Loading...
R-00-06-08-11A5 - 6/8/2000RESOLUTION NO. R- 00- 06- 08 -11A5 WHEREAS, §8.610(4) Code of Ordinances (1995 Edition) provides for the reimbursement for the oversizing of water mains, and WHEREAS, 3406, Ltd. has submitted a reimbursement request for the oversizing of water mains associated with the Wood Glen, Section 5, Phases 1 and 2 subdivision improvements, and WHEREAS, the City Council wishes to approve said reimbursement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the City Council hereby approves of the reimbursement to 3406, Ltd. of $6,720.00, which is the cost of oversizing water mains associated with the Wood Glen, Section 5, Phases 1 and 2 subdivision improvements. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this the 8th day of June, 2000. ST: /. .I 4L.I Y K:\ WPDOCS \RSSOLIIPI \R00608A6.WPD /sc , City Secretary -e T A. LUKA, A. S LUKA, City of Round Rock, Mayor Texas E OCKWOOD NGINEERS, INC. CIVIL ENGINEERING & PLANNING (512) 451 -7092 FAX (512) 377 -5402 May 16, 2000 Mr. Danny Halden, P.E. Department of Public Works City of Round Rock 2008 Enterprise Round Rock, Texas 78664 Re: Wood Glen, Section 5, Phase II LE # 99 -710 Statement of Oversize Credit Dear Mr. Heiden: The Wood Glen owner was required by the Public Works Department to oversize an 8- inch diameter wastewater line to a 12 -inch diameter wastewater line in the above referenced project in order to provide wastewater service to an upgradient tract. An 8- inch diameter line would have provided adequate service to this project. The calculation of the oversize credit due to the owner is as follows: (12" — 8 ") = 4" oversize Oversize Credit = (4" x 1,428 LF x $2.60 /IN /LF) = $ 14,851.20 Wood Glen, Section 5, Phase II contains 29 single - family lots and 2 lots (13/B, 20 /A) which are restricted to uses other than residential. The oversize fees are as follows: Water 29 lots x $150 /lot $ 4,350.00 Wastewater 29 lots x $ 150 /lot $ 4,350.00 1501 -A W. ANDERSON LN., SUITE 102 • AUSTIN, TEXAS 78757 Mr. Danny Halden Page 2 Statement of Oversize Credit #99 -710 The amount of oversize fees due by the owner are as follows: Please verify the above calculations. A copy of the wastewater collection plan for the project is attached for your use. Water Oversize Fee Wastewater Oversize Fee Wastewater Oversize Credit Total Oversize Fee Credit OCKWOOD ENGINEERS, INC. Fred C. Lockwood, P.E. cc: 3406, Ltd. Mr. Paul Heiligenthal s5 p2 oversize fee.doc $ 4,350.00 4,350.00 < 14,851.20> $ 6,151.20 OCKWOOD NGINEERS, INC. CIVIL ENGINEERING & PLANNING (512) 451 -7092 FAX (512) 377 -5402 February 10, 2000 Mr. Danny Heiden, P.E. Department of Public Works City of Round Rock 2008 Enterprise Round Rock, Texas 78664 Re: Wood Glen, Section 5, Phase I LE # 99 -702 Statement of Oversize Credit Dear Mr. Heiden: The Wood Glen owner was required by the Public Works Department to oversize an 8- inch diameter wastewater line to a 12 -inch diameter wastewater line in the above referenced project in order to provide wastewater service to an upgradient tract. An 8- inch diameter line would have provided adequate service to this project. The calculation of the oversize credit due to the owner is as follows: (12" — 8 ") = 4" oversize Oversize Credit = (4" x 372 LF x $2.60 /IN /LF) = $ 3,868.80 Wood Glen, Section 5, Phase 1 contains 11 single - family lots. The use of lot 4, block 'A' is limited by restrictive covenant to TNRCC requirements which do not allow the construction of a residence on the lot. The oversize fees are as follows: Water / 11 lots x $150 /lot Wastewater 11 lots x $ 150 /lot $ 1,650.00 $ 1,650.00 C Z / P � � o to 604 4) 1501 -A W. ANDERSON LN., SUITE 102 • AUSTIN, TEXAS 78757 Mr. Danny Heiden Statement of Oversize Credit The amount of oversize fees due by the owner are as follows: Please verify the above calculations. A copy of the wastewater collection plan for the project is attached for your use. Sincere Water Oversize Fee Wastewater Oversize Fee Wastewater Oversize Credit Total Oversize Fee Credit cc: 3406, Ltd. Mr. Paul Heiligenthal s5 p1 oversize fee.doc CKWOOD ENGINEERS, INC. Fred C. Lockwood, P.E. FRED C. LOCKWOOD 9 i 50141 co . % i f 1 �08AL � $ 1,650.00 1,650.00 < 3,868.80> $ 568.80 ✓ Page 2 #99 -702 DATE: June 2, 2000 SUBJECT: City Council Meeting — June 8, 2000 ITEM: 11.A.5. Consider a resolution authorizing an oversize reimbursement in the amount of $6,720 to 3406, Ltd. for the construction of a 12- inch wastewater main in conjunction with Wood Glen, Section 5, Phase 1 and Wood Glen, Section, 5, Phase 2 subdivision improvements. The oversizing was necessary to provide wastewater service for properties upstream of the Wood Glen development. Staff Resource Person: Jim Nuse, Public Works Director.