R-01-03-22-12G2 - 3/22/2001K \ WPDDCS \RKSDLDTI \R10322G2.WPD /ec
RESOLUTION NO. R- 01- 03- 22 -12G2
WHEREAS, the City of Round Rock has previously entered into a
contract ( "Contract ") with ECO Resources, Inc. for the Chisholm Valley
and Westwind neighborhoods Waterline Replacement Program, and
WHEREAS, the Council has determined that it is necessary to make
changes to the quantity of work to be performed or materials,
equipment, or supplies to be provided, and
WHEREAS, it has been determined that it is necessary to change
said Contract in accordance with the attached Contract Change Order No.
1, and
WHEREAS,the Council has determined that this Change Order No. 1
will not result in an increase of the original contract price by more
than 25 percent, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Contract Change Order No. 1 to the Contract with ECO
Resources, Inc. for the Chisholm Valley and Westwind neighborhoods
Waterline Replacement Program.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
RESOLVED this 22nd day of March, 2001.
A EST:
g.GANNS—IAN City Secretary
Cg 'l57/A76 /7427 inl6z., R.551..
2
City of Round Rock, Texas
ITEM
DESCRIPTION
CONTRCAT
QUANTITY
CONTRACT
UNIT
UNIT
PRICE
CONTRACT
AMOUNT
QUANTITY
THIS PERIOD
AMOUNT
THIS PERIOD
PREVIOUS
QUANTITY
QUANTITY
TO DATE
AMOUNT
TO DATE
Change order#1
1A LONG DOUBLES
7
EA
1,520.00
7
10,642.00
2A SHORT DOUBLES
17
EA
744.00
17
12,648.00
3A LONG QUAD.
6
EA
1,620.00
6
9,720.00
4A SHORT QUAD.
10
EA
844.00
10
8,440.00
Total
41,450.00
CONTRACTOR PAY REQUEST
CLIENT
CITY OF ROUNDROCK
RESOURCES,INC
ESTIMATE NO. CHANGE ORDER #1
DATE 1 -30 -01
PROJECT TITLE JOB NO. 68859
ROUND ROCK WATERLINE REPLACEMENT
PACKAGE B
•
. -.4: ***4• A eon ppO�pOEG a °Q � .
�+ � °e�°o 0� OQO oo
C t4a d• 0► ° fi0 00
.4 ITA,lotr
o ��i:4
PSI
�.
BID PACKAGE B
S WRACTICEA18 N MAYS 418 N MAYS 2.14 -01
DATE: March 16, 2001
SUBJECT: City Council Meeting — March 22, 2001
Resource:
History:
Jim Nuse, Public Works Director
Bill Stablein, Engineering Assistant
Funding:
Cost: $ 41,450.00
Source of funds: Blue Tubing Fund
Outside Resources: ECO Resources, Inc.
ITEM: 12.G.2. Consider a resolution authorizing the Mayor to execute Change Order
No. I to the contract with ECO Resources, Inc. for the Chisholm
Valley and Westwind neighborhoods Waterline Replacement Program.
This change order is for additional services that were discovered during
the construction phase of Bid Package B. The Blue Tubing replacement
program replaces defective water service lines to individual residents.
This is a phased construction project to cover the entire City.
The Blue Tubing replacement program replaces defective water service lines to
individual residents. This is a phased construction project to cover the entire City.
Impact: By replacing the defective water service tubing our water system dependability is
maintained.
Benefit: This improvement to our water system not only enhances the over all effectiveness of
the system, but reduces the costs associated with repairs and replacement of the
defective tubing.
Public Comment: Public comment received during public meetings prior to construction in
each area.
Sponsor: N/A