R-00-06-08-11A1 - 6/8/2000Mayor
Robert A. Srluka, Jr.
Mayor Pro-tem
Martha A. Chavez
Council Members
Tom Nielson
Earl M. Hairston
Rick Stewart
Earl Palmer
Jimmy Joseph
City Manager
Robert L. Bennett, Jr
City Attorney
Stephan L Sheets
June 15, 2000
Mr. Ed Rolf
Gamey Construction
3711 Burnet Road, Suite A -12
Austin, Texas 78757
Dear Mr. Rolf:
221 East Main Street
Round Rock, Texas 78664
512- 218 -5400
The Round Rock City Council approved Resolution No. R- 00- 06- 08 -11A1 at their
regularly scheduled meeting on June 8, 2000. This resolution approves Change Order
No. 1 for the construction of the West Water Transmission Main.
Enclosed is a copy of the resolution and Change Order for your files. If you have any
questions, please do not hesitate to contact Steve Miller at 218 -5555.
Sincerely,
6
Christine Martinez
Assistant City Secretary
Enclosures
Fax: 512 -218 -7097
1- 800 -735 -2989 TDD 1- 800 - 735 -2988 Voice
www.ci.round -rock tx us
fff tr D'{
CITY OF ROUND ROCK
i. „k$
Mayor
Robert A. Stlukn, Jr.
Mayor Pro -tem
Martha Chavez
Council Members
Tom Nielson
Earl M. Hairston
Rick Stewart
Earl Palmer
Jimmy Joseph
City Manager
Robert L Bennett, Jr
City Attorney
Stephan L Sheets
June 15,2000
Mr. Brad Castleberry
HDR Engineering, Inc.
2211 South IH -35, Suite 300
Austin, Texas 78741
Dear Mr. Castleberry:
1 -800. 735.2989 TDD 1. 800. 735.2988 Voice
www.ci.round -rock tx us
221 East Main Street
Round Rock, Texas 78664
512- 218 -5400
The Round Rock City Council approved Resolution No. R- 00- 06- 08 -11A1 at their
regularly scheduled meeting on June 8, 2000. This resolution approves Change Order
No. 1 to the contract with Garney Construction for the construction of the West Water
Transmission Main.
Enclosed is a copy of the resolution and Change Order for your files. If you have any
questions, please do not hesitate to contact Steve Miller at 218 -5555.
Sincerely,
/
Christine Martinez
Assistant City Secretary
Enclosures
Fax: 512- 218 -7097
RESOLUTION NO. R- 00- 06- 08 -11A1
WHEREAS, the City of Round Rock has previously entered into a
contract ( "Contract ") with Garney Company, Inc. for the construction of
the West Water Transmission Main, and
WHEREAS, it has been determined that it is necessary to change
said Contract in accordance with the attached Contract Change Order No.
1, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Contract Change Order No. 1 to the Contract with
Garney Company, Inc. for the construction of the West Water
Transmission Main.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
RESOLVED this 8th day of June
RO A. STLUK ,, 'JR. , Mayor
TEST: City of Round Rock, Texas
C A 14 IL! i A •
ANNE LAND, City Secretary
Ki\ WPOOCS \RRSOLUSI \R00608A1.WP0 /ac
CPR No
Item and DescnptIon of Changes
ContraNYPnce
Contract Time
Decreabe
Increase
Decrease
Increase
1
Delete corrosion protection system including joint
bonding and corrosion test stations.
11,300.00
0
0
0
2
Delete 24" Gate Valve specified at Sta. 103 +00 and
replace with 30" Butterfly Valve.
0
3,100.00
0
0
3
Modify alignment along Wyoming Spgs. Dr. to
accommodate the Medical Center site conditions.
0
65,669.84
0
0
Sub
Difference Net
11,300.00
68,769.84
0
0
0
57,469.84
0
0
Project Name:
City of Round Rock Water System Improvements
West Transmission Potable Water Pipeline
Project Owner (Name, Address)
City of Round Rock, Texas
2008 Enterprise Dr.
Round Rock, Texas 78664
Project Contractor. (Name, Address)
Garney Companies
1331 N.W. Vivion Rd.
Kansas City, MO 64118
It is anreed o modify the Contract referred to above as follows:
Summary: It Is agreed to modify the Contract referred to above as follows:
Contract Price prior to this Change Order Contract Time prior to this Change Order
1 61 A93,333.00 1260 clays
Net Increase (decrease) of this Change Order Net Increase (decrease) of this Change Order
($57,469.84 1 0 days
Revised Contract Price with all approved Change Orders Revised Contract Time with all approved Change Orders
1 $1,950,802.84 1260 days
The changes included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of
the original Con ract as though included therein.
