Loading...
R-00-06-08-11A4 - 6/8/2000).,�� 0; CITY OF ROUND ROCK Mayor Robert A. Sttuka, Jr. Mayor Pro -tem ManhaA Chavez Council Members TOM Nielson Earl M. Hairston Rick Stewart Earl Palmer Jimmy Joseph City Manager Robert L Bennett. Jr. City Attorney Stephan L Sheets June 15, 2000 Mr. Frank V. King Bay Maintenance Company, Inc. P.O. Box 8859 Horseshoe Bay, Texas 78657 Dear Mr. King: 221 East Main Street Round Rock Texas 78664 512- 218 -5400 The Round Rock City Council approved Resolution No. R- 00- 06- 08 -11A4 at their regularly scheduled meeting on June 8, 2000. This resolution approves Change Order No. 2 for the Rubio Subdivision Improvement Project. Enclosed is a copy of the resolution and Change Order for your files. If you have any questions, please do not hesitate to contact Larry Madsen at 218 -5555. Sincerely, ' n n n l Christine Martinez Assistant City Secretary Enclosures Fax 512- 218 -7097 1 -800- 735.2989 TDD 1 -800- 735 -2988 Voice www.ci round- rock.tx.os „05z . - ; CITY OF ROUND ROCK Mayor Robert A. Straka, .1r Mayor Pro -tem Martha Chavez Council Members Tom Nielson Earl M. Hairston Rick Stewart Earl Palmer Jimmy Joseph City Manager Robert L. Bennett, Jr. City Attorney Stephan G Sheets June 15, 2000 Mr. Chien Lee, P. E., AICP Hejl, Lee & Associates, Inc. 601 Farley Drive Austin, TX 78753 Dear Mr. Lee: 221 East Main Street Round Rock, Texas 78664 512- 218 -5400 The Round Rock City Council approved Resolution No. R- 00- 06- 08 -11A4 at their regularly scheduled meeting on June 8, 2000. This resolution approves Change Order No. 2 to the contract with Bay Maintenance Company for the Rubio Subdivision Improvement Project. Enclosed is a copy of the resolution and Change Order for your files. If you have any questions, please do not hesitate to contact Jim Nuse at 218 -5555. Sincerely, 0,hwi„tntu. Christine Martinez Assistant City Secretary Enclosures Fax: 512 -218 -7097 1- 800 - 735 -2989 MD 1- 800 - 735 -2988 Voice wwwct round -rock tx us RESOLUTION NO. R- 00- 06- 08 -11A4 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Bay Maintenance Company, Inc. for the Rubio Subdivision Street and Drainage Channel Improvements project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Bay Maintenance Company, Inc. for the Rubio Subdivision Street and Drainage Channel Improvements project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 8th day of June ATTEST: E LAND, City Secretary Re\ WPDOCS \RBSOLUTI \R00608A4.WPD /sc T A. TLUKA'4'IR. , Mayor City of Round Rock, Texas NO. DESCRIPTION UNIT UNIT PRICE ORIGINAL CONTRA CHANGE ORDER 41 CHANGE ORDER 62 REVISED CONTRACT my AMOUNT QTY AMOUNT QTY AMOUNT QTY AMOUNT 1 R 0 W. PREPARATION STA. S 500.00 13 S 6,500 00 0.98 S 490.00 14 S 6,990.00 2 STREET EXCAVATION SY 1000 3,180 31,80000 261 2,610.00 3,441 34,410.00 3 SUBGRADE PREPARATION SY 1.00 3,180 3,180.00 261 261.00 3,441 3,441.00 4 15" CRUSHED LIMESTONE BASE SY 12 00 450 5,400 00 450 5,400.00 5 12" CRUSHED LIMESTONE BASE SY 800 3,180 25,44000 261 2,08800 3,441 27,528.00 6 2" MAC PAVEMENT SY 500 3,096 15,48000 261 1,30500 3,357 16,785.00 7 18" CONCRETE RIBBON CURB LF 6.00 2,870 17,220.00 196 1,176.00 