R-01-02-22-10E3 - 2/22/2001and a, \vaoom \assocvr:\sa02aas3 .1.11 se RESOLUTION NO. R- O1- 02- 22 -10E3 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Kinsel Industries, Inc. for the Water Treatment Plant Phase IV Expansion Project, and WHEREAS,the Council has determined that it is necessary to make changes to the plans or specifications of the Contract due to unforeseen circumstances, and to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 5, and WHEREAS,the Council has determined that this Change Order No. 5 will not result in an increase of the original contract price by more than 25 percent, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 5 to the Contract with Kinsel Industries, Inc. for the Water Treatment Plant Phase IV Expansion Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 22nd day of February, 2001. ATTEST: LAND, City Secretary 2 R� =` A. STLUKA, JR /, Mayor City of Round Rock, Texas CITY OF ROUND ROCK CONTRACT CHANGE ORDER NO. 5 Date: Sheot 11 of 71 ADDED TIME DAYS Contras: Water Treatment Plant Expansion, Phase IV Orman City of Round Rock, 221 Fast Main Street, Round Rock Texas 78884 o KInsellndustri., Inc., 13121 Broadway, to 300, Houston, Texas 77081 (Contractor) You are hereby requested to comply with the ha changes from the Contract b pg 1 i E ? m 8 8 .z Vli m 1 � m „ S a ,,E D� 5 1 i 1 . 5- °i Il 8 w 1 E E 5 5 E E Ti Imo 4.iiii i 111 a,> z°adwm...o 0 o N o 0 D ($8,800.00) ($135,000.00) ($112,808.00) 888 8 CATION: I tems Identified daring course of construction and represent charges In respome to conditions toad in the field. ORIGINAL CONTRACT AMOUNT: Dolms:($ $8,048,800.001 CONTRACT AMENDMENT (CA) AMOUNTS: Dollars:[$ $288,30727] I S CHANGE ORDER (C.O.) AMOUNT: Dollars:1$ ( 5180,534.17)) PREVIOUS CHANGE ORDER AMOUNT: Dollars:($ $8,317.00) CHANGE ORDERS TO -DATE AMOUNT: Dollars:]$ ($135,401.17)] TOTAL CONTRACT PLUS C.O.S AND CA Dollars:[$ $8.178,748.10] TOTAL PERCENT CHANGE: PERCENT %: 215 0000mnm will become a supplement to the contract mM all provisions will apply hereto: r- 1. tf 3 tit 1 C . .. - Engineer Dale: c - -a( i it !_ -� t.SG -l.., Win. :17,21 Contactor Data: * v / 4 ,, Cn ) OF kouga Qocre 2-Z7-0 1 D Change Order No. 5,xls WATER TREATMENT FACILITY SAGRAPEEZAMISCEUANEOUSMATER TREATMENT PLAbrAWYR 211:1101 C DM Camp Dresser & McKee Inc, TRANSMITTAL TO: Chris Smith/Scott Zimmerman Kinsel Industries FROM: Greg T. Swoboda, P.E. RE: City of Round Rock WTP — Phase IV Expansion Change Order No. 5 DATE: January 31, 2001 Transmitted are three signed copies of Change Order No. 5 for the City of Round Rock WTP Ph IV Expansion Project. Please review, sign and return the three signed copies to Mr. Don Rundell of the City of Round Rock by Friday, February 2, 2001. If you have any questions or comments, please let me know. xc: Mr. Don Rundell, CORR Attachments DATE: February 15, 2001 SUBJECT: City Council Meeting — February 22, 2001 ITEM: 10.E3. Consider a resolution authorizing the Mayor to erectile Change Order No. S to the Contract with Kinsel Industries Inc for the Water Treatment Plant Phase IV Expansion Project due to unforeseen circumstances, and to make changes to the quantity of work to be performed or materials, equipment or supplies to be provided This Change Order No. 5 is necessary for the final completion of this project. It covers unanticipated items that were discovered during construction and represents necessary changes in response to conditions found in the field. This Change Order is a net decrease of $160,934.17, which results in a net decrease of $136,461.17 to the current contract total. Therefore the final contract total is $6,176,746.10 for a total increase to the original contract amount of approximately 2.2 %. Resource: Jim Nuse, Public Works Director Don Rundell History: This Change Order No. 5 is necessary for the final completion of this project It covers unanticipated items that