ro ntrootorby
Recommended for Approval By (HDR Engineering, Inc )
6412.t1EY
Approved for • -r b - Attest Date
er en
Distribution
FORM III- 5020 -2 (Version I 0 Oct 90)
Copyright 1991 HDR Enginecnng.1ne
Owner
Contractor
HDR Project No
Task 5020
07225 -040 -036
Owners Project No.:
N/A
Date of Issuance: April 18, 2000
Date of contract: February 17, 2000
Contract Penod: 260 days
Date
10Rce 1 1Fleld
Change Order No. 1
1 C /
4 (1 8 /oo
Date
III - 5020 -2
100% Employee Owned
1331 N. W. Vivian Road Kansas City, Missouri 64118 -4554 (816) 741. 4600 /fax (816) 741 -4488
3711 Burnet Rd. Suite A -I2 Austin, Texas 78757 (512) 371 -3917 /fax (512) 371 -3918
DATE: May 18, 2000
TO: Mr. Steve Miller
City of Round Rock, Texas
2008 Enterprise Drive
Round Rock, Texas 78664
FROM: Ed Rolf •
Garney Construction
8711 Burnet Road
Suite A -12
Austin, Texas 78757
RE: West Transmission Main
Signed Change Order No. 1
Dear Mr. Miller,
As discussed at today's progress meeting, I am forwarding the signed copy of Change Order
Number One for process and payment. I will copy this letter via fax to Niel Graff.
Thank you, and please call with any questions or comments.
Sincerely,
d Rolf
GCI Project Manag
cc: Job 2619 file
C arney
CONSTRUCTION
r
1
Protect Name
West Transmission Potable Water Pipeline
Protect Owner City of Round Rock
HDR Project No 07225 -040 -036
Owner's Project No of applicable) NIA
Regulatory Agency Project No (if applicable) N/A
ntIated by
X Engineer Contractor
Contractor:
Garney Companies
Attention:
The following change In the contract on this project Is proposed
• A breakdown of cost SHALL be attached.
• Work shall not commence until authorized by the Owner.
Descdpllon of the Proposed Change:
Provide all labor, materials, and equipment to add or delete the Work identified below. Provide
proposal identifying costs associated with labor and materials separated with Contractor's Overhead
and Profit for the Work denoted separately as well.
1. Delete all labor and materials associated with the installation of the corrosion monitoring system.
System includes all monitoring stations and DIP joint bonding indica in the Contract Drawings
and Specifications.
Increased Decreased Lfklchanged
by calendar day
This change will _ Add !^ 3educl _ Not Change
$ 1 j �
O G.
4 /Contracrcr
( Date 3 - 7-00
F009) 111. 5010 -3 Nun 90)
Copyright 1991 111)0 Eng,nvcnng. Inc
>%
By
Task5010
Date
1 )
Owner's Action:
Accepted
(Date
/ 1
All work shall be in accordance with the terms, stipulations, and HDR Recommendation
conditions of the onginal Contract Documents. If the work herein
provided for is Approved by Change Order, the time of completion will
be:
ended
By. HDR rt glr enng. Inc
Change Proposal
Request No.1
(Not a Change Order)
Do,NOt Recommend
prance
/ per.
lL
Date 2/23/00
I11. 5010.3
Project Name
West Transmission Potable Water Pipeline
Project Owner City of Round Rock
H00 Project No 07225- 040 -036
Owners Project No Of applicable) N/A
Regulatory Agency Project No (il applicable) N/A
Initiated by
X Engineer Contractor
Contractor:
Garney Companies
Attention:
The following change in the contract on this project is proposed.
• A breakdown of cost SHALL be attached.
• Work shall not commence until authorized by the Owner.
Description of the Proposed Change.
Provide all labor, materials, and equipment to add or delete the Work identified below. Provide
proposal identifying costs associated with labor and materials separated with Contractor's Overhead
and Profit for the Work denoted separately as well.
1. Delete from the Work the 24" diameter gate valve identified at Sta. 103 +00 and replace It with a
30" diameter butterfly valve to be provided in compliance with Section 15103 of the Contract
Specifications.
