R-00-12-14-13D3 - 12/14/2000K: \WPDOCS \RESOLDTI \ROU14D1.WPD /sC r RESOLUTION NO. R -00- 12- 14 -13D3 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Chasco Contracting, Inc. for the Harrell Parkway Street Improvement Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, and WHEREAS, the Council has determined that this Change Order No. 2 will not result in an increase of the original contract price by more than 25 percent, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Chasco Contracting, Inc. for the Harrell Parkway Street Improvement Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 14th day of December, 2000. T EST: I.11 C[Nlet LAND, City Secretary 2 A. STLUKA, , Mayor City of Round Rock, Texas Baker - Aicklen & Associates, Inc. Consulting Engineers CONTRACT CHANGE ORDER NO. 2 Contract For: Harrell Parkway Road Improvements Owner: City of Round Rock Contractor: Chasco Contracting. You are hereby requested to comply with the following changes from the contract plans and specifications: Description of Changes COI -Al Add reconstructing & extending 3 identified culvert crossings on Harrell Parkway: Sta. 13 +24 Rt, Sta. 22 +35 Rt, Sta. 54+25 Rt and Lt, complete in place CO2 -A2 Add repair air release valve at the intersection of CR 113 & Harrell Parkway and adjustment of the vault to finish grade, complete in place CO2 -A3 Add replace air release valve, complete in place CO2 -A4 Add 2 -4" sleeves under Harrell Parkway: Sta. 60+00, and Sta. 24 +00, complete in place CO2 -A5 Add 4" concrete collar with ring and cover on valve at Sta. 13 +21 Rt CO2 -A6 Add cleaning of road, complete in place CO2 -A7 Add place 3" base at existing pavilion, complete in place CO2 -A8 Add place 3" base at soccer fields CO2 -A9 Add 1,275 L.F. of TxDOT standard guard rails, terminal anchor sections, concrete coring for metal posts, complete in place CO2 -D 1 Delete 900 L.F. of guard rail, complete in place $16,200.00 CO2 -D2 Delete (from change order #1) remove and replace Concrete headwall, complete in place $ 1,500.00 Date: 11/02/00 Sheet No. 1 of 2 Job No. 601- 562 -31 DECREASE INCREASE Contract Price Contract Price $ 10,460.00 $ 200.00 $ 300.00 $ 640.00 $ 500.00 $ 1,400.00 $ 2,860.00 $ 2,530.00 $ 35,730.00 Baker - Aicklen & Associates, Inc. Consulting Engineers Justification: City Review Changes The amount of the Contract before this Change Order is Four Hundred Thirty One Thousand, Five Hundred Sixteen and 70/100 Dollars The Amount of the Contract will DECREASE/INCREASE by the sum of Thirty Six Thousand. Nine Hundred Twenty and 00 /100 Dollars The CONTRACT TOTAL including this Change Order will be Four Hundred Sixty Eight Thousand, Four Hundred Thirty Six and 70/100 Dollars The Contract Completion Date will remain unchanged. This document will become a su.plement to the Contract and all provisions will apply hereto. Chasco ontrac (Contracto 0:\601. 562 -3 lkhangeorder#2 I I -02- 00 -0O.doc Subtotal: Net Changes in Contract Price: $ $ 36,920.00 //• zD. uo Date Date: 11/02/00 Sheet No. 2 of 2 Job No. 601 - 562 -31 $17,700.00 $ 54,620.00 $431,516.70 $ 36.920.00 $468,436.70 Harrell Parkway 3:1GINM .CRAffiroAIENVE NgVNEBtWNII- 2.0WMMLPAAI(WAY DATE: December 8, 2000 SUBJECT: City Council Meeting — December 14, 2000 ITEM: 13.D.3. Consider a resolution authorizing the Mayor to execute Change Order No. 2 to the contract for the Harrell Parkway Street Improvements Project with Chasco Contracting, Inc. for changes in the quantity of work to be performed which include materials, equipment, or supplies to be provided. This change order includes final