Loading...
R-01-04-12-14C2 - 4/12/2001 RESOLUTION NO.R-01-04-12-14C2 WHEREAS, a mold infestation in the Clay Madsen Recreation Center locker room caused unforeseen damage to the property, and WHEREAS, repair and remediation of the property is necessary because of said unforeseen damage, and WHEREAS, competitive bids were not taken pursuant to Section 252.022(a) (3) of the Local Government Code, and WHEREAS, Austin Duraclean has submitted a contract to perform the necessary remediation, and WHEREAS, the City Council wishes to enter into said contract with Austin Duraclean, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a contract with Austin Duraclean for repair and remediation of the locker room at the Clay Madsen Recreation Center. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 12th day of Apr4R074S6rLU4&, , Mayor A EST: City of Round Rock, Texas J E LAND, City Secretary 0,\RPOOCS\RRSOLWI\R10411C3.RPD/ec 04/06/01 09:20 FAX 512 218 5548 PARD 2002 APR-06-2001 FRI 10:36 AM FROM: FAX: PAGE 1 -Estimate Austin Duradean �Struc`o-t-t. 12342 B FM 620 Combined Austin,TX 78754 Pbona:(512)442-5326 PAX:(512)257.8314 Job: Round Rook Rocnad on Center Estimator: Rick Upshsw Job 4; RBU 1003 Jnls Location Customer Company: Roun Address d Rock Recreation Center Site ddr Risk Atkins Site Areess ss 1: 1600 Gatti9 School Road Customer Name: Site Address 2: Address 1; 1600 Gattis School Road City,State,Zip: Round Rack TX Address 2: City,State,zip: Round Rock,TX Location Phone tl; Home Phone: (__-)—_ Location Bus#: (512)218-5540 Business Phone: (512)218-5540 Location FAX#: L-)--- Fax Number: U_-_ Insurance Information policy,Informatf)U Insurance Co= Type of Loss: Unspecified Peril Address 1: Policy Type; Address 2: Policy Number: City,State,Zips Deductible: Business Phone#: Date of Loss: Business Fax#: Claim W. Policy eMail Address: l:arective Dares d Adjuster: Structure Detail gbycb= $110,703.70 SubTotal S110,703.70 Contents Detail Contents $750.00 Sulaotal $750.00 Total 5111,453.70 RPR-06-2001 10:29 512 218 5548 97: P.02 04/06/01 09:20 FAX 512 218 5548 PARD U003 FAX: PAGE 2 APR-06-2001 FRI 10:11 AM FROM: Job: Round Rock Recreation Cents Estimator. Rick Upshow Jab 8:REU 1003 Bathroom 1-23'0"x 33'8" x 9'11" CF 7,678.91 PER i 13.33 SFF774.33 SFW 1,123.89 SFC 774,33 Area Description: Men's Bathroom Item#Item Desert tion gull, nit Measure Price Cast Bathroom 1 1 Remove,Bio-wash With anti-microbial,and reset lockers-2 men, 8.00 HRS $65,00 $520.0 4hours 485,00 SFW $1.75 $848.75 ngle 2 Remove drywall from walls-si layer-and discard using standard biohazard protocol. Includes drywall above and behind lockers,as well as above sink mirror area. Also includes removing and discarding all drywall using standard biohazard protocol. 250.00 3 Remove studded walls and replace with $6 masonry 0.00 SFW $18.50 $9, 0.00 SFW $12.00 $6,720.00 4 Drywall Furring 56 5 Ceilings 500.00 SFC. $10.25 $5,125.00 6 Concrete Footings for Masonry Walls $0,00 SF $10.27 5513.50 7 Bio-Wash wlanti-microbial,hepa vacuum,and encapsulate 1,555.00 BA $1,75 52,72125 affected cinderblock walls. Includes all stall Walls as well, 8 Bio-wash w/anrimicrobial,rinse&vacuum floors-2 applications 774,33 SFF $0.75 $580,75 9 Bio-wash w/antimicrobial,rinse&.wipe down celllngs 774.33 SFC $0.75 $580.75 10 Wet solution base fagging(fungi/bacteria)per cubic foot 7,678.81 CF $0,05 $383.94 Subtotal for Dathroom 1: 