R-00-06-08-11A3 - 6/8/2000RESOLUTION NO. R- 00- 06- 08 -11A3 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Hensel Phelps Construction Co. for the construction of the Round Rock Convention Center & Dell Diamond Complex, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 3 to the Contract with Hensel Phelps Construction Co. for the construction of the Round Rock Convention Center & Dell Diamond Complex. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. ATTEST: RESOLVED this 8th day of Jur;e, 200 ( E LAND, City Secretary K. \WPDOCSARF_SOLUTRR00608A3 WPDIsc City of Round Rock, Texas PROJECT: ROUND ROCK CONVENTION CENTER COMPLEX Package "C" TO: Hensel Phelps Construction Co. 8322 Cross Park Drive Austin, TX 78754 The Contract is changed as follows: Incorporate the work described in the following Items. All appropriate back up information is attached. See Attachment 'A' for Items included in this Change Order This Change Order Is not In effect and will not be Included In the Contract Documents until signed by the Owner, Architect and Contractor. Changes Included herein are subject to all conditions affecting them under the substitution specification section. SUMMARY The original Contract Sum was $15,163,000.00 Net change by previously authorized Change Orders $35,679.00 The Contract Sum prior to this Change Order was $15,198,679.00 The Contract Sum will be Increased by this Change Order $68,365.00 The new Contract Sum including this Change Order will be $15,267,044.00 The Contract Time will be Unchanged by (0) Days The Date of Substantial Completion as of the date of this Change Order therefore is 01- Apr -00 Changes included in the summary above do not include modifications which have been authorized by Construction Change Directive(s). HKS INC. 1919 McKINNEY AVENUE DALLAS, TX 75201 -1753 A 1 �k ^ 1 — L By: Mr Kevin A. Taylor 8 Dale' 05/16/2000 Date: • HKS INC. City of Round Rock 2008 Enterprise Dr. Round Rock, TX 78664 H I<S CHANGE ORDER Hensel Phelps Construction Co. 8322Crm- "ark e CHANGE ORDER NO: 03 INITIATION DATE: 16- May -00 ARCHITECTS PROJECT NO.: 6407 CONTRACT FOR: Package C Building Construction CONTRACT DATE: 07/08/1999 Authorized: Dallas / Los Angeles / Orlando / Richmond / Tampa Round Rock Express Baseball Club 3400 E. Pal ' ' alley Round R6 I TX 7 By: M. R.D. Sneed Date: 9 • /7 • Oa C HKS 701 -1995 Project: ROUND ROCK CONVENTION CENTER COMPLEX Package "C" HKS Project # 6407 _ HI<S CHANGE ORDER NO. 03 ATTACHMENT 'A' Incorporate the work described in the following Items. All appropriate back up information is attached. DATE of Days CONTRACTOR CHANGE #: COST: DESCRIPTION: Added PROPOSAL: xHPCC - 29 $2,345.00 Add metal plate cover at outfield wall padding 0 05/02/2000 xHPCC $16,818.00 Scoreboard and Auxiliary Scoreboard 0 04/12/2000 Electrical xHPCC - 56 $32,073.00 Mechoshades in Convention Center 0 05/09/2000 xHPCC -63 $17,039.00 Miscellaneous revisions 0 05/09/2000 xHPCC ($2,500.00) Credit for Monitor Modules 0 05/09/2000 xHPCC $2,590.00 Additional electrical revisions 0 05/09/2000 TOTAL: $68,365.00 TOTAL DAYS THIS CHANGE ORDER:. 0 Page 1 of 1 MAY. 26. 2000 10:25AM NOR ENGINEERING INC. - AUSTIN ,NO. 5506 P. 2 May 26, 2000 Mr. Steve Miller, P_E. Utilities Engineer City of Round Rock 2008 Enterprise Round Rock, TX 78664 Re: City of Round Rock Water System lmprovments Contract No. 4A REBID Chisholm Valley Standpipe Demolition Dear Mr. Miller: On May 23, 2000, HDR assisted the City in opening bids for the project referenced as Contract No. 4A -- REBID — Chisholm Valley Standpipe Demolition. Five bid proposals were received. A tabulation of the bids is attached. The lowest qualified, responsive Bidder for the project is Hunter Demolition & Wrecking Corporation with a Bid amount of $16,000. We have confirmed the project requirements and schedule with Hunter's project manager, reviewed the qualifications statement submitted with the bid proposal, and contacted several of their references. Although their bid is somewhat lower than the second place bidder, Hunter confirmed that they understand the project specifications and requirements and are comfortable with the amount bid. In addition, we uncovered no other concerns with their ability to perform the work indicated. Therefore, we recommend award of the contract to Hunter Demolition and Wrecking Corporation in the amount of $16,000, Please call should you have any questions or need any further information. Sincerely, Neil A. Graff, P.E. Project Manager 05/26/2000 FRI 11:27 [T% /R% NO 69757 Ij002 Iseler Demolition, Inc. Y Y 1,500.00 31,750.00• 33,250.00 Hunter Demolition & Wrecking Corporation Y Y 0.00 16,000.00 16,000.00 A & R Demolition Y Y 7,500.00 28,000.00 35,500.00 J. T. B. Services Y Y 1,200.00 23,649.00 24,849.00 Pittsburg Tank & Tower, Inc. Y Y 3,415.00 33,515.00 36,930.00 • N N Bidder Bid Opeing May 23. 2000 City of Round Rock Water System Improvements . Contract No. 4A REBID - Chisholm Valley Standpipe Demolition Bidders Tabulation Sheet 0 Q 0 5/24/00 < • Vl D R� Feet ROUND ROCK EXPRESS STADIUM RREEDYNT/D/ARCDATA/WUNCILAGENDA ITEMS/ROUND ROCK EXPRESS STADIUM DATE: June 2, 2000 SUBJECT: City Council Meeting — June 8, 2000 ITEM: 11.A.3. Consider a resolution authorizing the Mayor to execute a Change Order No. 3 with Hensel Phelps Construction Co. for the Round Rock Convention Center & Dell Diamond Complex. The change order is an addition in the amount of $68,365 and is a combination of cost related to clarification of plans and value engineering. The total new contract amount will be $15,267,044. Original contract amount: $15,163,000 Change order #1: ($ 165,226) Change order #2: + $ 200,905 Change order #3: + $ 68,365 Total Contract Amount: $15,267,044 Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director.