Loading...
R-00-09-14-10B5 - 9/14/2000RESOLUTION NO. R- 00- 09- 14 -10B5 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ( "Contract ") with Rodriguez & Huggins, Inc. to establish the alignment of A.W. Grimes Boulevard from US 79 to south of Louis Henna Boulevard, preparation of a schematic, and preparation of right -of -way documents, and WHEREAS, Rodriguez & Huggins, Inc. has submitted Supplemental Agreement No. 3 to the Contract to provide for additional surveying services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 3 to the Contract with Rodriguez & Huggins, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 3 to the Contract with Rodriguez & Huggins, Inc., a copy of said supplemental agreement being attached hereto and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted K,\ WPOOCS \RESOLUTI \R0091485.NPO /sc upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 14th day of September, 2000. ATTEST: JOANNE LAND, City Secretary 2 RO:` A. STLUKA, JR., Mayor City of Round Rock, Texas STATE OF TEXAS THE COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Rodriquez & Huggins, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 13 of May, 1999 to establish the align- ment of Arterial B from US 79 to South of Louis Henna Boulevard, prepare a schematic, and prepare right of way documents of critical parcels, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $1,302,198.82 without modification of the con- tract, and WHEREAS, it has become necessary to amend the contract to provide for (1) a change in the scope of services at zero costs to produce the plan set for inclusion in the Texas Turnpike Authority (TTA) letting package, (2) additional costs for sur- veying services to be provide by SAM, and (3) additional costs for conversion of existing FEMA model by Epsey, Padden Consultants, Inc., and WHEREAS, the Engineer has agreed to have the additional work performed for $16,235.00 increasing the lump sum fee for the contract to $1,318,433.82. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 4, COMPENSATION, shall be amended by the changing the lump sum amount payable under this contract as $1,318,433.82. ATTACHMENT "B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM NO. 2 to ATTACHMENT B. IN WITNESS WHEREOF, the City and the Engineer have executed Supple- mental Agreement in duplicate. THE ENGINEER / �l By: Mark od q ez 8-3o-.200 Date CITY I ' :. D ROCK By: i rlh obert A. Stluka, J ., Mayor Date EXHHiIT A SERVICES TO BE PROVIDED BY THE CITY OF ROUND ROCK The City of Round Rock will furnish to the Engineer the following items /information: RIGHT -OF -WAY (ROW) 1. Assist in the utility coordination process. FIELD SURVEYING 1. Provide all survey information to date. ROADWAY DESIGN CONTROL 1. Design speed and specific criteria for project design. 2. Coordination necessary to secure typical section and preliminary design approval. 3. Develop proposed pavement sections /designs. DRAINAGE DESIGN 1. Provide available information on existing drainage facility. 2. Hydraulic design criteria for project design. 3. Provide standard details as necessary. SIGNING, PAVEMENT MARKINGS AND SIGNALIZATION 1. Provide standard detail as necessary. MISCELLANEOUS (ROADWAY) 1. Coordinate and host utility coordination meetings. 