R-01-04-26-14E6 - 4/26/2001RESOLUTION NO. R- O1- 04- 26 -14E6 WHEREAS, the City of Round Rock has previously entered into an agreement for engineering services ( "Agreement ") with Baker - Aicklen & Associates, Inc. for the design of roadway improvements on CR 122 from Forest Creek to Brushy Creek, and WHEREAS, Baker - Aicklen & Associates, Inc. has submitted Supplemental Agreement No. 1 for engineering services for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 with Baker - Aicklen & Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 with Baker - Aicklen & Associates, Inc. for engineering services for a change in the scope of services. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 26th day of April, 2001. E LAND, City Secretary O. \NPOOCS \EESOLUTI \E1P92666.WPO /m 4. A .6 RO= RT A. STLUKA, , Mayor City of Round Rock, Texas STATE OF TEXAS § THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker - Aicklen & Associates, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 13 of May, 1999 to prepare right of way documents, construction plans, specifications, and estimates for the interim wid- ening of CR 122 from Forest Creek Drive to Brushy Creek; and the preparation of a right of way schematic and a roadway design schematic for the future widening of CR 122 from Forest Creek Drive to US 79 to a 4 -lane divided arterial, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires termination of the Contract on January 31, 2000, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $170,600 without modification of the contract, and WHEREAS, it has become necessary to amend the contract to provide for addi- tional engineering services which include additional traffic control plans, and WHEREAS, the Engineer has agreed to have the additional work performed for $10,900 increasing the maximum lump sum fee for the contract to $181,500. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be extended until April 30, 2002, ARTICLE 4, COMPENSATION, shall be amended by the changing the maxi- mum lump sum amount payable under this contract to $181,500. ATTACHMENT `B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM NO. 2 to ATTACHMENT B. IN WITNESS WHEREOF, the City and the Engineer have executed Supple- mental Agreement in duplicate. THE ENGINEER By: A. William !z, P.E. Date CITY:` • •. D RO K By: 1► alb obert A. Stluk. Jr., Mayor Date SUBCONSULTANT: SERVICES TO BE PROVIDED BY THE ENGINEER A. ALLIANCE ENGINEERING COMPANY — TRAFFIC CONTROL PLAN PREPARATION Baker - Aicklen & Assoc., Inc. proposes to sub - contract the engineering design of the Traffic Control Plan to Alliance Engineering Company. Scope of Services: ADDENDUM NO. 2 TO ATTACHMENT B 1. Provide construction plans for control of traffic during the remainder of the improvements to the roadway. 2. Provide a construction sequence that incorporates the methods of traffic control. o. \601- 559- 26\addendum#2attB4- 5- 01.doc Baker- Alcklen & Assoc., Inc Effective September, 2000, the following rates are recommended for work performed on an hourly- charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES STANDARD RATE SCHEDULE (Labor Rate Table 35) Classification Rates Project Engineer /Surveyor/Planner $110.00 per hour Staff Engineer /Surveyor/Planner $95.00 per hour Project Designer /Coordinator $85.00 per hour Engineering Assistant/Surveying Assistant/GPS Processor $70.00 per hour Senior Engineering/Surveying CAD Technician $60.00 per hour Engineering/Surveying CAD Technician/Field Representative $55.00 per hour CAD Draftsman $45.00 per hour Secretary $45.00 per hour Expert Witness/Testimony /Deposition Services Two Times Rates Principal (as appropriate) $120.00 per hour FIELD PARTY SERVICES Rates 1 -Man Field Party $70.00 per hour 2 -Man Field Party $95.00 per hour 3 -Man Field Party $120.00 per hour 4 -Man Field Party $145.00 per hour GPS Field Unit with Operator (Note 5) $100.00 per hour GPS Field Unit without Operator (Note 5) $60.00 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles (Note 1) $ 0.35 per mile By Firm's Survey Trucks (Notes 1, 2, 3 & 4) $ 0.35 per mile Subsistence of out -of -city work $100.00 per day Reproduction & Printing by Firm, Prevailing Com- Survey Stakes, Lathes, Iron Rods mercial Rates Or and other Direct Expense Cost, Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50 -mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show - up time and return to office, resulting from inclement weather conditions, etc. 4. Field Party stand -by time will be charged for at the above -shown appropriate rates. 5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates. 6. The firm's professional liability is limited to the total amount of compensation associated with a specific project up to a maximum of $50,000. Baker-Alck &Associates, Inc. Eng /Surveyors County Road 122 Improvements m..,+ «111+4, DATE: April 20, 2001 SUBJECT: City Council Meeting — April 26, 2001 ITEM: * 14.E.6. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 to the Contract for Engineering Services with Baker-Aicklen & Associates, Inc. for the design of roadway improvements on CR 122 from Forest Creek to Brushy Creek. Supplemental Agreement No. 1 will modify the Scope of Work to include the preparation of a traffic control plan for this project. Approval of Supplemental Agreement No. 1 in the amount of $10,900 will bring the total cost of the contract to $181,500. Resource: Jim Nuse, Public Works Director Tom Word, Traffic Engineer History: The original contract was approved on May 13, 1999 by council by resolution no. R-99-05-13B15 for preparation of right of way documents, construction plans, specifications, and estimates for the interim widening of CR 122 from Forest Creek Drive to Brushy Creek; and the preparation of a right of way schematic and a roadway design schematic for the future widening of CR 122 from Forest Creek Drive to US 79 to a 4 -lane divided arterial. Supplemental Agreement No. 1 will modify the Scope of Work to include the preparation of a traffic control plan for this project. Approval of Supplemental Agreement No. 1 in the amount of $10,900 will bring the total cost of the contract to $181,500. Funding: Cost: $10,900 Source of funds: 96 GO Bonds Outside Resources: Baker - Aicklen & Associates, Inc. Impact/Benefit: This project will improve safety and mobility for this road, and reduce maintenance activities and costs associated with the existing pavement. Public Comment: N/A Sponsor: N/A ssts �rpR ' � A CITY OF ROUND ROCK .uerrt j Mayor Robert A. Stluka, Jr Mayor Pro -tem Tom Nielson Council Members Alan McCraw Carrie Pin Earl Palmer Isabel Callahan Gary Coe City Manager Robert L Bennett, Jr City Attorney Stephan L Sheets August 15, 2001 Mr. Bill Waeltz, P.E. Baker- Aicklen & Associates, Inc. 203 E. Main St., Suite 201 Round Rock, TX 78664 Dear Mr. Waeltz: 221 East Main Street Round Rock, Texas 78664 512- 218 -5400 The Round Rock City Council approved Resolution No. R- 01- 04 -26- 14E6 at their regularly scheduled meeting on April, 26 2001. This resolution approves Supplemental Agreement No. 1 with Baker - Aicklen & Associates, Inc. for engineering services to change the scope of services for the design of roadway improvements on CR122 from Forest Creek to Brushy Creek. Enclosed is a copy of the resolution and original agreement for your files. If you have any questions, please do not hesitate to contact Jim Nuse at 218 -5555. Christine Martinez Assistant City Secretary Enclosures Fax: 512 -218 -7097 1 -800- 735- 2989TD1) 1- 800 - 735 -2988 Voice www.ci.round -nick tx.us