3,066 18,39600 8 ASPHALT OVERLAY TON 70.00 350 24,50000 350 24,500.00 9 MORTARED ROCK RIP RAP SY 70.00 35 2,450.00 35 2,450.00 10 6' WIDE CONCRETE VALLEY GUTTER LF 35 00 70 2,450 00 70 2,450.00 11 METAL BEAM GUARD RAIL LF 40.00 85 3,400.00 85 3,400.00 12 CHANNEL CLEARING @PREPARATION STA 1,00000 21 21,000.00 21 21,00000 13 CHANNEL EXCAVATION CY 6.00 30,000 180,00000 30,000 180,00000 14 CHANNEL EMBANKMENT CY 3 00 6,000 18,00000 6,000 18,000 00 15 9x4' BOX CULVERT NASH ST. LS 40,000.00 1 40,00000 1 40,00000 16 CONCRETE PAVEMENT 9 CULVERT INCLUDING SUBGRADE PREP S.Y. 30.00 95 2,850.00 95 2,850.00 17 CONCRETE RIP RAP @IH35 FRONTAGE ROAD SY. 34.00 417 14,178.00 417 14,178.00 18 10' WIDE VALLEY GUTTER @ NASH ST. LF 50.00 50 2,500.00 50 2,500.00 19 CONCRETE TRICKLE CHANNEL LF 3000 2,120 63,600.00 , 2.120 63,60000 20 STABILIZED CONSTRUCTION ENTRANCE L S 1,200.00 1 1,200.00 1 1,200 00 21 DEMOLITION & REMOVAL OF EXISTING HOUSE LS 15,000.00 1 15,000 00 1 15,000 00 22 10' ACCESS ROAD ALONG CHANNEL LF 10.00 2,120 21,200 00 2,120 21,200 00 23 CHANNEL RE-VEGETATION LS 0.25 26,000 6,500.00 26,000 6,50000 24 10" PVC 5DR- 35 WASTEWATER LINE (ALL DEPTHS) LF 40.00 225 9,000.00 225 9,00000 25 10" PVC SD2- 18 WASTEWATER LINE (ALL DEPTHS) LF 45.00 325 14,625.001 325 14,625.00 26 6" PVC SDR -18 WASTEWATERLINES(ALL DEPTHS) LF 40.00 118 4,720.00 118 4,72000 27 8" PVC C - 900 (CL 200) WATER LINE LF 20.00 125 2,500.00 125 2,500 00 28 6" PVC C -900 (CL 200) WATER LINE LF 16.00 1,040 16,640.00 98 1,568 00 1.138 18,208 00 29 2" PVC C -900 (CL 200) WATER LINE LF 10.00 120 1,200.00 120 1,200 00 30 CONCRETE CAP LF 7.00 1,346 9,422.00 1.346 9,422 00 31 DROP MANHOLE EA 2,500.00 1 2,500.00 I 2,500 00 32 FIRE HYDRANT ASSEMBLY EA 1,50000 3 4,500.00 3 4,500,00 33 SERVICE RE- CONNECT EA 300.00 20 6,000.00 20 6,00000 34 6" GATE VALVE EA 400.00 3 1,200.00 1 400 00 4 1,600 00 35 CONNECT PROP. 6" WL TO EXIST. 8" WL LS 1,500.00 1 1,500.00 1 1,500 00 36 CONNECT PROP. 6 "WL TO EXIST.2 "WL LS 500.00 1 50000 1 500.00 37 CONNECT PROP. 6 "WL TO EXIST. I "WL LS 30000 I 300.00 1 30000 38 SILT FENCE LF. 200 255 510.00 255 51000 39 TREE PROTECTION LF. 100 320 320.00 320 320.00 40 ROCK BERM LF 8.00 150 1,200.00 150 1,200.00 41 TRAFFIC CONTROLS & DETOUR L.S. 10,000.00 1 10,000.00 1 10,000.00 42 CLEANUP & RESTORATION LS. 3,000.00 1 3,000.00 1 3,00000 43 GRATE INLET W /STORM SEWER @ MAYS & NASH LS 1,50000 1 1,500.00 1 1,500.00 44 REVEGETATION ROADWAY SY. 025 1,645 41125 1,645 411.25 50 LABOR TO INSTALL NEW WATER METER AND BOXES EA 4149 20 829.78 20 829.78 51 RE- INSTALL CONCRETE CONC VALLEY GUTTER LS 1,990 70 1 1,990.70 1 1,990.70 52 INSTALL GRATE INLET & 12" DRAIN PIPE LS 6,807.00 1 6,807.00 1 6,807.00 60 REMOBB.IZATION LS 1 25,000.00 1 25,000.00 61 MORTARED RIP RAP AROUND TREES LS I 2,310.00 1 2,310.00 62 HANDRAILS ALONG BOX CULVERT LS 1 4,000.00 1 4,000.00 63 CHANNEL BOTTOM DRY STACK ROCK RIP RAP LS 1 11,550 00 1 11,550.00 TOTAL CONTRACT AMOUNT 5 615,396.25 519,525.48 42,860.00 S 677,781.73 dunge2slf CITY OF ROUND ROCK RUBIO SUBDIVISION IMPROVEMENT . CHANGE ORDER #2 HLA PROJECT NO. 13571 Recommended By: C�l/ r7 �"°--- Hell, Iran & Associates, Inc. Accepted By: Approved nd Rock Date: Updated 5 -22 -2000 Date • 5.