2. Prepare and coordinate any Utility Agreements required. EXHIBIT B SERVICES TO BE PROVIDED BY THE ENGINEER The work effort and the management for the project included in this contract will be conducted in the Engineer's office in Austin, Texas. The Engineer will be readily accessible to the City of Round Rock staff, Texas Tumpike Authority (TTA) staff, the managing General Engineering Consultant (GEC) and other Prime and Sub - Providers. The Engineer shall coordinate closely with TTA staff, GEC and other Prime and Sub - Providers involved in the proposed project development. At a minimum, monthly progress reports will be submitted, which will detail on- going work as well as work accomplished since the previous report. A memorandum documenting progress meetings will be prepared by the Engineer. The Engineer shall prepare construction plans and documents for inclusion with other plans and documents prepared by other Engineers selected by TTA. The resulting merged plan set will be processed by TTA as one document and let to contract by Texas Department of Transportation ( TxDOT). When feasible, TxDOT or TTA standard drawings, and specifications of previously approved special provisions /specifications will be utilized. If a special provision or special specification must be developed under this contract, it shall be in the above format, and, to the extent possible, incorporate references to TxDOT's approved test procedures. All work is subject to the review and approval of TTA. For those items which require preliminary approval, a special designation for preliminary submission is noted in the following list of services to be provided. The plan sheets specified in the following list of tasks will adhere in format and content to example sheets provided by the TTA's Project Manager. Specific project items not adequately addressed on the example sheets should be discussed with the TTA's Project Manager. To minimize revisions, the Engineer should request sample copies of any sheets /schematics/etc. for clarification. The Engineer will solicit and secure written permission for entry to accomplish any work beyond the existing right of way. The Engineer is fully responsible for any traffic control required from any data collection activities. The control must be consistent with the TxDOT procedures. The Engineer may not close a lane of traffic without the written approval of the TTA's Project Manager. All survey work shall be done in accordance with Texas Board of Professional Surveyors "Manual of Practice for Land Surveying." The Engineer shall provide the following engineering services required for the preparation of the plans, specifications and estimate (PS &E). PRELIMINARY DESIGN STUDIES 1. Collect and review all available data. 2. Develop a design schematic on controlled planimetrics and ortho - photography. PUBLIC INVOLVEMENT 1. Prepare public meetings displays and exhibits, as required. RIGHT -OF -WAY (ROW) 1. Participate in the utility coordination process. 2. Develop proposed ROW requirements for Arterial B. FIELD SURVEYING 1. Establish two (2) permanent bench marks for the project. 2. Provide ties to existing property corners and right of way points. 