY @ $6.50 /SY $ $ 4,966.00 4c) Add Curb and Gutter for Median — 322 LF @ $6.00/LF $ $ 1,932.00 4d) Add Curb & Gutter for Islands — 456 LF @ $10.25/LF $ $ 4,674.00 4e) Add Embankment behind Curb — 280 CY @ $3.00 /CY $ $ 840.00 4f) Add 5'x5' Junction Box w/ 4'x4' Grate —1 @ $5,500.00/EA $ $ 5,500.00 4g) Add Concrete Driveway Approaches — 2,291 SF @ $8.00 /SF $ $ 18,328.00 4h) Add Curb & Gutter for Driveway Curb Returns — 152 LF @ $6.00/LF $ $ 912.00 4i) Remove Curb & Gutter (Greenlawn) at Prop. Driveways — 281 LF @ $6.00/LF $ 1,686.00 $ 4j) Add 24" Steel Casing — 125 LF @ $103.75/LF $ $ 12,968.75 4k) Revise Existing Manhole to Make it Traffic Bearing — 1 LS @ $4,450.00/LS $ $ 4,450.00 Baker - Aicklen & Associates, Inc. Consulting Engineers Description of Changes CONTRACT CHANGE ORDER NO. 2 (cont'.) Date: 5/2/00 Sheet No. 2 of 4 Job No. 601 DECREASE INCREASE Contract Price Contract Price 5) 8" Wastewater Line 5a) Add — 8" Wastewater Line - 286 LF @ $114.00/LF $ $ 32,604.00 5b) Add 1 — 4' Dia. Manhole @ $6,309.00/EA $ $ 6,309.00 5c) Add 1 — 4' Dia. Drop Manhole @ $12,964.00/EA $ $ 12,964.00 6) Over excavation for clay subgrade 6a) Add Excavation — 750 CY @ $5.00 /CY $ $ 3,750.00 6b) Add Sub -Base— 375 CY @ $3.00/CY $ $ 1,125.00 6c) Add Flexible Base — 664 ton ® $8.56 /ton $ $ 5,683.84 7) Existing Driveways 7a) Add Concrete Driveway Approach for Existing Driveways - 700 SF ® $8.00 /SF $ $ 5,600.00 7b) Add Gravel Driveway — 1,276 SF @ $2.00 /SF $ $ 2,552.00 7c) Remove Curb & Gutter (Greenlawn) — 70 LF @ $6.00/LF $ 420.00 $ 8) 12" Water Line 8a) Add 12" Gate Valve - 1 EA @ $1,380.00/SF $ $ 1,380.00 8b) Add 12" Class 250 Waterline with Fittings —20 LF @ $118.00/LF $ $ 2,360.00 9) Storm Drain Repair /Clean -up Caused by Other Contractor— 1 LS @ $10,000.00/LS $ $ 10,000.00 10) HMAC & Base Repair @ Guy Wires — 1 LS @ $4,000.00/LS $ $ 4,000.00 11) Escalation 11a) 4" HMAC Type C Surface Course - 27,260 SY @ $1.15 /SY $ $ 31,349.00 lib) 17" Flexible Base — 2,336 SY @ $0.50 /SY $ $ 1,168.00 11c) Fuel for Equipment — 11,700 gal. @ $0.25 /gal. $ $ 2,925.00 Baker - Aicklen & Associates, Inc. Consulting Engineers CONTRACT CHANGE ORDER NO. 2 (cont'.) Date: 5/2/00 Sheet No. 3 of 4 Job No. 601- 543 -23 DECREASE INCREASE Description of Changes Contract Price Contract Price 12) De- mobilization & Remobilization — 1 LS @ $48,000/LS $ $ 48,000.00 13) Relocate Air Release Valve — 1 LS @ $1,250.00/LS $ $ 1,250.00 14) Additional Rental for Barricades — 4 mo. ® $1,000.00 /mo. $ $ 4,000.00 From January 6, 2000 to April 10, 2000 (when the contract was to be completed) is 96 Calendar Days. An additional 24 days shall be added to the Contract to perform the additional items for Revision Number 2. The City of Round Rock is expected to approve this Change Order May 11, 2000. The new contract completion date will be September 8, 2000. Justification: Client's Request $ 2,106.00 $ 248,203.84 Net Changes in Contract Price $ $ 246,097.84 Baker - Aicklen & Associates, Inc. Consulting Engineers The amount of the Contract before this Change Order is Two Million Three Hundred Fifteen Thousand Seven Hundred Forty One and 87/100 Dollars The Amount of the Contract will DECREASE/INCREASE by the sum of Two Hundred Forty Six Thousand, Ninety Seven and 84/100 Dollars $ 246.097.84 The CONTRACT TOTAL including this Change Order will be Two Million, Five Hundred Sixty One Thousand, Eight Hundred Thirty Nine and 71/100 Dollars This document will become a supplement to the Contract and all provisions will apply hereto. Austin Bri dge and Road,,( Contractor) Baker- Aickle Associates, Inc., (Engineer) CONTRACT CHANGE ORDER NO. 2 (cont'.) Flo J Date Date City o R ound Rock, (Own Date Date: 5/2/00 Sheet No. 4 of 4 Job No. 601- 543 -23 $ 2,315,741.87 $ 2,561.839.71