adjustments in the quantity of work items plus additional guardrail added for safety. The change order is an additional amount of $36,920.00 to complete the project. Resource: Jim Nuse, Public Works Director Larry Madsen, Public Works Construction Manager History: Harrell Parkway Street Improvements Funding: Cost: $36,920.00 Source of funds: G. 0. Bond Outside Resources: Chasco Contracting Impact: Provide a traffic flow through the park Benefit: Improvements will provide safety for the vehicular traffic Public Comment: Addressed during bond package CITY OF ROUND ROCK y iuNS Mayor Robert A. Sdoka, Jr. Mayor Pro -tem Earl M. Hairston Council Members 7bm Nielson Carrie Pitt Earl Palmer Isabel Gallahan Jimmy Joseph City Manager Robert L Bennett, Jr City Attorney Stephan L Sheets April 30, 2001 Mr. Bill Waeltz, P.E. Baker - Aicklen & Associates, Inc. 203 E. Main St., Suite 201 Round Rock, TX 78664 Dear . aeliz: Sincerely, Joanne Land Assistant City Manager/ City Secretary Enclosure Fax: 512- 218 -7097 • 1- 800 - 735 -2989 TDD 1.800- 735 -2988 Voice www.ci.round- rock.tx.us 221 East Main Street Round Rock, Texas 78664 512- 218 -5400 The Round Rock City Council approved Resolution No. R- 00- 12- 14 -13D3 at their regularly scheduled meeting on December 14, 2000. This resolution approves Change Order No. 2 for the Harrell Parkway Street Improvement Project. Enclosed is a copy of the resolution and change order for your files. If you have any questions, please do not hesitate to contact Jim Nuse at 218 -5555. A CITY OF ROUND ROCK '�enrest Mayor Robert A. Stlaka, Jr Mayor Pro -tem Earl M. Hairston Council Members Tom Nielson Carrie Pitt Earl Palmer Isabel Callahan !many Joseph City Manager Robert L. Bennett. Jr. City Attorney Stephan L Sheets April 30, 2001 Mr. Temple Aday Chasco Contracting Co. P.O. Box 1057 Round Rock, TX 78680 Dear��: 221 East Main Street Round Rock, Texas 78664 512 -218 -5400 The Round Rock City Council approved Resolution No. R- 00- 12- 14 -13D3 at their regularly scheduled meeting on December 14, 2000. This resolution approves Change Order No. 2 for the Herrell Parkway Street Improvement Project. Enclosed is a copy of the resolution and change order for your files. If you have any questions, please do not hesitate to contact Jim Nuse at 218 -5555. Sincerely, Joanne Land Assistant City Manager/ City Secretary Enclosure Fax: 512- 218 -7097 1. 800 - 735.2989 TDD 1-800-735-2988 Voice www.ci.round- rock.tx.us jib' Baker- Aicklen & Associates, Inc. Consulting Engineers CONTRACT CHANGE ORDER NO. 2 Contract For: Harrell Parkway Road Improvements Owner: City of Round Rock Contractor: Chasco Contracting. C01-Al Add reconstructing & extending 3 identified culvert crossings on Harrell Parkway: Sta. 13 +24 Rt, Sta. 22 +35 Rt, Sta. 54 +25 Rt and Lt, complete in place Date: 11/02/00 Sheet No. 1 of 2 Job No. 601 - 562 -31 You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE Description of Changes Contract Price Contract Price $ 10,460.00 CO2 -A2 Add repair air release valve at the intersection of CR 113 & Harrell Parkway and adjustment of the vault to finish grade, complete in place $ 200.00 CO2 -A3 Add replace air release valve, complete in place $ 300.00 CO2 -A4 Add 2 -4" sleeves under Harrell Parkway: Sta. 60+00, and Sta. 24 +00, complete in place $ 640.00 CO2 -A5 Add 4" concrete collar with ring and cover on valve at Sta. 13 +21 Rt $ 500.00 CO2 -A6 Add cleaning of road, complete in place $ 1,400.00 CO2 -A7 Add place 3" base at existing pavilion, complete in place $ 2,860.00 CO2 -A8 Add place 3" base at soccer fields $ 2,530.00 CO2 -A9 Add 1,275 L.F. of TxDOT standard guard rails, terminal anchor sections, concrete coring for metal posts, complete in place $ 35,730.00 CO2 -D1 Delete 900 L.F. of guard rail, complete in place $16,200.00 CO2 -D2 Delete (from change order #1) remove and replace Concrete headwall, complete in place $ 1,500.00 Baker - Aicklen & Associates, Inc. Consulting Engineers Subtotal: Justification City Review Changes Net Changes in Contract Price: $ $ 36,920.00 The amount of the Contract before this Change Order is Four Hundred Thirty One Thousand. Five Hundred Sixteen and 70/100 Dollars The Amount of the Contract will DECREASE/INCREASE by the sum of Thirty Six Thousand. Nine Hundred Twenty and 00 /100 Dollars The CONTRACT TOTAL including this Change Order will be Four Hundred Sixty Eight Thousand. Four Hundred Thirty Six and 70/100 Dollars The Contract Completion Date will remain unchanged. This document will become a supplement to the Contract and all provisions will apply hereto. Chasco o i tractin (Contractor) er- Aicklen B .0 .� , City Owner o:\601- 562- 31\changeorder#2 11 -02- 00- OO.doc es, Inc., (Engineer) //•20•oe) Date f'-ZZ -on Date /A .V-7 -ad Date Date: 11/02/00 Sheet No. 2 of 2 Job No. 601- 562 -31 $17,700.00 $ 54,620.00 $431,516.70 $ 36.920.00 $468,436.70 Baker - Aicklen & Associates, Inc. Consulting Engineers CONTRACT CHANGE ORDER NO. 2 Contract For: Harrell Parkway Road Improvements Owner: City of Round Rock Contractor: Chasco Contracting. You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE Description of Changes Contract Price Contract Price C01-Al Add reconstructing & extending 3 identified culvert crossings on Harrell Parkway: Sta. 13 +24 Rt, Sta. 22 +35 Rt, Sta. 54 +25 Rt and Lt, complete in place CO2 -A2 Add repair air release valve at the intersection of CR 113 & Harrell Parkway and adjustment of the vault to finish grade, complete in place CO2 -A3 Add replace air release valve, complete in place CO2 -A4 Add 2 -4" sleeves under Harrell Parkway: Sta. 60 +00, and Sta. 24 +00, complete in place CO2 -A5 Add 4" concrete collar with ring and cover on valve at Sta. 13 +21 Rt CO2 -A6 Add cleaning of road, complete in place CO2 -A7 Add place 3" base at existing pavilion, complete in place CO2 -A8 Add place 3" base at soccer fields CO2 -A9 Add 1,275 L.F. of TxDOT standard guard rails, terminal anchor sections, concrete coring for metal posts, complete in place CO2 -D1 Delete 900 L.F. of guard rail, complete in place $16,200.00 CO2 -D2 Delete (from change order #1) remove and replace Concrete headwall, complete in place $ 1,500.00 Date: 11 /02 /00 Sheet No. 1 of 2 Job No. 601 - 562 -31 $ 10,460.00 $ 200.00 $ 300.00 $ 640.00 $ 500.00 $ 1,400.00 $ 2,860.00 $ 2,530.00 $ 35,730.00 Baker - Aicklen & Associates, Inc. Consulting Engineers Justification: City Review Changes The amount of the Contract before this Change Order is Four Hundre s T One Tho and Five Hundred . ixteen and 70/100 I ollars The Amount of the Contract will DECREASE/INCREASE by the sum of Thirty Six Thousand. Nine Hundred Twenty and 00 /100 Dollars The CONTRACT TOTAL including this Change Order will be Four Hundred Sixty Eight Thousand. Four Hundred Thirty Six and 70/100 Dollars The Contract Completion Date will remain unchanged. This document will become a supplement to the Contract and all provisions will apply hereto. o: \601 - 562- 31\changeorder#2 11- 02- 00- 00.doc Date: 11/02/00 Sheet No. 2 of 2 Job No. 601- 562 -31 Subtotal: $17,700.00 $ 54,620.00 Net Changes in Contract Price: $ $ 36,920.00 /1.Zd• Date / / -1Z •oc Date $431,516.70 $ 36,920.00 $468,436.70