-22-2 Date: (_g- pQ HEJL, LEE & ASSOCIATES, INC. .• DANIEL P. HEX, JR. PE,R.P.LS.,AICP - CHIENY LEE P.E,AICP . ENGINEERING SURVEYING PLANNING 601 FARLEY DRIVE AUSTIN, TEXAS 78753 PHONE 512- 836 -1848 FAX 512.836 -6499 MEMQRANDU Mr. Don Rundell, P.E., Mr. L Madsen Public Works Department, City of Round Rock • Chien Lee, P.E., AICP. aroi; DATE: May 22, 2000 PROJECT: Rubio Subdivision Improvement RE: , HLA Project No. 13571 • - - ;SUBJECT: Contractor's Change Order N. 2 FROM: . Pursuant to the city's ' request for the following listed additional improvements for, the referenced project, please find attached Change Order No. 2 in the amount of $42,860.00 to the contract: 1. The construction project was temporarily suspended in September ' 1999 due to the pending condemnation hearing of an existing house located within the proposed channel. The condemnation processing was finally resolved and the contractor was able to re- mobilize its crew to proceed on the work. This change order includes the re- , mobilization cost and the associated quantity adjustment for the project . with an increase in the amount of $25,000.00. - - '2. To 'provide better erosion control around the existing trees upstream from the Nash Street culvert„ an additional 50' long mortared rock rip- rap is proposed with an increase in the amount of $2,310.00. 3. To provide pedestrian safety along the Nash Street culvert, handrails • are proposed along both upstream 'and downstream sides of the box • . culvert. This improvement will have an increase in the amount of $4,000.00. ' 4. Install dry stack of oversized rock rip rap approximately 60' upstream and 40' downstream from'the Nash Street box culvert to mitigate the " 'erosion potential of the drainage channel is proposed. - This improvement will have an increase in the amount of $11,550.00. Hejl, Lee &' Associates, Inc. recommends the city approve Change Order No. 2 to Bay Maintenance Company contract on Rubio • Subdivision Improvement project in the amount of $42,860.00. -. CC: Bay Maintenance Company (Letter &Form Only) $ 615,396,25 19,525.48 41860,00 $ 677.781.73 The updated contract amount is presented below: Original Contract Amount Change Order No. 1 This Change Order (No. 2) Revised Contract Amount Should this proposed change order meet with your approval, -please execute the attached form and retum to our office for coordination with the contractor. . We look forward to the continuing progress of this project. If you have ' . any questions about this project, please do not hesitate to contact our office.'. ' Attachment: Change Order (No. 2) Form Letters from Bay Maintenance Company dated: 5 -18- 2000, 4 -27 -2000, and 4 -20 -2000. ' . - 04.20 00 1.1:11 F.AS 8305985006 BA6 MAiNTESA-CCE - aJ 0 2 April 20, 2000 Dan Hejl, P.E. Hejl, Lee 84 Associates 601 Farley Drive Austin, TX 78753 RE: Rubio Subdivision Street & Channel Improvements Dear Mr. Hej I: This letter contains some of the information requested at the meeting on April 7, 2000. This includes proposed compensation for delays and remobilization related to the conflicting