527,243.94 Total for Bathroom 1 $27,243.94 Bathroom 2-23'0"x 33'8" x 9'11" SFF 774.33 SFW 1,123,89 SFC 774.33 CF 7,678,81 PER 113.33 Area Description: Women's Baftmnm Item#Item Description #Units Unit Measure Price Cost Bathroom 2 1 Remove,Bic-wash with anti-microbial,and roast lockers-2 men, 8.00 BRS $65.00 $520.00 4 hours 2 Remove drywall from walls-single layer-and discard using 48$,00 SFW $1,75 $848.75 standard biohazard protocol. Includes drywall above and behind lockers,as well as above sink mirror arcs, Also includes removing and discarding all drywall using standard biohazard protocol. 3 Remove studded walls and replace with masonry 500.00 SFW $18.50 $9,250.00 4 Drywall Furring 560,00 SFW $12.00 $6,720,00 5 Ceilings 500.00 SFC $10.25 $5,125.00 6 Concrete Footings for Masonry Walls 50.00 SF S10.27 $513.50 7 1310-Wash w/anti-microbial,hepa vacuum,and encapsulate 1,555.00 BA $1.75 $2,72125 aMcted cinderblock walls. Includes all stall walls as well. 8 B10-wash w/antimicrobial.rinse&vacuum floors-2 applications 774.33 SFF $0,75 $580.75 9 Bio-wash w/antimicrobial,rinse&wipe down ceilings 774.33 SFC $0.75 $580.75 10 Wet solution base fogging(fungilbacteria)per cubic foot 7,678.81 CF $0.05 $383.94 Date printed 328/01 Report: Structure/Contents Combined Page Number 2 APR-06-2001 10:29 512 218 5548 97% P.03 04/06/01 09:21 FAX 512 218 5548 PARD 121004 FAX: PAGE 3 APR-06-2001 FRI 10:11 KM FROM; P Estimator Rick U Shaw Job t RSU 1003 er Job: Round Rock RecreadanCent Bathroom 2 23'0"x 33-11" x 9'3.1"(Continued) De I 0 It m scnntlarr #Unita unit Mea Price CoFS Subtotal for Bathroom 2: $27,243.94 Totalfor Bathroom 2 $27,243.94 N0rtb Hallwa -7'9"x 56'10" x 9'7" pPA 113.67 SFF 440.46 SFW 1,237.85 SFC 440.46 CF 4,221.06 Area Description: Hallway that runs East and Weston the North;side of the bathroom. Although this hall is much longer,the measurement referred to here for the long wall is for only the area to be remedlated,from the Northwest corner of the bathrooms w the janitor,s cluset. Also,we are only remediating one wall in this hall,that being the outside of the bathroom walls. Deductions were made for restroom entrance. Deductions r (3)Total 224 Square Foot Opening(L)7'10"x 9'1 Wall(S2)TV x 9'7" Wall(Sl)TVx9'7" Item#Item Description #Units t r Price Cost North Hallway 544.69 SFW Si.75 $953.21 1 Remove drywall from walls-single layer-and discard using standard biohazard protocol. South wall of this hallway. 2 Replace water resistant drywall-518" 544.69 SF $1.90 $1,034,91 South wall ofthis hllway. 3 Wall prep-skilled labor 544.69 SFW S1.00 $544.69 South wall of this hallway 4 Wash,seal&paint walla-3 cents 544.69 SFW 50.79 $430.31 South wall of this hallway, 5 Bio-wash w/antimicrobial,rinse&wipe down ceilings 440.46 SFC $0.75 $330.34 6 Bio-wash w/antimicrobial,rinse&wipe down walla-2 1,237.85 SFW $0.75 $928.39 applications North wall of this hallway,and on the South wall of this hallway after removing contaminated drywall. 