R-00-12-14-13D6 - 12/14/2000RESOLUTION NO. R- 00- 12- 14 -13D6
WHEREAS, the City of Round Rock desires to retain engineering
services for traffic signal progression studies on U.S. 79 between
Chisholm Trail and County Road 122., and
WHEREAS, WHM Transportation Engineering Consultants, Inc. has
submitted a Contract for Engineering Services to provide said services,
and
WHEREAS, the City Council desires to enter into said contract
with WHM Transportation Engineering Consultants, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a Contract for Engineering Services with WHM
Transportation Engineering Consultants, Inc., for engineering services
for traffic signal progression studies on U.S. 79 between Chisholm
Trail and County Road 122, a copy of said contract being attached
hereto and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
W.\ WPIIOCS \RESOLOTI \R01214D6.WPO/6c
RESOLVED this 14th day of December, 2000.
E LAND, City Secretary
2
City of Round Rock, Texas
STATE OF TEXAS
COUNTY OF WILLIAMSON
Contract No.
THIS CONTRACT FOR ENGINEERING SERVICES (AContract @) is made by and between the
City of Round Rock, 221 E. Main St., Round Rock, Texas 78664, hereinafter called ACity@ and
WHM Transportation Engineering Consultants, Inc., having its principal business address at
2717 Rio Grande St., Austin, TX 78705, hereinafter called "Engineer" for the purpose of
contracting for engineering services.
WITNESSETH
WHEREAS, Government Code, Chapter 2254, Subchapter A, "Professional Services
Procurement Act" provides for the procurement of professional services of engineers; and
engcenvc.WHM /spectw
WHEREAS, the City desires to contract for engineering services described as follows:
Prepare peak period progression studies for the section of US 79 between Chisholm
Trail and CR 122.
AGREEMENT
NOW, THEREFORE, the City and the Engineer, in consideration of the mutual covenants
and agreements herein contained, do hereby mutually agree as follows:
ARTICLE 1
SCOPE OF SERVICES TO BE PROVIDED BY CITY
The City will furnish items and perform those services for fulfillment of the Contract as
identified in Attachment A - Services to be Provided by the City, attached hereto and made a part
of this Contract.
Page 1 of 13
ARTICLE 2
SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER
The Engineer shall perform those engineering services for fulfillment of the Contract as
identified in Attachment B - Services to be Provided by the Engineer, attached hereto and made a
part of this Contract.
The Engineer shall prepare a schedule of work identified as Attachment C - Work
Schedule, attached hereto and made a part of this Contract. The Work Schedule shall contain a
complete schedule so that the Engineer's Scope of Services under this Contract can be
accomplished within the specified time and contract cost. The Work Schedule will provide specific
work sequence and definite review times by the City and the Engineer of the work performed. If
the review time should take longer than shown on the work schedule, through no fault of the
Engineer, additional contract time will be authorized by the City through a supplemental
agreement if requested by a timely written request from the Engineer and approved by the City.
ARTICLE 3
CONTRACT PERIOD
After execution of this Contract, the Engineer shall not proceed with the work outlined
under Article 2 until authorized in writing by the City to proceed as provided in Article 6. This
Contract shall terminate at the close of business on September 29, 2000 unless extended by
written supplemental agreement duly executed by the Engineer and the City prior to the date of
termination, as provided in Article 11 - Supplemental Agreements, or otherwise terminated as
provided in Article 19 - Termination. Any work performed or cost incurred after the date of
termination shall be ineligible for reimbursement.
The Engineer shall notify the City in writing as soon as possible if it determines, or
reasonably anticipates, that the work under this Contract cannot be completed before the
termination date, and the City may, at its sole discretion, extend the contract period by timely
supplemental agreement as provided in Article 11- Supplemental Agreements. The Engineer shall
allow adequate time for review and approval of the request for time extension by the City prior to
expiration of this Contract.
ARTICLE 4
COMPENSATION
The City shall pay and the Engineer agrees to accept the lump sum amount shown below as
full compensation for the engineering services to be performed under this Contract.