3. Provide ties to planimetric features. Provide DGN mapping file. 4. Tie and profile existing drainage facilities and cross section natural drainage features as needed. 5. Provide ties to existing underground and overhead utilities, as needed. 6. Set horizontal and vertical control. 7. Provide natural ground cross - sections at 50 feet intervals. ROADWAY DESIGN CONTROL 1. Refine the horizontal and vertical alignment of roadways. 2. Provide design cross - sections. 3. Compute earthwork quantities. 4. Prepare typical sections. 5. Develop plan /profile sheets. 6. Develop intersection/driveway details. 7. Miscellaneous roadway details. DRAINAGE DESIGN 1. Prepare drainage area maps showing existing conditions and proposed improvements. 2. Prepare hydraulic computations for culverts, channels, storm sewer and inlets. 3. Prepare hydraulic data sheets. 4. Develop storm sewer plan/profile and culvert cross section sheets. 5. Develop miscellaneous drainage details. 6. Summary of quantities for drainage items. 7. Develop SW3P plans per phase consistent with the TCP. 8. Prepare SW3P quantities and summaries. SIGNING , PAVEMENT MARKINGS AND ILLUMINATION 1. Prepare signing and pavement markings layout: 2. Prepare summary of small signs. 3. Prepare summary of pavement markings. 4. Prepare Illumination Layouts and summaries. MISCELLANEOUS (ROADWAY) 1. Develop Traffic Control Plan (TCP), Detours, and Sequence of Construction layouts. A detailed TCP shall be developed utilizing the MUTCD and the current TxDOT Barricade and Construction Standards. Each phase should identify the existing and proposed traffic control devices that will be used to handle traffic during each sequence of construction, including regulatory signs, warning signs, construction warning signs, guide signs, route markers, construction pavement markings, channelizing devices, portable changeable message signs, flashing arrow boards, barricades, barriers, etc. 2. Prepare a narrative of the construction sequencing. 3. Prepare phasing quantities and summaries. 4. Prepare exhibits for utility agreements. 5. Prepare miscellaneous details as required 6. Prepare estimate, specifications and general notes. 7. Prepare special specifications as required for non - standard items. 8. Prepare cost estimate. 9. Prepare construction time estimate. PROJECT INFORMATION Round Rock, Texas City of Round Rock Contract No. Work Authorization RATES Engineer IV E4 $ 37.50 Hour Engr Spec IV SP4 $ 37.50 Hour Engineer III E3 $ 37.50 Hour Engineer II E2 $ 32.25 Hour Engr Spec II SP2 $ 32.69 Hour Engr Tech III ET3 $ 26.00 Hour Engr Tech II ET2 $ 25.00 Hour Engr Tech I ET1 $ 15.00 Hour Final Ortho- photography Plots Reproduction Mileage Airline Flights Per Diem Mail & Deliveries SF SF $ 0.28 Mile EA Day EA Overhead Rate Profit 155.00% 12.00% PROJECT DETAILS Project Length Railroad Crossings Bridges Channels (Requiring Sections) Bridge Class Culverts Other Culverts Traffic Signals Overhead Sign Bridges (OSB) Cantilever Overhead Signs (COSS) Large Signs ROW Parcels Agency / Commitee meetings Public Meetings Public Hearings Environmental Documents: Cat Ex EA EIS 0.366 0 0 0 0 0 1 0 0 0 Mi Each Each Each Each Each Each Each Each Each 4 Each O Each O Each O Each O Each 0 Each 0 Each Rodriguez & Huggins, Inc Round Rock, Texas City of Round Rock R & H SHEET COUNT Contract No. Work Authorization F.C. 