7 Bio-wash w/antimicrobial.rinse&vacuum floors-2 applications 440116 SFF $0.75 $330.35 8 Wet solution base fogging(fungi/bacterie)per cubic foot 4,221.06 CF $0.05 $211.05 Subtotal for North Hallway: $4,763.25 Total for North Hallway $4,763.25 South Hallway-9'7"x 56'10" x 9'7" SFF 544.65 SFW 1,272.99 SFC 544.65 CF 5$19.59 PER 113.67 Area Description: Hallway that runs Best and West along the South side of the bathrooms.Although this hall is much longer,the measurement referred to here for the long wall is for only the area to be rcmediated,from the Southwest comer ofthe bathrooms to Meeting Room 1. Also,we are only remcdtating one wall in this hall,that bring the outside of the bathroom walls.Deductions were made for restroom entrance, Deductions:(3)Tda1259SquareFeat Opening(L)7'10"x 917 Wall(Sl)9'7"x9'7" Wall(S2)9'7"x9'7" Item#Item Description #Units Unit Measure Price Cost South Hallway Date Printed RUM Report: Structure./Contents Combined Page Number 3 APR-06-2001 10:30 512 2te 5549 97i P.04 04/06/01 09:21 FAX 512 218 5548 PARD (6005 FAX: PAGE 4 APR-06-2001 FRI 10:11 AM FROM: iroa�t: Rick Upsbaw E6t ai+onCanter Co t Sob: RaundRcCkReat Co i ued pc1Ce Item Ile cri do $849.92 South tlatlway 1e layer-and���u mg 485,61 SM $lay 1 Removo drywall from walls-sing y standard biohazard protocol. Norttr wall of this hallway 2 Replace water resistant drywall-5/8" 495.67 SP $1.90 $922.77 North wall of this hallway. 3 Wall prep-skilled labor 485.67 SFW 51.00 $485.67 North wall in this hallway 4 Wash,seal&paint walls-3 coats 485,67 SFW $0.79 $383.68 South wall of this hallway. 5 Rio-wash w/antimicrobial,rinse&wipe down ceilings 544,65 SFC $0.75 $408.49 6 Bio-wash w/mtimicrobial,rinse&wipe down walls-2 1272.99 SFW $0,75 $954,74 applications South wall of this hallway,and on the North wall after removing contaminated dry-wall. 7 Bic-wash w/antirnicroblal.rinse&vacuum floors-2 applications 544.65 SFF $0.75 $408A9 8 Wet solution base fogging(flingi/bacceria)per cubic foot 5,219.59 CF $0.05 $260.98 Subtotal for South Hallway: $4,674.74 Total for South Hallway 54,674,74 West Hallwa -5'9"x42`3" x 9'7" SFF 242.94 SFW 920,00 SFC 242.94 Cl?2,328.15 PER 96.00 Area Description: Deductlons: (3)Taal 165 Square Feet Opening(L)5'9"x 91711 Wall(SI)5'9"x9'7" Wall(S2)5'9"x9'7" Item#Item Description #IJnits Uplt Measure Price Cost Wcst Hallway 1 Remove wallpaper-per hour-alrilledlabor 460.00 SFW $1.00 5460.00 East wall ofthis hallway. 2 Remove drywall from walls-single layer-and discard using 460.00 SFW $1,75 $805.00 standard biohazard protocol. East wall of this hallway. 3 Replace water resistant drywall-5/8" 460.00 SF $1.90 $874,00 East wall of this hallway, 4 Wall preparation-unskilledlabor 460.00 SFW $1.00 $460.00 East wall of this hallway, 5 Plant-skim coat-2 costs 460.00 SFW $0.85 $391.00 F-est wall ofthis hallway, 6 Replace wallpaper-sanitas&vinyls 0.00 ROLL $25.00 $.00 Fast well of this hallway. 7 Bio-wash w/antimicrobial,rinse&wipe dower ceilings 242.94 SFC $0.75 $182.21 8 Bio-wash w/antimicrobial,rinse&wipe down walls-2 920.00 SFW $0.75 $690.00 applications West Wall of"hallway. 9 Bio-wash w/antimicrobial.rinse&vacuum floors-2 applications 242.94 SFF 50,75 S182.21 10 Wet solution base fogging(f uigl(bacteria)par cubic foot 2,328.15 CF $0.05 $116.41 Subtotal for West Hallway: $4,160.83 Total for West Hallway $4,160.83 Date Printed 329101 Report: Stmchae/Contents Combined PW Number 4 APR-06-2001 10:30 512 216 5548 97: P.05 04/06/01 09:22 FAX 512 218 5548 PARR [moos APR-06-2001 FR! 10:12 AM FROM: FAX: PAGE 5 Job: Round Rock Retreafion Cmtu Estimator: Rick Upshaw lobo:REU 1003 Services and Supplies-_ SFCaOO CF 0.00 P13R 0,00 SFF0.00 . SFW0.00 Area Dascripticn: Item!!Item Deecrt a #UPI i Me ure Price Cos Services and Supplies 100A0 EA $12.00 $1,200.00 1 Tyvek chemical&odor resistant suit 2 