The lump sum amount payable under this Contract without modification of the Contract is
$ 14, 000.00 as shown in Attachment D - Fee Schedule. The lump sum amount payable may be
revised by supplemental agreement in the event of a change in scope, additional complexity from
that originally anticipated or character of work as authorized by the City.
engcontre.WEU.vspeetw
Page 2 of 13
The Engineer shall prepare and submit to the City monthly progress reports in sufficient
detail to support the progress of the work and in support of invoice requesting monthly payment.
Any preferred format will be identified in Attachment B. Satisfactory progress of work shall be
maintained as a condition of payment.
The fee may be adjusted if additional work is approved by supplemental agreement and
performed by the Engineer.
engcontrc.WHM/spectw
ARTICLE 5
METHOD OF PAYMENT
Payments to the Engineer for services rendered will be made while work is in progress.
The Engineer will prepare and submit to the City, no more frequently than once per month, a
progress report stating the percent completion of the work accomplished during the billing period
and to date, and one original and one copy of a certified invoice in a form acceptable to the City).
The submittal shall also include the progress assessment report, identified as Attachment H -2.
Payment of the lump sum fee will be in proportion to the percent completion of the work tasks
identified in Attachment D - Fee Schedule. Upon receipt and approval of each statement, the City
shall make a good faith effort to pay the amount which is due and payable within thirty (30) days.
The City shall reserve the right to withhold payment pending verification of satisfactory work
performed. The Engineer must submit adequate proof to the City that the task was completed.
The certified statements shall show the total amount earned to the date of submission and
the amount due and payable as of the date of the current statement. Final payment does not relieve
the Engineer of the responsibility of correcting any errors and /or omissions resulting from its
negligence.
ARTICLE 6
NOTICE TO PROCEED
The City will issue a written authorization to proceed with the work identified in the scope
of services. The City shall not be responsible for actions by the Engineer or any costs incurred by
the Engineer relating to additional work not included in Attachment B - Services to be Provided by
the Engineer.
ARTICLE 7
PROGRESS
The Engineer shall, from time to time during the progress of the work, confer with the
City. The Engineer shall prepare and present such information as may be pertinent and necessary,
or as may be requested by the City, in order to evaluate features of the work.
At the request of the City or the Engineer, conferences shall be provided at the Engineer's
Page 3 of 13
office, the office of the City, or at other locations designated by the City. These conferences shall
also include evaluation of the Engineer's services and work when requested by the City.
Should the City determine that the progress in production of work does not satisfy the
Work Schedule, the City shall review the work Schedule with the Engineer to determine corrective
action needed.
The Engineer shall promptly advise the City in writing of events which have a significant
impact upon the progress of the work, including:
(1) problems, delays, adverse conditions which will materially affect the ability to attain
program objectives, prevent the meeting of time schedules and goals, or preclude the
attainment of project work units by established time periods; this disclosure will be
accompanied by statement of the action taken, or contemplated, and any City
assistance needed to resolve the situation; and
(2) favorable developments or events which enable meeting the work schedule goals
sooner than anticipated.
ARTICLE 8
SUSPENSION
Should the City desire to suspend the work, but not terminate the Contract, this may be
done by thirty (30) calendar days verbal notification followed by written confirmation from the
City to that effect. The thirty day notice may be waived in writing by both parties. The work may
be reinstated and resumed in full force and effect within sixty (60) days of receipt of written notice
from the City to resume the work. The sixty day notice may be waived in writing by both parties.
If the City suspends the work, the contract period as determined in Article 3 is not affected
and the Contract will terminate on the date specified unless the Contract is amended.
The City assumes no liability for work performed or costs incurred prior to the date
authorized by the City to begin work, during periods when work is suspended, or subsequent to
the contract completion date.