160 ROADWAY DESIGN CONTROLS Scale No Hrs / Ea Title Sheet Sheet Index Proj. Layout, Typicals,XSlope & Hortz Align Data Typical Sections Horizontal Align Data Cross Slope Data Cross Sections Plan / Profile Sheets Intersection Details Misc, Roadway Details Driveway Details 1"=500' 1 "S0', 25,0 24.0 2 30.0 2 30.0 O 0.0 O 0.0 O 00 2 39.0 O 0.0 3 39.0 0 0.0 FC 160 Total 9 35.00 F.C. 161 DRAINAGE Scale No Firs / Ea Drainage Area Maps & Hydr Computations / Data Hydraulic Computations / Data Bridge Hydraulic Data Storm Sewer Plan / Profile Culvert Cross Section and Details Bridge Class Culvert Layouts Channel Plan / Profile Misc Drainage Details SW3P Permanent Erosion Control Summary of Drainage & Erosion Control Inlet and Manholes Summary Structure Summary Erosion Control Summary 1"=200' 1"=50' 1" =100' 35.0 0.0 0.0 39.0 0.0 0.0 0.0 0.0 25.0 24.0 22.0 0.0 0.0 0.0 FC 161 Total 6 29.33 F.C. 162 SIGNING, MARKINGS, AND SIGNALIZATION Scale No Hrs / Ea Signing and Pavement Marking Plans Signal General Notes Signal Existing Conditions Signal Layout Signal Elevations Signal Phasing Signal Wiring TSFD - Traffic Signal Foundation Standard Signal Summary Summary of Signing and Pavement Markings Striping and Pavement Marking Standards Signal Standards 1" =100' 1"=.50' 26.0 2.0 0.0 35.0 23.0 24,0 24.0 21.0 25.0 24.0 2.0 2.0 FC 162 Total 2 25.00 F.C. 183 MISCELLANEOUS (ROADWAY) Scale No Hrs /Ea Sequence Details, Typicals & Notes Traffic Control Plan Traffic Control Plans (Typical Sections) Detour Plan / Profile Detour /Misc Details Illumination General Notes Estimate & Quantity Sheets Summary of Quantities Miscellaneous Standard Sheets Bidding & Letting Documents 1 =100' O 290 3 35.0 O 0.0 0 0.0 0.0 35.0 O 29.0 O 35.0 O 45.0 O 2.0 O 3.0 FC 163 Total 4 35.00 F.C. 170 BRIDGE DESIGN Scale No His /Ea Bge Layouts Bridge Details Bridge Summaries 0.0 0.0 0.0 FC 170 Total O 0.00 PLAN SET TOTAL Rodriguez & Huggins, Inc 21 32.43 F.C. 110 ROUTE AND DESIGN STUDIES E4 SP4 E3 E2 SP2 ET3 ET2 Total CADD Coordination of sub - consultants 0.0 0.0 0.0 24.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0+$ m N 8? O m 0 O O O O O O O O O O O O O G O 0 0 O. - Prepare Alternative Schematics 4.0 8.0 36.0 1 1 1 1 0.0 Prepare cost estimates for alternatives - Evaluate and select technically preferred alternative 8.0 8.0 4.0 1 1 1 - Determine roadway geometry 24.0 BA 9.0 OA Run preliminary earthwork and determine ROW 4.0 16.0 0.0 Prepare Geometric Schematic 8.0 24.0 OA Refine cost estimate for preferred alternative 8.0 Coordinate with TTA 16.0 16.0 8.0 0.0 Coordinate with other Prime Providers 6.0 24.0 40.0 24.0 16.0 0.0 0.0 PC 110 Total 38 64 120 24 U 64 9 319 0 F.C. 120 ENVIRONMENTAL STUDIES j E4 SP4 E3 E2 SP2 ET3 ET2 1 Total CADD Coordination of sub-consultants Preliminary environmental document review Prepare meeting displays / exhibits Brief TxDOT and other agencies Arrange for facilities for Public Meetings / Hearings Schedule & advertise Public Meetings / Hearings Conduct Public Meetings / Hearings Prepare Public Meeting / Hearing Summaries Final environmental document review 8.0 0.0 0.0 24.0 0.0 0.0 0.0 0 0 0 0 0 0 0 0 0 O O O O O G O O O O O G O G O - - 0.0 - - - - - _ r oa 1 1 1 1 1 1 1 r - - 1 F.C.150 FIELD SURVEYS / MAPPING E4 SP4 E3 E2 SP2 ET3 ET2 Total CADD