R-01-02-22-10E4 - 2/22/2001 RESOLUTION NO. R-01-02-22-10E4 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ("Contract") with HDR Engineering, Inc. for the Lake Creek Pump Station Improvements Project, and WHEREAS, HDR Engineering, Inc. has submitted Amendment No. 1 to the Contract to include the replacement of the chemical control system, the modification of existing piping, and the design of a 16-inch water line, as described in the attached Amendment No. 1, and WHEREAS, the City Council desires to enter into said Amendment No. 1 to the Contract with HDR Engineering, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Amendment No. 1 to the Contract with HDR Engineering, Inc. to include the replacement of the chemical control system, the modification of existing piping, and the design of a 16- inch water line, a copy of said amendment being attached hereto and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. a�\wauoce\RE90L 1\R10223 a.—/.. RESOLVED this 22nd day of February, 2001. C��"L RO A. STLUKA, JR., Mayor City of Round Rock, Texas ATTEST: ��Q,^, _ /VVYL2 d, A", JOT&E LAND, City Secretary 2 AMENDMENT No.I To the CONTRACT FOR ENGINEERING SERVICES between THE CITY OF ROUND ROCK and HDR ENGINEERING,INC. Dated October 14,1999 GENERAL This constitutes an Amendment to the Contract for Engineering Services—Lake Creek Pump Station Improvements Project for PROFESSIONAL SERVICES between the City of Round Rock"City"and HDR Engineering,Incorporated,of Austin,Texas(HDR). The scope of services to be provided by the Engineer as listed in Attachment B of the Contract is amended to include the following. For the Design Phase,include in the following in the specifications and drawings to be developed for Bidding Purposes: • Replace existing chlorine and ammonia control system and combine all telemetry at the site into one location for local monitoring and control as well as communication with the Water Treatment Plant. • Include a new sodium hydroxide storage and feed facility. • Modify existing well collection piping to address hydraulic concerns and provide for one master flow meter. • Modify existing pump discharge piping to address hydraulic and pipe condition concerns and provide one master flow meter. • Include demolition of the existing building housing Well Nos.1 and 2 and the associated old chlorine storage and feed facility. • Include plugging of Well Nos.2,5,6 and 10. • Provide protection from flooding for Well No.3. • Provide testing for lead-based coatings and the presence of asbestos for the equipment and structures to be demolished. • Coordinate with the City regarding the construction contract documents to be used. • Provide surveying services and two design drawing sheets depicting the plan and profile of a proposed 16-inch water line between the Tower Drive Pump Station and the South 81 Standpipe. This new line will replace the existing 12-inch water line now in place. The drawings will be used by the City to have the improvements constructed as part of the ongoing Dell Way road construction project. No specifications will be provided,and it is anticipated that the City will supply their standard specifications to the road construction contractor. The above listed items will be completed on the basis of Lump Sum in the amount of Fifty-four Thousand Dollars($54,000.00). This fee shall include Lump Sum fees as listed below for analytical testing and subconsultant services: • lead-based coating testing.-$600.00 • asbestos testing-$5,000.00 • Baker-Aicklen&Associates(surveying)-$5,800.00 The term of this Amendment shall commence on the signing date and continue in effect until such time as terminated in writing by either party. SIGNATURE WARRANTY The undersigned signatory on signatories for the Engineer hereby represents and warrant that the signatory is an officer of the organization for which he or she has executed this Contract and that he or she has full and complete authority to enter into this Contract on behalf of the firm. The above-stated representations and warranties are made for the purpose of including the City to enter into this Contract. IN WITNESS BEREOF,the City and the Engineer have executed these presents in duplicate. The Engineer-HDR Engineering,Inc. By: /64�� fames K.(Ken)Han y,P.E. Executive Vice President City of Round Rock By: =.rt A.Stluka,Jr. Mayyn a or^ �1 d Date: o - "0 LAKECREEKPUW STAMN _ CRFRK -Ell i I F — ---- L---�- T N 4ovnd Ro�� LAKECREEK PUMP STATION o J 6 aw als s: nvm nae�mnaems�rovsmwcrzamve��cm�srnnaN xaoi DATE: February 15,2001 SUBJECT: City Council Meeting—February 22,2001 ITEM: 10.E.4. Consider a resolution authorizing the Mayor to execute Amendment No. 1 to the Contract for Engineering Services with HDR Engineering, Inc. for the Lake Creek Pump Station Improvements project. The total fee for this amendment is $54,000.00. The general scope of work under this amendment is to replace existing chemical control system and telemetry for local control and monitoring at the Water Treatment Plant,modify existing piping from pumps to go through one master flow meter, and the plugging of wells 2, 5,and 10.Also,included in this amendment is the design of a16-inch water line between the Tower Drive Pump Station and the South 81 Tank,this line will be constructed under a future change order to the Dell Way (South Mays) Street and Drainage project. Resource: Jim Nuse,Public Works Director Don Rundell History: Council approved the current contract with HDR for the Lake Creek Pump Station Improvements on the 14`s day of October 1999 for$167,280.00.These improvements were needed to replace and upgrade the existing vertical turbine pumps to deliver water to the 924 pressure plain.Also,to consolidate the existing multiple electric feeds into the site into a single feed.Additionally,these improvements were to include upgrading the electrical building,the fluoridation system,and chemical feed system,which will simplify operations and maintenance. The general scope of work under this amendment is to replace existing chemical control system and telemetry for local