If the Engineer is of the opinion that any work it has been directed to perform is beyond the
scope of this Contract and constitutes extra work, it shall promptly notify the City in writing. In
the event the City finds that such work does constitute extra work and exceeds the maximum
amount payable, the City shall so advise the Engineer and a written supplemental agreement will
be executed between the parties as provided in Article 11. The Engineer shall not perform any
proposed additional work or incur any additional costs prior to the execution, by both parties, of a
supplemental agreement. The City shall not be responsible for actions by the Engineer or any costs
incurred by the Engineer relating to additional work not directly associated with the performance
of the work authorized in this Contract or as amended.
engcontrc.WHM/spectw
ARTICLE 9
ADDITIONAL WORK
Page 4 of 13
ARTICLE 10
CHANGES IN WORK
If the City finds it necessary to request changes to previously satisfactorily completed work
or parts thereof which involve changes to the original scope of services or character of work under
the Contract, the Engineer shall make such revisions if requested and as directed by the City. This
will be considered as additional work and paid for as specified under Article 9 - Additional Work.
The Engineer shall make such revisions to the work authorized in this Contract which has
been completed as are necessary to correct errors appearing therein, when required to do so by the
City. No additional compensation shall be paid for this work.
ARTICLE 11
SUPPLEMENTAL AGREEMENTS
The terms of this Contract may be modified by supplemental agreement if the City
determines that there has been a significant change in (1) the scope, complexity or character of the
service to be performed; or (2) the duration of the work. Additional compensation, if appropriate,
shall be identified as provided in Article 4.
Any supplemental agreement must be executed by both parties within the contract period
specified in Article 3 - Contract Period.
It is understood and agreed that no claim for extra work done or materials furnished shall
be made by the Engineer until full execution of the supplemental agreement and authorization to
proceed is granted by the City. The City reserves the right to withhold payment pending
verification of satisfactory work performed.
ARTICLE 12
OWNERSHIP OF DOCUMENTS
All data, basic sketches, charts, calculations, plans, specifications, and other documents
created or collected under the terms of this Contract are the exclusive property of the City and
shall be furnished to the City upon request. All documents prepared by the Engineer and all
documents furnished to the Engineer by the City shall be delivered to the City upon completion or
termination of this Contract. The Engineer, at its own expense, may retain copies of such
documents or any other data which it has furnished the City under this Contract. Release of
information shall be in conformance with the Texas Open Records Act.
engcootrc.wl- nvspectw
Page 5 of 13
ARTICLE 13
PERSONNEL, EQUIPMENT AND MATERIAL
The Engineer shall furnish and maintain, at its own expense, quarters for the performance
of all services, and adequate and sufficient personnel and equipment to perform the services as
required. All employees of the Engineer shall have such knowledge and experience as will enable
them to perform the duties assigned to them. Any employee of the Engineer who, in the opinion of
the City, is incompetent, or whose conduct becomes detrimental to the work, shall immediately be
removed from association with the project when so instructed by the City. The Engineer certifies
that it presently has adequate qualified personnel in its employment for performance of the services
required under this Contract, or will be able to obtain such personnel from sources other than the
City.
The Provider may not change the Project Manager without prior consent of the City.
ARTICLE 14
SUBCONTRACTING
The Engineer shall not assign, subcontract or transfer any portion of the work under this
Contract without prior written approval from the City. All subcontracts shall include the
provisions required in this Contract and shall be approved as to form, in writing, by the City prior
to work being performed under the subcontract.
No subcontract relieves the Engineer of any responsibilities under this Contract.
ARTICLE 15
EVALUATION OF WORK
The City and any authorized representatives, shall have the right at all reasonable times to
review or otherwise evaluate the work performed or being performed hereunder and the premises
in which it is being performed. If any review or evaluation is made on the premises of the
Engineer or a subprovider, the Engineer shall provide and require its subproviders to provide all
reasonable facilities and assistance for the safety and convenience of the City or USDOT
representatives in the performance of their duties.
engcoutrc. WHJ 1 /spectw
Page 6 of 13
engconrcc. WEUf /spectw
ARTICLE 16
SUBMISSION OF REPORTS
All applicable study reports shall be submitted in preliminary form for approval by the City
before final report is issued. The City's comments on the Engineer's preliminary report will be
addressed in the final report.