Coordination of sub- consultants 8.0 0.0 0.0 24.0 0.0 0.0 0.0 0 0 0 0 O 00000 b - Digital Orthophotography file preparation 40 0 0 40 0 U U 0.0 Controlled Aerial Mapping file preparation 0.0 - - r oa 1 -- 1 1 1 1 t r F.C. 130 RIGHT OF WAY PLANS E4 SP4 E3 E2 SP2 ET3 ET2 Total CADD Coordination of sub - consultants Utility coordination Prepare Utility Sheets 40.0 0.0 0.0 40.0 0.0 0.0 0.0 0$ 0 0 0 0 - - 0.0 FC 130 Total 40 0 0 40 0 U U U 0 Round Rock, Texas City of Round Rock R & H MANHOUR ESTIMATE Contract No Work Authorization Rodriguez 8 Huggins, Inc F.C. 161 DRAINAGE E4 SP4 E3 E2 SP2 ET3 ET2 Total CADD Coordination of sub - consultants Drainage Area Maps & Hydr Computations / Data Hydraulic Computations / Data Bridge Hydraulic Data Storm Sewer Plan / Profile Culvert Cross Section and Details Bridge Class Culvert Layouts Channel Plan / Profile Misc Drainage Details SW3P Permanent Erosion Control Summary of Drainage & Erosion Control Inlet and Manholes Summary Structure Summary Erosion Control Summary ODOOOOOOO O o 0 0 o G G o 0 0 0 0 0 0 :OO?oo �cc ooaovOO n 000 o N 0000m0000 O D O O m D O 0000000000000n O O O o 0 0 0 0 0 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 O 0 0 ODD O O O O O O O O O O o 0 0 0 0 0 0 0 0 G O 0 0 0 0 ; 0 0 0 o D D D O o 0 0 0 0 0 0 0 0 FC 161 Total 0 38 1 38 100 0 0 0 176.0 0 F.C. 182 SIGNING, MARKINGS, AND SIGNALIZATION I E4 SP4 E3, E2 SP2 ET3 ET2 1 Total CADD Coordination of sub - consultants Signing Schematic Existing Sign and Marking Inventory Existing Signal Layout Inventory Signing and Pavement Marking Plans Signal General Notes Signal Existing Conditions Signal Layout Signal Elevations Signal Phasing Signal Wiring TSFD - Traffic Signal Foundation Standard Signal Summary Summary of Signing and Pavement Markings Si. nal Standards Doom OOOOO vo 0 o O N o o c o 0 0 0 o N o 0000000000000 0 0 0 0 0 0 0 0 0 0 0 0 O o O o m O O O O O O o N 0 0 0 0 0 0 g O N G 33 O O V Y O ° n , O R O O o N 0 dodOdddciddood O O 0 0 0 O O O Vf Ooo 6 OoOooc O o 0 0 0 o 0 O o O O O O O O 0 O O N G G O 0 0 N O O J O O O O O O o 0 0 0 G G FC 162 Total f 5 0 5 — 1 'nfl 3 10 10 1 50 0 F.C. 180 ROADWAY DESIGN CONTROLS L E4 SP4 E3 E2 SP2 ET3 Eft Total CADD Coordination of sub-consultants Title Sheet Sheet Index Proj. Layout, Typicals,X -Slope & H_.. -- Align Data Typical Sections Horizontal Align 0ata Cross Slope Data Cross Sections Plan / Profile Sheets Intersection Details Misc. Roadway Details Driveway Details L 10 ODD O O aO GGOMG['i0 �- 10 1 O O N N O O O M O M G1 33 O O V Y O ° n , O R 39 O O m m 0 0 0 m o n 36 O O m m O G G t e O o m M 36 ° O m m G m 0 0 0 m O M 150 0 0 0 0 0,Z 0 Z 0 R 314.0 O O G i l 0 0 O q 6 �° iv 0 FC 160 Total F.C. 163 MISCELLANEOUS (ROADWAY) L E4 SP4 E3 E2 SP2 ET3 Eft r Total CADD Coordination of sub - consultants Sequence Details. Typicals & Notes Traffic Control Plan Traffic Control Plans (Typical Sections) Detour Plan / Profile Detour /Misc Details Illumination General Notes Estimate & Quantity Sheets Summary of Quantities Miscellaneous Standard Sheets Bidding & Letting Documents OO MOD O Oo giggigggiggggg ggggggigggg o �oo � DOOo ooc000m00000 o° 000000 eN oon0000 _ I N o o 0 0 0 0 0 C o D o o o o o D ddOcicidoddda FC 163 Total 11 14 0 14 49 7 28 28 Q 140.0 0 F.C. 170 BRIDGE DESIGN E4 SP4 E3 E2 