were discovered during construction and represents necessary changes in response to conditions found in the field. This Change Order is a decrease of $160,934.17. Outside Resources: Kinsel Industries, Inc. Public Comment: N/A Impact: Corrects items found during construction that needed repair and/or replacement Benefit: Is to minimize the potential of critical system failure, which could result in critical water shortages to our customers. Funding: Cost: ($160,934.17) Source of funds: Transfers from Capital Recovery Fees Sponsor: N/A The original contract amount was $6,046,900.00, with the previous change orders and contract amendments the contract amount had increased to $6,337,680.27 a 4.81% increase. With this Change Order No. 5 this amount will be reduced to $6,176,746.10 or just a 2.15% increase over the original contract amount Mayor Robert A. SHaka, J, Mayor Pro-tem Earl M. Hairston Council Members Tom Nielson Carrie Pitt Earl Palmer Isabel Callahan Jimmy Joseph City Manager Robert L Bennea, Jr. City Attorney Stephan L Sheets CITY OF ROUND ROCK February 28, 2001 Mr. Greg T. Swoboda, P.E. Camp Dresser & McKee Inc. 9111 Jollyville Road, Suite 105 Austin, Texas 78759 Dear Mr. Swoboda: The Round Rock City Council approved Resolution No. R- 01- 02- 22 -10E3 at their regularly scheduled meeting on February 22, 2001. This resolution approves Change Order No. 5 to the Contract with Kinsel Industries, Inc. for the Water Treatment Plant Expansion, Phase IV Expansion Project. Enclosed is a copy of the resolution and original change order for your files. If you have any questions, please do not hesitate to contact Don Rundell at 218 -5554. Sincerely, Enclosures Fax: 512 -218 -7097 Joanne Land Assistant City Manager/ City Secretary 1- 800 - 735 -2989 TDD 1- 800 -735 -2988 Voice www.ci.roimd- rock.tx.us 221 East Main Street Room) Rock, Texas 78664 512. 218 -5400 CITY OF ROUND ROCK CONTRACT CHANGE ORDER NO. 5 Date: Sheet 11 of 11 ADDED TIME DAYS Contract: Water Treatment Plant Expansion, Phase IV Owner. City of Round Rock, 221 East Main Street, Round Rock Texas 75684 T o: Mosel Industries, Inc., 5121 Broadway, Suite 300, Houston, Twins 77081 (Contractor) You are hereby requested to comply with the following changes from the Contract Plana and Specifications: •: v{•:{ vhf: ff.•:?{{{ : ?: { ? {:.:•: }:v }::: } } }} } } }...... . w'v::X?•.iti?h4}::::}: }:4'f.• }:: }'- } } }:? {. }:?•:: ••}}:?• } }}:4: } }: ?: yfi:{ Description of Changes 1. 0 Addition of NEMA 4X Electrical Enclosure for backwash pump and blower controls. 2.0 Temporary stem extension for raw water valve. 3.0 Various Electrical Changes including Repair of exle0ng electrical equipment: Replacement of existing PLC processors. spare hard end processor and replacement of oo sdng UPS; and Repair of existing wiring for air scan blower. 4.0 Replacement of Rapid Mix Baffle Plates. 5.0 Ph. III Door Modifications 8.0 Addition of HVAC concrete slab, 7.0 Addition of concrete ikons a1 rock rubble bench. 8.0 Addition of sidewalk work 9.0 Addition of Key Interlocks for Distribution Swtchboams. 10.0 Replacement of discontinued Ethernet ...doh_ 11.0 Replacement of Florculator 2B VFD. 12.0 Addition of relays, power supplies and rewire controls for fluoride focmty. 13.0 Credit for elimination of mad excavation work 14.0 Credit for elimination of Base Bid Item No. 3 from the congeal_ 15.0 Credit for reduction of work In Base Bid Item No 4. Decrease (08,600.00) (8135,000.00) (0112,608.00) Increase $1,39200 01,103.00 554,818.00 $7.801.00 $800.00 5500.00 5500.00 $5.000.00 04,331.80 07,676.59 03,411.14 06,140.31 JUSTIFICATION: Items identified during course of construction and represent changes in response 10 conditions found In the flea ORIGINAL CONTRACT AMOUNT: Dollars:[$ $8,048,600.00] CONTRACT AMENDMENT (CA) AMOUNTS: Dofioa,]$ $288,307.271 THIS CHANGE ORDER (C.O.) AMOUNT: Dollars:[$ ( $160,934.17)] PREVIOUS CHANGE ORDER AMOUNT: Do1ers:1$ 09,317.00] CHANGE ORDERS TO -DATE AMOUNT: Dollars (8136,461.17)] TOTAL CONTRACT PLUS C.O.S AND CA Dollars:[$ $8,176,746.10] TOTAL PERCENT CHANGE: PERCENT %: 2.15 This document will become a supplement to the contract and all provisions �. will apply hereto: 1 / 3 1/0■ Dao : -- - o ( D • R` ,I ± � � _ i near . (LC- . �a1iP;� Contractor D ate: (� t , 0 RQUA)D Pcde/ a� - o l ty i.