All work shall be In accordance with the terms, stipulations, and HDR Recommendation:
conditions of the original Contract Documents. If the work herein
provided for is Approved by Change Order, the time of completion will
be.
_ Increased _ Decreased xjUnclarged
by _ calendar days.
This change will. add _ Dedua _ Not Change
s:7 I c'
nlraclor /
I Dd18 �—
9-00
10001 111.5010.3 (Jun Stn
top. right 1991 1150 E',o',ocnng Inc
task 5010
By
Recom ended
Accepta
By: HDR
q 1
gDaenng. InC
I ...1 2, -4/ tre
Dale
Change Proposal
Request No.2
(Not a Change Order)
Not Recommend
plane
Date 2/23/00
ers Action.
_VC aepted NOt'Atcepled
By Owner
Date
1114010.3
•05
Contractor:
Garney Companies
Attention:
The following change in the contract on this project is proposed.
• A breakdown of cost SHALL be attached.
• Work shall not commence until authorized by the Owner.
Description of the Proposed Change'
All work shall be In accordance with the terms, stipulations, and
conditions of the original Contract Documents. If the work herein
provided for Is Approved by Change Order, the time of completion wit
be:
Reconune •ed
Acceptance
_ Increased _ Decreased
by _ calendar days.
ha
This change wil I: )Add Deduct _ Not Change
$ ros
1 — A17 1/0 e -
General Contractor
—
FORM 111. 5010 -3 (1w 90) Task 5010
Capynghl 1991 11DR Fng,neenng, Inc
y
HDR Recommendation:
Date
Ow9ers Action:
Accepted
I By owner
D
10059 61 Z
Change Proposal
Request No.3
(Not a Change Order)
Project Name
West Transmission Potable Water Pipeline
Project owner City of Round Rock
HDR Project No. 07225 - 040 -036
Owner's Project No. (If applicable): N/A
Regulatory Agency Project No (if appbcabley NIA
rutiated by
X Engineer Contractor
Provide all labor, materials, and equipment to add or delete the Work identified below. Provide
proposal identifying costs associated with labor and materials separated with Contractor's Overhead
and Profit for the Work denoted separately as well.
1. Modify Work associated with the alignment along Wyoming Springs Medical Center to address
changed site conditions, additional efforts required, and revised construction scheduling.
By. NOR Ergi
pted
Date: 4118100
111- 5010.3
$ENT By: ; 818 7414488;
(3/ / / G COMPANIES, INC.
PHONE (816) 941 -41300
1331 N.W. VIVION ROAD I KANSAS CITY, MISSOURI 64118 -4554 FAX (816) 741 -4488
VIA FACSIMILE
April 7, 2000
HDR Engineering, Inc,
2211 South IH -35
Suite 300
Austin, Texas 78741
Attn: Mr. Brad Castleberry
Re: City of Round Rock — West Transmission Potable Water Pipeline
Change Conditions Proposal
Wyoming Springs Medical Center Area
APR -7 -00 2:09PM; PAGE 2/4
Dear Mr. Castleberry,
Garney Companies, Inc. respectfully submits the following costs associated with the early
mobilization, changed conditions. and work out of planned sequencing related to the Wyoming
Springs Medical Center. A brief description of Included (but not limited) costs are below:
• Removal and replacement of new curb & gutter.
• Hauloff and disposal of removed curb & gutter.
• Parking Lot related subgrade and base prep.
• Relocation of temporary electrical power to Medical Center.
• Extra mobilization of GCI crew and equipment.
• Extra mobilization of trencher sub.
• Extra trenching depth due to relocation of ARV & vault.
• Extra trenching depth due to new utilities.
• Location and exposing of new utilities at Medical Center.
• Associated hoe - ramming around new utilities at Medical Center.
• 30" DIP connection /closure material.
• Rental equipment to support trencher prior to GCI crew mobilization.
• Additional labor for early trencher support.
• Additional crew timo related to new utilities, depth, etc.
• Re- staking /surveying
• Applicable labor fringe, additions to bond and insurance.