SP2 ET3 ET2 Total CADD Coordination of sub - consultants Bridge Layouts Bridge Details Bridge Summaries 000 Goa poo odd goo 000 000 goo o00 odd goo o00 0000 0000 FC 170 Total 0 0 0 0 0 0 0 1 0.0 0 Round Rock, Texas City of Round Rock Contract No. Work Authorization Rodriguez & Huggins, Inc F.C. 110 ROUTE AND DESIGN STUDIES R & H MANHOUR SUMMARY Round Rock, Texas Contract No. City of Round Rock Work Authorization Manhours Rate Direct Labor Engineer IV 38 $37.50 $ 1,425.00 Engr Spec IV 64 $37.50 $ 2,400.00 Engineer III 120 $37.50 $ 4,500.00 Engineer II 24 $32.25 $ 774.00 Engr Spec II 0 $32.69 $ - EngrTechlll 64 526.00 $ 1,664.00 Engr Tech II 9 $25.00 $ 225.00 Sub -total 319 $ 10,988.00 F.C. 120 ENVIRONMENTAL STUDIES Manhours Rate Direcl Labor Engineer IV 0 $37.50 $ Engr Spec IV 0 $37.50 $ Engineer III 0 $37.50 $ Engineer II 0 $32 25 $ Engr Spec II 0 532.69 $ Engr Tech III 0 $26.00 $ Engr Tech II 0 525.00 $ Sub -total 0 $ F.C. 130 RIGHT OF WAY PLANS Manhours Rate Direct Labor Engineer IV 40 $37.50 $ 1,500.00 Engr Spec IV 0 $37.50 $ Engineer III 0 $37.50 $ Engineer II 40 $32.25 $ 1,290.00 Engr Spec II 0 $32.69 $ Engr Tech III 0 $26.00 $ Engr Tech!! 0 $25.00 $ - Sub -total 80 $ 2,790.00 F.C. 150 FIELD SURVEYS / MAPPING Manhours Rate Direct Labor Engineer IV 8 $37.50 $ 300.00 Engr Spec IV 0 $37.50 $ Engineer III 0 $37.50 $ Engineer II 24 $32.25 $ 774.00 Engr Spec II 0 $32.69 $ Engr Tech III 0 $26.00 $ Engr Tech II 0 $25.00 $ - Sub -total 32 $ 1,074.00 Rodriguez & Huggins, Inc Round Rock, Texas Contract No. City of Round Rock Work Authorization F.C. 160 ROADWAY DESIGN CONTROLS Manhours Rate _ Direct Labor Engineer IV 10 $37.50 $ 375.00 Engr Spec IV 10 $37.50 $ 375.00 Engineer 111 33 $37.50 $ 1237.50 Engineer 11 39 $32.25 $ 1,257.75 Engr Spec 11 36 $32.69 $ 1,176.84 Engr Tech III 36 $26.00 $ 938.00 Engr Tech 11 150 $25.00 $ 3,750.00 Sub -total 314 $ 9,108.09 F.C. 161 DRAINAGE Manhours Rate Direct labor Engineer IV Engr Spec IV Engineer III Engineer 11 Engr Spec II Engr Tech 111 Engr Tech II F.C. 162 SIGNING, MARKINGS, AND SIGNALIZATION Engineer IV Engr Spec IV Engineer III Engineer II Engr Spec II Engr Tech 111 Engr Tech II F.C. 163 MISCELLANEOUS ROADWAY Manhours Rate Direct Labor Engineer IV 14 $37.50 $ 525.00 Engr Spec IV 0 $37.50 $ - Engineer 111 14 $37.50 $ 525.00 Engineer 11 49 $32.25 $ 1 580 25 Engr Spec II 7 $32.69 $ 228.83 Engr Tech III 28 $26.00 $ 728.00 Engr Tech 11 28 $25.00 $ 700.00 Sub -total 140 $ 4,287.08 F.C. 170 BRIDGE DESIGN Engineer IV Engr Spec IV Engineer III Engineer 11 Engr Spec II Engr Tech III Engr Tech 11 Sub -total Sub -total Sub -total R & H MANHOUR SUMMARY Rodriguez & Huggins, Inc O $37.50 $ - 38 $37.50 $ 1,425.00 38 $37.50 $ 1,425.00 100 $32.25 $ 3,225.00 O $32.69 $ - O $26.00 $ - O $25.00 $ 176 $ 6,075.00 Manhours 5 0 5 18 3 10 10 51 O $37.50 $ O $37.50 $ O $37.50 $ O $32.25 $ O $32.69 $ O $26.00 $ O $25.00 $ O $ Rate Direct Labor $37.50 $ 187.50 $37.50 $ - $37.50 $ 187.50 $32.25 $ 580.50 $32.69 $ 98,07 $26.00 $ 260.00 $25.00 $ 250.00 $ 1,563.57 Manhours Rate Direct Labor EXHIBIT D City of Round Rock Contract No. Work Authorization DIRECT OVERHEAD TOTAL FIXED FEE TOTAL LABOR COSTS: LABOR 155.00% LABOR +OVHI COST F.C. 110 ROUTE AND DESIGN STUDIES $ 10,988.00 $ 17,031.40 $ 28,019.4 F.C. 120 ENVIRONMENTAL STUDIES $ - $ - $ - F.C.135 RIGHT OF WAY PLANS $ 2,790.00 $ 4,324.50 $ 7,114.5 F.C. 150 FIELD SURVEYS / MAPPING $ 1,074.00 $ 1,664.70 $ 2,738.70 3 328.64 F.C. 160 ROADWAY DESIGN CONTROLS $ 9,108.09 $ 14,117.54 $ 23,225.63 $ 2,787.08 F.C. 161 DRAINAGE $ 6,075.00 $ 9,416.25 $ 15,491.25 $ 1,858.95 F.C. 162 SIGNING, MARKINGS, AND SIGNALIZATION $ 1,563.57 $ 2,423.53 $ 3,987.10 $ 478.45 F.C. 163 MISCELLANEOUS (ROADWAY) $ 4,287.08 $ 6,644.97 $ 10,932.05 $ 1,311.85 F.C. 170 BRIDGE DESIGN $ - $ - $ - $ TOTALS 1 $ 35,885.74 $ 55,622.90 $ 63,489.24 5 10,981.04 $ 102,489.67 DIRECT COSTS: 1 EXPENSES: RATE QUANTITY TOTAL Final Ortho-photography Plots N W N f 9 M (9 19 W H Mileage Airline Flights Per Diem Mail & Deliveries • 1.00 TOTAL EXPENSES $ 15.71 SUB-CONTRACTS: TASK TOTAL Surveying and Mapping (SAM) ROW Sketches, 9 Parcels Field Notes & $ 15,165.00 Monumenlation TOTAL SUB- CONTRACTS II $ 15,165.00 TOTAL DIRECT COSTS 6 15,180.71 TOTAL COST I $ 117,670.38 Rodriguez & Huggins, Inc RE: Arterial `B" Dear Mr. Word: RCDPIGUEZ & HUGGINS, INC CONSULTING ENGINEERS • 11211 TAYLOR DRAPER LN • SUITE 100 • AUSTIN, TEXAS 76759 • 512.251 -9546 • FAX 512.231 -9155 Mr. Thomas E. Word, Jr., P.E. City of Round Rock 2008 Enterprise Dr. Round Rock, TX 78664 July 3, 2000 Attached is a letter from SAM, Inc. detailing additional costs associated with the above referenced project. These services are not included in the current contract, but are necessary to completion of the PS &E package. The fees have been reviewed by R&H and we feel that they are justified. As we discussed, please combine this request with the previously submitted Espey Padden supplemental estimate into one contract adjustment. As usual, if additional information is required, please advise. Very truly i11Y uggrns Vice resident RODRIGUEZ & HUGGINS, INC CONSULTING ENGINEERS • 11211 TAYLOR DRAPER IN • SUITE 100 • AUSTIN, TEXAS 20759 • 512.231 -9514 • FAX 512,231 -9133 Mr. Thomas E. Word, Jr., P.E. City Traffic Engineer City of Round Rock 2008 Enterprise Round Rock, TX 78664 RE: Arterial "B" Study Dear Mr. Word: June 19, 2000 The above referenced project includes the proposed Brushy Creek crossing and associated hydraulic analysis. During the course of project development, we discovered that the existing FEMA model was coded in WSP -2 format and required conversion into HEC -RAS format. This conversion was something that was not scoped in the contract and not something we were equipped to handle ourselves. With your knowledge, we contracted Espey, Padden Consultants, Inc. (EPC) to accomplish this conversion, update the converted HEC -RAS model to include new survey data and develop the proposed conditions model at Brushy Creek. This has proven to be a very prudent addition to the R &H team; however, we never requested supplemental fees from the City to cover this additional work performed by EPC. A subsequent Supplemental Agreement was approved by the City for EPC to accomplish the same scope at Lake Creek , Dry Branch Trib 1, and Dry Branch. We respectfully request, at this late date, that a Supplemental Agreement be approved to increase the contract by $5,735.00 to cover the above detailed costs at Brushy Creek. As usual, if additional information is required, please feel free to call on us. Very truly yo