ARTICLE 17
VIOLATION OF CONTRACT TERMS /BREACH OF CONTRACT
Violation of Contract terms or breach of contract by the Engineer shall be grounds for
termination of the Contract and any increased cost arising from the Engineer's default, breach of
contract or violation of contract terms shall be paid by the Engineer.
ARTICLE 18
TERMINATION
The Contract may be terminated before the stated termination date by any of the following
conditions.
(1) By mutual agreement and consent, in writing of both parties.
(2) By the City by notice in writing to the Engineer as a consequence of failure by the
Engineer to perform the services set forth herein in a satisfactory manner.
(3) By either party, upon the failure of the other party to fulfill its obligations as set
forth herein.
(4) By the City for reasons of its own and not subject to the mutual consent of the
Engineer upon not less than thirty (30) days written notice to the Engineer.
(5) By satisfactory completion of all services and obligations described herein.
Should the City terminate this Contract as herein provided, no fees other than fees due and
payable at the time of termination shall thereafter be paid to the Engineer. In determining the value
of the work performed by the Engineer prior to termination, the City shall be the sole judge.
Compensation for work at termination will be based on a percentage of the work completed at that
time. Should the City terminate this Contract under (4) of the paragraph identified above, the
amount charged during the thirty (30) day notice period shall not exceed the amount charged
during the preceding thirty (30) days.
If the Engineer defaults in the performance of this Contract or if the City terminates this
Contract for fault on the part of the Engineer, the City will give consideration to the actual costs
incurred by the Engineer in performing the work to the date of default, the amount of work
required which was satisfactorily completed to date of default, the value of the work which is
Page 7 of 13
usable to the City, the cost to the City of employing another firm to complete the work required
and the time required to do so, and other factors which affect the value to the City of the work
performed at the time of default.
The termination of this Contract and payment of an amount in settlement as prescribed
above shall extinguish all rights, duties, and obligations of the City and the Engineer under this
Contract, except the obligations set forth in Article 19 of this Contract. If the termination of this
Contract is due to the failure of the Engineer to fulfill its contract obligations, the City may take
over the project and prosecute the work to completion. In such case, the Engineer shall be liable to
the City for any additional cost occasioned the City.
The Engineer shall be responsible for the settlement of all contractual and administrative
issues arising out of the procurement made by the Engineer in support of the scope of services
under this Contract.
ARTICLE 19
COMPLIANCE WITH LAWS
The Engineer shall comply with all applicable Federal, State and local laws, statutes,
codes, ordinances, rules and regulations, and the orders and decrees of any court, or
administrative bodies or tribunals in any manner affecting the performance of this Contract,
including, without limitation, worker's compensation laws, minimum and maximum salary and
wage statutes and regulations, and licensing laws and regulations. When required, the Engineer
shall furnish the City with satisfactory proof of its compliance therewith.
ARTICLE 20
INDEMNIFICATION
The Engineer shall save harmless the City and its officers and employees from all claims
and liability due to activities of itself, its agents, or employees, performed under this Contract and
which are caused by or result from error, omission, or negligent act of the Engineer or of any
person employed by the Engineer. The Engineer shall also save harmless the City from any and all
expense, including, but not limited to, attorney fees which may be incurred by the City in
litigation or otherwise resisting said claim or liabilities which may be imposed on the City as a
result of such activities by the Engineer, its agents, or employees.
ARTICLE 21
ENGINEER'S RESPONSIBILITY
The Engineer shall be responsible for the accuracy of its work and shall promptly make
necessary revisions or corrections resulting from its errors, omissions, or negligent acts without
compensation. The Engineer's responsibility for all questions arising from design errors and /or
omissions will be determined by the City. The Engineer will not be relieved of the responsibility
for subsequent correction of any such errors or omissions or for clarification of any ambiguities
until after the construction phase of the project has been completed.
eogcontrc.WHM/spenw
Page 8 of 13
ARTICLE 22
ENGINEER'S SEAL
The responsible Engineer shall sign, seal and date all appropriate engineering submissions
to the City in accordance with the Texas Engineering Practice Act and the Rules of the State Board
of Registration for Professional Engineers.