Please note that Garvey Companies, Inc. is expediting the installation of the 30" DIP In the area
of the Wyoming Springs Medical Center. Our plan is to have a full pipe crew on -slte to install this
section on April 10, 2000. We would like to also note that this section of pipe will remain untested
until all pipe is installed. therefore any future improvements unrelated to our contract will be
subject to removal and replacement at additional costs to our contract. This will also apply to the
Walgreen's development at Highway 620 and Wyoming Springs Road
10014 EMPLOYEEOWNW
SENT.By::;
As you know, we have already completed much of this work in order to accommodate Cooper
Medical Buildings and the construction of the Center, so we appreciate your attention to this
matter in expediting process and payment.
Thank you very much, and please do not hesitate to call with questions or requests for additional
Information.
Sincerely,
Ed Rolf
Project Manager
Gamey Companies, Inc.
cc; Mr. Steve Swatek, GCi
Mr. Tim Simmons. GCI
Mr. Steve Miller, CORR
Job 2619 file
816 7414488; -
APR -7 -00 2:10PM; PAGE 3/4
816 7414498;
Change Order 1
APR -18 -00 3:27PM; PAGE 2/2
15 :20
.— -- T
Change Order 1
-
J_
Round Rock W. Transmission Mein
des pricing for changed cohd In ma area from station 23+00 to 29+50 (Wyoming Springs Medical Comer)
r
ITEM
UNIT PRICE
MATERIAL
LABOR
EQUIP
SUB
$ 076.00
Bid Rem
- -
.
Eatra trenching depth
S 1.50
Trencher moblIi Son
E 1,00000
$ 1,000.00
Gel equipment mobilizetbn
S 500.00
6 500.00
Move temporary electrical pole (deleted)
- '—
_
30" sleeve and megeluga
9 1,700.00
$ 1,700.00
-
Haulof ooncr.te curb (bucidoada)
$ 40,00
$ 200.00
$ 17,680.00
Replace concrete curb
S 17,580,00
Per diem expenses (le)
5 598.00
$ 596.00
Re•stoking/aurveying (deleted)
S -
0 -
Data Quest Equip Rates
_
2
Cat 345 Excavator
$ 1.147,00
6 2,204.00
Cat 9500
5 41650
6 833,00
Tamp
S 227.50
_
0 -
JobTrudt
S 74.50
$ 146.00
N
Ford F350
5 70,50
S 141.00
Rental Equipment
Komatsu PC300 (1 week 5,5,( + mob)
3 3,067.50
$ 3,687.60
2
Komatsu WP360 (1 week rental +mob)
S 2,774.00
S 5,548.00
2
John Deere 310E (1 week rental • mob)
3 1,195.00
9 2,300.00
Day.
Komatsu PC400 vdhseram(1 week+ mob)
S 8,73250
t 6,732.60
Labor Including Fringe
Forman
S 332,33
-
S 1,661.56
Manage
S 294 25
S 1.471,26
Hoe Operator
S 260.28
6 638.68
Leadneen
6 235.62
0 2,366.20
7
2
Loader Operator
S 269.28
5 1,884.96
Piperayor
$ 17672
6 363A4
—
"—
Labor
$ 15989
s 3 19.76
o
Labor
5 151.47
S •
TIME EXETENT(ON
Column subtotals
S 2,296.00
$ 8,58584
5 23,255.00
S 18,55500
y�var
S 229.60
5 85
S 2,325 50
$ 1.855 50
Subtotal
S 2,525.60
$ 9,44442
$ 25,58050
S 20,410.50
10% Profit
6 252.56
3 944,44
S 2,658.08
$ 2,041.05
C olunn totals
S 2,778.19
3 10,380.67
$ 20,138.55
$ 22,451.85
Sub -Total For Change
563,757.13
Benda S ((mummer (716)
3 1,912.71
_
$65,669.84/
TOTAL CHANGE ORDER NUMBER 1:
� — —
816 7414498;
Change Order 1
APR -18 -00 3:27PM; PAGE 2/2
DATE: June 2, 2000
SUBJECT: City Council Meeting — June 8, 2000
ITEM: 11.A.1. Consider a resolution authorizing the Mayor to execute Change
Order Number 1 for Garney Companies in the amount of
$57,469.84 for the West Transmission Pipeline. This contract
change involves the substitution of a valve, the deletion of the
corrosion protection system and extra work encountered at a newly
developed medical center parking area. The valve substitution is
appropriate because of its location, the corrosion system is not
necessary because of the stable soil conditions in this area and the
work at the medical center involved the replacement of curbing.
Staff recommends approval. Staff Resource Person: Jim Nuse,