Gloves-latex per pair 250.00 EA $3.00 $750.00 mask-wlhepa filter 30.00 EA $$9.50 $495.00 3 Half-fact; 30.00 EA $9.50 $285.00 4 Splash goggles 1.00 EA $5,700.00 $5,700,00 5 Setup and Maintain complete containment area Setting up a containment zone is mandatory for the remediation of mold, This will be done with plastic she-in all of the hallways, Each roan going into the containment area will be wearing a Tyvek suit,splash goggles, half-meek with respirator,and latex gloves. Wbanthcy leavethe containment area for any reason,the suit has to be replaced.Austin Dtuscelan will fellow all of these safety procedures for maximum safety for Austin Duraclean personnel,as well as for customer's protection. 10.00 HRS $50.00 $500.00 6 OSHA required bto-wasb down of man&equipment 30.00 DAYS $580.00 $17,400,00 7 4 Hepa Air Filters Q$145 per day,per machine Hope Air Scrubbers are roquimd to create negative air pressure within the comainment zone,as well as to clean the air of mold that will be contaminating the air within the containment zone during remeditetion. We earimsm that the Air Scrubbers will need to be in place for 30 days, inlcuding the time they have already been in place. 1 EA $1,555,00 $1,555.00 8 Furnish enclosed 40 c.y.dumpster with locked doors 0.00 DAYS $25.00 $750.00 9 Decontaminared"Clean Roem"Style Storage Trailer 30.00 EA $$25.00 $790.00 10 ElectricaVMechanical I1 Bass 110,00 LF $720 5792.00 12 Paint&WallcoVering 1.00 EA $8,550.00 $8,550.00 13 Barricades @Protection 1.00 EA $1,800,00 $1,800.00 14 Final Cleanup and Decontamination Procedure 1.00 EA $2,800,00 $2,800.00 Subtotal for Services and Supplies: $43,367.00 Total for Services and Supplies $43,367.00 Date Printed 3(18/01 Report., Structure/Contents Combined Page Number 5 APR-06-2001 10:30 512 218 5549 97% P•06 DATE: April 6,2001 SUBJECT: City Council Meeting—April 12,2001 ITEM: 14.C.2. Consider a resolution authorizing the Mayor to execute a contract with Austin Duraclean for repair and reamediation of the locker room at the Clay Madsen Recreation Center.These improvements are for the removal and reconstruction of portions of walls in the locker rooms and one hallway in the Clay Madsen Recreation Center. Resource: Sharon Prete,Parks and Recreation Director History: Due to the method of cleaning the Clay Madsen Recreation Center locker rooms,a mold problem was created. When discovered,immediate action was taken to inform and safeguard rec.center patrons. As the last step in the remediation process we will tear out"moldy"dry wall and replace it with concrete block. This process will take approximately one month to complete,but will not cause the center to close. Because this is a health,safety,and welfare issue the City Attorney has advised PARD that state law allows the City to hire a contractor without going through the bid process. Funding: Cost: $111,453.70 Source of funds: Clay Madsen Recreation Center Budget Outside Resources: Rosengarten,Smith&Associates Inc.was hired to determine the severity of the problem and recommend actions to be taken. Impact: If not addressed,the problem will worsen and could cause harm to patrons and staff due to air quality issues. Benefit: This action will correct the problems and will allow us to adequately clean the locker room floor. Public Comment: When the problem was discovered,patrons and staff were informed. Sponsor:PARD � n w —' �- of-o�-a c�-��{��