house in the channel and an estimated cost to extend some mortared rock riprap. The items discussed at the meeting that are not addressed here are: the cost of the handrail to the culvert and any issues relating to possible lend-based paint and asbestos in the house. We are waiting for more information on these. Concerning the remobilization and delays caused by the conflicting house in the channel, I have gone through our project records and abulated our actual costs, our projected costs to complete, and our original anticipated costs. 1 have attached these to this letter as table 1. All costs shown are for mass or "rough" excavation only and include only labor and equipment specific to that operation — support equipment is excluded. Our cost to date on the mass excavation is 055,846.50. Our projected cost to complete is 044,700. The sum of these two is 5100,646.50. Our original budget for all the mass excavation was 567,836.67; thus, we anticipate being about 033,000 over budget on this operation alone. Aside from the cost overrun due to the delays, we will incur some cost to remobilize our equipment and re- survey. These costs will total 02,770.00 and are detailed in table 2. The total from delays and remobilization from above is about 535,500.00. Keep in mind this is direct cost only (no overhead or profit) and only for labor and equipmenr. To pun this in perspective, an the total project so for we have incurred a direct cost of $481,614 on a budget of 5432,487 — about a 549,000 overrun to date. We are not making the assertion that all of the overruns are attributed to the denial of access to pan of the work; the wet weather and same other problems undoubtedly had a role. However, when you look,at the figures on the excavation keeping in mind that our switch from a scraper based crew to a loader & truck based crew was made solely because of the conflict with the house, one can see that the delay conhibuted heavily to these losses. We are willing to accept S25,000 for compensation on delays and remobilization associated with the house. On a different note, we have measured how much additional mortared rock riprap we believe will be required around the tree by the box culvert. It should take a section of riprap 50' long by 6' high, or approximately 33sy. At 5701 SY this would total 52310.00. I know we are all anxious to et started an this project B D 1 again, so 1 we can get this resolved as soon as possible. Please call me with any questions or comments at (830) 598-2535 (office) or (512) 633.2042 (mobile). CC: Edward Brooks, BINCI Frank Dan King, 3MC1 BAU MAIEDIANCE CCIWANy, GENERAL CONTRACTOR HORSESHOE BAY BOX 8859 HORSESHOE BAY, TEAS 78657 Phone (830) 598 -2535 Fax (630) 598 -5006 - Table 1 - Maas Eaay.,iso O..npl56 A. Eacnvatto. Done to Date 42499 -52499 5 weeks 615C Sewer, 06 Dour C. Original Estimate for Mau E:uvula s 10 weeks 615C Scraper. 06 Dour T.hte 2 - Remob0iaa6oa Cate Labs S 12,000.00 Equipment S 6.00000 Rend S 8,930.00 Fuel tam Scraper 5 2,50000 524/99 - 7'7/99 5.5 weeks 136 Duster. 