R-00-12-21-9C2 - 12/21/2000RESOLUTION NO. R- 00- 12- 21 -9C2
WHEREAS, the City of Round Rock desires to retain site
administration and inspection services in connection with the painting
of the southeast elevated water tank, and
WHEREAS, Heart of Texas Inspection Services, Inc. has submitted
a professional services agreement to provide said services, and
WHEREAS, the City Council desires to enter into said agreement,
Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an agreement with Heart of Texas Inspection
Services, Inc. for site administration and inspection services in
connection with the painting of the southeast elevated water tank, a
copy of said agreement being attached hereto and incorporated herein
for all purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
RESOLVED this 21st day of Dumber, 200
E LAND, City Secretary
R: \NPOOCS \RESOLUTI \HOT.WPO /ec
RO -f° A. STLUKA, 3R., Mayor
City of Round Rock, Texas
A. Pre Construction Phase
PROPOSAL FOR SERVICES
The scope of services to be provided as related to the Pre Construction and Construction
Phase of the following project.
1. Establish the scope of work and specifications based on the site surveys and
research conducted. Prepare contract documents authorized by the Owner.
2. Assist the Owner in the advertisements of the project for bids.
3. Assist the Owner in the opening and tabulation of bids for construction of the
project and consult with the Owner as to the proper action to be taken, based on
all of the considerations involved.
4. Assist in the preparation of formal Contract Documents.
5. Conduct a pre construction meeting with the Contractor and Owner.
B. Construction Phase
1. Conduct on site visits to provide Quality Assurance Surveillance and observe the
progress and quality of the executed work in accordance with the Contract
Documents. In performing these services, reasonable measures will be taken to
protect the Owner against defects and deficiencies in the work of the Contractor.
Responsibility for the actual supervision of construction operations or for the
safety measures that the contractor takes or should take can not be guaranteed.
During the on site inspection visits the following will be performed:
- Pre - surface preparation inspection.
- Measurement of ambient conditions.
- Evaluation of compressor and surface preparation equipment.
- Determination of surface preparation cleanliness and profile.
- Inspection of application equipment.
- Witnessing coating mixing.
- Inspecting coating application.
- Determination of wet film thickness.
- Determination of dry film thickness.
- Evaluating cleanliness between coats.
- Evaluate cure.
- Finalize inspection and testing of project by submitting a final report to Owner.
2. The inspection methods to be implemented for the sandblasting and coating
inspections will consist of visual inspections, mil gauging, holiday testing, profile
gauging and atmospheric measuring. All inspections will verify compliance with
the A W WA D102-97 and contract specifications.
The measurement of air temperature, surface temperature, humidity, dew point,
coating thickness and holiday detection will be recorded in an inspectors log book.
The equipment to obtain such measurements will be supplied by HOT.
3. Consult and advise with the Owner. issue all instruction to the contractor requested
by the Owner; and prepare and issue routine change orders with Owner's approval
4. Review with the Owner, submittals by the Contractor. This review is for the
benefit of the Owner and covers only general conformance with the information
given by the Contract Documents. This review does not relieve the Contractor of
any responsibility such as appropriate safety measures to protect workers, property
and the public, of the necessity to construct a complete and workable facility in
accordance with the Contract Documents.
5. Obtain and review monthly and final estimates for payments to the contractor, and
furnish to the Owner any recommended payments to contractors and suppliers;
assemble written guarantees which are required by the Contract Documents.
6. Conduct with the Owner and contractor, a final inspection of the project for
compliance with the Contract Documents and submit recommendations concerning
project status, as it may affect Owner's final payment to Contractor.
7. The Owner agrees to pay on a monthly basis for services rendered, as outlined
above, as hereinafter set forth:
Basic fee for this project shall be a lump sum basis: the total fee shall not exceed
$7,000.00 unless authorized by the Owner in writing.
Should you find this proposal acceptable at the prices, terms, and conditions offered,
please indicate your acceptance by signing in the space provided.
Executed on this the oul day of DEZER186L 199OE
ACCEPTED
A I
4 / f 4edk
John H. ' onze R.'rt A. Stluka, Jr., yor
Presid' t City of Round Rock, Texas
HOT nspec +on - ces, Inc.
1
S.E. Elevated Tank
4 j
•„ 0,5
SAGRAPHICS'COUNCIL AGENDA ITEMMENGINEEPJNO 12-21-COSE ELEVATED T■J4K
DATE: December 15, 2000
SUBJECT: City Council Meeting — December 21, 2000
ITEM: 9.C.2. Consider a resolution authorizing the Mayor to execute a
professional service agreement with Heart of Texas Inspection
Services, Inc. for the administration and inspection of the tank
painting of the southeast- elevated water tank. The paint on the
elevated water tank in Southeast Round Rock is deteriorating. HOT
Inspection inspected the interior of the tank and determined that it is
sound. This contract will provide plans and specifications of the re-
coating of the exterior of the tank, as well as administration and
inspection of the project.
Resource: Jim Nuse, Public Works Director
History: Paint on the elevated water tank in Southeast Round Rock is deteriorating.
HOT Inspection inspected the interior of the tank and determined that it is
sound. This contract will provide plans and specifications of the recoating of
the exterior of the tank.
The preliminary investigation of the tank was performed under an LOA for
$3,000.
Funding:
Cost: $7,000
Source of funds: Utility Funds
Outside Resources: HOT Inspection
Impact/Benefit: This work will extend the life of the tank.
December 4, 2000
HOT INSPECTION SERVICES, INC.
Welding Consultants & Inspection Specialists
James R. Nuse, P.E.
Director of Public Works
City of Round Rock
2008 Enterprise Drive
Round Rock, Texas 78664
Subject: Pre Construction and Construction Proposal
Ref: Southeast Elevated Tank
DearJim:
P.O. Box 1208 Round Rock, Tx 78680
(512) 244 -2523 FAX (512) 244 -0607
I have put together a proposal for providing services to the City of Round Rock to oversee
and administrate the recoating of the referenced project. I plan to work directly under your
supervision which would essentially keep the project specification writing, bidding,
administration and surveillance under the City's umbrella. This process will be
advantageous to the City by creating a closer line of communication and authority over the
project.
This proposal is to prepare bid documents, administrate the bidding process and oversee
the project. I look forward in working with you, as I am quite confident that this project
will be a success. T , k you for the confidence and consideration as always.
CITY OF ROUND ROCK
J % \\ 4
gyiiii /1111
Mayor
Robert A. Silaka. .k
Mayor Pro-tem
Earl M. Nairn.
Council Members
Tom Nielson
Carrie Pitt
Earl Palmer
Isabel Callahan
Jimmy Joseph
City Manager
Robert Bennett, Jr.
City Attorney
Stephan L. Sheets
April 30, 2001
Mr. John H. Konzen
Heart of Texas Inspection Services, Inc.
P.O. Box 1208
Round Rock, TX 78680
Dear
Sincerely,
Enclosure
e �S
The Round Rock City Council approved Resolution No. R- 00- 12- 21 -9C2 at their
regularly scheduled meeting on December 21, 2000. This resolution approves the
agreement for site administration and inspection services in connection with the painting
of the southeast elevated water tank.
en:
Enclosed is a copy of the resolution for your files. If you have any questions, please do
not hesitate to contact Jim Nuse at 218 -5555.
oanne Land
Assistant City Manager/
City Secretary