`-,:; c: Rock / • :r Oats: Change Order No. 5.010 Mayor Robert A. SHaka, Jr Mayor Pro -tem Fart M. Hairston Council Members Tom Nielson Carrie Pin Purl Palmer Isabel Gallahsm Jimmy Joseph City Manager Robert L Bennett. Jr. City Attorney Stephan L Sheets CITY OF ROUND ROCK February 28, 2001 Mr. Scott Zimmerman Kinsel Industries, Inc. 8121 Broadway, Suite 300 Houston, TX 77061 Dear Mr. Zimmerman: The Round Rock City Council approved Resolution No. R- 01- 02- 22 -10E3 at their regularly scheduled meeting on February 22, 2001. This resolution approves Change Order No. 5 to the Contract with Kinsel Industries, Inc. for the Water Treatment Plant Expansion, Phase IV Expansion Project. Enclosed is a copy of the resolution and original change order for your files. If you have any questions, please do not hesitate to contact Don Rundell at 218 -5554. Sincerely, anne Land Assistant City Manager/ City Secretary Enclosures Fax: 512.218 -7097 A 1- 800 - 735 -2989 TDD 1-800- 735 -2988 Voice www.d.mmd- mck.lx.os 221 Fast Main Street Round Rock, Texas 78664 512 -218 -5400 CITY OF ROUND ROCK CONTRACT CHANGE ORDER NO. 6 Date: Sheet 11of 1 ADDED TIME DAYS Contract: Water Treatment Plant Expansion, Phase W Owner. City of Round Rock, 221 East Main Street, Round Rock Texan 78804 T o: IOnsel Indumtr(es, Ins., 8121 Broadway, Suite 300, Houston, Texas 77081 (Contractor) You are hereby requested to comply with the following changes from the Contract Plme and Speclflrattone: r... ; ; ;:;; :;:}F: {: :;:i:0 ; : ;, {'• ; ::; ...::;:;:;:;:;:;;;:;:i ;;;:;: S:ti:s;: $::;:m: :<::<= r: : ;:: {•:•.'•r: }:'}': :$ ::):;:$: :: Description of Changes 7 .0 Addition of NEMA 4% Electrical Enclosure for bath pump and blower controls. 2.0 Temporary stem extension for raw water valve. 3.0 Venous Electricai Changes including: Repair of existing elecbicol equipment Replacement of existing PLC pmcoesors, spare front end processor and replacement of existing UPS; and Repair of existing wiring for air scour blower. 4.0 Replacement of Rapid Mix Baffle Plates. 5.0 Ph. 111 Door Modifications 6.0 Addition of HVAC concrete slab. 7.0 Addition of concrete flume el rack rubble trench. 8.0 Addition of sidewalk Mork 9.0 Addition of Key Inte4ocks for Distribution Swikhboeds. 10.0 Replacement of discontinued EOeemet switch 11.0 Replacement of Rxarlator 2B VFD. 120 Addition of relays, power supplies end rewire controls for fa4ori80 lacedy. 13.0 Credit for elimination of mad excavation work 14.0 Credit for elimination of Base Bo Item No. 3 from time contract 15.0 Credit for reduction of work In Base Bid Item No 4. Decrease ($8.800.00) (5135,000.00) (5112,808.00) Increase $1,392.00 $1,103.00 $54,818,00 07.801.00 $800.00 $500.00 $500.00 55.000.00 $4,331.80 $7,876.58 $3.411.14 08,140.31 JUSTIFICATION: items Identified during muse of ccrmtruxllon end represent changes In response to conditions found In the geld. ORIGINAL CONTRACT AMOUNT: Do0es:(S $8,048.900.001 CONTRACT AMENDMENT (CA) AMOUNTS: Dollars:($ 5288,307.27] THIS CHANGE ORDER (C.O.) AMOUNT: Dolere:($ ( $180,934.17)] PREVIOUS CHANGE ORDER AMOUNT: Dollars:[$ $9,317.00] CHANGE ORDERS TO -DATE AMOUNT: Dottie:($ ($138,481.17)] TOTAL CONTRACT PLUS C.O.S AND CA Dolma:[$ 08,176,748.10] TOTAL PERCENT CHANGE: PERCENT %: 2.15 This document will become a supplement to the contract and all provisions \ �._._._;. . a ` ' CDM • Engineer will apply hereto: %/ 31 � PI Date: a -a-�l *;V/ s,-,-c___ ^ IO , Contractor e: ..; .0 . '.•J r Date: Charge Oder No. 5.x 0