ARTICLE 23
NONCOLLUSION
The Engineer warrants that it has not employed or retained any company or persons, other
than a bona fide employee working solely for the Engineer, to solicit or secure this Contract and
that it has not paid or agreed to pay any company or engineer any fee, commission, percentage,
brokerage fee, gifts, or any other consideration, contingent upon or resulting from the award or
making of this Contract. For breach or violation of this warranty, the City shall have the right to
annul this Contract without liability or, in its discretion, to deduct from the contract price or
compensation, or otherwise recover, the full amount of such fee, commission, percentage,
brokerage fee, gift or contingent fee.
ARTICLE 24
INSURANCE
The Engineer shall furnish the City a properly completed Certificate of Insurance approved
by the City prior to beginning work under this Contract and shall maintain such insurance through
the contract period. The completed Certificate of Insurance shall be attached hereto and identified
as Attachment G.
ARTICLE 25
INSPECTION OF ENGINEER'S BOOKS AND RECORDS
AND AUDIT REQUIREMENTS
The City shall have the exclusive right to examine the books and records of the Engineer
for the purpose of checking the amount of work performed by the Engineer at the time of contract
termination. The Engineer shall maintain all books, documents, papers, accounting records and
other evidence pertaining to cost incurred and shall make such materials available at its office
during the contract period and for four (4) years from the date of fmal payment under this Contract
or until pending litigation has been completely and fully resolved, whichever occurs last. The City
or any of its duly authorized representatives, shall have access to any and all books, documents,
papers and records of the Engineer which are directly pertinent to this Contract for the purpose of
making audits, examinations, excerpts and transcriptions.
engconnc.WH 4/ peccw
Page 9 of 13
ARTICLE 26
DEBARMENT, SUSPENSION AND DISCIPLINARY ACTION
The Engineer warrants that the representations included in the Debarment Certification
(Negotiated Contracts) submitted with the offer to provide services are current and still valid.
ARTICLE 27
COPYRIGHTS
The City shall have the royalty free, nonexclusive and irrevocable right to reproduce,
publish or otherwise use, and to authorize others to use any reports developed by the Engineer for
governmental purposes.
The Engineer agrees to comply with the Special Provision AComputer Graphics Files for
Document and Information Exchange,@ if determined by the City to be applicable to this Contract
and if so stated in Attachment B and attached hereto.
engconttc.WHIN/spectw
ARTICLE 28
COMPUTER GRAPHICS FILES
ARTICLE 29
SUCCESSORS AND ASSIGNS
The Engineer, and the City, do hereby bind themselves, their successors, executors,
administrators and assigns to each other party of this agreement and to the successors, executors,
administrators, and assigns of such other party in respect to all covenants of this Contract. The
Engineer shall not assign, subcontract or transfer its interest in this Contract without the prior
written consent of the City.
ARTICLE 30
SEVERABILITY
In the event any one or more of the provisions contained in this Contract shall for any
reason, be held to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or
unenforceability shall not affect any other provision thereof and this Contract shall be construed as
if such invalid, illegal, or unenforceable provision had never been contained herein.
Page 10 of 13
This Contract constitutes the sole and only agreement of the parties hereto and supersedes
any prior understandings or written or oral contracts between the parties respecting the subject
matter defined herein.
engcomc.WEQM/apectw
ARTICLE 31
PRIOR CONTRACT SUPERSEDED
Page 11 of 13
engcon¢c.WHM /spectw
City of Round Rock
Attn.: City Manager
221 E. Main St.
Round Rock, TX 78664
with copy to:
Stephan L. Sheets
City Attorney
309 E. Main St.
Round Rock, Texas 78664
ARTICLE 32
NOTICES
All notices to either party by the other required under this Contract shall be personally
delivered or mailed to such party at the following respective address:
Engineer: WHM Transportation Consultants, Inc.