1.70 fattier Loner S 13,200.00 Equipment 5 10,725.00 • Scraper Ravned so reduce costs Hourly Trucks S 2.491.50 TOTAL 0 55j46.50 8. Excavation ao Rat of Channel (anticipated) 4 weeks 330 Excavaue, 06 Doer, L Loader Labor S 14,600.00 Equipment S 12,60000 • Shan tame period and mess left by evens Hourly Trucks S 17,10000 preclude use of scraper TOTAL S 44,700.00 D6, 330, 1.70 - tdlc during iokart 2 work days S 1,460 00 Haul Truck wim Driver 2 work days S 750 00 Surveyor w/ Truck 2 work lays , 5 560.00 C1t&M1 TOTAL 5 'annul' mass exam/ labor dr equipment (A +H) anticipated mats 0x04/ COSTS (C) wonobdrmnal amts Labor S 30,000.00 Equipment S 12,00.00 Reuse) S 20,836.67 fuel an Scraper 5 5,000,00 TOTAL 5 67,636.67 TOTAL 9 2,770.00 5100,546.50 S (61,836.67) 2,770.00 TOTAL S 35,179.03 Bay Maintenance Company To: Dan Hejl Fax #: 15128366499 Company: Hejl, Lee & Assoc. Subject: Rubio Subdivision Handrail Sent: 4/27/00 at 933:16 AM Dan, Frank PC BOX 8859 Horseshoe Bay, TX 78657 (830) 598-2535 (830) 598-5006 fax From: Frank V King Fax*: 8305985006 Tel #• 8305982535 Pages: 1 (including cover) I finally got a price put together for the handrail on Nash st. I assumed the city would want about 40' of rail on each side of the culvert for a total of 80 LF. The pnce for this is $50 / LF - or 54000.00. The rail would oe fabricated like the detail that Chien sent me last week, and painted silver. May 18, 2000 Chien Lee, P.E. Hejl, Lee & Associates 601 Farley Drive Austin, TX 78753 Dear Mr. Lee: BAy MAINTENANCE COMPANY, INC_ GENERAL CONTRACTOR HORSESHOE BAY BOX 8859 HORSESHOE BAY, TEXAS 78657 Phone (830) 598 -2535 Fax (830) 598 -5006 RE: Rubio Subdivision Street & Channel Improvements Pursuant to our discussion at the Rubio Channel Progress meeting today, we have prepared some pricing on the proposed rock riprap at the box culvert. We estimated approximately 385 SY of riprap will be required. This quantity represents covering the entire channel bottom (excluding the trickle channel) and two feet of the side slopes on each side. We will excavate down 18" to place the rock riprap. Our price for the installation will be $30 / SY or $11,550.00. The rock riprap will utilize material from the Texas Crushed Stone quarry. The material is called 24" RIP RAP #024 and has the following average gradations: 40% in 18 " -24" range, 40% in 12 " -18" range, and 20% in the 6 " -12" range. Please call me with any questions you might have. CC: Edward Brooks, BMCI Larry Madsen, CORR RUBIO SUBDIVISION RUBIO SUBDIVISION 300 0 300 600 Feet PW G 1° KKKr11Y1J 1 /U/AKCUA IA/W UNLILAUENUA 11bMb /KUHIU bUIUUIVIMUN DATE: June 2, 2000 SUBJECT: City Council Meeting — June 8, 2000 ITEM: 11.A.4. Consider a resolution authorizing the Mayor to execute a Change Order No. 2 with Bay Maintenance Co. for the Rubio Street and Drainage project. This change order is an addition in the amount of $42,860.00. This is a combination of quantity adjustments, remobilization and safety and erosion controls. The total new contract is in the amount of $677,781.73. Original contract amount: $ 615,396.25 Change order #1: + $ 19,525.48 Change order #2: + $ 42,860.00 Total Contract Amount: $677,781.73 Staff recommends approval. Staff Resource Person: Jim Nuse, Public Works Director.