Billy I uggins Vice P sident 4029 Capital of Texas Highway South, Brodie Oaks Professional Plaza, Sulle 8125 IN Austin, Texas 18704 512-441-0515, fax 512.326-3029 w� -- — — So IrftNx•xERIaL IaPPIYe•EN61NEEPIN6 samosam•ino-aus.com June 21, 2000 Mr. Mike Midkiff Rodriguez & Huggins, Inc. 11211 Taylor Draper Lane #100 Austin, Texas 78759 Re: Arterial B Additional Services SAM, Inc. Job No. 99105 Dear Mike: We have revised our additional services estimated fees as per our meeting on June 13, 2000. Per your request, SAM, Inc. will provide the following additional services with estimated fees as shown below. I. Due to the realignment on the Jennings and Hoover tracts we had to set, locate, and elevate an additional five aerial targets. The cost to perform this task is $3,000.00. II. The cost to perform a level loop from the FEMA benchmarks on Gattis School Road that you have outlined on your fax dated June 20, 2000 to our existing vertical control for Arterial B will be $2,100.00. We will provide you with the difference in elevation between the two datums for both the north and south ends of the project. III. SAM, Inc. field survey personnel (as differentiated from a qualified arborist) will tag and locate all trees 8 -inch (diameter breast high) and greater for the approximate 4 acre right -of -way tract that is within the M&M Equities IV, Inc. tracts. Using the formula of 1 foot of crown radius for each inch of trunk diameter, the calculated canopy for all located trees will be shown. A tree list with tag numbers, tree diameter and species (common name) in an ASCII file, and a working dgn file with hardcopy will be delivered. The cost for this task will be $5,400.00. Thank you for the opportunity to be of service. If you have any questions do not hesitate to give us a call. This proposal if approved, would be an addendum to our existing contract. Sincerely, Michael R. Hatcher, RPLS Vice President 0,,jobs199105Mmidkiff doc 2 a W an DATE: September 8, 2000 SUBJECT: City Council Meeting — September 14, 2000 ITEM: 10.B.5. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 3 with Rodriquez & Huggins, Inc., for additional surveying on the A. W. Grimes Boulevard Project. Staff Resource Person: Jim Nuse, Public Works Director. Mayor Robert A. Sfluka, Jr. Mayor Pro-tem Earl M. Hairston Coundl Members Tom Nielson Carrie Pits Earl Pahner Isabel Callahan Jimmy Joseph City Manger Robert L Bennett Jr. Clty Attorney Stephan L Sheets CITY OF ROUND ROCK November 13, 2000 Mr. Mark Rodriquez Rodriquez & Huggins, Inc. 11211 Taylor Draper Lane, Suite 100 Austin, TX 78759 Dear Mr. Rodriguez: Sincerely, Joanne Land City Secretary Enclosures Fax: 512 -218 -7097 & 1- 800 - 735 -2989 TDD 1- 800 - 735 -2988 Voice www.ci.roand- rock.tx.us 221 East Main Street Round Rock, Texas 78664 512 -218 -5400 The Round Rock City Council approved Resolution No. R- 00- 09- 14 -10B5 at their regularly scheduled meeting on September 14, 2000. This resolution approves Supplemental Agreement No. 3 to the Contract with Rodriguez & Huggins, Inc. for additional survey services for the alignment of A. W. Grimes Boulevard. Enclosed is a copy of the resolution and supplemental agreement for your files. If you have any questions, please do not hesitate to contact Jim Nuse at 218 -5560.