Loading...
R-00-09-28-9C8 - 9/28/2000 RESOLUTION NO. R-00-09-28-9C8 WHEREAS, the City of Round Rock has previously entered into a contract ("Contract") with Muniz Concrete and Contracting, Inc. for the Greenslopes Sidewalk Improvements project, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Muniz Concrete and Contracting, Inc. for the Greenslopes Sidewalk Improvements project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 28th day of Se 2000. RO T A. STLUKA, JR„ 4 AT ST: City of Round Rock, Texas J E LAND, City Secretary %:\WPDOCS\R880LVfI\R0093BC9.WPO/ec CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 1 OF 2 DEPARTMENT: Public Works DATE: 9H/00 PROJECT: Greenslopes Sidewalk Improvements CHANGE ORDER NO: 1 JUSTIFICATION: ORIGINAL CONTRACT PRICE: $91,832.50 T.D.L.R.recommendations,shallow PREVIOUS CHANGE ORDERS: $0.00 waterlines encountered,replacement THIS CHANGE ORDER: $21,332.50 of damaged existing sidewalks. CHANGE ORDERS TO DATE: $21,332.50 CHANGE DATA ADDED DAYS DESCRIPTION OF UNIT CALENDAR/ ITEM# CHANGES UNIT QTY. PRICE AMOUNT WORKING 1 Retaining Walls L.F. 300 $32.50 $9,750.00 2 Handicap Ramps Ea. 7 $750.00 $5,250.00 3 Waterline repairs at 705 Logan Ea. 1 $445.00 $445.00 4 Waterline repairs at 501 Logan Ea. 1 $575.00 $575.00 and 407 Logan 5 Waterline repairs at 505 Logan Ea. 1 $375.00 $375.00 6 Driveway repairs at 509 Logan Ea. 1 $247.50 $247.50 7 Existing sidewalk removed Ea. 1 $395.00 $395.00 at Logan and Lawnmont(S.E.) 8 Pour new section of sidewalk Ea. 1 $350.00 $350.00 at 1006 Lawnmont TOTAL:I CONTINUE NEXT SHEET PREPARED BY: �s..v�l/c _ l° �oD PERCENT OF ORIGINAL CONTRACT PRICE ENGINEEFtj DATE THIS CHANGE ORDER: 23.23% Muniz Con to nd Obntracting,Inc PREVIOUS CHANGE ORDER: CONT CTOR TOTAL%CHANGE: 25.23% gY; ORIGINAL CONTRACT PRICE PLUS TITLE: V Ileg, CHANGE ORDERS: $113,165.00 APPROV CITY OF ROUND KOCK oonstco2/forms6nk CITY OF ROUND ROCK CONSTRUCTION CHANGE ORDER PAGE 2 OF 2 DEPARTMENT: Public Works DATE: 911100 PROJECT: Greenslopes Sidewalk Improvements CHANGE ORDER NO: i CHANGE DATA ADDED DAYS DESCRIPTION OF UNIT CALENDAR/ ITEM# CHANGES UNIT QTY. PRICE AMOUNT WORKING 9 Extra grading and excavation Ea. 1 $475.00 $475.00 between 800 Logan and 705 Logan 10 Extra grading and excavation Ea. 1 $575.00 $575.00 between 705 Logan and 703 Logan 11 Extra grading and excavation Ea. 1 $495.00 $495.00 between 303 Logan and 305 Logan 12 Extra grading and excavation Ea. 1 $450.00 $450.00 between 1204 and 1206 Greenlawn 13 Extra grading and excavation Ea. 1 $450.00 $450.00 between 1206 and 1208 Greenlawn 14 Extra grading and excavation Ea. 1 1 $525.00 $525.00 between 1308 and 1400 Greenlawn 15 Extra grading and excavation Ea. 1 $975.00 $975.00 between 301 Logan and exisiting sidewalk. TOTAL: $21,332.50 28 DAYS constco2/forms6Ak on on on- POP WN AR Ems Ems mass O .� �� ♦ �� � � is ��■■��■�������� meow"1111111111 � �,■./� �1111111�II1111111■ IIIIIIIIIIIIl11 r� 1►��j�� ��■���■■■■�■■■iiii ■� VIIIONW K�1��!�� WIN Ow MINE MINE ��■1■■■■:■ ��� �1��►%�IIIl111rrr����i`/'��,���111�� • ►�i�• ■-■■ ■■ � MISSION 1% �4��i1i , �� ♦._111 ♦♦ �,�1� �1��•►111 �� iii i1 11 ►/I ILY,1lllllalk-Ak 1i ■ ■■ ■p loss 11111111111111►�� 1111:x111.r ■� iii j� ��! iir all 1■111 1111111 j'� OEM milli MEN MMM :� 1����11111�11��� 1�t� MRS.i G : ��� DATE: September 22,2000 SUBJECT: City Council Meeting—7:00 p.m. ITEM: 9.C.8. Consider a resolution authorizing the Mayor to execute Change Order No.I to the contract with Muniz Concrete and Contracting,Inc.for the Greenslopes Sidewalk Improvements Project This Change Order is an increase of$21,332.50.The new total contract amount is$113,165.00 The Change Order consists of additional handicap ramps,retaining wall,waterline repair and relocations. Also,additional excavation to satisfy the Texas Department of Licensing and Regulations accessibility requirements.Staff recommends approval. Staff Resource Person: Jim Nuse,Public Works Director. CITY OF ROUND ROCK ... 221 Fast Mein Saaet • td` Roved Rock Texas 78664 �iiindtttt 512-218-5400 October 26,2000 Mr.Jose Juan Mufiiz Mudiz Concrete&Contracting,Inc. P.O.Box 161524 Austin,TX 78716 Dear Mr.Muffiz: The Round Rock City Council approved Resolution No. R-00-09-28-9C8 at their regularly scheduled meeting on September 28, 2000. This resolution approves the Change Order No.1 to the Contract with Mufiiz Concrete and Contracting,Inc. for the Greenslopes Sidewalk Improvements project. Enclosed is a copy of the resolution and agreement for your files. If you have any questions,please do not hesitate to contact Jim Nuse at 218-5560. Sincerely, * A,e WL Joanne Land City Secretary Robert A.Sd"Jx Enclosures Mayor Pro-tam Part M.Hairmn Camta Members 7bm Nielson Carrie Pitt Eari Pabaer Isabel Gallahan A-W Joseph Robert L Helmet[.Jr. CltyMoroey Fax:512-218.7097 1-800-735-2989TDD 1-800.735-2988 Yoke Stephan L Sheets www.eimusd-tock.6c® rte, OA, u