R-01-04-12-14E6 - 4/12/2001RESOLUTION NO. R- O1- 04- 12 -14E6
WHEREAS, the Round Rock Transportation System Development
Corporation ( "RRTSDC ") has previously adopted a Transportation Capital
Improvement Plan ( "Plan "), and
WHEREAS, the
WHEREAS, the bylaws of the RRTSDC require that said amendments to
the Plan be approved by the City Council, and
WHEREAS, the City Council wishes to approve said amendments to
the Plan, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the amendment to the Transportation Capital Improvement Plan
approved by the Round Rock Transportation System Development Corporation,
which is attached hereto as Exhibit "A ", is hereby approved.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended, and the Act.
RESOLVED this 12th day of Apri
LAND, City Secretary
01 \WPCOCS \RESOWfI \R10412E6.wPn /0c
RRTSDC wishes to amend said Plan, and
City of Round Roc
Mayor
Texas
- - -- - -- -- - -
2001 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM
ROCK TRANSPORTATION SYSTEM DEVELOPMENTCORPORAT CORPORATION '
— - --- - - -- --- --- --- - -- -- - - -
TWO YEAR ELEMENT
- ROUND
-- ____ -- - - - -
Protect Name
Project Limits
Work Description
Fiscal
Year In
TCIP
Projected
Contract Award
Estimated
Trans. Corp.
Funding
Other
Funding
Total Cost
Artenal A
From US 7910 Forest Creek
Drive
Preliminary engineenng to establish alignment and
ROW requirements. Protective ROW purchase
2000
N/A
$650,000
$650,000
Forest Creek
From Double Creek Drive to
800' West of Forest Ridge
Subdivision
2000
April 1, 2001
$2,204,030
$2,204,030
$4,408,06C
Double Creek
Dnve
From Gaits School Rd to
MKT ROW
2000
Apnl 1, 2001
$2,500,000
c
$2,500,000
A W, Gnmes Blvd
(Arterial B)
From US 79 to Louis Henna
Blvd
Phase I Construction from Louis Henna to North of
1999
Fall 2000
518,100,000
$2,500,000 b
$20,600,00C
Lakecreek Phase II Construction from North of
Lakecreek to US 79
Artenal C
From RM 620 to Sam Bass
Rd
Acquire ROW for Artenal C and construct
bicycle /sidewalk facility to access high school and
swimming pool
2000
FY 2001
$800,000
$800,000
CR 113
From FM 1460 to CR 122
Design, purchase nght-of-way and construct 4 -lane
divided arterial
2000
Summer 2001
$4,383,500
51,116,500 b
$5.800,000
FM 1460
From US 79 to 1200' N of US
79
Acquire ROW for highway relocation
2000
FY 2000
$360,000
$5,300,000 a
$5,660,000
Greenlawn
Extension
From Louis Henna Blvd to 111
35 Frontage Road
Construct 4 lane divided artenal
1998
March 1, 1999
$3,825,000
$636,556 b
$4,461,556
Greenlawn
Interchange
At IH 35
Construct Greenlawn Interchange with IH 35
2001
June 1, 1999
55,000,000
$5,000,000 a
$10,000,010
LEGEND a= Stato/Federal Fund
_ _
b . Private
a. 90 GO Banda
d = WAamson County
Project Name
Project Limits
Work Description
Fiscal
Year In
TCIP
Projected
Contract Award
Estimated
Trans. Corp.
Funding
Other
Funding
Total Cost
Hagler- Ballly Study
1. SH 130 Toll Study; 2. SH 45 Implementation
Strategy; 3. Railroad Relocation Feasibility Study;
4. Implementation Strategy for 10 -Year Roadway
Plan
2000
N/A
5350,000
$350,000
II-135 Tumarounds
FM 1325 /Louis Henna
Hester's Crossing
Construct frontage road tumarounds
1999
June & Oct 2000
$3,650,00C
93,175,000 a
86,825,00C
Pnme Strategies
Assist City in Interagency coordination for SH 45
2000
FY 2000
$100 OOC
$100,00C
RM 620
at Union Pacific Railroad
Construct railroad grade separation
2001
FY 2001
52,500,000
$4,600,000 a
$7,100,000
SH 45
Round Rock East City Limits
to Round Rock West City
Acquire ROW for SH 45
2000
FY 2000
$15000_000 a
$8,000,000 d
__$44.530,000
—$2-1,530 000
South Mays Street
Improvements
South Mays Street, Dell Way
& Gattis School Road
Extension
Realign streets, widen streets, extend streets
1999
August 2000 & FY
2001
$4,580,000
$5,876,000 a
510,458,000
Traffic Signals
Vanous locations
Design and construct traffic signals
2001
2000
$800,000
$800,000
Traffic Modeling
Citywide (SH 130)
Assist City in assessing impacts of SH 130
2000
N/A
$75,000
S75,000
Traffic Signal
Coordination
FM 1325 /Louis Henna
McNeil/IN 35 /RM 620 US 79
Construct and implement coordinated traffic signal
systems
1998
May 1, 2000
$100,000
8100,000
US 79
From CR 195 to CR 110
Reconstruct highway to 4 lane divided highway
1999
December -99
82,550,000
53,500,000 a
$6,350,000
9300,000 (est) d
US 79
From FM 1460 to CR 195
Construct 4 -lane divided highway
2000
FY 2001
$4,400,000
$3,000,000 a
57,400,000
Transportation
Consulting
Miscellaneous consulting work in support of
transportation program
2001
N/A
$200,000
$200,000
_ — ra __ ____
LEGEND a =Sate/FF Fund
TWO YEAR ELEMENT
578,657,530
$60,208,088
5138,865,61E
b = Private -
c .96 GO Bonds
d= wilbamson County
DATE: April 6, 2001
SUBJECT: City Council Meeting — April 12, 2001
ITEM: * 14.E.6. Consider a resolution approving amendments to the
Transportation Capital Improvement Plan (TCIP) which were
previously approved by the Round Rock Transportation
System Development Corporation.
Resource: Tom Word, Traffic Engineer
History: The Transportation Capital Improvement Plan (TCIP) is a two -year spending
plan for improvements to major roads and arterials in the City. Funding for this
plan is provided through the 1/2% sales tax established for the purpose of
transportation improvements. The TCIP is being amended to supplement
funding for a number of projects and to add an additional project for a railroad
relocation feasibility study.
Funding:
Cost: See attached amended TCIP
Source of funds: 1/2% sales tax (Round Rock Transportation System Development
Corporation)
Outside Resources: N/A
ImpactBenefit: Increased mobility and traffic safety in Round Rock.
Public Comment: A public hearing for these amendments will be held by the Round Rock
Transportation System Development Corporation on April 12, 2001.
Sponsor: N/A