Attn.: Mike Mclnturff
2717 Rio Grande
Austin, Texas 78705
Page 12 of 13
The undersigned signatory or signatories for the Engineer hereby represent and warrant
that the signatory is an officer of the organization for which he or she has executed this Contract
and that he or she has full and complete authority to enter into this Contract on behalf of the firm.
The above - stated representations and warranties are made for the purpose of inducing the City to
enter into this Contract.
IN WITNESS HEREOF, the City and the Engineer have executed these presents in duplicate.
WHM Transportation Engineering Consultants, Inc.
THE ENGINEER
By: ,2a4-c, )
Signature
MIKE MCINTURFF
Printed Name
PRESIDENT
Title
12/14/00
Date
i
By. �:1� , i�/
rt A. Stluka, Jr., M or
LIST OF ATTACHMENTS
eogconvc. WFIM /spectw
ARTICLE 33
SIGNATORY WARRANTY
Attachment A - Services to be Provided by the City
Attachment B - Services to be Provided by the Engineer
Attachment C - Work Schedule, if applicable
Attachment D - Fee Schedule
Attachment E - Work Authorizations, if applicable
Attachment F - Supplemental Work Authorizations, if applicable
Attachment G - Certificate of Insurance, if applicable
Page 13 of 13
EXHIBIT A
SERVICES TO BE PROVIDED BY THE CITY OF ROUND ROCK
The City of Round Rock will furnish to the Engineer the following items/information:
1. A game schedule for events taking place at the stadium.
2. A stadium site plan with number of parking spaces, driveways and their layout.
3. A copy of the roadway plans showing the new lane configurations at intersection of US 79 and
the stadium entrance.
eogcontrc.WHM/speaw
engcontrc.WHM/spectw
EXHIBIT B
SERVICES TO BE PROVIDED BY THE ENGINEER
1. Meet with Client and project team to obtain necessary information, confirm scope of work and
peak periods for data collection, establish project schedule and provide updates on project
progress. Three meetings are assumed.
2. Observe existing traffic operations on the study area network to note operational problems,
traffic patterns, parking, etc.
3. Conduct travel time runs along US 79 during each peak period to observe existing traffic
progression. Travel time information will be used to correlate PASSER 11 analysis results to real
world conditions.
4. Obtain turning movement counts at the following intersections during two peak periods (AM and
PM) to document existing traffic conditions:
a. US 79 and Chisholm Trail
b. US 79 and 111 35 West Frontage Road
c. US 79 and IH 35 East Frontage Road
d. US 79 and Mays Street
e. US 79 and Egger Avenue
f. US 79 and Georgetown Street
g. US 79 and Sunrise Road
h. US 79 and FM 1460
i. US 79 and Harrell Parkway (entrance to Old Settlers Park)
j. US 79 and Dell Diamond Driveway
k. US79andCR122
Turning movement counts will not be collected for the special event timing plan since this plan
will be implemented during off -peak periods. Instead, electronic tube counters will be placed at
various locations along US 79 to document through volumes, and the timing plan will be
developed based on those counts and traffic projections for stadium unloading.
5. Perform progression analysis using PASSER lI and PASSER III for the proposed system along
US 79 using traffic volume data listed previously for three peak periods. The system will consist
of the 11 intersections listed above.
6. Prepare a report documenting analysis results for presentation to the City of Round Rock and the
Texas Department of Transportation (TxDOT). Presentation to TxDOT will occur, if necessary,
to discuss timing modifications to the IH 35 intersections.
7. Meet with City of Round Rock and TxDOT staff as needed to review analysis results. Two
meetings are assumed.
1P D
Principal, C. Michael Walton, Ph.D., P.E.
Principal, Randy B. Machemehl, Ph.D., P.E.
Principal, Mike Mclnturff, M.Eng., P.E.
