R-01-02-08-9C4 - 2/8/2001RESOLUTION NO. R- 01- 02- 08 -9C4 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Kinsel Industries, Inc. for the Water Treatment Plant Expansion, Phase IV, and WHEREAS, it has been determined by the City's engineering staff that it is necessary to replace Motor Control Center No. 1 at the Water Treatment Plant, and WHEREAS, the City Council hereby determines that the replacement of said Motor Control Center No. 1 is necessary to preserve or protect the public health or safety of the City's residents, and therefore falls within an exception of the State's bidding requirements, and WHEREAS, Kinsel Industries, Inc. has submitted Contract Amendment No. 2 to include the replacement of Motor Control Center No. 1, and WHEREAS, the City Council desires to enter into said Contract Amendment No. 2 with Kinsel Industries, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Amendment No. 2 with Kinsel Industries, Inc., to include the replacement of Motor Control Center No. 1, a copy of said Contract Amendment No. 2 being attached hereto and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this x: \wPSOCS \RESOLUT I \RIO 0 9C4 .WPU /SC Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 8th day of February, 2001. ATTEST: LAND, City Secretary 2 ROB •T A. STLUKA,6QR., Mayor City of Round Rock, Texas CITY OF ROUND ROCK CONTRACT AMENDMENT NO. Dale: ADDED TIME DAYS Sheet 1 of 1 2 Contract: Water Treatment Plant Expansion, Phase IV Owner: City of Round Rock, 221 East Main Street, Round Rock Texas 78664 To: Kinsel Industries, Inc., 8121 Broadway, Suite 300, Houston, TX 77061 (Contractor) You are hereby requested to comply with the following changes from the Contract Plans and Specifications: f: :::::::::•. �::::. �::::::::: :::•. VA•:. Y.: Y. •.Y.V.:.Y.•.Y.Y.:Y.Y.•.Y:.: :::• :::::::::::: ti: ti ;i: {;:v:ti;i:�: } } }: {. }:r { {. }::.; Description of Changes Decrease Increase 1.0 Remove and replace MCC -1, add relays to MCC -2 and modify the main service to the switchgear. $166,483.27 June 29, 2001 JUSTIFICATION: MCC -1 which is approximately 15 years old is being replaced to improve system reliability and health and safety. ORIGINAL CONTRACT AMT: Dollars:[$ 6,046,900.00] CONTRACT AMMENDMENTS (C.A) AMT: Dollars:[$ 266,307.27] THIS CHANGE ORDER (C.O.) AMT: Dollars:[$ 0.00] PREVIOUS CHANGE ORDER AMT: Dollars:[$ 9,317.00] CHANGE ORDERS TO DATE AMT: Dollars:[$ 24,473.00] ORIGINAL CONTRACT PLUS C..0.s AND C.A.s: Dollars:[$ 6,337,680.27] TOTAL PERCENT CHANGE: PERCENT %: 4.81 This document will become a su plement to the contract and all provisions will apply hereto: Z. bra-, 1/ ./ CDM En Ineer Date: - W / C I l 7,9 of Kinsel) In • . - trie -'1" c. Contractor Date: fff p C' nd Roc Owner Date: Contract Amendment No. 2.xls DATE: February 2, 2001 SUBJECT: City Council Meeting — February 8, 2001 ITEM: 9.C.4. Consider a resolution authorizing the Mayor to execute Amendment No. 2 to the Contract with Kinsel Industries, Inc. for the construction of the Water Treatment Plant Phase IV expansion project. This contract amendment is necessary to replace Motor Control Center No. 1 (MCC -1). Unanticipated internal deterioration of MCC -1 was discovered during the replacement of MCC -2. This will allow same contractor to incorporate the new MCC -1 into the current scheme to easily expand in the future. This will require and additional cost of $166,483.27 bringing the contract total to $6,337,680.27 for a total increase to the original contract amount of approximately 4.8 %. Resource: Jim Nuse, Public Works Director Don Rundell, Senior Engineer History: This project is to replace our Motor Control Center No. 1 (MCC -1) at the Water Treatment Plant. Under the current contract Kinsel Industries, Inc. replace MCC -2. With the Phase IV Water Treatment Plant expansion it became very apparent that with another hot summer with high water demands MCC -1 would most likely fail. Reducing our potable water supply by 50 percent for five months. Funding: Cost: $166,483.27 Source of funds: Transfers from Capital Recovery Fees Outside Resources: Kinsel Industries, Inc. Impact: This is a Health and Safety issue. MCC -1 must be replaced before our high summer demands. If our current MCC -1 goes out our ability to supply treated water will be reduced by half. Also, if this were to happen it would take five months to replace. Benefit: Is to minimize the potential of critical system failure, which could result in critical water shortages to our customers. Public Comment: N/A Sponsor: N/A