control and monitoring at the Water Treatment Plant,modify existing piping from pumps to go through one master flow meter,and the plugging of wells 2,5,and 10.Also,included in this amendment is the design of al 6-inch water line between the Tower Drive Pump Station and the South 81 Tank,this line will be constructed under a future change order to the Dell Way(South Mays)Street and Drainage project. Funding: Cost: $54,000.00 Source of funds: Transfers from Fund 24-LCRA Outside Resources: HDR Engineering,htc. Impact: To minimize the potential of critical system failure, which could result in serious water shortages to our customers. Benefit: Minimize any negative impact on the system by minimising possible down time. Also,to simplify the operations and maintenance of the Lake Creek Pump Station. Public Comment: N/A Sponsor: N/A t eta CITY OF ROUND ROCK 221 Fast Main Sheet .ii pll'ltls Roved Rock 12—&5400 February 28,2001 Mr.James K.Haney,P.E. HDR Engineering,Inc. 2211 South IH 35.Suite 300 Austin,TX 78738 Dear q : The Round Rock City Council approved Resolution No. R-01-02-22-10E4 at their regularly scheduled meeting on February 22, 2001. This resolution approves Amendment No.1 to the Contract with HDR Engineering,Inc.for the Lake Creek Pump Station Improvements Project. Enclosed is a copy of the resolution and original amendment for your files. If you have any questions,please do not hesitate to contact Don Rundell at 218-5554. S' cerely, 1 � Joanne Land Assistant City Manager/ Mayor City Secretary Robert A.Stlaka.h. Mayor Prater! Fart M.Rairrmv Enclosures Cornell Members Tom Nielson Carrie Pltr Earl Palmer Isabel GaOahan Jimmy Joseph Cay Manager Robert L Bennett Jr. City Atlomey Fax:512-218-7097 1-BOO-735-2989TDD 1-800-735-2988 Voim Stephan L Sheets w .dsomd-mck.tx.- RESOLUTION NO.R-01-02-22-10E4 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ("Contract") with HDR Engineering, Inc. for the Lake Creek Pump Station Improvements Project, and WHEREAS,HDR Engineering, Inc. has submitted Amendment No. 1 to the Contract to include the replacement of the chemical control system, the modification of existing piping, and the design of a 16-inch water line, as described in the attached Amendment No. 1, and WHEREAS, the City Council desires to enter into said Amendment No. 1 to the Contract with HDR Engineering, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Amendment No. 1 to the Contract with HDR Engineering, Inc. to include the replacement of the chemical control system, the modification of existing piping, and the design of a 16- inch water line, a copy of said amendment being attached hereto and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. K�\B—B\naouvn\cioaaaM.M/Be RESOLVED this 22nd day of February, 2001. RO A. STLUKA, JR., Mayor City of Round Rock, Texas ATTEST: JO#NE LAND, City Secretary 2 AMENDMENT No.1 To the CONTRACT FOR ENGINEERING SERVICES between THE CITY OF ROUND ROCK and HDR ENGINEERING,INC. Dated October 14,1999 GENERAL This constitutes an Amendment to the Contract for Engineering Services—Lake Creek Pump Station Improvements Project for PROFESSIONAL SERVICES between the City of Round Rock"City"and HDR Engineering,Incorporated,of Austin,Texas(HDR). The scope of services to be provided by the Engineer as listed in Attachment B of the Contract is amended to include the following. For the Design Phase,include in the following in the specifications and drawings to be developed for Bidding Purposes: • Replace existing chlorine and ammonia control system and combine all telemetry at the site into one location for local monitoring and control as well as communication with the Water Treatment Plant. • Include a new sodium hydroxide storage and feed facility. • Modify existing well collection piping to address hydraulic concerns and provide for one master flow meter. • Modify existing pump discharge piping to address hydraulic and pipe condition concerns and provide one master flow meter. • Include demolition of the existing building housing Well Nos.1 and 2 and the associated old chlorine storage and feed facility. • Include plugging of Well Nos.2,5,6 and 10. • Provide protection from flooding for Well No.3. • Provide testing for lead-based coatings and the presence of asbestos for the equipment and structures to he demolished. • Coordinate with the City regarding the construction contract documents to be used. • Provide surveying services and two design drawing sheets depicting the plan and profile of a proposed 16-inch water line between the Tower Drive Pump Station and the South 81 Standpipe. This new line will replace the existing 12-inch water line now in place. The drawings will be used by the City to have the improvements constructed as part of the ongoing Dell Way road construction project. No specifications will be provided,and it is anticipated that the City will supply their standard specifications to the road construction contractor. The above listed items will be completed on the basis of Lump Sum in the amount of Fifty-four Thousand Dollars($54,000.00). This fee shall include Lump Sum fees as listed below for analytical testing and subconsultant services: r • lead-based coating testing.-$600.00 • asbestos testing-$5,000.00 • Baker-Aicklen&Associates(surveying)-$5,800.00 The tern of this Amendment shall commence on the signing date and continue in effect until such time as terminated in writing by either party. SIGNATURE WARRANTY The undersigned signatory on signatories for the Engineer hereby represents and warrant that the signatory is an officer of the organization for which he or she has executed this Contract and that he or she has full and complete authority to enter into this Contract on behalf of the firm. The above-stated representations and warranties are made for the purpose of including the City to enter into this Contract. IN WITNESS HEREOF,the City and the Engineer have executed these presents in duplicate. The Engineer—HDR Engineering,Inc. By:Q 1_66� fames K.(Ken)"ey,P.E. Executive Vice President City of Round Rock By: rt A.Stluka,Jr. Mayor Date: 'Q—.1 a—0