Senior Engineer
Engineer III
Engineer II
Engineer I
Engineering Associate IV
Engineering Associate III
Engineering Associate II
Engineering Associate I
Engineering Assistant
CADD Technician
Technical Illustrator
Engineering Technician II
Engineering Technician I
Administrative Associate
Clerical I
Outside Consultant
WHM Standard Labor Schedule
Hourly Rates
Effective January 1, 2000
Standard Legal
Court Appearance
Expert Testimony
Deposition
$200.00 $400.00
$125.00 $250.00
$115.00 $230.00
$90.00 $180.00
$85.00 $170.00
$80.00 $160.00
$75.00 $150.00
$70.00 $140.00
$60.00 $120.00
$55.00 $110.00
$50.00 $100.00
$45.00 $90.00
$50.00 $100.00
$45.00 $90.00
$40.00 $80.00
$30.00 $60.00
$40.00 580.00
530.00 $60.00
Prevailing Rate Twice prevailing Rate
*Minimum of one eight hour day will be charged for staff person involved in
court appearance, deposition, traveling, or working out of town.
Expenses
Traffic Counts (Tube)
Traffic Counts (Lane Counter /Classifier)
110% of cost
$200.00 each
$100.00 each
WHM Transportation Engineering Consultants, Inc. - Austin, Texas
r
Signal Progession on US Hwy 70
from Chisholm Trail to County Rd 122
DATE: December 8, 2000
SUBJECT: City Council Meeting — December 14, 2000
ITEM: 13.D.6. Consider a resolution authorizing the Mayor to execute an
agreement with WHM Transportation Consultants, Inc. for traffic
signal progression studies on US 79 between Chisholm Trail and CR
122.
Resource: Jim Nuse, Public Works Director
Tom Word, Traffic Engineer
History: At the February 24, 2000 City Council meeting the Council approved Resolution
No. R- 00- 02- 24 -11F1. This resolution authorized the Mayor to enter into an
agreement with WHM Transportation Engineering Consultants, Inc. for the
design of traffic signal systems for Louis Henna Blvd. and US 79. The work
was actually negotiated in two separate agreements, one for Louis Henna Blvd
for $12,500 and one for US 79 for $14,000. Only the contract for the for Louis
Henna Blvd. work was attached to the resolution document which was presented
and reviewed by the Council. The contract for the US 79 work inadvertently
was not attached to the resolution. We are requesting the Council to approve
this resolution specifically authorizing the US 79 contract.
This work is included in the Transportation Capital Improvement Program
(TCIP) previously approved by the Round Rock Transportation System
Development Corporation and this City Council.
Funding:
Cost: $14,000
Source of funds: Round Rock Transportation System Development Corporation
Outside Resources: WHM Transportation Consultants, Inc.
Benefit: The development of traffic signal progression plans for US 79 will improve
mobility and decrease delay.
Public Comment: This work was included in public hearings for the TCIP. No comments
were offered at the hearing.
Mayor
Robert A. Stluka, Jr.
Mayor Pro-tem
Earl M. Hairston
Coundl Members
Tom Nielson
Carrie Pitt
Earl Palmer
Isabel Callahan
Jimmy Joseph
City Manager
Robert L Bennett. Jr.
City Attorney
Stephan L Sheets
CITY OF ROUND ROCK
April 30, 2001
Mr. Mike Mclnturff
WFIM Transportation Consultants, Inc.
2717 Rio Grande Street
Austin, TX 78705
Dear Mr. Mclnturff
Sincerely,
Joanne Land
Assistant City Manager/
City Secretary
Enclosure
Fax: 512- 218 -7097
1- 800 - 735 -2989 TDD 1- 800 -735 -2988 Voice
www.ci.round- wck.tx.us
221 East Main Street
Round Rock, Texas 78664
512- 218 -5400
The Round Rock City Council approved Resolution No. R- 00- 12- 14 -13D6 at their
regularly scheduled meeting on December 14, 2000. This resolution approves the contract
for the traffic signal progression studies on U.S. 79, between Chisholm Trail and County
Road 122.
Enclosed is a copy of the resolution and contract for your files. If you have any questions,
please do not hesitate to contact Tom Word at 218 -5562.